Lead Strategies Update Matt Cullen, P.E. | Water & Wastewater Commission September 14, 2022 Agenda Background/Austin’s history EPA’s Lead and Copper Rule Revisions Lead Service Line Inventory Federal Funding for Lead Related Work Additional Requirements: School and Child Care Facility Education and Sampling EPA’s Lead and Copper Rule Revisions (LCRR) Goal: Further reduce exposure to lead in drinking water Final LCRR regulations issued on January 15, 2021 Placed under federal review until December 16, 2021, when made effective Current LCRR compliance date for water systems: October 16, 2024 • Complete Lead Service Line Inventory facilities over five-year period • Begin mandatory public education activities and coordination of lead sampling for schools & childcare EPA is preparing Lead and Copper Rule Improvement to be released prior to October 2024 Lead Service Line Inventory Lead pipe Identify water service line materials • Includes public and private service line Categorize service line material • Non-lead • Lead • Lead Status Unknown • Galvanized Requiring Replacement Complete by October 16, 2024 and submit to TCEQ AW Goal: All service lines in “non-lead” category Lead Service Line Inventory Meters in AW’s System • Total – 252,000 • Non-lead due to age – 196,000 • Non-lead due to field investigation – 17,350 • Galvanized – 1,350 • Still to be field investigated – 37,300 On track to be complete by late 2023/ early 2024 Public Side Materials 1,350 37,300 213,350 Not Lead TBD Galvanized Private Side Materials 700 37,300 214,000 Not Lead TBD Galvanized Federal Funding for Lead Related Work Funding allotted in the 2021 Bipartisan Infrastructure Law (BIL) through the Drinking Water State Revolving Fund (DWSRF) AW submitted the galvanized service replacement program to Texas Water Development Board (TWDB) for funding, but the project was not selected. AW continuously analyzes projects for potential DWSRF funding. AW is tracking costs for developing inventory, future school and childcare sampling, and potential galvanized service replacements. School & Child Care Facility Activities Regulatory requirements beginning as of October 16, 2024: Provide lead education materials to all schools and licensed childcare facilities • Health risk information • EPA’s 3Ts for Reducing Lead in Drinking Water Toolkit Coordinate and schedule for lead sampling of facilities between Oct. 2024 – Oct. 2029 • Required for all elementary schools and childcare …
Regular Called Meeting of the Water and Wastewater Commission August 10, 2022 — 6:00 pm Austin Energy Headquarters 4815 Mueller Boulevard Austin, Texas Some members may be participating by videoconference. The meeting may be viewed online at: http://www.austintexas.gov/page/watch-atxn-live For more information go to: http://www.austintexas.gov/wwc Public comment will be allowed in-person or remotely by telephone. Speakers may only register to speak on an item once either in-person or remotely and will be allowed up to three minutes to provide their comments. Registration no later than noon the day before the meeting is required for remote participation. To register, call or email the board liaison at 512-972-0115 or Blanca.Madriz@austintexas.gov . To register to speak in person, people must sign up at least ten minutes before the meeting is called to order. Commissioners: William Moriarty (Mayor) Jesse Penn (District 1) Alex Navarro (District 2) Travis Michel (District 3) Chien Lee, Chair (District 4) Christianne Castleberry, Vice Chair (District 5) Vacant (District 6) Judy Musgrove (District 7) Vacant (District 8) Grant Fisher (District 9) Susan Turrieta (District 10) CALL TO ORDER PUBLIC COMMUNICATION: GENERAL APPROVAL OF MINUTES 1. Approval of minutes from the July 20, 2022, special called meeting of the Water and Wastewater Commission. DISCUSSION AND POSSIBLE ACTION ON RECOMMENDATIONS TO COUNCIL 2. Recommend approval to negotiate and execute a cooperative contract with DeSpain & Associates, Inc. d/b/a DAI Source for maintenance and support of a web-based integrated business intelligence suite, for a term of three years in an amount not to exceed $400,000. 3. Recommend approval to negotiate and execute a contract with HORIZON Lab Systems, LLC to provide laboratory information management software licenses, maintenance, and managed support services, for a term of five years in an amount not to exceed $720,000. 4. Recommend approval to award a contract with Vanguard Utility Service, Inc. d/b/a VUS Inc. to provide large diameter water meter exchange services, for a term of four years in the amount not to exceed $2,000,000. The City of Austin is committed to compliance with the American with Disabilities Act. Reasonable modifications and equal access to communications will be provided upon request. Meeting locations are planned with wheelchair access. If requiring Sign Language Interpreters or alternative formats, please give notice at least 2 days (48 hours) before the meeting date. Please call Blanca Madriz at Austin Water, 512-972-0115 for additional information; TTY users’ route through Relay Texas at 711. For …
Item 2 # 22-2411 Water &Wastewater Commission: August 10, 2022 Council: September 1, 2022 Posting Language Recommend approval to negotiate and execute a cooperative contract with DeSpain & Associates, Inc. d/b/a DAI Source for maintenance and support of a web-based integrated business intelligence suite, for a term of three years in an amount not to exceed $400,000. MBE/WBE This procurement was reviewed for subcontracting opportunities in accordance with City Code Chapter 2-9C Minority Owned and Women Owned Business Enterprise Procurement Program. For the services required for this procurement, there were no subcontracting opportunities; therefore, no subcontracting goals were established. Lead Department Financial Services Department Client Department Austin Water Chief Information Officer, David Johnson Fiscal Note Funding in the amount of $119,784 is contingent upon approval of the Fiscal Year 2022-2023 Operating Budget of Austin Water. Funding for the remaining contract term is contingent upon available funding in future budgets. Purchasing Language Multiple contractors within this cooperative purchasing program were reviewed for these services. The Financial Services Department has determined this contractor best meets the needs of the department to provide the services required at the best value for the City. Council Committee, Boards and Commission Action August 10, 2022 - To be reviewed by the Water & Wastewater Commission Additional Backup Information The contract will provide maintenance and support of IBM Cognos, a web-based integrated business intelligence suite, for Austin Water. IBM Cognos software is used for reports and dashboards that include key performance indicators related to safety, equity, performance measures, customer service, water conservation reports, and treatment asset data. IBM Cognos is used by various divisions within Austin Water including finance, human resources, engineering, pipeline operations, and laboratory. The State of Texas Department of Information Resources cooperative establishes competitively bid contracts that can be utilized by the State and other government agencies through a cooperative agreement. Cooperative agreements save taxpayer dollars by leveraging the State’s volume-buying power to drive down costs on hundreds of contracts through a streamlined cooperative purchasing program. Strategic Outcome(s) Government that Works for All
Item 3 # 22-2412 Water &Wastewater Commission: August 10, 2022 Council: September 1, 2022 Posting Language Recommend approval to negotiate and execute a contract with HORIZON Lab Systems, LLC to provide laboratory information management software licenses, maintenance, and managed support services, for a term of five years in an amount not to exceed $720,000. MBE/WBE Sole source contracts are exempt from the City Code Chapter 2-9C Minority Owned and Women Owned Business Enterprise Procurement Program; therefore, no subcontracting goals were established. Lead Department Financial Services Department Client Department Austin Water Assistant Director of Operations, Rick Coronado Fiscal Note Funding in the amount of $120,000 is contingent upon approval of the Fiscal Year 2022-2023 Operating Budget of Austin Water. Funding for the remaining contract term is contingent upon available funding in future budgets. Purchasing Language Sole Source Council Committee, Boards and Commission Action August 10, 2022 - To be reviewed by the Water & Wastewater Commission Additional Backup Information The contract will provide laboratory information management software licenses, maintenance, and managed support services for Austin Water’s existing HORIZON Laboratory Information Management System (LIMS). The HORIZON LIMS platform enables the Austin Water Laboratory Services Division to house all analytical data, and functions as the hub for other major laboratory functions and to communicate, generate, and deliver reports to state and federal agencies as well as to its customers. Austin Water Laboratory Division maintains laboratories at three locations and is accredited in accordance with the Texas Commission on Environmental Quality (TCEQ) and The National Environmental Laboratories Accreditation Conference Institute (TNI) requirements. This contract will enable the laboratory to continue to meet all existing and future TCEQ/TNI accreditation requirements as well as the overall laboratory LIMS needs. Austin Water Laboratory Services Division staff use the LIMS daily to produce over 200 regulatory compliance reports annually. HORIZON Lab Systems, LLC is the sole supplier and authorized Services Company for the HORIZON Laboratory Information Management System, including HORIZON Data Management, HORIZON Field, HORIZON Logbooks, and instrument interfacing products. Additional software, Item 3 # 22-2412 Water &Wastewater Commission: August 10, 2022 Council: September 1, 2022 services, support, and training relating to the HORIZON product are not available from any other supplier source. Strategic Outcome(s) Government that Works for All
Item 4 # 22-2638 Water &Wastewater Commission: August 10, 2022 Council: September 1, 2022 Posting Language Recommend approval to award a contract with Vanguard Utility Service, Inc. d/b/a VUS Inc. to provide large diameter water meter exchange services, for a term of four years in the amount not to exceed $2,000,000. MBE/WBE This solicitation was reviewed for subcontracting opportunities in accordance with City Code Chapter 2-9C Minority Owned and Women Owned Business Enterprise Procurement Program. For the services required for this solicitation, there were no subcontracting opportunities; therefore, no subcontracting goals were established. Lead Department Financial Services Department Client Department Austin Water Assistant Director of Customer Experience, Randi Jenkins Fiscal Note Funding in the amount of $166,666 is available in the Fiscal Year 2021-2022 Operating Budget of Austin Water. Funding for the remaining contract term is contingent upon available funding in future budgets. Purchasing Language The Financial Services Department issued an Invitation for Bids (IFB) 2200 WJT1015 for these services. The solicitation was issued on March 18, 2022 and closed on May 2, 2022. The recommended contractor submitted the only responsive offer. A complete solicitation package, including a tabulation of the bid received, is available for viewing on the City’s Financial Services website, Austin Finance Online. Link: Solicitation Documents. Council Committee, Boards and Commission Action August 10, 2022 - To be reviewed by the Water & Wastewater Commission Additional Backup Information Austin Water (AW) is currently rolling out a citywide smart water meter program called My ATX Water. This program is modernizing AW's water metering system by replacing more than 250,000 analog water meters with digitally read water meters connected to a wireless network by 2025. Of the nearly 250,000 analog water meters scheduled for replacement, approximately 450 large- diameter meters are incompatible and need replacement to complete the My ATX Water project deployment. This contract will ensure the large-diameter meters meet the same installation timeframe by exchanging up to 40 meters per month. Large-diameter meter replacements often require heavy equipment, right-of-way and street closure permits, confined space entry requirements, and extensive commercial property coordination, requiring a dedicated resource. Strategic Outcome(s) Health and Environment
Item 5 # 22-2659 Water &Wastewater Commission: August 10, 2022 Council: September 15, 2022 Posting Language Recommend approval to award a contract with TSG Industries, LLC for portable office trailers in an amount not to exceed $492,880. MBE/WBE This solicitation was reviewed for subcontracting opportunities in accordance with City Code Chapter 2-9D Minority Owned and Women Owned Business Enterprise Procurement Program. For the goods required for this solicitation, there were no subcontracting opportunities; therefore, no subcontracting goals were established). Lead Department Financial Services Department Client Department Austin Water Assistant Director of Operations, Rick Coronado Fiscal Note Funding is available in the Fiscal Year 2021-2022 Operating Budget of Austin Water. Purchasing Language The Financial Services Department issued an Invitation for Bids (IFB) 2200 MLJ1005 for these goods. The solicitation was issued on April 25, 2022 and closed on May 24, 2022. Of the two offers received, the recommended contractor submitted the lowest responsive offer. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s Financial Services website, Austin Finance Online. Link: Solicitation Documents. Council Committee, Boards and Commission Action August 10, 2022 - To be reviewed by the Water & Wastewater Commission Additional Backup Information The contract is for a one-time purchase of five new portable office trailers to be used at Austin Water locations throughout the City. The contractor services will include delivery, installation, and skirting of 12’ x 44’ portable office trailers to be installed at Ullrich Water Treatment Plant, Davis Water Treatment Plant, Hornsby Bend Biosolids Management Facility, Govalle Occupational Development and Support, and Webberville Service Center. As part of the outcome of Winter Storm Uri After Action Report and Emergency Preparedness Plan, the portable office trailers are needed to provide additional office space for essential staff, enabling them to report directly to assigned facilities, provide direct service as required, and reduce reaction time in emergency situations. The trailers will also provide a location for personnel to office while serving as essential personnel during emergency events. The electrical, sewer, water, and communications setup will be handled internally by Austin Water. Strategic Outcome(s) Government that Works for All, Safety
Item 6 # 22-2631 Water &Wastewater Commission: August 10, 2022 Council: September 1, 2022 Posting Language Recommend approval to award and execute a construction contract with Udelhoven, Inc., for the Govalle Site Domestic Wastewater Service Improvements project in the amount of $1,138,969 plus a $113,897 contingency, for a total contract amount not to exceed $1,252,866. (District 3) MBE/WBE This contract will be awarded in compliance with City Code Chapter 2-9A (Minority Owned and Women Owned Business Enterprise Procurement Program) by meeting the goals with 6.81% MBE and 1.44% WBE participation Lead Department Financial Services Department Client Department Austin Water Assistant Director of Engineering Services, Shay Ralls Roalson Fiscal Note Funding is available in the Capital Budget of Austin Water. Purchasing Language Lowest responsive bid of three bids received through a competitive Invitation for Bid solicitation. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s Financial Services website, Austin Finance Online. Link: Solicitation Document. Council Committee, Boards and Commission Action August 10, 2022 - To be reviewed by the Water & Wastewater Commission Additional Backup Information The Govalle Wastewater Treatment Plant (WWTP) was constructed in 1937 and was, at the time, the first WWTP in Austin to utilize the sludge process for wastewater treatment. The plant was in operation for 69 years and was decommissioned in 2006 when wastewater flows were diverted to the South Austin Regional WWTP. Currently, Austin Water uses the site for training, office space, and maintenance activities. The scope of this project is to construct new grinder pumps to collect domestic wastewater flows from the restrooms at the Govalle Administrative and Maintenance buildings and convey the flows to the centralized wastewater collection system on Linger Lane. The existing domestic wastewater collection system will be abandoned and decommissioned. This project will enable Austin Water staff to continue to utilize the office and training facilities at the Govalle WWTP. This item includes one allowance. The allowance of $25,000 will be used to address any contaminated soil and/or water at the site. An allowance is an amount that is specified and included in the construction contract or specifications for a certain item(s) of work whose details are not yet determined at the time of bidding. Item 6 # 22-2631 Water &Wastewater Commission: August 10, 2022 Council: September 1, 2022 Due to the potential for unforeseen issues that may arise during construction, …
Item 7 # 22-2655 Water &Wastewater Commission: August 10, 2022 Council: September 1, 2022 Posting Language Recommend approval of a resolution authorizing the issuance by Pilot Knob Municipal Utility District No. 2 of Unlimited Tax Bonds, Series 2022, in a principal amount not to exceed $3,690,000. Lead Department Financial Services Department Client Department Austin Water Assistant Director of Environmental, Planning & Development Services, Kevin Critendon Fiscal Note This item has no fiscal impact. Council Committee, Boards and Commission Action August 10, 2022 - To be reviewed by the Water & Wastewater Commission Additional Backup Information Pilot Knob Municipal Utility District No. 2 (the “District”), a political subdivision of the State of Texas, was created under the laws of the State of Texas by House Bill No. 1756, Acts of the 82nd Texas Legislature, Regular Session (2011), Chapter 8376, Subtitle F, Title 6, Texas Special District Local Laws Code (the “Enabling Legislation”), and operates under Chapters 49 and 54 of the Texas Water Code. The Enabling Legislation became effective May 23, 2011, and created the District, subject to the consent of the City of Austin (the “City”) to the creation. The City consented to the creation of the District by Council action taken March 22, 2012 (the “Consent Ordinance”) and under the terms of the Consent Agreement between the City, the District, and Carma Easton LLC, a Texas limited liability company (the “Developer”) dated effective as of April 13, 2012 (the “Consent Agreement”). The City and the District entered into a Strategic Partnership Agreement dated as of June 5, 2012 (as amended, the “SPA”), as authorized by Section 43.0751, Texas Local Government Code, which sets forth the terms and conditions of the City’s annexation of the land within the District and on which the District will continue to exist as a limited district, Pilot Knob Limited District No. 2 (the “Limited District”), in accordance with Section 43.0751, Texas Local Government Code, and the Enabling Legislation following the City’s full- purpose annexation of the land within the District as provided in Consent Agreement and the SPA. The District, which currently contains 557.187 acres of land, is located within the extraterritorial jurisdiction of the City in southeast Travis County, Texas. The District is located approximately eight miles southeast of the downtown portion of the City, adjacent to the east side of McKinney Falls Parkway and approximately one mile west of U.S. Highway 183. …
Item 8 # 22-2656 Water &Wastewater Commission: August 10, 2022 Council: September 1, 2022 Posting Language Recommend approval of a resolution authorizing the issuance by Pilot Knob Municipal Utility District No. 3 Unlimited Tax Bonds, Series 2022, in the amount of $12,400,000. Lead Department Financial Services Department Client Department Austin Water Assistant Director of Environmental, Planning & Development Services, Kevin Critendon Fiscal Note This item has no fiscal impact. Council Committee, Boards and Commission Action August 10, 2022 - To be reviewed by the Water & Wastewater Commission Additional Backup Information Pilot Knob Municipal Utility District No. 3 (“District”), a political subdivision of the State of Texas, was created under the laws of the State of Texas by House Bill No. 1758, Acts of the 82nd Texas Legislature, Regular Session (2011), Chapter 987, codified as Chapter 8377, Subtitle F, Title 6, Texas Special District Local Laws Code (“Enabling Legislation”), and operates under Chapters 49 and 54 of the Texas Water Code. The Enabling Legislation became effective May 25, 2011, and created the District, subject to the consent of the City of Austin (“City”). The City consented to the creation of the District by Council action taken March 22, 2012 (“Consent Ordinance”) and under the terms of the April 13, 2012 Consent Agreement between the City, the District, and Carma Easton LLC, a Texas limited liability company (“Developer”). The City and the District entered into a Strategic Partnership Agreement dated as of June 4, 2012 (“SPA”), as authorized by Section 43.0751, Texas Local Government Code. The SPA sets forth the terms and conditions of the City’s annexation of the land within the District and frames the terms by which the District will continue to exist as a limited district, Pilot Knob Limited District No. 3 following the City’s full- purpose annexation of the land within the District as provided in Consent Agreement and the SPA. The District, which currently contains 677.567 acres of land, is within the extraterritorial jurisdiction of the City in southeast Travis County, Texas. The District is approximately eight miles southeast of the downtown portion of the City, adjacent to the east side of McKinney Falls Parkway and approximately one mile west of U.S. Highway 183. An extension of William Cannon Drive, the initial phases of which are under construction, bisects the District in an east-west direction. Cottonmouth Creek traverses the District in a north-south direction. The Austin-Bergstrom …
Item 9 # 22-2654 Water &Wastewater Commission: August 10, 2022 Council: September 1, 2022 Posting Language Recommend approval of a resolution authorizing the issuance by Southeast Travis County Municipal Utility District No. 1 (“District”) of $3,000,000 Unlimited Tax Bonds, Series 2022. Lead Department Financial Services Department Client Department Austin Water Assistant Director of Environmental, Planning and Development Services, Kevin Critendon Fiscal Note This item has no fiscal impact. Council Committee, Boards and Commission Action August 10, 2022 - To be reviewed by the Water & Wastewater Commission Additional Backup Information Southeast Travis County Municipal District No. 1 (the “District”), a political subdivision of the State of Texas, was created under the laws of the State of Texas by Senate Bill No. 1913, Acts of the 82nd Texas Legislature, Regular Session (2011), Chapter 1114, now codified as Chapter 8382, Subtitle F, Title 6, Texas Special District Local Laws Code (the “Enabling Legislation”), and operates under Chapters 49 and 54 of the Texas Water Code. The Enabling Legislation became effective May 25, 2011, and created the District, subject to the consent of the City of Austin (the “City”) to the creation. The City consented to the creation of the District by Council action taken March 22, 2012 (the “Consent Ordinance”) and under the terms of the Consent Agreement between the City, the District, and Qualico CR, L.P., a Texas limited partnership (the “Developer”) dated effective as of April 17, 2012 (the “Consent Agreement”). The City and the District entered into a Strategic Partnership Agreement dated as of June 4, 2012 (as amended, the “SPA”), as authorized by Section 43.0751, Texas Local Government Code, which sets forth the terms and conditions of the City’s annexation of the land within the District and on which the District will continue to exist as a limited district, Southeast Travis County Limited District No. 1 (the “Limited District”), in accordance with Section 43.0751, Texas Local Government Code, and the Enabling Legislation following the City’s full-purpose annexation of the land within the District as provided in Consent Agreement and the SPA. The District, which currently contains 187.72 acres of land, is located within the extraterritorial jurisdiction of the City in southeast Travis County, Texas. The District is located approximately 12 miles southeast of the central business district of the City of Austin in southeastern Travis County, Texas. The District lies generally southeast of State Highways 130 and 71. …
Item 2 # 22-2411 Water &Wastewater Commission: August 10, 2022 Council: September 1, 2022 Posting Language Recommend approval to negotiate and execute a cooperative contract with DeSpain & Associates, Inc. d/b/a DAI Source for maintenance and support of a web-based integrated business intelligence suite, for a term of three years in an amount not to exceed $400,000. MBE/WBE This procurement was reviewed for subcontracting opportunities in accordance with City Code Chapter 2-9C Minority Owned and Women Owned Business Enterprise Procurement Program. For the services required for this procurement, there were no subcontracting opportunities; therefore, no subcontracting goals were established. Lead Department Financial Services Department Client Department Austin Water Chief Information Officer, David Johnston Fiscal Note Funding in the amount of $119,784 is contingent upon approval of the Fiscal Year 2022-2023 Operating Budget of Austin Water. Funding for the remaining contract term is contingent upon available funding in future budgets. Purchasing Language: Multiple contractors within this cooperative purchasing program were reviewed for these services. The Financial Services Department has determined this contractor best meets the needs of the department to provide the services required at the best value for the City. Council Committee, Boards and Commission Action: August 10, 2022 - To be reviewed by the Water & Wastewater Commission. Additional Backup Information: The contract will provide maintenance and support of IBM Cognos, a web-based integrated business intelligence suite, for Austin Water. IBM Cognos software is used for reports and dashboards that include key performance indicators related to safety, equity, performance measures, customer service, water conservation reports, and treatment asset data. IBM Cognos is used by various divisions within Austin Water including finance, human resources, engineering, pipeline operations, and laboratory. The State of Texas Department of Information Resources cooperative establishes competitively bid contracts that can be utilized by the State and other government agencies through a cooperative agreement. Cooperative agreements save taxpayer dollars by leveraging the State’s volume-buying power to drive down costs on hundreds of contracts through a streamlined cooperative purchasing program. Strategic Outcome(s): Government that Works for All. Item 2 # 22-2411 Water &Wastewater Commission: August 10, 2022 Council: September 1, 2022 PRICE ANALYSIS Cost Analysis: The proposed contract pricing is consistent with a 0.95% increase represented in the market
Item 3 # 22-2412 Water &Wastewater Commission: August 10, 2022 Council: September 1, 2022 Posting Language Recommend approval to negotiate and execute a contract with HORIZON Lab Systems, LLC to provide laboratory information management software licenses, maintenance, and managed support services, for a term of five years in an amount not to exceed $720,000. MBE/WBE Sole source contracts are exempt from the City Code Chapter 2-9C Minority Owned and Women Owned Business Enterprise Procurement Program; therefore, no subcontracting goals were established. Lead Department Financial Services Department Client Department Austin Water Assistant Director of Operations, Rick Coronado Fiscal Note Funding in the amount of $120,000 is contingent upon approval of the Fiscal Year 2022-2023 Operating Budget of Austin Water. Funding for the remaining contract term is contingent upon available funding in future budgets. Purchasing Language: Sole Source Council Committee, Boards and Commission Action: August 10, 2022 - To be reviewed by the Water & Wastewater Commission. Additional Backup Information: The contract will provide laboratory information management software licenses, maintenance, and managed support services for Austin Water’s existing HORIZON Laboratory Information Management System (LIMS). The HORIZON LIMS platform enables the Austin Water Laboratory Services Division to house all analytical data, and functions as the hub for other major laboratory functions and to communicate, generate, and deliver reports to state and federal agencies as well as to its customers. Austin Water Laboratory Division maintains laboratories at three locations and is accredited in accordance with the Texas Commission on Environmental Quality (TCEQ) and The National Environmental Laboratories Accreditation Conference Institute (TNI) requirements. This contract will enable the laboratory to continue to meet all existing and future TCEQ/TNI accreditation requirements as well as the overall laboratory LIMS needs. Austin Water Laboratory Services Division staff use the LIMS daily to produce over 200 regulatory compliance reports annually. HORIZON Lab Systems, LLC is the sole supplier and authorized Services Company for the HORIZON Laboratory Information Management System, including HORIZON Data Management, HORIZON Field, HORIZON Logbooks, and instrument interfacing products. Additional software, Item 3 # 22-2412 Water &Wastewater Commission: August 10, 2022 Council: September 1, 2022 services, support, and training relating to the HORIZON product are not available from any other supplier source. Strategic Outcome(s): Government that Works for All. PRICE ANALYSIS a) Cost Analysis: The proposed contract pricing is consistent with a 9.72% increase represented in the market
Item 4 # 22-2638 Water &Wastewater Commission: August 10, 2022 Council: September 1, 2022 Posting Language Recommend approval to award a contract with Vanguard Utility Service, Inc. d/b/a VUS Inc. to provide large diameter water meter exchange services, for a term of four years in the amount not to exceed $2,000,000. MBE/WBE This solicitation was reviewed for subcontracting opportunities in accordance with City Code Chapter 2-9C Minority Owned and Women Owned Business Enterprise Procurement Program. For the services required for this solicitation, there were no subcontracting opportunities; therefore, no subcontracting goals were established. Lead Department Financial Services Department Client Department Austin Water Assistant Director of Customer Experience, Randi Jenkins Fiscal Note Funding in the amount of $166,666 is available in the Fiscal Year 2021-2022 Operating Budget of Austin Water. Funding for the remaining contract term is contingent upon available funding in future budgets. Purchasing Language: The Financial Services Department issued an Invitation for Bids (IFB) 2200 WJT1015 for these services. The solicitation was issued on March 18, 2022 and closed on May 2, 2022. The recommended contractor submitted the only responsive offer. A complete solicitation package, including a tabulation of the bid received, is available for viewing on the City’s Financial Services website, Austin Finance Online. Link: Solicitation Documents. Council Committee, Boards and Commission Action: August 10, 2022 - To be reviewed by the Water & Wastewater Commission. Additional Backup Information: Austin Water (AW) is currently rolling out a citywide smart water meter program called My ATX Water. This program is modernizing AW's water metering system by replacing more than 250,000 analog water meters with digitally read water meters connected to a wireless network by 2025. Of the nearly 250,000 analog water meters scheduled for replacement, approximately 450 large- diameter meters are incompatible and need replacement to complete the My ATX Water project deployment. This contract will ensure the large-diameter meters meet the same installation timeframe by exchanging up to 40 meters per month. Large-diameter meter replacements often require heavy equipment, right-of-way and street closure permits, confined space entry requirements, and extensive commercial property coordination, requiring a dedicated resource. Strategic Outcome(s): Health and Environment. Item 4 # 22-2638 Water &Wastewater Commission: August 10, 2022 Council: September 1, 2022 PRICE ANALYSIS a) b) Solicitations: 210 notices were sent, including 6 MBE and 6 WBE firms with no M/WBE firms responding. Cost Analysis: The proposed contract pricing is consistent with a 16.2% …
Item 5 # 22-2659 Water &Wastewater Commission: August 10, 2022 Council: September 15, 2022 Posting Language Recommend approval to award of a contract with TSG Industries, LLC for portable office trailers in an amount not to exceed $492,880. MBE/WBE This solicitation was reviewed for subcontracting opportunities in accordance with City Code Chapter 2-9D Minority Owned and Women Owned Business Enterprise Procurement Program. For the goods required for this solicitation, there were no subcontracting opportunities; therefore, no subcontracting goals were established). Lead Department Financial Services Department Client Department Austin Water Assistant Director of Operations, Rick Coronado Fiscal Note Funding is available in the Fiscal Year 2021-2022 Operating Budget of Austin Water. Purchasing Language: The Financial Services Department issued an Invitation for Bids (IFB) 2200 MLJ1005 for these goods. The solicitation was issued on April 25, 2022 and closed on May 24, 2022. Of the two offers received, the recommended contractor submitted the lowest responsive offer. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s Financial Services website, Austin Finance Online. Link: Solicitation Documents. Council Committee, Boards and Commission Action: August 10, 2022 - To be reviewed by the Water & Wastewater Commission. Additional Backup Information: The contract is for a one-time purchase of five new portable office trailers to be used at Austin Water locations throughout the City. The contractor services will include delivery, installation, and skirting of 12’ x 44’ portable office trailers to be installed at Ullrich Water Treatment Plant, Davis Water Treatment Plant, Hornsby Bend Biosolids Management Facility, Govalle Occupational Development and Support, and Webberville Service Center. As part of the outcome of Winter Storm Uri After Action Report and Emergency Preparedness Plan, the portable office trailers are needed to provide additional office space for essential staff, enabling them to report directly to assigned facilities, provide direct service as required, and reduce reaction time in emergency situations. The trailers will also provide a location for personnel to office while serving as essential personnel during emergency events. The electrical, sewer, water, and communications setup will be handled internally by Austin Water. Strategic Outcome(s): Government that Works for All, Safety. Item 5 # 22-2659 Water &Wastewater Commission: August 10, 2022 Council: September 15, 2022 PRICE ANALYSIS a) Solicitations: 47 notices were sent, including 0 MBE and 3 WBE firms with no M/WBE firms responding. b) Cost Analysis: The proposed contract pricing …
WATER AND WASTEWATER COMMISSION REGULAR CALLED MEETING MINUTES Wednesday, August 10, 2022 The Water and Wastewater Commission convened in a regular meeting on August 10, 2022, at Austin Energy Headquarters, 4815 Mueller Boulevard, Austin, Texas. Chair Lee called the Water and Wastewater Commission to order at 6:00 p.m. Committee Members in Attendance: Chien Lee (Chair), Christianne Castleberry (Vice-Chair), William Moriarty (remote), Travis Michel (remote), Judy Musgrove (remote), Grant Fisher, Susan Turrieta Committee Members Absent: Jesse Penn, Alex Navarro PUBLIC COMMUNICATION: GENERAL There were no speakers registered for Public Communication. APPROVAL OF MINUTES 1. Approve the minutes of the July 20, 2022, special called meeting of the Water and Wastewater Commission. The minutes from the July 20, 2022, special called meeting were approved on Vice- Chair Castleberry’s motion and Commissioner Fisher’s second on a 6-0 vote with Commissioner Turrieta abstaining, Commissioners Penn and Navarro absent and two vacancies. DISCUSSION ITEMS 2. Recommend approval to negotiate and execute a cooperative contract with DeSpain & Associates, Inc. d/b/a DAI Source for maintenance and support of a web-based integrated business intelligence suite, for a term of three years in an amount not to exceed $400,000. The motion to approve the recommendation was approved on a 7-0 vote on Commissioner Turrieta’s motion and Commissioner Fisher’s second, Commissioners Penn and Navarro absent and two vacancies. 3. Recommend approval to negotiate and execute a contract with HORIZON Lab Systems, LLC to provide laboratory information management software licenses, maintenance, and managed support services, for a term of five years in an amount not to exceed $720,000. The motion to approve the recommendation was approved on a 7-0 vote on Commissioner Turrieta’s motion and Commissioner Fisher’s second, Commissioners Penn and Navarro absent and two vacancies. 4. Recommend approval to award a contract with Vanguard Utility Service, Inc. d/b/a VUS Inc. to provide large diameter water meter exchange services, for a term of four years in the amount not to exceed $2,000,000. The motion to approve the recommendation was approved on a 7-0 vote on Commissioner Turrieta’s motion and Commissioner Fisher’s second, Commissioners Penn and Navarro absent and two vacancies. 5. Recommend approval to award a contract with TSG Industries, LLC for portable office trailers in an amount not to exceed $492,880. The motion to approve the recommendation was approved on a 7-0 vote on Commissioner Turrieta’s motion and Commissioner Fisher’s second, Commissioners Penn and Navarro absent and two vacancies. …
Special Called Meeting of the Water and Wastewater Commission July 20, 2022 — 6:00 pm Permitting & Development Center – Room 1405 6310 Wilhelmina Delco Dr. Austin, Texas Some members may be participating by videoconference. The meeting may be viewed online at: http://www.austintexas.gov/page/watch-atxn-live For more information go to: http://www.austintexas.gov/wwc Public comment will be allowed in-person or remotely by telephone. Speakers may only register to speak on an item once either in-person or remotely and will be allowed up to three minutes to provide their comments. Registration no later than noon the day before the meeting is required for remote participation. To register, call or email the board liaison at 512-972-0115 or Blanca.Madriz@austintexas.gov . To register to speak in person, people must sign up at least ten minutes before the meeting is called to order. Commissioners: William Moriarty (Mayor) Jesse Penn (District 1) Alex Navarro (District 2) Travis Michel (District 3) Chien Lee, Chair (District 4) Christianne Castleberry, Vice Chair (District 5) Vacant (District 6) Judy Musgrove (District 7) Christy Williams (District 8) Grant Fisher (District 9) Susan Turrieta (District 10) CALL TO ORDER PUBLIC COMMUNICATION: GENERAL APPROVAL OF MINUTES 1. Approval of minutes from the June 8, 2022, regular meeting of the Water and Wastewater Commission. DISCUSSION AND POSSIBLE ACTION ON RECOMMENDATIONS TO COUNCIL 2. Recommend approval to negotiate and execute a contract with Environmental Improvements Inc., to provide parts for chemical feed pumps, for a term of five years in an amount not to exceed $860,000. 3. Recommend approval to award and execute a construction contract with Santa Clara Construction, Ltd., for Wastewater Line Renewal and Spot Rehab Service Contract (2023 to 2025) Indefinite Delivery/Indefinite Quantity contract in the amount of $3,200,000 for an initial 1-year term, with two 12-month extension options of $3,200,000, for a total contract amount not to exceed $9,600,000. (Districts 1-10) 4. Recommend approval to award and execute a construction contract with Facilities Rehabilitation, Inc., for the Truman Heights Water and Wastewater Pipeline Rehabilitation project in the amount of $3,597,261 plus a $359,726.10 contingency, for a total contract amount not to exceed $3,956,987.10. (District 1) The City of Austin is committed to compliance with the American with Disabilities Act. Reasonable modifications and equal access to communications will be provided upon request. Meeting locations are planned with wheelchair access. If requiring Sign Language Interpreters or alternative formats, please give notice at least 2 days (48 hours) …
Item 14 Water & Wastewater Commission: July 20, 2022 Council: August 17, 2022 Posting Language Recommend approval of Austin Water’s Fiscal Year 2022-2023 Proposed Operating Budget, Capital Budget, new appropriations, and 5-Year Capital Improvement (CIP) spending plan. MBE/WBE N/A Lead Department Austin Water Client Department Austin Water Assistant Director of Financial Services, Joseph Gonzales Fiscal Note N/A Purchasing Language: N/A Council Committee, Boards and Commission Action: July 20, 2022 - To be reviewed by the Water & Wastewater Commission. Additional Backup Information: This action authorizes approval of Austin Water’s Fiscal Year 2022-2023 Operating Budget, Capital Budget Appropriations and 5-year Capital Improvement Projects spending plan. Council is scheduled to adopt the budget on three readings on August17, 2022 through August 19, 2022. The City Code in Section 15-9-3 specifically requires a public hearing prior to the City Council approving any changes in electric, water, wastewater, and garbage collection rates. Austin Water has not proposed water or wastewater service rate changes for Fiscal Year 2022-2023. Strategic Outcome(s): Government That Works for All.
Item 10 # 22-2423 Water & Wastewater Commission: July 20, 2022 Council: July 28, 2022 Posting Language Recommend approval to negotiate and execute a Construction Manager at Risk Agreement with MGC Contractor’s Inc. for preconstruction and construction phase services for the Walnut Creek Primary Clarifier and Flow Equalization Basin Rehab project in an amount not to exceed $32,700,000. (District 1). MBE/WBE This contract will be awarded in compliance with City Code Chapter 2-9A (Minority Owned and Women Owned Business Enterprise Procurement Program) by meeting the goals with 16.77% MBE, and 3.79% WBE participation. Lead Department Financial Services Department Client Department Austin Water Assistant Director of Engineering Services, Shay Ralls Roalson Fiscal Note Funding is available in the Capital Budget of Austin Water. Purchasing Language: Best value to the City of one offer received. A complete solicitation package, including a tabulation of the bids received, is available for viewing, is available for viewing on the City’s Financial Services, website, Austin Finance Online. Link: Solicitation Document. Prior Council Action: March 3, 2022 – City Council authorized negotiation and execution of an amendment to the professional services agreement with Black & Veatch Corp. for professional engineering services for the Walnut Creek Primary Clarifier and Flow Equalization Basin Rehab project in the amount of $4,100,000 for a total contract amount not to exceed $5,100,000. December 9, 2021 – Council approved the use of the Construction Manager at Risk alternative delivery method of contracting. March 26, 2020 – City Council authorized negotiation and execution of a professional services agreement with Black & Veatch Corporation (staff recommendation) for Request for Qualifications Solicitation No. CLMP284 to provide engineering services for the Walnut Creek Wastewater Treatment Plant Primary Clarifier and Flow Equalization Basin Rehab project in an amount not to exceed $1,000,000. Council Committee, Boards and Commission Action: July 20, 2022 - To be reviewed by the Water & Wastewater Commission. Additional Backup Information: The Walnut Creek Wastewater Treatment Plant (WWTP) receives wastewater flow from Austin Water's wastewater collection system. The plant was originally built in 1977. Over the years, the Item 10 # 22-2423 Water & Wastewater Commission: July 20, 2022 Council: July 28, 2022 treatment plant has undergone numerous improvements and upgrades to modernize treatment methods as well as expand treatment capacity to 75 million gallons per day (MGD) with a 2-hour peak flow of 165 MGD. Treated plant effluent is discharged into the Colorado River. …
Item 11 # 22-2364 Water & Wastewater Commission: July 20, 2022 Council: July 28, 2022 Posting Language Recommend approval to negotiate and execute a cost participation agreement with Stillwater Capital Investments, LLC for the City to reimburse the developer for an amount not to exceed $409,975 for costs associated with the design and construction of an oversized water main related to Service Extension Request No. 5077 that will provide water service to a proposed industrial development located at 13338 Old San Antonio Road. Lead Department Austin Water. Client Department Austin Water Assistant Director of Environmental, Planning and Development Services Kevin Critendon Fiscal Note Funding is available in the Fiscal Year 2021-2022 Capital Budget of Austin Water. Council Committee, Boards and Commission Action: July 20, 2022 – To be reviewed by the Water and Wastewater Commission. Additional Backup Information: The Stillwater Old San Antonio Rd project consists of approximately 59 acres of land located at 13338 Old San Antonio Road (the “Property”). The Property is located within the City of Austin’s (the “City”) 2-mile Extra-Territorial Jurisdiction, Impact Fee Boundary, Austin Water’s service area for water, the Desired Development Zone, and the Onion Creek Watershed. A map of the property location is attached. Stillwater Capital Investments, LLC (the “Applicant”) is proposing to develop approximately 641,280 square feet of office-warehouse. The Applicant requested that the City provide water utility service to the Property as proposed in Service Extension Request (SER) No. 5077. The Applicant has requested Austin Water also provide retail wastewater service to the Property. In accordance with Chapter 25-9 of the City Code, the City has asked the Applicant to oversize the water main in order to serve additional properties within the South water pressure zone consistent with the City’s long range planning goals for this area. If approved by City Council, the City will cost participate in this construction project only to the extent of the City’s proportionate share of the oversized water main. The proposed oversized improvements include construction of approximately 3,100 feet of 16-inch water main from the existing 16-inch water main in Avenida Mercado St and extend south along Old San Antonio Rd to the Property. The City will reimburse the Applicant for an overall total amount not to exceed $409,975 for hard costs and soft costs. Hard costs include, but are not limited to, construction and materials. Soft costs include, but are not limited to, preliminary …
Item 12 # 22-2367 Water & Wastewater Commission: July 20, 2022 Council: July 28, 2022 Posting Language Recommend an increase to the City’s participation in the cost participation agreement with Stillwater Capital Investments, LLC for the City to reimburse the developer for an amount not to exceed $2,886,408 for costs associated with the design and construction of an oversized lift station and force main related to Service Extension Request No. 5078R that will provide wastewater service to a proposed industrial development located at 13338 Old San Antonio Road. Lead Department Austin Water. Client Department Austin Water Assistant Director of Environmental, Planning and Development Services, Kevin Critendon Fiscal Note Funding is available in the Fiscal Year 2021-2022 Capital Budget of Austin Water. Prior Council Action: August 26, 2021 – Council authorized the negotiation and execution of a cost reimbursement agreement. Council Committee, Boards and Commission Action: July 20, 2022 – To be reviewed by the Water and Wastewater Commission. Additional Backup Information: The Stillwater Old San Antonio Rd project consists of approximately 59 acres of land located at 13338 Old San Antonio Road (the “Property”). The Property is located within the City of Austin’s (the “City”) 2-mile Extra-Territorial Jurisdiction, Impact Fee Boundary, Austin Water’s service area for wastewater, the Desired Development Zone, and the Onion Creek Watershed. A map of the property location is attached. Stillwater Capital Investments, LLC (the “Applicant”) is proposing to develop approximately 641,280 square feet of office-warehouse within the Property. Service Extension Request (SER) No. 5078 was approved to extend City wastewater utility service to approximately 36-acres of the Property; however, that wastewater service plan is now being amended as proposed in SER No. 5078R. The Applicant has requested to incorporate their additional approximately 23-acre tract into SER-5078R (previously submitted under separate SER application, SER No. 5085). Additionally, the Applicant now proposes an entirely industrial development instead of the previously anticipated mix of residential development on the 36-acre tract and industrial development on the 23-acre tract. The Applicant has requested Austin Water also provide retail water service to the Property. Prior Council Action: City Council on August 26, 2021, authorized the negotiation and execution of a Cost Reimbursement Agreement (“Agreement”) between the City and the Applicant to allow for reimbursement up to $1,930,850.00 for hard costs and soft costs for the oversized portion of the wastewater improvements required in the original SER-5078. The original required oversized improvements …
Item 13 # 22-2368 Water & Wastewater Commission: July 20, 2022 Council: July 28, 2022 Posting Language Recommend approval of Service Extension Request No. 5313 for wastewater service to a 4.44-acre tract located at 8738 W US 290 Hwy within the Drinking Water Protection Zone, the City’s 2-mile Extra-Territorial Jurisdiction and Austin Water’s service area. Lead Department Austin Water. Client Department Austin Water Assistant Director of Environmental, Planning and Development Services, Kevin Critendon Fiscal Note There is no anticipated fiscal impact. Council Committee, Boards and Commission Action: July 20, 2022 - To be reviewed by the Water & Wastewater Commission June 1, 2022 – Recommended by the Environmental Commission Additional Backup Information: The Austin Ready Mix project consists of approximately 4.44 acres of land located at 8738 W US 290 Hwy (the “Property”). The Property is located entirely within the City of Austin’s (the “City”) 2- mile Extra-Territorial Jurisdiction, Impact Fee Boundary, Austin Water’s service area for wastewater, the Drinking Water Protection Zone, and the Slaughter Creek Watershed. A map of the property location is attached. Applicant: Brett Denton (the “Applicant”) is proposing to develop 82,000 sq. ft. of office warehouse. The Applicant requested that the City provide wastewater utility service to the Property and Austin Water has determined the service requirements as proposed in Service Extension Request (SER) No. 5313. Austin Water will provide retail water service to the Property. City Code § 25-9-35 requires City Council approval for this SER because the Property is located within the Drinking Water Protection Zone and outside the City’s full-purpose corporate limits. The City will not cost participate on this project. Infrastructure Improvements: To serve the Property, the Applicant will be required to construct approximately 810 feet of appropriately sized force main from the existing 8-inch gravity wastewater main (Project No. 2009- 0588; MH# 240183) located in Circle Dr. near South Bend Ave. west along Circle Dr. then south and west along South Bend Ave. to the Property. The proposed wastewater improvements are sized to serve the needs of the Property and will conform to all City Code requirements. These improvements will be designed in accordance with City’s Environmental Criteria Manual and Utilities Criteria Manual and will be inspected by the City’s Development Services Department. The Applicant will construct all required improvements at Item 13 # 22-2368 Water & Wastewater Commission: July 20, 2022 Council: July 28, 2022 their cost and dedicate …
Item 15 # 22-2409 Water &Wastewater Commission: July 20, 2022 Council: July 28, 2022 Posting Language Recommend approval to ratify a contract with John Zamora Jr. d/b/a King Daddy Distribution LLC. for bottled and canned drinking water in the amount of $247,824. MBE/WBE This contract is exempt from the City Code Chapter 2-9D Minority Owned and Women Owned Business Enterprise Procurement Program; therefore, no subcontracting goals were established Lead Department Financial Services Department Client Department Austin Water Assistant Director of Financial Services, Joseph Gonzales Fiscal Note Funding was available in the Fiscal Year 2021-2022 Operating Budget of Austin Water. Purchasing Language: Ratification Council Committee, Boards and Commission Action: July 20, 2022 - To be reviewed by the Water & Wastewater Commission. Additional Backup Information: On February 5, 2022, Austin Water issued a boil water notice for all of its customers because of an emergency with the water system due to water quality degradation impacting a water treatment plant’s production. This resulted in an urgent need for the immediate distribution of clean drinking water until the boil water notice was lifted. The contract provided for bottled and canned water which was distributed at various locations across the City. Due to the urgent situation, an emergency was declared, and the purchase was made immediately in order to protect the health and safety of residents. This request is for ratification of the emergency contract. Strategic Outcome(s): Safety, Government that Works for All.
Item 18 Water & Wastewater Commission: July 20, 2022 Council: July 28, 2022 Posting Language Recommend approval of Austin Water Capital Improvements Projects located in the Drinking Water Protection Zone for inclusion in Austin Water’s 5-year Capital spending plan as required by Financial Policy No. 8 Lead Department Austin Water Client Department Austin Water Assistant Director of Financial Services, Joseph Gonzales Council Committee, Boards and Commission Action: April 19, 2022 – Recommended by the Resource Management Commission on an 8-0 vote, with Commissioner Davis abstaining, Commissioner Chavarria absent, and one vacancy. May 4, 2022 – Recommended by the Environmental Commission on a 10-0 vote, Commissioner Thompson was absent. July 20, 2022 - To be reviewed by the Water & Wastewater Commission. Additional Backup Information: In accordance with Austin Water's financial policies, the Boards and Commissions review process and the City’s annual budget review process provides citizens an opportunity to comment on growth-related projects within the Drinking Water Protection Zone (DWPZ). Capital improvement projects for new water and wastewater treatment plants, capital expansions, and growth- related projects that are located in the DWPZ were identified and submitted, as part of the annual budget process, to the following Boards and Commissions: Water and Wastewater Commission, Resource Management Commission, and the Environmental Board. These Boards and Commissions reviewed growth-related DWPZ capital projects spending plans, provided input, reviewed consistency with Imagine Austin comprehensive plan, reviewed effect on growth within the DWPZ, and made recommendation on project approval for inclusion in Austin Water’s 5-year capital spending plan. Strategic Outcome(s): Government That Works for All. Memorandum To: Boards and Commissions From: Greg Meszaros, Director, Austin Water Date: March 23, 2022 Subject: Board and Commission and Citizen Review of new Growth-related Capital Improvement Projects in Drinking Water Protection Zone The Austin City Council approved an amendment to Austin Water’s (AW) Financial Policy No. 8 to provide for enhanced Board and Commission and citizen reviews of AW’s new growth-related capital improvement projects (CIP) located in the Drinking Water Protection Zone (DWPZ). The previous ordinance (No. 20130117-017) took effect on January 28, 2013 and on August 11, 2021 ordinance (No. 20210811-001) amended the DWPZ financial policy. AW is presenting the new growth-related projects to Boards and Commissions as set forth in the ordinance. The revised Financial Policy No. 8 reads as follows: Capital improvement projects for new water and wastewater treatment plants, capital expansions, and growth-related projects that are …
Item 2 # 22-2264 Water & Wastewater Commission: July 20, 2022 Council: July 28, 2022 Posting Language Recommend approval to negotiate and execute a contract with Environmental Improvements Inc. to provide parts for chemical feed pumps, for a term of five years in an amount not to exceed $860,000. MBE/WBE Sole source contracts are exempt from the City Code Chapter 2-9D Minority Owned and Women Owned Business Enterprise Procurement Program; therefore, no subcontracting goals were established. Lead Department Financial Services Department Client Department Austin Water Assistant Director of Financial Services, Joseph Gonzales Fiscal Note Funding in the amount of $28,667 is available in the Fiscal Year 2021-2022 Operating Budget of Austin Water. Funding for the remaining contract term is contingent upon available funding in future budgets. Purchasing Language: Sole Source Council Committee, Boards and Commission Action: July 20, 2022 - To be reviewed by the Water & Wastewater Commission. Additional Backup Information: The contract will provide proprietary, industry-standard parts for critical equipment used to feed numerous treatment chemicals such as chlorinators, ammoniators, and Encore 700 pumps. Because these parts are used at both water and wastewater plants, it is of utmost importance Austin Water maintains a reliable inventory at City facilities. Environmental Improvements Inc. is the sole authorized water and wastewater distributor representative in the state of Texas. The current contract expires on August 3, 2022. The requested authorization amount was determined using a departmental estimate based on historical spend and future usage. The recommended contractor is the current provider for these services. Strategic Outcome(s): Health and Environment.
Item 3 # 22-2389 Water &Wastewater Commission: July 20, 2022 Council: July 28, 2022 Posting Language Recommend approval to award and execute a construction contract with Santa Clara Construction, Ltd. for the Wastewater Line Renewal and Spot Rehab Service (2023 to 2025) Indefinite Delivery/Indefinite Quantity contract in the amount of $3,200,000 for an initial 1-year term, with two 12-month extension options of $3,200,000, for a total contract amount not to exceed $9,600,000. MBE/WBE This contract will be awarded in compliance with City Code Chapter 2-9A (Minority Owned and Women Owned Business Enterprise Procurement Program) by meeting the goals with 1.75% MBE and 1.07% WBE participation. Lead Department Financial Services Department Client Department Austin Water Assistant Director of Engineering Services, Shay Ralls Roalson Fiscal Note Funding is contingent upon available funds in future Austin Water Capital budgets. Purchasing Language: Lowest responsive bid of two bids received through a competitive Invitation for Bid solicitation. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s Financial Services website, Austin Finance Online. Link: Solicitation Documents. Council Committee, Boards and Commission Action: July 20, 2022 - To be reviewed by the Water & Wastewater Commission. Additional Backup Information: Indefinite Delivery/Indefinite Quantity contracts provide for an indefinite quantity of services for a fixed time, usually an initial term with extension options. They are commonly used when precise quantities of supplies or services, above a specified minimum, cannot be determined. Indefinite Delivery/Indefinite Quantity contracts help streamline the contract process and service delivery and allow the City the flexibility to add work as needs arise or change. As each project is defined, a specific work assignment will be given to the contractor who will complete the scope of work for the unit prices included in the contract. Work deadlines will be established for each work assignment. As needed and required, this contract is for the repair and replacement of deteriorated wastewater mains throughout the city including performing emergency repairs on wastewater mains and the wastewater collection system. In general, projects are larger or more complex than Austin Water (AW) crews can complete, but too small, isolated, or time sensitive to competitively bid as individual construction contracts. Item 3 # 22-2389 Water &Wastewater Commission: July 20, 2022 Council: July 28, 2022 The wastewater collection system is essential for conveying wastewater to the treatment plants. Due to growth in Austin and deterioration …
Item 4 # 22-2390 Water &Wastewater Commission: July 20, 2022 Council: July 28, 2022 Posting Language Recommend approval to award and execute a construction contract with Facilities Rehabilitation, Inc., for the Truman Heights Water and Wastewater Pipeline Rehabilitation project in the amount of $3,597,261 plus a $359,726.10 contingency, for a total contract amount not to exceed $3,956,987.10. (District 1) MWBE This contract will be awarded in compliance with City Code Chapter 2-9A (Minority Owned and Women Owned Business Enterprise Procurement Program) by meeting the goals with 98.89% MBE and 1.11% WBE participation. Lead Department Financial Services Department Client Department Austin Water Assistant Director of Engineering Services, Shay Ralls Roalson. Fiscal Note Funding is available in the Capital Budget of Austin Water. Purchasing Language: Lowest responsive bid of three bids received through a competitive Invitation for Bid solicitation. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s Financial Services, website, Austin Finance Online. Link: Solicitation Documents. Council Committee, Boards and Commission Action: July 20, 2022 − To be reviewed by the Water and Wastewater Commission. Additional Backup Information: The Truman Heights Water and Wastewater Pipeline Rehabilitation project is part of the Renewing Austin Program. The Renewing Austin Program is an ongoing effort to replace, and upgrade deteriorated and aging water mains with a documented history of multiple breaks, that are in poor condition, and that impact service delivery. In addition, the program coordinates and includes wastewater lines in poor condition and in need of replacement within the project area. This project consists of the repair and replacement of existing water and wastewater mains located within the Truman Heights Neighborhood. Construction is to occur on the following streets: Samuel Huston Avenue, Bunche Road, Downs Drive, Hillcrest Lane, Woodmoor Drive, Woodmoor Circle, Stonegate Drive, Stonegate Circle, and Elmsgrove Drive. The work consists of the construction of approximately 5,058 linear feet of 8-inch waterline and 1,963 linear feet of 8-inch wastewater line including manholes, valves, and service lines to individual properties. Construction will include pavement repair for all trenches and revegetation of all disturbed areas. Due to the potential for encountering unknown underground utilities during construction, a 10% contingency in funding has been included to allow for the expeditious processing of any change orders. A contingency is an additional amount of money added to the construction budget to cover Item 4 # 22-2390 Water &Wastewater …
Item 5 # 22-2392 Water &Wastewater Commission: July 20, 2022 Council: July 28, 2022 Posting Language Recommend approval to award and execute a construction contract with Excel Construction Services, LLC, for the Rock Harbour Lift Station Improvements project in the amount of $6,036,600 plus a $603,660 contingency, for a total contract amount not to exceed $6,640,260. (District 10) MWBE This contract will be awarded in compliance with City Code Chapter 2-9A (Minority Owned and Women Owned Business Enterprise Procurement Program) by meeting the goals with 7.23% MBE and 2.54% WBE participation. Lead Department Financial Services Department Client Department Austin Water Assistant Director of Engineering Services, Shay Ralls Roalson. Fiscal Note Funding is available in the Capital Budget of Austin Water. Purchasing Language: Lowest responsive bid of four bids received through a competitive Invitation for Bid solicitation. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s Financial Services website, Austin Finance Online. Link: Solicitation Document. Council Committee, Boards and Commission Action: July 20, 2022 — To be reviewed by the Water and Wastewater Commission. Additional Backup Information: The Rock Harbour Lift Station was constructed in 1997, population growth in the area requires expansion of the lift station to convey increased wastewater flow. The lift station has exceeded its design capacity, resulting in significantly increased maintenance challenges and odor issues. The Rock Harbour Lift Station is part of the Austin Water wastewater collection system consisting of over 130 Lift Stations, 78 miles of force mains, and 2,900 miles of gravity lines. Lift Stations are typically mechanical systems of pumps, pipes and controls that lift and convey wastewater from lower to higher elevations within hilly terrain. The purpose of this project is to construct a new lift station to meet demand and reduce maintenance and odor problems. The new lift station design includes a wet well, valve vault, odor control equipment, screening equipment, electrical improvements to meet current Austin Water standards, a natural gas generator, and a retaining wall. Construction of these improvements will allow Austin Water to continue to provide wastewater services to the increasing population in the area as well as reduce the release of odor into the local neighborhood. Due to the potential for unknown conditions when working in an operating wastewater facility and the need to minimize equipment downtime, a 10% contingency in funding has been included to allow for …
Item 6 # 22-2393 Water &Wastewater Commission: July 20, 2022 Council: July 28, 2022 Posting Language Recommend approval to award and execute a construction contract with PGC General Contractors, LLC, for the 2021 Facilities – Large Facilities Indefinite Delivery/Indefinite Quantity contract in the amount of $5,000,000 for an initial 1-year term, with two 1-year extension options of $5,000,000, for a total contract amount not to exceed $15,000,000. MWBE This contract will be awarded in compliance with City Code Chapter 2-9A (Minority Owned and Women Owned Business Enterprise Procurement Program) by meeting the goals with 6.28% MBE and 1.35% WBE participation. Lead Department Financial Services Department Client Department Austin Water Assistant Director of Engineering Services, Shay Ralls Roalson Fiscal Note Funding for the initial amount of $5,000,000 is available in the Capital Budget of Austin Water. Purchasing Language: Lowest responsive bid of one bid received through a competitive Invitation for Bid solicitation. A complete solicitation package, including a tabulation of the bids received, is available for viewing, is available for viewing on the City’s Financial Services, website, Austin Finance Online. Link: Solicitation Document. Council Committee, Boards and Commission Action: July 20, 2022 – To be reviewed by the Water and Wastewater Commission Additional Backup Information: Previous Indefinite Delivery/Indefinite Quantity contracts were developed to support facility needs such as emergency response services and non-emergency improvements for components of the Austin Water system. Those contracts have been completed and fully expended. Indefinite Delivery/Indefinite Quantity contracts provide for an indefinite quantity of services for a fixed time, usually an initial term with extension options. They are commonly used when precise quantities of supplies or services, above a specified minimum, cannot be determined. Indefinite Delivery/Indefinite Quantity contracts help streamline the contract process and service delivery and allow the City the flexibility to add work as needs arise or change. As each project is defined, a specific work assignment will be assigned to the contractor who will complete the scope of work for the unit prices included in the contract. Work deadlines will be established for each work assignment. The work covered under this contract consists of providing services for operations support and the rehabilitation of existing large facility projects. The contractor will provide service to repair/replace components of the facilities due to issues such as deterioration, damage, or obsolescence. Consultant design efforts shall be used when required by the scope of the needed work, but …
Item 7 # 22-2394 Water &Wastewater Commission: July 20, 2022 Council: July 28, 2022 Posting Language Recommend approval to negotiate and execute amendments to the professional services agreements with K Friese and Associates, Inc. (WBE) and CAS Consulting and Services, Inc. (MBE) for engineering services for the Oltorf Street Reclaimed Water Main Phase 1 & 2 projects in the amount of $334,395.94, for a total contract amount not to exceed $1,695,395.94. (Districts 3 and 9) MBE/WBE This amendment will be awarded in compliance with City Code 2-9B (Minority Owned and Women Owned Business Enterprise Procurement Program). Current participation to date for K Friese and Associates, Inc. is 58.45% MBE and 26.447% WBE. Current participation to date for CAS Consulting and Services, Inc. is 68.37% MBE and 22.59% WBE. Lead Department Financial Services Department Client Department Austin Water Assistant Director of Engineering Services, Shay Ralls Roalson Fiscal Note Funding in the amount of $334,395.94 is available in the Capital Budget of Austin Water. Purchasing Language: Original contracts were awarded through a qualifications-based selection process. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s Financial Services website, Austin Finance Online. Link: Solicitation Documents. Prior Council Action: May 23, 2019 – Council approved a professional services agreement with K Friese & Associates, Inc. for the Oltorf Street Reclaimed Water Main Phases 1 & 2 in an amount not to exceed $1,300,000. Council Committee, Boards and Commission Action: July 20, 2022 - To be reviewed by the Water & Wastewater Commission. May 8, 2019 - No Recommendation by the Water and Wastewater Commission due to a lack of quorum votes. Commissioner Ho motioned to approve, Commissioner Schmitt second. Commissioners Moriarty, Schmitt, and Ho approved; Commissioners Penn, Lee, Turrieta, Williams and Michel recused, and Commissioners Castleberry, Parton and Grant were absent Additional Backup Information: The Oltorf Street Reclaimed Water Main Phases 1 & 2 projects were identified in Austin Water’s 2013 Completing the Core plan as a near-term construction project necessary to complete a core loop through downtown and east Austin. Completing the core loop interconnects Austin Water’s reclaimed water system north and south of the Colorado River, adds customers, and builds economies of scale. These are two of a total of five projects required to loop Austin Water’s reclaimed water distribution system north of the river to the system south of the river. Item 7 …
Item 8 # 22-2395 Water &Wastewater Commission: July 20, 2022 Council: July 28, 2022 Posting Language Recommend approval to negotiate and execute an amendment to the professional services agreement with AECOM Technical Services, Inc., for engineering services for the Walnut Creek Wastewater Treatment Plant Expansion to 100 million gallons per day project in the amount of $45,000,000 for a total contract amount not to exceed $60,000,000. MWBE • This amendment will be awarded in compliance with City Code 2-9B (Minority Owned and Women Owned Business Enterprise Procurement Program). Current participation to date is 15.80% MBE and 15.80% WBE. Lead Department Financial Services Department Client Department Austin Water Assistant Director of Engineering Services, Shay Ralls Roalson. Fiscal Note Funding is available in the Capital Budget of Austin Water. Purchasing Language: Original contract was awarded through a qualifications-based selection process. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s Financial Services website, Austin Finance Online. Link: Solicitation Documents. Prior Council Action: July 29, 2020 – Council approved a professional services agreement with AECOM Technical Services, Inc. for the Walnut Creek Wastewater Treatment Plant Expansion to 100 million gallons per day in an amount not to exceed $15,000,000. Council Committee, Boards and Commission Action: July 20, 2022 — To be reviewed by the Water & Wastewater Commission. Additional Backup Information: The Walnut Creek Wastewater Treatment Plant is permitted to treat and discharge an average daily flow of 75 million gallons per day (MGD) and a two-hour peak flow of 165 MGD. The treated plant effluent discharges into Segment No. 1428 of the Colorado River Basin. A portion of the plant’s effluent is used for non-potable water on the plant site and supplies much of the City’s growing Reclaimed Water Program. The Texas Commission on Environmental Quality (TCEQ) regulates the quality of effluent discharged into the Colorado River and the quality of reclaimed water. This project will expand the plant to treat and discharge an annual average daily flow of 100 MGD and a two-hour peak flow of 300 MGD. The expansion is needed based on projected future flows of wastewater into the plant, in accordance with TCEQ regulations and the requirements of the Texas Administrative Code. The project will implement additional treatment processes in the existing Item 8 # 22-2395 Water &Wastewater Commission: July 20, 2022 Council: July 28, 2022 facilities to meet more …
Item 9 # 22-2397 Water & Wastewater Commission: July 20, 2022 Council: July 28, 2022 Posting Language Recommend approval to award and execute a construction contract with Austin Underground, Inc. for Onion Creek Reclaimed Water Main Phase 1 project in the amount of $8,252,332 plus a $825,233.20 contingency, for a total contract amount not to exceed $9,077,565.20. (District 2). MWBE This contract will be awarded in compliance with City Code Chapter 2-9A (Minority Owned and Women Owned Business Enterprise Procurement Program) by meeting the goals with 85.97% MBE and 0.95% WBE participation. Lead Department Financial Services Department Client Department Austin Water Assistant Director of Engineering Services, Shay Ralls Roalson. Fiscal Note Funding is available in the Capital Budget of Austin Water. Purchasing Language: Lowest responsive bid of three bids received through a competitive Invitation for Bid solicitation. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s Financial Services website, Austin Finance Online. Link: Solicitation Documents. Council Committee, Boards and Commission Action: July 20, 2022 — To be reviewed by the Water and Wastewater Commission Additional Backup Information: The Onion Creek Reclaimed Water Main Phase 1 project is identified in the 2011 Reclaimed Water Master Plan and the 2013 Completing the Core summary to increase economies of scale in the reclaimed water system. The project provides an opportunity to build economies of scale in the reclaimed water system by supplying a source of reclaimed water to the Goodnight Ranch Development, Onion Creek Soccer Fields, Onion Creek District Park, Dove Springs Recreation Center, and the Dove Springs Health Center. Austin Water is negotiating a Service Extension Request (SER) with the Goodnight Ranch Development with the provision of supplying approximately 70-90 MG per year of reclaimed water. The project consists of the installation of approximately 11,850 linear feet of 16-inch ductile iron pipe, 260 linear feet of 8-inch ductile iron reclaimed water pipe, and 1,330 linear feet of 6-inch PVC C-900 reclaimed water pipe to be installed using open cut methods. In addition, the project includes 3,000 linear feet of 20-inch and 630 linear feet of 8-inch HDPE reclaimed water line pipe to be installed by the Horizontal Directional Drilling (HDD) method beneath four creek crossings, and 365 linear feet of 16-inch ductile iron water line pipe to be installed using jack and bore methods. The project also contains erosion sedimentation controls, tree protection, …
WATER SUPPLY UPDATE Teresa Lutes, P.E., Managing Engineer, Systems Planning Division Water and Wastewater Commission | July 20, 2022 Combined Storage of Lakes Buchanan and Travis January 1, 2005 through July 1, 2022 2.0M ac-ft Full Storage t e e f - e r c a , e g a r o t S 2,200,000 2,000,000 1,800,000 1,600,000 1,400,000 1,200,000 1,000,000 800,000 600,000 400,000 200,000 0 Current Water Supplies Combined Storage Volume: ~1.2 MAF (as of 7/15/2022) 0.6M ac-ft Interruptible stored water for non-Garwood divisions was not provided by LCRA in 2012 through 2015. 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 t e e F - e r c A 225,000 200,000 175,000 150,000 125,000 100,000 75,000 50,000 25,000 0 Highland Lakes Inflows Average 1942 - Present Average 2008 - 2015 2021 2022 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec LCRA Lake Levels Forecast Current Stage Source NOAA 3-Month Outlook Questions
Protecting our community’s last wild spaces for the benefit of wildlife, water, and people WILDLAND FIRE MANAGEMENT Matt Hollon, Environmental Conservation Division Manager Water and Wastewater Commission | July 20, 2022 Growing WUI: Wildland Urban Interface WUI = area where structures and other human development meet or intermingle with natural vegetation More than 90% of fires are caused from human ignition Danger of fire spreading from a road, power line, or neighborhood into a preserve, or vice versa, increases as Austin urbanizes Forecast for hot, dry summer: we need to be prepared Presentation Outline Role of Wildland Conservation Division (WCD) Planning Overview Cooperative Projects Tools for Wildfire Preparedness AW Facilities and Operations Next Steps Role of Wildland Conservation Division The Wildland Conservation Division’s role in a Fire-Adapted Community is to manage fire use and fire potential to benefit watersheds, habitat, and public safety. Fuels Reduction Projects Ignition Prevention Prescribed Burning Ecological Restoration Cooperative Projects Long Range Planning Over 25,000 acres of land directly managed PLANNING OVERVIEW WCD Planning Overview Wildland programs have approved land management plans and adopted Best Management Practices for wildfire mitigation. Balcones Canyonlands Conservation Plan (BCCP) and permit (1996) Balcones Canyonlands Preserve land management plan (1999, 2007) Water Quality Protection Lands land management plan (2001, 2012, 2022*) * Currently in development. Wildfire Risk Modeling Hazard Determination 2009 - Fuels assessments and fire behavior modeling specific to the BCP produced by Baylor University as a part of the Community Wildfire Protection Plan (CWPP) 2012 - Refined methods for wildfire risk determination developed with AFD Wildfire Contingency Plans Across all AW Wildlands facilities and properties, hazard mapping is underway to inform strategic site planning and guide emergency responders Plans support individual and recurring Firewise assessments and fuel mitigation projects Wildfire Prevention Plans Wildfire Prevention Plans required prior to access for all City of Austin Wildland Conservation Division properties. Elements of these plans: Fire suppression equipment on site ID Fire department jurisdiction Wildfire spotter designation, name and phone # Emergency contacts This guarantees two-way protection for both conservation lands and infrastructure providers COOPERATIVE PROJECTS Cooperative Projects Austin/Travis County Wildfire Coalition Live Fuel Moisture Monitoring Program • Bi-monthly tracking since 2006 BCCP Collaborative Infrastructure Projects AFD Wildfire Division • Support Firewise messaging and outreach efforts to …
WATER AND WASTEWATER COMMISSION RECOMMENDATION 20220720 – ITEM 17 July 20, 2022 Seconded By: Commissioner Travis Michel Date: Subject: Budget Committee Report Motioned By: Vice-Chair Christianne Castleberry Recommendation The Water and Wastewater Commission approved the attached Budget Committee Report. The Budget Committee Report recommends approval of the proposed Austin Water Fiscal Year 2022- 2023 budget. Description of Recommendation to Council See Attached Report from the Water and Wastewater Commission’s Budget Committee Rationale: The Budget Committee of the Water and Wastewater Commission appreciates the opportunity to review Austin Water’s proposed Fiscal Year 2022 - 2023 budget and provide recommendations for the Water and Wastewater Commission. The attached report outlines the Committee’s review and recommendations, based on budget information provided by Austin Water staff and not the “official” budget document. This is due to City Management policy which restricts the release of the “official” budget submittal until it has been presented to Council. This delayed release does not allow the Committee sufficient time to thoroughly review the “official” document, and have recommendations posted for the Commission’s regularly scheduled August meeting. The Committee is confident that the information provided by Austin Water staff was thorough and representative of Austin Water’s official proposed Fiscal Year 2022 - 2023 budget. Vote For: Chien Lee, Jesse Penn, Judy Musgrove, Christy Williams, Grant Fisher, Travis Michel, Christianne Castleberry Against: None Abstain: None Absent: William Moriarty, Alex Navarro, Susan Turrieta Attest: Blanca Madriz, Water & Wastewater Commission Liaison 1 of 1 WATER & WASTEWATER COMMISSION BUDGET COMMITTEE REPORT APPROVED ON 7/20/2022 Overview The Committee appreciates the opportunity to review Austin Water’s FY 2022-2023 (FY23) budget material and provide the following summary to the Water and Wastewater Commission. Budget Committee Members: Susan Turrieta, Chair Travis Michel, Vice Chair Grant Fisher Jesse Penn Budget Review Executive Summary Austin Water Assistant Director of Financial Services, Joseph Gonzales and staff presented an FY 2021-2022 (FY 22) budget vs. actual update and an overview of 5-year forecast and FY 2022-2023 (FY 23) Proposed Budget, including revenue and rate projections, transfers, program requirements, debt service requirements, and Austin Water’s 5-year CIP spending plan. These items are highlighted below: • Enterprise Resiliency - Austin Water (AW) continues to focus on enhancing emergency preparedness and responsiveness, developing operational resiliency for a range of emergent condition, and identifying and addressing natural hazards resulting from climate change. The proposed FY 2023 budget includes $13.6 million of ongoing operating …
Approved: July20, 2022 Annual Internal Review This report covers the time period of 7/1/2021 to 6/30/2022 Water and Wastewater Commission 1. The Water and Wastewater Commission mission statement is set forth in Section 2-1- 186 of the Municipal Code of the City of Austin, Texas which states: (A) The Water and Wastewater Commission members should reside inside the utility's service area. Not more than two members should be involved in development or development-related activities. (B) The purpose of the Water and Wastewater Commission is to: (1) review, analyze, and advise the City Council on the policies and resources relating to the city water and wastewater utility and water quality; and (2) assist the City Council in ensuring that the City's residents are provided with an adequate, economical, and potable supply of water and a stable, economical and environmentally safe system of wastewater disposal. (C) The Commission shall act as an advisory body to the City Council and shall review programs and make recommendations regarding: (1) the protection and integrity of the water resources for the City; (2) minimization of water quality impacts to downstream areas; (3) implementation of programs that achieve goals and objectives relating to water supply management, water demand management, and land water quality control; (4) the fiscal solvency of said programs; and (5) the fiscal health of the utility. 7/1/2021 – 6/30/2022 Annual Internal Review (D) The Commission may conduct an annual review of the commission’s goals and objectives, and the activities needed to achieve these goals and objectives in the following areas, for the year covered by the program: (1) water supply distribution; (2) water demand and conservation management; (3) wastewater treatment and collection; (4) water quality; (6) utility operating budget; (7) rates and fees; and (8) citizen education. (5) service area master planning and capital improvement project development; (E) The Commission may review and make reports and recommendations to the City Council, or other appropriate Boards and Commissions, concerning the following matters: (1) water and wastewater capital improvement program proposals; (2) water and wastewater bond programs; (3) monitoring of capital recovery fee revenues on a quarterly basis, and review of capital recovery fee dollar amount on an annual basis from the effective date of capital recovery fee ordinance; (4) review of the City's annual budget proposal for the water and wastewater utility; (5) quarterly review of water and wastewater ending balances; (6) cost effectiveness and …
WATER AND WASTEWATER COMMISSION SPECIAL CALLED MEETING MINUTES Wednesday, July 20, 2022 The Water and Wastewater Commission convened in a special called meeting on July 20, 2022, at Permitting & Development Center, 6310 Wilhelmina Delco, Austin, Texas. Chair Lee called the Water and Wastewater Commission to order at 6:00 p.m. Committee Members in Attendance: Chien Lee (Chair), Christianne Castleberry (Vice-Chair), Jesse Penn, Travis Michel (remote), Judy Musgrove, Christy Williams (remote), Grant Fisher Committee Members Absent: William Moriarty, Alex Navarro, Susan Turrieta PUBLIC COMMUNICATION: GENERAL There were no speakers registered for Public Communication. APPROVAL OF MINUTES 1. Approve the minutes of the June 8, 2022, regular meeting of the Water and Wastewater Commission. The minutes from the June 8, 2022, regular meeting were approved on Vice- Chair Castleberry’s motion and Commissioner Penn’s second on a 7-0 vote with Commissioners Moriarty, Navarro and Turrieta absent and one vacancy. DISCUSSION ITEMS 2. Recommend approval to negotiate and execute a contract with Environmental Improvements Inc., to provide parts for chemical feed pumps, for a term of five years in an amount not to exceed $860,000. The motion to approve the recommendation was approved on Vice-Chair Castleberry’s motion, Commissioner Penn’s second on a 7-0 vote with Commissioners Moriarty, Navarro and Turrieta absent and one vacancy. 3. Recommend approval to award and execute a construction contract with Santa Clara Construction, Ltd., for Wastewater Line Renewal and Spot Rehab Service Contract (2023 to 2025) Indefinite Delivery/Indefinite Quantity contract in the amount of $3,200,000 for an initial 1-year term, with two 12-month extension options of $3,200,000, for a total contract amount not to exceed $9,600,000. (Districts 1-10) The motion to approve the recommendation was approved on Commissioner Fisher’s motion, Commissioner Penn’s second on a 6-0 vote with Chair Lee recusing, Commissioners Moriarty, Navarro and Turrieta absent and one vacancy. 4. Recommend approval to award and execute a construction contract with Facilities Rehabilitation, Inc., for the Truman Heights Water and Wastewater Pipeline Rehabilitation project in the amount of $3,597,261 plus a $359,726.10 contingency, for 1 a total contract amount not to exceed $3,956,987.10. (District 1) The motion to approve the recommendation was approved on Vice-Chair Castleberry’s motion, Commissioner Penn’s second on a 7-0 vote with Commissioners Moriarty, Navarro and Turrieta absent and one vacancy. 5. Recommend approval to award and execute a construction contract with Excel Construction Services, LLC., for the Rock Harbour Lift Station Improvements project in the …