REGULAR MEETING OF THE WATER AND WASTEWATER COMMISSION WEDNESDAY, DECEMBER 10, 2025 – 4:00 P.M. AUSTIN WATER HEADQUARTERS WALLER CREEK CENTER 625 E 10TH STREET AUSTIN, TEXAS Some members of the Water and Wastewater Commission may be participating by videoconference. The meeting may be viewed online at: http://www.austintexas.gov/page/watch- atxn-live Public comment will be allowed in-person or remotely via telephone. Speakers may only register to speak on an item once either in-person or remotely and will be allowed up to three minutes to provide their comments. Registration no later than noon the day before the meeting is required for remote participation by telephone. To register to speak remotely, contact Vicky Addie, 512-972-0332, vicky.addie@austintexas.gov. CURRENT COMMISSIONERS: Chris Maxwell-Gaines, Chair (District 8) Amanda Marzullo (District 3) Alex Navarro (District 2) Shwetha Pandurangi (District 6) Mike Reyes (District 4) Evan Wolstencroft (District 5) CALL TO ORDER PUBLIC COMMUNICATION: GENERAL AGENDA Marcela Tuñón, Vice Chair (District 9) William Moriarty (Mayor) Alex Ortiz (District 7) Jesse Penn (District 1) Shannon Trilli (District 10) Speakers signed up to speak at the meeting being called to order will each be allowed a three- minute allotment to address their concerns regarding items not posted on the agenda. APPROVAL OF MINUTES 1. Approve the minutes of the Water and Wastewater Commission Regular meeting held November 12, 2025. DISCUSSION AND ACTION ITEMS 2. Recommend authorization of recurring exempted procurements under Texas Local Government Code Chapter 252 for utility locator notification services for Austin Water with Texas Excavation Safety System Inc. d/b/a Texas811, in a total amount not to exceed $200,000. Funding: $200,000 is available in the FY 2025-2026 Operating Budget of Austin Water. STAFF BRIEFINGS 3. 4. 5. Staff briefing regarding Austin Water Strategic Plan Update. Presentation by Allison Orton Sprigg, Austin Water Enterprise Strategic Planning Manager Staff briefing regarding Water Forward 2024 Water Supply Strategies including aquifer storage and recovery and other water supply projects. Presentation by Marisa Flores- Gonzalez, Austin Water Resources Team Supervisor Staff briefing regarding Update on Austin Water’s Water Distribution System Water Loss and Mitigation. Presentation by Matt Cullen P.E., Austin Water Pipeline Engineering and Operations Support Division Manager COMMITTEE UPDATES 6. 7. Update from the Joint Sustainability Committee October 22, 2025 and November 19, 2025 meetings regarding conservation and sustainability initiatives. – Chair Chris Maxwell-Gaines Update from the Austin Integrated Water Resource Planning Community Task Force December 9, 2025 meeting regarding Water Forward Plan implementation. …

Scraped at: Dec. 4, 2025, 7:38 a.m.
Dec. 10, 2025

Item 01 - Draft Minutes from November 12 Meeting original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

WATER AND WASTEWATER COMMISSION SPECIAL CALLED MEETING MINUTES Wednesday, November 12, 2025 The Water and Wastewater Commission convened in a special called meeting on November 12, 2025 at Waller Creek Center, 625 E 10th Street, Austin, Texas. Commission Members in Attendance: William Moriarty (remote), Alex Navarro, Alex Ortiz, Shwetha Pandurangi, Jesse Penn, Mike Reyes (remote), Shannon Trilli (remote), Vice Chair Marcela Tuñón, and Evan Wolstencroft Commission Members Absent: Amanda Marzullo and Chair Chris Maxwell-Gaines Vice Chair Tuñón called the Water and Wastewater Commission to order at 4:04 p.m. PUBLIC COMMUNICATION: GENERAL Texas State Representative Stan Gerdes spoke in opposition to the proposed Aquifer Storage & Recovery Collaboration Agreement (Item 8). APPROVAL OF MINUTES 1. Approval of minutes from the October 15, 2025 regular meeting of the Water and Wastewater Commission. The minutes were approved on Commissioner Pandurangi’s motion and Commissioner Navarro’s second on a 9-0 vote with two absences. DISCUSSION AND ACTION 2. Recommend approval of a contract for Wallace and Tiernan parts for critical equipment for Austin Water with Environmental Improvements, Inc. for an initial term of two years with up to three one-year extension options in an amount not to exceed $1,261,600. Funding: $231,293 is available in the Operating Budget of Austin Water. Funding for the remaining contract term is contingent upon available funding in future budgets. Recommended on Commissioner Wolstencroft’s motion and Commissioner Pandurangi’s second on a 9-0 vote with two absences. 3. Recommend approval of a contract for construction services for the Northwest Area Lift Station Improvements: Four Points Center Lift Station with Facilities Rehabilitation, Inc., in the amount of $3,774,900.00 plus a $377,490.00 contingency for a total contract amount not to exceed $4,152,390.00. Funding is available in the Capital Budget of Austin Water. Recommended on Commissioner Penn’s motion and Commissioner Navarro’s second on an 8-0 vote with Commissioner Pandurangi recusing and two absences. 4. Recommend approval of an amendment to the contract for engineering services for the Center Street Pump Station Replacement and Electrical Improvements project with CDM Smith, Inc., in the amount of $6,000,000 for a revised total contract amount not to exceed $12,000,000. Funding: $6,000,000 is available in the Capital Budget of Austin Water. Recommended on Commissioner Wolstencroft’s motion and Commissioner Pandurangi’s second on an 8-0 vote with Commissioner Reyes recusing and two absences. Page 1 of 3 5. Recommend approval of a resolution authorizing the defeasance of certain outstanding Water and Wastewater …

Scraped at: Dec. 4, 2025, 7:38 a.m.
Dec. 10, 2025

Item 02 - Texas811 original pdf

Thumbnail of the first page of the PDF
Page 1 of 1 page

Item 2 Water & Wastewater Commission: December 10, 2025 Council: December 11, 2025 Posting Language ..Title Recommend authorization of recurring exempted procurements under Texas Local Government Code Chapter 252 for utility locator notification services for Austin Water with Texas Excavation Safety System Inc. d/b/a Texas811, in a total amount not to exceed $200,000. Funding: $200,000 is available in the Fiscal Year 2025-2026 Operating Budget of Austin Water. ..De Lead Department Austin Water. Fiscal Note $200,000 is available in the Fiscal Year 2025-2026 Operating Budget of Austin Water. Council Committee, Boards and Commission Action: December 10, 2025 - To be reviewed by the Water and Wastewater Commission. MBE/WBE: Sole source services are exempt from the City Code Chapter 2-9B (Minority-Owned and Women-Owned Business Enterprise Procurement Program); therefore, no subcontracting goals were established. Purchasing: Sole Source. Additional Backup Information: Austin Water (AW) routinely uses this sole source utility locator service, as required by Texas Utilities Code, Title 5, Chapter 251, which states that AW must use a notification center service to locate and mark utility lines in a right-of-way prior to performing any excavation activities. These services provide an additional layer of security for all underground utilities by placing a physical mark on the pavement to assist the excavator in locating the utility, while allowing precautions to be taken while operating near marked utilities. With increased construction expected around the City, excavations and directional bores are expected to increase every year. While these sole source services are exempt from competitive procurement law, these routine transactions can exceed the City Manager’s authority when aggregated over an entire fiscal year. The previous contract for this service expired on July 22, 2025, and this action will allow for purchases on an as-needed basis. The authorization amount for this request was determined using departmental estimates based on historical spending.

Scraped at: Dec. 4, 2025, 7:38 a.m.
Dec. 10, 2025

Item 03 - Austin Water Strategic Plan Update Presentation original pdf

Thumbnail of the first page of the PDF
Page 1 of 19 pages

Strategic Plan Update Allison Orton Sprigg, Enterprise Strategic Planning Manager, Austin Water Water and Wastewater Commission December 10, 2025 Austin Water’s Strategic Plan  The Why  The What  The Intention  The Process  The Project  Project Timeline  Engagement & Results  Plan Goals & Strategies  Plan Alignment  Next Steps 2 Why we refreshed our Strategic Plan?  Shaping the future beyond 2020...  Extreme Weather Events & External Evaluations  This plan reflects our evolving environment:  Climate change  Population growth  Workforce sustainability  Community & Staff priorities 3 What will this new plan do?  Blueprint for Austin Water  Decision-making framework  Communications tool  Builds connections  Enables sharing of knowledge and expertise  Incorporates and aligns all existing plans  Long-range and flexible 4 The Intention  Thoughtful  Flexible  Transparent  Inclusive  Considers:  Austin Water staff input  Community input  Equity  Climate resilience  Accessible and informative 5 The Process  “Ground-Up” Feedback  All levels of Austin Water  The community we serve  Tactics  Focus Groups  Surveys  Listening Sessions 6 Project Timeline Jan-April 2024 Aug-Dec 2024 March 2025 May 2025 July 2025 Q1FY26 Procurement Project Kick-off Staff Engagement Community Engagement AW Internal Follow-up Plan Launch! Council Approval Contract Executed Staff Engagement Executive Retreat Community Engagement Goals, Strategies & Alignment July 2024 Jan–Feb 2025 April 2025 June 2025 Aug–Sep 2025 7 Robust Engagement and Input Surveys Employee Outreach 8 9 Result: New Mission, Vision and Goals  Mission  Austin Water works every day to provide water for people and care for the environment.  Vision  Building Austin’s water future, together  Five Goals 10 Goal: Create a people-first culture.  Strategies:  Culture  Training  Employee Care  Internal Communication and Engagement  Technical Depth American Water Works Association 2025 Wendall LaDue Utility Safety Award 11 Goal: Deliver high-quality and sustainable water, wastewater and environmental services for our customers.  Strategies:  Technical Expertise  Enterprise Performance  Knowledge Sharing  Resource Management Association of Metropolitan Water Agencies 2025 Sustainable Water Utility Management Award 12 Goal: Invest in and maintain dependable infrastructure and systems.  Strategies:  Forward-Looking  Smart Systems  Future-Ready Sustainability  Incremental Escalation National Association of Clean Water Agencies 2025 Platinum Peak Performance Award 13 Goal: Foster public confidence, preparedness …

Scraped at: Dec. 4, 2025, 7:39 a.m.
Dec. 10, 2025

Item 05 - Austin Water’s Water Distribution System Water Loss and Mitigation Presentation original pdf

Thumbnail of the first page of the PDF
Page 1 of 18 pages

Water Loss and Mitigation Briefing Austin Water | Water and Wastewater Commission | Dec. 10, 2025 Matt Cullen, P.E. Agenda Agenda • Overview • Water Loss Factors – 2023-2024 • Actions to Reduce Water Loss • Next Steps Overview  Austin Water’s water distribution system includes:  4,018 miles of pipeline  Pipes range in size from 2-inch to 84-inch diameter  Our multi-pronged approach to reduce sources of water loss:  On-going participation in industry best practices and innovations  Fast response to reported leaks  Infrastructure renewal investments  Proactive leak detection 3 Water Loss Trends 10.00 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 FY 08 FY 09 FY 10 FY 11 FY 12 FY13 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Infrastructure Leakage Index (ILI) 4 Water Loss & ILI Terms  ILI is an industry performance indicator calculated as the ratio of Current Annual Real Losses to Unavoidable Annual Real Losses  Real Losses: Water lost from system leaks and pressure-related issues.(cid:3031)(cid:3031)  Unavoidable Annual Real Losses: The theoretical minimum level of water loss through all feasible leakage control efforts, regardless of cost. Unavoidable Loss is based on system-specific factors:  miles of water mains  number of service connections  average annual system pressure  Apparent Losses: Water that is distributed to a user but isn't accurately measured or billed. Results in lost revenue rather than a physical loss of water. 5 Water Loss Factors 2023 – 2024 30% increase in calculated water loss attributed to:  Improvement in production flow measurement (0.5-1.0 billion gallons, or a 7-14% increase)  Updated reporting of municipal water use (0.816 billion gallons, or an 11% increase)  Increased “Real” Real Loss (0.376-0.876 billion gallons, or a 5-12% increase) 6 Actions to Reduce Water Loss  In 2023, Black & Veatch was contracted to analyze our Water Loss Program  The final 2024 Black & Veatch Report offered 32 recommendations:  11 are Complete or Operationalized  17 are In Progress  4 have prerequisite items that are In Progress 7 Leak Detection Practices  Evaluate entire system every 6 years  Explore more targeted approaches  Continue large diameter leak detection & condition assessment  Complete leak detection SOPs that include:  Contract standards  Data management  Ongoing staff training  Piloting new technologies  Inspecting ARV’s, valves & vaults on …

Scraped at: Dec. 4, 2025, 7:39 a.m.
Dec. 10, 2025

Item 04 - Water Forward 2024 Water Supply Strategies Presentation original pdf

Thumbnail of the first page of the PDF
Page 1 of 29 pages

Water Forward 2024 Water Forward 2024 Water Supply Strategies Water Supply Strategies Austin Water | 12/10/2025 Water and Wastewater Commission Water Forward 2024 Water Supply Strategies  Water Forward 2024 (WF24) Supply Strategies Overview  Adaptive Management Approach  WF24 Year One Implementation Updates by Strategy  Aquifer Storage and Recovery  Brackish Groundwater Desalination  Indirect Potable Reuse  Lake Walter E. Long  Other Related Efforts  Next Steps 2 Water Forward 2024 Supply Strategies Overview Water Forward 2024 Portfolio Utility-Side Water Loss Control • Production meter improvements • Expanded active leak detection programs • Additional analysis of smart meter data Customer Side Water Use Management • Expanded customer incentives for conservation • Use of smart meter data for customer-side leak identification, education, and outreach • Water use budgeting Native & Efficient Landscapes • New landscape ordinances & incentives • • Irrigation efficiency incentives Landscape conversion programs Non-Potable Reuse • Onsite Water Reuse Systems • Decentralized Reclaimed • Centralized Reclaimed 4 Water Supply Storage Aquifer Storage and Recovery Potable Reuse Indirect Potable Reuse New Water Supplies Brackish Groundwater Desalination Lake Walter E. Long On Channel Reservoir Strategies reliant on Colorado River and LCRA supplies 4 Water Supply Strategies 2030 - 2080 Portfolios All volumes in max annual yield, acre-feet per year Strategy 2030 2040 2050 2060 2070 2080 Aquifer Storage and Recovery Lake Walter E. Long Reservoir 0 0 44,500 44,500 44,500 44,500 44,500 18,300 18,300 18,300 18,300 18,300 Indirect Potable Reuse *** *** 22,400 22,400 22,400 22,400 Brackish Groundwater Desalination TOTAL 0 0 0 0 0 20,000 40,000 62,800 85,200 85,200 105,200 125,200 5 Adaptive Management Approach Water Forward 2024 Adaptive Management Approach  Update plan every five years using an adaptive management approach  Between updates: Implement, evaluate and adjust strategies  Plan alternate pathways to respond to lessons learned and changing conditions 7 Adaptive Management Approach  Excerpt from the Water Forward 2024 Plan Metric Annual strategy yield Strategy implementation progress Combined lake storage Adaptation Triggers Annual strategy yield falls below target levels for two years in a row Progress falls behind action timeline Combined lake storage remains below 750,000 AF for four months or longer Possible Adaptation Actions • Identify supply project delivery methods and tasks that can be accelerated • Evaluate possible alternative supply project configurations or approaches • Accelerate implementation of emergency supply strategies • Re-evaluate staffing and funding levels for projects …

Scraped at: Dec. 10, 2025, 6:32 p.m.
Dec. 10, 2025

Play video original link

Play video

Scraped at: Dec. 17, 2025, 4:01 a.m.
Nov. 12, 2025

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 4 pages

SPECIAL CALLED MEETING OF THE WATER AND WASTEWATER COMMISSION WEDNESDAY, NOVEMBER 12, 2025 – 4:00 P.M. AUSTIN WATER HEADQUARTERS WALLER CREEK CENTER 625 E 10TH STREET AUSTIN, TEXAS Some members of the Water and Wastewater Commission may be participating by videoconference. The meeting may be viewed online at: http://www.austintexas.gov/page/watch- atxn-live Public comment will be allowed in-person or remotely via telephone. Speakers may only register to speak on an item once either in-person or remotely and will be allowed up to three minutes to provide their comments. Registration no later than noon the day before the meeting is required for remote participation by telephone. To register to speak remotely, contact Vicky Addie, 512-972-0332, vicky.addie@austintexas.gov. CURRENT COMMISSIONERS: Chris Maxwell-Gaines, Chair (District 8) Amanda Marzullo (District 3) Alex Navarro (District 2) Shwetha Pandurangi (District 6) Mike Reyes (District 4) Evan Wolstencroft (District 5) Marcela Tuñón, Vice Chair (District 9) William Moriarty (Mayor) Alex Ortiz (District 7) Jesse Penn (District 1) Shannon Trilli (District 10) AGENDA CALL TO ORDER PUBLIC COMMUNICATION: GENERAL Speakers signed up to speak at the meeting being called to order will each be allowed a three- minute allotment to address their concerns regarding items not posted on the agenda. APPROVAL OF MINUTES 1. Approve the minutes of the Water and Wastewater Commission Regular meeting on October 15, 2025. The City of Austin is committed to compliance with the Americans with Disabilities Act. Reasonable modifications and equal access to communications will be provided upon request. For assistance, please contact the Liaison or TTY users’ route through 711. A person may request language access accommodations no later than 48 hours before the scheduled meeting. Please call or email Vicky Addie at Austin Water, at 512-972-0332 or vicky.addie@austintexas.gov, to request service or for additional information. DISCUSSION AND ACTION ITEMS 2. 3. 4. 5. 6. 7. Recommend approval of a contract for Wallace and Tiernan parts for critical equipment for Austin Water with Environmental Improvements, Inc. for an initial term of two years with up to three one-year extension options in an amount not to exceed $1,261,600. Funding: $231,293 is available in the Operating Budget of Austin Water. Funding for the remaining contract term is contingent upon available funding in future budgets. Recommend approval of a contract for construction services for the Northwest Area Lift Station Improvements: Four Points Center Lift Station with Facilities Rehabilitation, Inc., in the amount of $3,774,900 plus a $377,490 …

Scraped at: Nov. 29, 2025, 10:02 a.m.
Nov. 12, 2025

Play video original link

Play video

Scraped at: Nov. 29, 2025, 10:02 a.m.
Nov. 12, 2025

Item 01 - Draft Minutes from October 15, 2025 Meeting original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

WATER AND WASTEWATER COMMISSION REGULAR CALLED MEETING MINUTES Wednesday, October 15, 2025 The Water and Wastewater Commission convened in a regular called meeting on October 15, 2025 at Waller Creek Center, 625 E 10th Street, Austin, Texas. Commission Members in Attendance: Amanda Marzullo (remote), Chair Chris Maxwell-Gaines, William Moriarty (remote), Alex Ortiz, Shwetha Pandurangi, Mike Reyes (remote), Vice Chair Marcela Tuñón (remote), and Evan Wolstencroft (remote) Commission Members Absent: Alex Navarro, Jesse Penn and Shannon Trilli Chair Maxwell-Gaines called the Water and Wastewater Commission to order at 4:03 p.m. PUBLIC COMMUNICATION: GENERAL No speakers were registered. APPROVAL OF MINUTES 1. Approval of minutes from the September 17, 2025 regular meeting of the Water and Wastewater Commission. The minutes were approved with a date correction read into the record on Commissioner Pandurangi’s motion and Commissioner Reyes’ second on a 7-0 vote with three absences and Commissioner Ortiz off the dais. DISCUSSION AND ACTION 2. Recommend approval to authorize a contract for engineering services for the Pilot Knob Supply Water Transmission Main Project for Austin Capital Delivery Services with Jacobs Engineering Group, Inc., in an amount not to exceed $20,000,000. Funding: $20,000,000 is available in the Capital Budget of Austin Water. Recommended on Commissioner Pandurangi’s motion and Commissioner Reyes’ second on a 7-0 vote with three absences and Commissioner Ortiz off the dais. 3. Recommend approval to authorize a rotation list set of twelve contracts for engineering services for the 2025 Small Scale Water and Wastewater Pipeline Engineering Services Rotation List with Quiddity Engineering, LLC, Weston Solutions, Inc., Kimley-Horn and Associates, Inc., Tetra Tech, Inc., DAVCAR, Inc., dba DAVCAR Engineering Services, Riley Mountain Engineering, LLC, Martinez, Wright & Mendez, Inc., dba MWM DesignGroup, AtkinsRealis, USA, Inc., LJA Engineering, Inc., BGE, Inc., dba Brown & Gay Engineers, Inc., Doucet & Associates, Inc., and Halff Associates, Inc., for total contract amount not to exceed $26,000,000, divided among the firms. Funding: $26,000,000 is available in the Capital Budget of the Austin Water. Recommended on Commissioner Ortiz’s motion and Chair Maxwell-Gaines’ second on a 6-0 vote with Commissioners Pandurangi and Reyes recusing and three absences. 4. Recommend approval to authorize a contract for finance consulting services for Austin Water with NewGen Strategies and Solutions, LLC., for an initial term of one-year with up to four one-year extension options in an amount not to exceed $340,000. Funding: $180,000 is available in the Operating Budget of Austin Water. …

Scraped at: Nov. 29, 2025, 10:02 a.m.
Nov. 12, 2025

Item 02 - Wallace and Tiernan Parts for Critical Equipment original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Item 2 Water & Wastewater Commission: November 12, 2025 Council: November 20, 2025 Posting Language ..Title Recommend approval to authorize a contract for Wallace and Tiernan parts for critical water and wastewater equipment for Austin Water with Environmental Improvements, Inc. for an initial term of two years with up to three one-year extension options in an amount not to exceed $1,261,600. Funding: $231,293 is available in the Operating Budget of Austin Water. Funding for the remaining contract term is contingent upon available funding in future budgets. ..Body Lead Department Austin Financial Services. Client Department(s) Austin Water. Fiscal Note Funding in the amount of $231,293 is available in the Fiscal Year 2025-2026 Operating Budget of Austin Water. Funding for the remaining contract term is contingent upon available funding in future budgets. Procurement Language: Sole Source. MBE/WBE: Sole source contracts are exempt from the City Code Chapter 2-9B (Minority-Owned and Women-Owned Business Enterprise Procurement Program); therefore, no subcontracting goals were established. Council Committee, Boards and Commission Action: November 12 , 2025 - To be reviewed by the Austin Water and Wastewater Commission. Additional Backup Information: The contract will provide proprietary Wallace and Tiernan, industry-standard parts for critical equipment such as chlorinators, ammoniators, and Encore 700 pumps used to feed numerous treatment chemicals used at water and wastewater plants. Environmental Improvements Inc. is the exclusive distributor and authorized service provider representative for Evoqua Water Technologies, LLC, for equipment service and sales of aftermarket parts to municipal customers. The contract replaces a contract expiring August 4, 2027. The contract is being replaced early due to low remaining contract authority. Spend was higher than expected due to unexpected failures of actuators and ammoniators. Requested authorization is based on historical spending and departmental estimates of future needs. The contractor is the current provider of these goods. If a contract is not approved, it will prevent repair and maintenance of critical equipment, and interrupt the water and wastewater treatment process. Item 2 Water & Wastewater Commission: November 12, 2025 Council: November 20, 2025 Contract Details: Contract Term Initial Term Optional Extension 1 Optional Extension 2 Optional Extension 3 Total Length of Term 2 years 1 year 1 year 1 year 5 years Contract Authorization $ 504,640 $ 252,320 $ 252,320 $ 252,320 $1,261,600 Note: Contract Authorization amounts are based on the City’s estimated annual usage.

Scraped at: Nov. 29, 2025, 10:02 a.m.
Nov. 12, 2025

Item 03 - Northwest Area Lift Station Improvements - Four Points Center Lift Station original pdf

Thumbnail of the first page of the PDF
Page 1 of 4 pages

Item 3 Water & Wastewater Commission: November 12, 2025 Council: November 20, 2025 Posting Language ..Title Recommend approval to authorize a contract for construction services for the Northwest Area Lift Station Improvements: Four Points Center Lift Station for Austin Capital Delivery Services with Facilities Rehabilitation, Inc., in the amount of $3,774,900 plus a $377,490 contingency for a total contract amount not to exceed $4,152,390. Funding: $4,152,390 is available in the Capital Budget of Austin Water. ..Body Lead Department Austin Financial Services. Managing Department Austin Capital Delivery Services. Amount and Source of Funding Funding is available in the Capital Budget of Austin Water. Procurement Language: Austin Financial Services issued an Invitation for Bids solicitation IFB 6100 CLMC1075 for these goods and services. The solicitation was issued on June 16, 2025, and closed on July 17, 2025. Of the eight offers received, the bid submitted by the recommended contractor was the lowest responsive bid received. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s website. This information can currently be found at https://financeonline.austintexas.gov/afo/account_services/solicitation/solicitation_details.cfm?sid=141652 . MBE/WBE: This contract will be awarded in compliance with City Code Chapter 2-9A (Minority-Owned and Women- Owned Business Enterprise Procurement Program) by meeting the goals with 98.42% MBE and 1.58% WBE participation. Council Committee, Boards and Commission Action: November 12, 2025 – To be reviewed by the Water and Wastewater Commission. Additional Backup Information: This project will include improvements to a lift station identified in the Northwest Lift Station Long Range Planning Engineering Study to improve the wastewater system in Bull Creek wastewater basin. The lift station was built in 1998 as a wet well duplex station and requires rehabilitation to extend its useful life, ensuring the lift station operates in good working order and minimize ongoing maintenance costs. This project consists of rehabilitating an existing lift station to provide reliable service. The rehabilitated lift station design includes wet well coatings, valves, pumps, odor control equipment, electrical, communication, emergency generator, and resilience improvements to meet current City standards. Construction of these improvements will allow Austin Water to continue providing wastewater services to the increasing population in the area, as well as reducing noxious odors impacting the community. Due to the potential for unknown subsurface conditions a 10% contingency in funding has been included to allow for the expeditious processing of any change orders to cover any unforeseen construction costs …

Scraped at: Nov. 29, 2025, 10:02 a.m.
Nov. 12, 2025

Item 04 - Center Street Pump Station Replacement and Electrical Improvements Project original pdf

Thumbnail of the first page of the PDF
Page 1 of 5 pages

Item 4 Water & Wastewater Commission: November 12, 2025 Council: November 20, 2025 Posting Language ..Title Recommend approval to authorize an amendment to the contract for engineering services for the Center Street Pump Station Replacement and Electrical Improvements project with CDM Smith, Inc., in the amount of $6,000,000 for a revised total contract amount not to exceed $12,000,000 Funding: $6,000,000 is available in the Capital Budget of Austin Water. ..Body Lead Department Austin Financial Services. Managing Department Austin Capital Delivery Services. Amount and Source of Funding Funding is available in the Capital Budget of Austin Water. Procurement Language: Contract Amendment. MBE / WBE: Note: This contract will be awarded in compliance with City Code 2-9B (Minority-Owned and Women- Owned Business Enterprise Procurement Program). Current participation to date is 21.23% MBE and 23.78% WBE. Prior Council Action: January 26, 2023 – Council approved a professional service agreement with CDM Smith, Inc. for the Center Street Pump Station Replacement and Electrical Improvements project. Council Committee, Boards and Commission Action: November 12, 2025 – To be reviewed by the Water and Wastewater Commission January 18, 2023 – Recommended by the Water and Wastewater Commission on a vote of 6-0 vote Commissioner Michel’s motion, Chair Lee’s second, with Commissioner Penn recusing, Commissioners Musgrove and Turrieta absent and two vacancies. Additional Backup Information: The Center Street Reservoir and Pump Station Facility is part of Austin Water’s water distribution system consisting of water storage facilities, pump stations, and water pipes. The Center Street Pump Station moves water from the Central Zone of the distribution system to the south portion of the Central Zone. The Center Street Reservoir and Pump Station Facility shares site access with an EMS station, a City of Austin fuel station, and Austin Water’s Electrical and Instrumentation & Control Maintenance shop. The existing pump station and electrical substation have exceeded their useful life and require replacement to meet current Austin Water standards. The project is currently in the design phase, where the consultant, CDM Smith, Inc., is designing a new pump station and making specific improvements to the site. Item 4 Water & Wastewater Commission: November 12, 2025 Council: November 20, 2025 The services to be provided under this amendment are for continued design and bid phase engineering services to support the construction contract. It is anticipated that the new facility will be located entirely within the existing fenced area. Once the construction …

Scraped at: Nov. 29, 2025, 10:02 a.m.
Nov. 12, 2025

Item 05 - Bond Defeasance original pdf

Thumbnail of the first page of the PDF
Page 1 of 1 page

Item 5 Water & Wastewater Commission: November 12, 2025 Council: December 11, 2025 Posting Language ..Title Recommend approval of a resolution authorizing the defeasance of certain outstanding Water and Wastewater System Revenue Bonds, including authorizing the execution of an escrow agreement, and related documents. Funding: $46,633,211 is available in the Fiscal Year 2025-2026 Operating Budget of the Combined Utility Revenue Bond Redemption Fund. ..Body Lead Department Austin Financial Services. Fiscal Note Funding is available in the Fiscal Year 2025-2026 Operating Budget of the Combined Utility Revenue Bond Redemption Fund. Council Committee, Boards and Commission Action: November 12, 2025 – Item to be reviewed by the Water and Wastewater Commission. Additional Backup Information: A defeasance is a method of using available cash to pay off outstanding debt. The cash is placed in an escrow account with an escrow agent to make principal and interest payments on the required payment date for the bonds being deceased to the redemption date. Once the escrow is funded, the debt obligations payable from the escrow are no longer secured by or payable from the revenues initially pledged to their payment and the debt is legally and financially retired. The proposed related defeasance item seeks authorization to defense, or pay off, certain maturities of the City’s outstanding Water and Wastewater System Revenue Bonds. This process allows Austin Water to remove the debt from its books, which reduces debt levels, reduces interest, and improves debt service coverage by lowering the burden of debt service payments in the short-term. Also, this proposed defeasance action is in direct relation to achieving Water and Wastewater System rate stability over the next few years. The source of funds for the defeasance is Impact Fee/Capital Recovery Fee (CRF), Austin Water operating funds that includes cash collected from the developers of Indian Hills and Whisper Valley pursuant to the 2007 Cost Reimbursement Agreement. Impact fee/CRF collections are restricted in use by Texas Local Government Code Chapter 395.012. Allowable uses include paying costs of constructing capital or facility improvements, and pledging for payment of debt service issued to finance capital or facility improvements identified in the Impact Fee Capital Improvements Plan 5-Year Update. For this defeasance transaction, PFM Financial Advisors LLC will serve as Municipal Advisor, McCall, Parkhurst & Horton L.L.P. will serve as bond counsel, and The Arbitrage Group will serve as serving as Verification Agent.

Scraped at: Nov. 29, 2025, 10:02 a.m.
Nov. 12, 2025

Item 06 - Budget Amendment for Bond Defeasance original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Item 6 Water & Wastewater Commission: November 12, 2025 Council: December 11, 2025 Posting Language ..Title Recommend approval of an ordinance amending the Fiscal Year 2025-2026 Austin Water Operating Fund (Ordinance No. 20250815-005) to increase transfers out to the Combined Utility Revenue Bond Redemption Fund by $16,633,211; and amending the Fiscal Year 2025-2026 Combined Utility Revenue Bond Redemption Fund (Ordinance No. 20250815-005) to increase transfers in by $16,633,211 and increasing appropriations by $16,633,211 to defease and redeem outstanding Water and Wastewater System Revenue Refunding Bonds. Funding: Funding is available in the ending balances of the Fiscal Year 2025-2026 Austin Water operating funds. ..De Lead Department Austin Water. Fiscal Note Funding is available in the ending balances of the Fiscal Year 2025-2026 Austin Water operating funds. Reduction of these ending balance will maintain Austin Water’s compliance with relevant City financial policies. Prior Council Action: August 15, 2025 – Council approved Ordinance No. 20250815-005 adopting the Austin Water Operating Budget for the Fiscal Year 2025-2026. Council Committee, Boards and Commission Action: November 12, 2025 – To be reviewed by the Water and Wastewater Commission. Additional Backup Information: This budget amendment is related to the defeasance item that would authorize Austin Water to pay off certain maturities of the City’s outstanding Water and Wastewater System Revenue Bonds. A defeasance is a method of using available cash to pay off outstanding debt. The cash is placed in an escrow account held by a trustee to make principal and interest payments on the required payment date for the bonds being defeased until redemption or maturity. Once the defeasance is funded, the obligations payable from the escrow are no longer secured by or payable from the revenues initially pledged to their payment. The proposed related defeasance item seeks authorization to pay off certain maturities of the City’s outstanding Water and Wastewater System Revenue Bonds. This process allows Austin Water to remove the debt from its books, which reduces debt levels, reduces interest expense, and improves debt service coverage by lowering the burden of debt service payments in the short-term. Also, this proposed defeasance action is in direct relation to achieving a Water and Wastewater System rate stability over the next few years. The total source of funds for the defeasance of $46,633,211 will be provided from a combination of $30,000,000 in Impact Fee/ Capital Recovery Fee (CRF) collections, 16,633,211 in Austin Water Operating Funds, of which …

Scraped at: Nov. 29, 2025, 10:02 a.m.
Nov. 12, 2025

Item 07 - Lime Sustainability Study original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

Item 7 Water & Wastewater Commission: November 12, 2025 Council: December 11, 2025 Posting Language ..Title Recommend approval to authorize a contract for engineering services for Lime Sustainability and Water Treatment Process Evaluation for Austin Water with Hazen and Sawyer, D.P.C., in an amount not to exceed $1,100,000. Funding: $1,100,000 is available in the Capital Budget of Austin Water. ..Body Lead Department Austin Financial Services. Managing Department Austin Capital Delivery Services. Amount and Source of Funding Funding of $1,100,000 is available in the Capital Budget of Austin Water. Procurement Language: Austin Financial Services issued a Request for Qualifications solicitation RFQS CLMP387 for these services. The solicitation was issued on June 28, 2025, and closed on August 6, 2025. Of the Six offers received, the recommended contractor submitted the best evaluated responsive offer. A complete solicitation package, including a log of offers received, is available for viewing on the City’s website. This information can currently be found at: https://financeonline.austintexas.gov/afo/account_services/solicitation/solicitation_details.cfm?sid=142729. MBE / WBE: This contract will be awarded in compliance with City Code Chapter 2-9B (Minority-Owned and Women- Owned Business Enterprise Procurement Program). No goals were established for this solicitation. Council Committee, Boards and Commission Action: November 12, 2025 – To be reviewed by the Water and Wastewater Commission. Additional Backup Information: As part of Austin Water’s (AW) ongoing efforts to enhance operational resilience, this study will evaluate AW’s existing water treatment processes and explore alternatives for long-term sustainability. AW’s three water treatment plants – Davis, Ullrich, and Handcox – utilize lime softening in the treatment process to remove naturally-occurring calcium and magnesium in order to reduce hardness in the finished water. For decades, AW’s treatment process has produced high-quality drinking water that remains consistent throughout our distribution system, serving more than a million customers. The lime softening process requires frequent deliveries of large quantities of lime and produces significant lime residuals that must be dewatered and disposed off-site. AW maintains contracts with two vendors to supply lime and owns and operates a disposal site for residuals. Risks to AW’s operational resilience include increasing supply chain volatility, rising material costs, and storage and disposal space limitations. This project includes a desktop evaluation and feasibility study of the existing treatment process and several alternatives, including reusing spent lime and treatment options that do not use lime. This study will build on previous evaluations and explore innovative processes that may now be viable. The …

Scraped at: Nov. 29, 2025, 10:02 a.m.
Nov. 12, 2025

Item 08 - ASR Collaboration Agreement original pdf

Thumbnail of the first page of the PDF
Page 1 of 12 pages

Item 8 Water & Wastewater Commission: November 12, 2025 Council: November 20, 2025 Posting Language ..Title Recommend approval to execute a collaboration agreement with stakeholders related to field testing for an Aquifer Storage & Recovery project in Bastrop County. Funding: This item has no fiscal impact. Should the project move forward, the future financial impact will be determined as specific funding needs are presented to City Council in alignment with Austin Water’s 5-year Capital Improvement Plan. ..De Lead Department Austin Water. Fiscal Note This item has no fiscal impact. Should the project move forward, the future financial impact will be determined as specific funding needs are presented to City Council in alignment with Austin Water’s 5-year Capital Improvement Plan. Prior Council Action: November 21, 2024 - Council approved the updated Water Forward Plan. August 27, 2020 - Council approved a contract with HDR Engineering, Inc. for engineering services for an Aquifer Storage and Recovery Pilot and Program Management in an amount not to exceed $6,000,000. November 29, 2018 - Council approved the Water Forward Plan. Council Committee, Boards and Commission Action: November 12, 2025 - To be reviewed by the Water and Wastewater Commission. Additional Backup Information: This action is to enter into a collaboration agreement with stakeholders related to Aquifer Storage & Recovery (ASR) field testing in Bastrop County. After extensive scientific study through a desktop analysis phase that began in 2022, Austin Water identified a portion of the Carrizo-Wilcox aquifer in Bastrop County as a location to conduct exploratory field testing for an ASR project. The location was identified based on favorable geotechnical characteristics of the aquifer that provide the potential ability to safely store and retrieve large quantities of water. ASR is one of several water supply strategies in the Water Forward Plan, Austin’s 100-year water plan. The proposed project would store drinking water supply, which is sourced from the Colorado River and Highland Lakes upstream of Austin and treated at one of three water treatment plants. During times of water availability, water would be piped to the ASR project location to be stored deep underground. Before being stored in the aquifer, the water would be further treated to be compatible with native groundwater. When stored water is needed, it would be pumped back to Austin Water’s system. A Bastrop County ASR stakeholder group was formed in April 2025. Nine stakeholder meetings were held through September 30, …

Scraped at: Nov. 29, 2025, 10:02 a.m.
Nov. 12, 2025

Item 08 - ASR Collaboration Agreement - Community Feedback Part 1 of 4 Parts original pdf

Thumbnail of the first page of the PDF
Page 1 of 25 pages

Backup

Scraped at: Nov. 29, 2025, 10:02 a.m.
Nov. 12, 2025

Item 08 - ASR Collaboration Agreement - Community Feedback Part 2 of 4 Parts original pdf

Thumbnail of the first page of the PDF
Page 1 of 26 pages

November 11, 2025 The Honorable Kirk Watson Mayor, City of Austin P.O. Box 1088 Austin, TX 78767 RE: Request for Reconsideration of Austin’s Proposed Bastrop County ASR Project and MOU Dear Mayor Watson and Members of the Austin City Council; I am writing to urge the City of Austin to immediately reconsider its plan to move forward with the proposed Aquifer Storage & Recovery project in Bastrop County and the signing of the related MOU. The people of Bastrop County could not have been clearer in their opposition. Residents have packed every meeting, submitted countless comments, and raised legitimate concerns—but their voices have fallen on deaf ears at City Hall. The root issue is trust. From the day this project was announced in 2021, Austin has struggled to earn it. A lack of early communication and an approach where Austin Water dictated the terms rather than engaged as a partner created deep local skepticism. When Austin did come to the table, it only did so after I filed legislation to restrict this project. The community meetings that followed did not repair trust or provide full answers. That is why not a single elected official in Bastrop County has supported the MOU or the ASR project behind it—a fact carries real weight. Crossing county lines to inject treated water into an aquifer that serves another community is not responsible planning. It is overreach, plain and simple, and it plants a permanent flag of authority in a county that has made its objections known. The truth is: Austin has other options. The City can address the almost 30,000 acre-feet of water losses identified in its own audit, pursue smaller but viable sites within Travis County, and manage its resources responsibly without imposing on Bastrop County landowners. Signing this MOU would commit Austin taxpayers to millions of dollars in spending for a project that faces unanimous opposition from the citizens of Bastrop County. I have already passed legislation to block this overreach once and will continue to use every legislative and lawful tool available to stop it permanently. Moving forward now would only invite additional roadblocks and waste more of Austin’s taxpayer dollars on a project that will inevitably be stopped. The Legislature has already demonstrated strong interest in clarifying how cross-jurisdictional ASR projects are handled, and any attempt to advance a project with zero local support will only accelerate that scrutiny. For …

Scraped at: Nov. 29, 2025, 10:03 a.m.
Nov. 12, 2025

Item 08 - ASR Collaboration Agreement - Community Feedback Part 3 of 4 Parts original pdf

Thumbnail of the first page of the PDF
Page 1 of 31 pages

Backup

Scraped at: Nov. 29, 2025, 10:05 a.m.
Nov. 12, 2025

Item 08 - ASR Collaboration Agreement - Community Feedback Part 4 of 4 Parts original pdf

Thumbnail of the first page of the PDF
Page 1 of 29 pages

Backup

Scraped at: Nov. 29, 2025, 10:05 a.m.
Nov. 12, 2025

Item 09 - Guildford Cove Boosted Pressure Zone Waterline Improvements original pdf

Thumbnail of the first page of the PDF
Page 1 of 5 pages

Item 9 Water & Wastewater Commission: November 12, 2025 Council: December 11, 2025 Posting Language ..Title Recommend approval to authorize a contract for construction services for the Guildford Cove Boosted Pressure Zone Waterline Improvements for Austin Capital Delivery Services with Packsaddle Management LLC, in the amount of $3,554,944 plus a $355,495 contingency for a total contract amount not to exceed $3,910,439. Funding: $3,910,439 is available in the Capital Budget of Austin Water. ..Body Lead Department Austin Financial Services. Managing Department Austin Capital Delivery Services. Fiscal Note Funding is available in the Capital Budget of Austin Water. Procurement Language: Austin Financial Services issued an Invitation for Bids solicitation IFB 6100 CLMC1125 for these construction services. The solicitation published on July 14, 2025, and closed on September 4, 2025. Of the nine offers received, the bids submitted by the recommended contractor was the lowest responsive bid received. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s website. This information can currently be found at https://financeonline.austintexas.gov/afo/account_services/solicitation/solicitation_details.cfm?sid=142744 . MBE/WBE: This contract will be awarded in compliance with City Code Chapter 2-9A (Minority-Owned and Women- Owned Business Enterprise Procurement Program) by meeting the goals with 8.41% MBE and 1.03% WBE participation. Council Committee, Boards and Commission Action: November 12, 2025- To be reviewed by the Water and Wastewater Commission. Additional Backup Information: The Guildford Cove Boosted Pressure Zone Waterline Improvements project will enhance the water distribution capacity in the Long Canyon neighborhood to provide increased system capacity, reliability, and resilience improvements in the area. In 2020, the City adopted the new code for Wildland-Urban Interface (WUI) areas where structures and infrastructure are in or adjacent to areas at risk of wildfire. The Long Canyon neighborhood is within the City's WUI, putting it at an elevated risk of wildfire. This project will install approximately 7,500 feet of waterline parallel to existing capacity constrained waterlines along Guildford Cove, Leaning Rock Circle, Bell Mountain Drive, and Cuesta Trail to increase fire flow (water supply from the fire hydrant) and capacity in the Guildford Cove Hydropneumatic Distribution System. Plans include removing existing fire hydrants and installing new fire hydrants to facilitate increased fire flow. Item 9 Water & Wastewater Commission: November 12, 2025 Council: December 11, 2025 This item includes one allowance of $40,000 to be used to address private landscaping impacts/repairs. An allowance is an amount that is specified …

Scraped at: Nov. 29, 2025, 10:05 a.m.
Nov. 12, 2025

Item 10 - West Bank Lift Station Odor Control Facility original pdf

Thumbnail of the first page of the PDF
Page 1 of 5 pages

Item 10 Water & Wastewater Commission: November 12, 2025 Council: December 11, 2025 Posting Language ..Title Recommend approval to authorize a contract for construction services for the West Bank Lift Station Odor Control Facility for Austin Capital Delivery Services with Arguijo Corporation, in the amount of $673,012 plus a $67,302 contingency for a total contract amount not to exceed $740,313. Funding: $740,313 is available in the Capital Budget of Austin Water. ..Body Lead Department Austin Financial Services. Managing Department Austin Capital Delivery Services. Amount and Source of Funding Funding is available in the Capital Budget of Austin Water. Procurement Language: Austin Financial Services issued an Invitation for Bids solicitation IFB CLMC1116 for these services. The solicitation was issued on September 15, 2025, and closed on October 9, 2025. Of the two offers received, the bids submitted by the recommended contractor were the lowest responsive bids received. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s website. This information can currently be found at https://financeonline.austintexas.gov/afo/account_services/solicitation/solicitation_details.cfm?sid=142 509. MBE/WBE: This contract will be awarded in compliance with City Code Chapter 2-9A (Minority-Owned and Women- Owned Business Enterprise Procurement Program) by meeting the goals with 16.96% MBE and 1.59% WBE participation. Council Committee, Boards and Commission Action: November 12, 2025- To be reviewed by the Water and Wastewater Commission. Additional Backup Information: This project will address the odor complaints, reduce locations of pressurized air in the collection system, and mitigate corrosion at the West Bank Lift Station. Wastewater, by its nature, produces odor in the collection system. The installation of an odor control unit will reduce complaints from residents and customers, and will help the longevity of equipment, electrical, and utilities by reducing odors and corrosive gases. Due to the potential for unknown subsurface conditions and equipment conditions, a 10% contingency in funding has been included to allow for the expeditious processing of any change orders to cover any unforeseen construction costs associated with the project. This project is located within the Laguna Loma Park. The contractor will work closely with residents around the park to ensure safety and parking availability at all times. Item 10 Water & Wastewater Commission: November 12, 2025 Council: December 11, 2025 This construction contract is time sensitive and is a critical component of improving the infrastructure stability of the wastewater collection systems. Delay or deferral of this contract will …

Scraped at: Nov. 29, 2025, 10:05 a.m.
Nov. 12, 2025

Item 11 - Concordia Neighborhood Water and Wastewater Pipeline Renewal Project original pdf

Thumbnail of the first page of the PDF
Page 1 of 6 pages

Item 11 Water & Wastewater Commission: November 12, 2025 Council: December 11, 2025 Posting Language ..Title Recommend approval to authorize a contract for construction services for the Concordia Neighborhood Water and Wastewater Pipeline Renewal Project for Austin Water with Arguijo Corporation, in the amount of $3,679,254 plus a $367,926 contingency for a total contract amount not to exceed $4,047,179. Funding: $4,047,179 is available in the Capital Budget of Austin Water. ..Body Lead Department Austin Financial Services. Managing Department Austin Capital Delivery Services. Amount and Source of Funding Funding is available in the Capital Budget of Austin Water. Procurement Language: Ausin Financial Services issued an Invitation for Bids IFB 6100 CLMC1134 for these services. The solicitation was issued on August 4, 2025, and closed on September 11, 2025. Of the six offers received, the bid submitted by the recommended contractor was the lowest responsive bid received. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s website. This information can currently be found at https://financeonline.austintexas.gov/afo/account_services/solicitation/solicitation_details.cfm?sid=143037 . MBE/WBE: This contract will be awarded in compliance with City Code Chapter 2-9A (Minority-Owned and Women- Owned Business Enterprise Procurement Program) by meeting the goals with 7.41% MBE and 1.60% WBE participation. Council Committee, Boards and Commission Action: November 12, 2025 – To be reviewed by the Water and Wastewater Commission. Additional Backup Information: Concordia Neighborhood Water and Wastewater Pipeline Renewal Project is part of the Renewing Austin Program. This ongoing program replaces and upgrades deteriorated and aging water lines with a documented history of multiple breaks. In addition, the program coordinates and includes wastewater lines in need of replacement within the project area. The work consists of water system upgrades of approximately 4,200 linear feet of polyvinyl chloride pipe along with service connections and equipment. Wastewater system upgrades of approximately 2,500 linear feet of polyvinyl chloride pipe, manholes, service connections, and fittings. This item includes two allowances. An allowance of $20,000 will be used to address any contaminated soil or groundwater encountered during construction and an allowance of $20,000 will be used to address any non- compliant private wastewater laterals encountered during construction. An allowance is an amount that is specified and included in the construction contract or specifications for certain items of work when details are not determined at the time of bidding. Item 11 Water & Wastewater Commission: November 12, 2025 Council: December 11, …

Scraped at: Nov. 29, 2025, 10:05 a.m.
Nov. 12, 2025

Item 12 - Travis Heights Reclaimed Water Main original pdf

Thumbnail of the first page of the PDF
Page 1 of 5 pages

Item 12 Water & Wastewater Commission: November 12, 2025 Council: December 11, 2025 Posting Language ..Title Recommend approval to authorize a contract for construction services for the Travis Heights Reclaimed Water Main for Austin Water with Cash Construction Company, Inc., in the amount of $5,018,290 plus a $501,829 contingency for a total contract amount not to exceed $5,520,119. Funding: $5,520,119 is available in the Capital Budget of Austin Water. ..Body Lead Department Austin Financial Services. Managing Department Austin Capital Delivery Services. Amount and Source of Funding Funding is available in the Capital Budget of Austin Water. Procurement Language: Austin Financial Services issued an Invitation for Bids solicitation IFB 6100 CLMC1126 for these services. The solicitation was issued on July 28, 2025, and closed on September 25, 2025. Of the six offers received, the bids submitted by the recommended contractor was the lowest responsive bid received. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s website. This information can currently be found at https://financeonline.austintexas.gov/afo/account_services/solicitation/solicitation_details.cfm?sid=142862 . MBE/WBE: This contract will be awarded in compliance with City Code Chapter 2-9A (Minority-Owned and Women- Owned Business Enterprise Procurement Program) through the achievements of Good Faith Efforts with 0.26% MBE and 0.22% WBE participation. Council Committee, Boards and Commission Action: November 12, 2025 – To be reviewed by the Water and Wastewater Commission. Additional Backup Information: The Travis Heights Reclaimed Main project is identified in Austin Water’s 2011 Reclaimed Water Infrastructure Master Plan Update and the 2013 Completing the Core plan as a construction project necessary to complete a core loop through downtown Austin. Completing the core loop interconnects Austin Water’s reclaimed water systems north and south of the Colorado River which connects to the line from the Montopolis Reclaimed Water Reservoir and Pump Station and to the planned South 1st St Reclaimed Water Main project. The Travis Heights Reclaimed Water Main project will add 4,500 linear feet of reclaimed water main to Austin Water's reclaimed water system. Reclaimed water is wastewater that has been treated to a high quality and used for non-potable purposes such as irrigation, flushing toilets, and evaporative cooling. This item includes two allowances. An allowance of $25,000 will be used to address any contaminated soil or groundwater and an allowance of $9,000 will be used to address the installation of any reclaimed water service installations. An allowance is an amount that …

Scraped at: Nov. 29, 2025, 10:05 a.m.
Nov. 12, 2025

Item 13 - Austin's Aquifer Storage & Recovery Presentation original pdf

Thumbnail of the first page of the PDF
Page 1 of 6 pages

Austin’s Aquifer Storage & Recovery Project Water & Wastewater Commission | Nov 12, 2025 Shay Ralls Roalson, Director What is Aquifer Storage & Recovery? Aquifer Storage and Recovery (ASR) is a proven method of safely storing water in an aquifer to use later. 2 Timeline as of April 2025 P H A S E 1a Desktop Analysis 2022-23 After extensive scientific studies, we identified a portion of the Carrizo-Wilcox aquifer as the best suited to test for an ASR project. we are here P H A S E 1b P H A S E 2 P H A S E 3 Exploratory Field Testing Pilot ASR Testing Full-Scale ASR 36-42 months est. 36 months est. 8-10 years est. Our ask: We want to test water compatibility in a lab, working with Bastrop County stakeholders in a partnership approach. If proceeding, we would conduct limited water testing in the aquifer, assess impacts on nearby wells, and fund any needed fixes. If proceeding, we would build full- scale ASR project and deliver on commitments to Bastrop County. 3 Aquifer Storage & Recovery Key Points Storing Austin’s water – not taking Bastrop’s water: Austin Water will not take groundwater from Bastrop County Working with Willing Land Owners: Austin Water will not use eminent domain to acquire property for this project in Bastrop County Our Ask We want to test water compatibility in a lab over the next three years, working with Bastrop County stakeholders in a partnership approach. We would work hand in hand with industry and local experts on the ASR Technical Advisory Group. 4 Next Steps  November 20, 2025 - Austin City Council considers approval of the Phase 1B Field Testing Collaboration Agreement  Subject to Council approval of the Collaboration Agreement, a Technical Advisory Group will be formed to guide the Bastrop County field testing  Early 2026 - Additional Austin City Council authorization will be needed to initiate Phase 1B field testing, including:  Increased funding for consultant contracts due to expanded scope  Future real estate agreements with willing landowners 5 Questions? Water & Wastewater Commission | Nov 12, 2025

Scraped at: Nov. 29, 2025, 10:05 a.m.
Nov. 12, 2025

Item 14 - Austin Water Public Information Office Communications Overview original pdf

Thumbnail of the first page of the PDF
Page 1 of 17 pages

Communications Overview Communications Overview Amy Petri, Public Information Office Division Manager Water & Wastewater Commission | November 12, 2025 Agenda  Considerations and Drivers  Toolbox and Tactics  Recent Initiatives and Outcome 2 Good communication is the bridge between confusion and clarity. Nat Turner The competition for attention 4 Considerations and Drivers  Audience: What are people interested in? What do they want to know?  Messenger: Who does the audience trust and believe?  Timing: What else is happening that might shape our message or impact the outcome?  Adaptability: How can the message evolve based on new information or circumstances?  Measures of success: How do we know if the communications worked? 5 Communications Toolbox  Photography  Video  Brochures  Flyers  Reports  Web Site  My ATX Water customer portal  Speak Up Austin  Newsletters  Employees 6 Communications Tactics  Outreach and Engagement  CIP Outreach (~40 on-going projects at any given time)  Newsletters  Informational meetings  Dedicated web pages  Community Events  44 events  7,200 customers  Public Input and Open Houses  Rate Adjustments  Water Forward Plan Updates  Aquifer Storage & Delivery  Social Media  Facebook, X, Instagram, YouTube 7 Communications Tactics  Media Relations  Press Releases & Events  13 releases in 2025 (so far)  Walnut Creek Wastewater Treatment Plant Expansion and Improvements  Media Response (104 interviews or statements provided to inquiries this year)  Emergency Communications  8 PIO staff are part of Incident Management Team  Regular scenario training  Template development and translations  Customer Impacts  Planned and unplanned outages  Regulatory Reporting and Notifications 8 Communications Tactics  Advertising & Marketing  Annual contracts:  Value  Prime spots (guaranteed)  Seasonal emphasis  English and Spanish outlets  Extras and bonus ads  TV, Radio, Print and Digital outlets  Streaming services  Talk show appearances  Web and social  Paid content  Apps  Seasonal messaging 9 Recent New Initiative My ATX Water Portal Communications  Advanced metering replacements completed this summer  Potential move to Drought Stage 3  Pilot campaigns (May – September):  Increase portal registrations – “Register Now” campaign  Encourage saving water with Home Water Reports  Reduce off-schedule automatic irrigation 10 My ATX Water Portal Communications “Register Now” Campaign  2 email messages, 1 …

Scraped at: Nov. 29, 2025, 10:05 a.m.
Nov. 12, 2025

Item 15 - Water Management Strategy Q3 Report Briefing original pdf

Thumbnail of the first page of the PDF
Page 1 of 30 pages

Water Management Strategy Implementation REPORT Third Quarter 2025, July - September | November 2025 Water & Wastewater Commission, November 12, 2025 Contents  Third Quarter Summary  Water Conservation Updates  Water Loss Reduction Updates  Reclaimed Water and Onsite Reuse Updates  Conservation Outreach Updates  Water Supply Project Updates  Water Use and GPCD  Notes Regarding Data 2 Third Quarter Summary The Water Management Strategy Implementation Report is intended to provide transparency and accountability regarding the execution of strategies from the 2024 Water Conservation Plan and the 2024 Water Forward Plan. The plans include proactive and substantial demand management strategies and innovative local supply strategies, but the hard work necessary to complete the strategies and meet the goals are illustrated in the implementation reports. The third quarter of 2025 (July – September) includes what is typically the hottest and driest part of the year in Central Texas. In early July, Central Texas was struck by severe storms that caused severe damage and loss of life but filled Lakes Buchanan and Travis from 50 percent storage capacity to over 90 percent. On September 2, the City of Austin returned to the baseline Conservation Stage water restrictions from Stage 2 Drought restrictions. While the city’s water supply was nearly full, the latter two months of the quarter proved to be the typical hot and dry Texas summer. 3 Water Conservation Updates  New Community Outreach Grants to support innovative, community-lead conservation initiatives. (WCP, p. 40)  Applications accepted Oct. 15 – Nov. 30  Up to $3,000  Irrigation enforcement: 480 Customer 311 reports, 1,700 warnings, 243 citations  Stakeholder engagement for new Uniform Plumbing Code landscape irrigation restrictions (pressure reduction and 50% irrigation area in new homes)  Categorized all commercial, institutional, and industrial customer with North American Industrial Classification System (NAICS) code to aid in high use/leaks identification and the establishment of water use benchmarks  Began inclusion of conservation programs in the utility’s enterprise customer relations management software. 4 Water Conservation Metrics Residential Rebate Programs Approved Rebates 50 45 40 35 30 25 20 15 10 5 0 Drought Survival Tools Irrigation Upgrades Rainwater Harvesting Rebates WaterWise Landscape WaterWise Rainscape Other Residential Programs Q3 2024-Q2 2025 Q3 2025 5 Water Conservation Metrics Commercial Rebate Programs Approved Rebates 5 4 3 2 1 0 4 4 4 2 1 1 0 0 0 0 Bucks for Business …

Scraped at: Nov. 29, 2025, 10:06 a.m.
Oct. 15, 2025

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Regular Meeting of the Water and Wastewater Commission October 15, 2025 — 4:00 pm Austin Water Headquarters Waller Creek Center 625 East 10th Street, Austin, Texas Some members may be participating by videoconference. The meeting may be viewed online at: http://www.austintexas.gov/page/watch-atxn-live For more information go to: http://www.austintexas.gov/wwc Public comment will be allowed in-person or remotely by telephone. Speakers may only register to speak on an item once either in-person or remotely and will be allowed up to three minutes to provide their comments. Registration no later than noon the day before the meeting is required for remote participation. To register, call or email the board liaison Vicky Addie at 512-972-0332 or Vicky.Addie@austintexas.gov. To register to speak in person, people must sign up at least ten minutes before the meeting is called to order. Commissioners: William Moriarty (Mayor) Jesse Penn (District 1) Alex Navarro (District 2) Amanda Marzullo (District 3) CALL TO ORDER Mike Reyes (District 4) Evan Wolstencroft (District 5) Shwetha Pandurangi (District 6) Alex Ortiz (District 7) Christopher Maxwell-Gaines, Chair (District 8) Marcela Tuñón, Vice Chair (District 9) Shannon Trilli (District 10) PUBLIC COMMUNICATION: GENERAL APPROVAL OF MINUTES 1. Approval of minutes from the September 17, 2025 regular meeting of the Water and Wastewater Commission. DISCUSSION AND ACTION 2. Recommend approval to authorize a contract for engineering services for the Pilot Knob Supply Water Transmission Main Project for Austin Capital Delivery Services with Jacobs Engineering Group, Inc., in an amount not to exceed $20,000,000. Funding: $20,000,000 is available in the Capital Budget of Austin Water. 3. Recommend approval to authorize a rotation list set of twelve contracts for engineering services for the 2025 Small Scale Water and Wastewater Pipeline Engineering Services Rotation List with Quiddity Engineering, LLC, Weston Solutions, Inc., Kimley-Horn and Associates, Inc., Tetra Tech, Inc., DAVCAR, Inc., dba DAVCAR Engineering Services, Riley Mountain Engineering, LLC, Martinez, Wright & Mendez, Inc., dba MWM DesignGroup, AtkinsRealis, USA, Inc., LJA Engineering, Inc., BGE, Inc., dba Brown & Gay Engineers, Inc., Doucet & Associates, Inc., and Halff Associates, Inc., for total contract amount not to exceed $26,000,000, divided among the firms. Funding: $26,000,000 is available in the Capital Budget of the Austin Water. The City of Austin is committed to compliance with the American with Disabilities Act. Reasonable modifications and equal access to communications will be provided upon request. Meeting locations are planned with wheelchair access. If requiring Sign Language Interpreters …

Scraped at: Oct. 8, 2025, 6:37 p.m.
Oct. 15, 2025

Item 01 - Draft Minutes from September 17th Meeting original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

WATER AND WASTEWATER COMMISSION REGULAR CALLED MEETING MINUTES Wednesday, September 17, 2025 The Water and Wastewater Commission convened in a regular called meeting on July 16, 2025 at Waller Creek Center, 625 E 10th Street, Austin, Texas. Commission Members in Attendance: Amanda Marzullo, William Moriarty (remote), Shwetha Pandurangi (remote), Jesse Penn (remote), Mike Reyes, Shannon Trilli, Vice Chair Marcela Tuñón, and Evan Wolstencroft (remote) Commission Members Absent: Chair Chris Maxwell-Gaines, Alex Navarro, and Alex Ortiz Vice Chair Tuñón filled in as Chair and called the Water and Wastewater Commission to order at 4:03 p.m. PUBLIC COMMUNICATION: GENERAL No speakers were registered. APPROVAL OF MINUTES 1. Approval of minutes from the August 20, 2025 regular meeting of the Water and Wastewater Commission. The minutes were approved on Commissioner Pandurangi’s motion and Commissioner Trilli’s second on an 8-0 vote with three absences. DISCUSSION AND ACTION 2. Recommend approval of an ordinance regarding water rates proposed by Aqua Texas, Inc., an investor-owned utility, for its Travis County customers located in the City’s corporate limits in Council Districts 5, 8, and 10. Funding: This item has no fiscal impact. Recommended on Commissioner Marzullo’s motion and Commissioner Trilli’s second on an 8-0 vote with three absences. 3. Recommend approval to authorize two contracts for lab supplies and lab chemicals for Austin Water with Midland Scientific Inc. and VWR International LLC d/b/a VWR International, each for an initial term of three years with up to two one-year extension options in amounts not to exceed $5,000,000, divided between the contractors. Funding: $1,000,000 is available in the Operating Budget of Austin Water, funding for the remaining contract term is contingent upon available funding in future budgets. Recommended on Commissioner Pandurangi’s motion and Commissioner Marzullo’s second on an 8-0 vote with three absences. 4. Recommend approval to authorize a contract for Wastewater Line Renewal and Spot Rehab Service Contract Indefinite Delivery Indefinite Quantity (2026 to 2028) for Austin Water with Santa Clara Construction, LTD., in the amount of $3,200,000 for a term up to three years for a total not to exceed $9,600,000. Funding: $3,200,000 is available in the Capital Budget of Austin Water. Funding for the extension options is contingent upon available funding in future budgets. Recommended on Commissioner Pandurangi’s motion and Commissioner Marzullo’s second on an 8-0 vote with three absences. Page 1 of 2 5. Recommend approval of a resolution authorizing Austin Water to continue the …

Scraped at: Oct. 8, 2025, 6:38 p.m.
Oct. 15, 2025

Item 02 - Pilot Knob Supply Water Transmission Main original pdf

Thumbnail of the first page of the PDF
Page 1 of 4 pages

Item 2 Water & Wastewater Commission: October 15, 2025 Council: October 23, 2025 Posting Language ..Title Recommend approval to authorize a contract for engineering services for the Pilot Knob Supply Water Transmission Main Project for Austin Capital Delivery Services with Jacobs Engineering Group, Inc., in an amount not to exceed $20,000,000. Funding: $20,000,000 is available in the Capital Budget of Austin Water. ..Body Lead Department Austin Financial Services. Managing Department Austin Capital Delivery Services. Amount and Source of Funding Funding of $20,000,000 is available in the Capital Budget of Austin Water. Purchasing Language: Austin Financial Services issued a Request for Qualifications solicitation RFQS 6100 CLMP384 for these services. The solicitation was issued on April 16, 2025, and closed on May 28, 2025. Of the five responses received, the recommended consultant submitted the best evaluated response. A complete solicitation package, including a log of responses received, is available for viewing on the City’s website. This information can currently be found at https://financeonline.austintexas.gov/afo/account_services/solicitation/solicitation_details.cfm?sid=142367. MBE / WBE: This contract will be awarded in compliance with City Code Chapter 2-9A (Minority-Owned and Women- Owned Business Enterprise Procurement Program) by meeting the goals with 16.00% MBE and 3.00% WBE participation. Council Committee, Boards and Commission Action: October 15, 2025 – To be reviewed by the Water and Wastewater Commission. Additional Backup Information: This project is a 2021 Winter Storm Uri After Action Report recommendation. The proposed Pilot Knob Supply Water Transmission Main project will provide greater ability to serve Southeast Austin and supply water to the Pilot Knob Reservoir and Pump Station. With increasing projected growth in both the Central and South Pressure Zones, the ability to provide additional transmission capacity to the Pilot Knob Reservoir is needed to provide reliable service to Austin’s southeast service area. The Pilot Knob Supply Water Transmission Main project will install approximately 76,000 linear feet of water transmission main from a water transmission main north of the Colorado River near Longhorn Dam to the Pilot Knob Reservoir. A routing study will be performed to determine the project alignment. Construction of the transmission main may require lane closures or traffic detours, impacting public transportation. Any necessary water service outages will be communicated to allow customers sufficient notice and time to prepare. These outages are expected to be minimal in number and duration. Delay or deferral of this contract will impact Austin Water’s ability to provide water distribution to new development …

Scraped at: Oct. 8, 2025, 6:38 p.m.
Oct. 15, 2025

Item 03 - 2025 Small Scale Water and Wastewater Pipeline Engineering Services Rotation List original pdf

Thumbnail of the first page of the PDF
Page 1 of 9 pages

Item 3 Water & Wastewater Commission: October 15, 2025 Council: October 23, 2025 Posting Language ..Title Recommend approval to authorize a rotation list set of twelve contracts for engineering services for the 2025 Small Scale Water and Wastewater Pipeline Engineering Services Rotation List with Quiddity Engineering, LLC, Weston Solutions, Inc., Kimley-Horn and Associates, Inc., Tetra Tech, Inc., DAVCAR, Inc., dba DAVCAR Engineering Services, Riley Mountain Engineering, LLC, Martinez, Wright & Mendez, Inc., dba MWM DesignGroup, AtkinsRealis, USA, Inc., LJA Engineering, Inc., BGE, Inc., dba Brown & Gay Engineers, Inc., Doucet & Associates, Inc., and Halff Associates, Inc., for total contract amount not to exceed $26,000,000, divided among the firms. Funding: $26,000,000 is available in the Capital Budget of the Austin Water. ..Body Lead Department Austin Financial Services. Managing Department Capital Delivery Services. Amount and Source of Funding Funding of $26,000,000 is available in the Capital Budget of the Austin Water. Procurement Language: Austin Financial Services issued a Request for Qualifications solicitation RFQS 6100 CLMP382 for these services. The solicitation was issued on May 14, 2025, and closed on June 26, 2025. Of the 35 offers received, the recommended contractors submitted the best evaluated responsive offers. A complete solicitation package, including a log of offers received, is available for viewing on the City’s website. This information can currently be found at https://financeonline.austintexas.gov/afo/account_services/solicitation/solicitation_details.cfm?sid=142248. MBE / WBE: These contracts will be awarded in compliance with City Code Chapter 2-9B (Minority-Owned and Women- Owned Business Enterprise Procurement Program) by meeting the goals with 9.18% MBE and 3.02% WBE participation. Council Committee, Boards and Commission Action: October 15, 2025 – To be reviewed by the Water and Wastewater Commission. Additional Backup Information: As a standard business practice, the City routinely engages the services of professional engineering firms to perform analysis, design, and support services associated with construction or improvement of City capital assets. Rotation List contracting allows the City to always have a group of qualified consultants available to perform a specific type of recurring work in a timely manner to meet the project and operational needs of the City. Prior to issuing, this solicitation was reviewed by the City’s Rotation List Advisory Committee, which is made up of staff from the Austin Financial Services, the Austin Small and Minority Business Resources, Austin Transportation and Public Works , and other user departments. The total authorization amount, the number of firms to be recommended for selection, …

Scraped at: Oct. 8, 2025, 6:38 p.m.
Oct. 15, 2025

Item 04 - NewGen Strategies and Solutions Finance Consulting Services original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Item 4 Water & Wastewater Commission: October 15, 2025 Council: October 23, 2025 Posting Language ..Title Recommend approval to authorize a contract for finance consulting services for Austin Water with NewGen Strategies and Solutions, LLC., for an initial term of one-year with up to four one-year extension options in an amount not to exceed $340,000. Funding: $180,000 is available in the Operating Budget of Austin Water. Funding for the remaining contract term is contingent upon available funding in future budgets. ..Body Lead Department Austin Financial Services. Client Department(s) Austin Water. Fiscal Note Funding in the amount of $180,000 is available in the Fiscal Year 2025-2026 Operating Budget of Austin Water. Funding for the remaining contract term is contingent upon available funding in future budgets. Procurement Language: Professional Services. MBE/WBE: This contract is exempt from the City Code Chapter 2-9B (Minority-Owned and Women-Owned Business Enterprise Procurement Program); therefore, no subcontracting goals were established. Council Committee, Boards and Commission Action: October 15, 2025 - To be reviewed by the Water and Wastewater Commission. Additional Backup Information: The contract will provide financial consulting services for Austin Water (AW) with an emphasis on updating wholesale utility rates within the cost-of-service models. This contract also includes enhancing revenue forecasting models, conducting additional cost recovery analyses, and preparing for a Public Utility Commission (PUC) wholesale rate filing. The goal of this collaborative effort is to ensure that wholesale rates accurately reflect actual usage and service requirements. The cost-of-service models are crucial for revising these rates to ensure they represent the true costs of the services provided. Currently, several wholesale customers are paying rates established by the PUC in 2016 that do not align with their specific usage patterns or service needs. AW is seeking ongoing support from NewGen Solutions & Strategies, LLC., to implement these specialized models, which will help create a more equitable rate structure that better meets the needs of these customers while improving the overall efficiency of the pricing framework as we prepare for the PUC rate filing. The Contractor has proven expertise in electric, water, wastewater, natural gas, and solid waste utility projects, specializing in financial feasibility, depreciation, valuations, and cost-of-service analyses. The firm employs one of fewer than 20 professionals nationwide with an Accredited Senior Appraiser designation in Public Utilities from the American Society of Appraisers. Item 4 Water & Wastewater Commission: October 15, 2025 Council: October 23, 2025 The contract …

Scraped at: Oct. 8, 2025, 6:38 p.m.
Oct. 15, 2025

Item 06 - Proposed 2026 Water and Wastewater Commission Regular Meeting Schedule original pdf

Thumbnail of the first page of the PDF
Page 1 of 1 page

Water and Wastewater Commission 2026 Regular Meeting Schedule - Proposed Third Wednesday of the month (unless otherwise specified) at 4:00pm or 6pm? All meetings to be held at Austin Water Headquarters, Waller Creek Center, 625 East 10th Street, Austin, Texas January 14, 2026 (council 1/22) February 18, 2026 (council 2/26) March 11, 2026 (SXSW 3/12-3/18; Spring Break 3/16-3/20) (council 3/12 and 3/26) April 15, 2026 (council 4/23) May 20, 2026 (council 5/28) June 17, 2026 (no council mtgs sched) July 15, 2026 – Regular meeting (council 7/23) July 29, 2026 – Budget meeting (due to Budget Adoption in Aug) August 19, 2026 (first day of school for AISD is August 16th) (council 8/27) September 16, 2026 (council 9/24) October 14, 2026 (council 10/22) Tuesday, November 10 (Veterans Day is Wed, 11/11) (council 11/19) No December Commission meeting (council 12/3) Revised 10.01.2025

Scraped at: Oct. 8, 2025, 6:38 p.m.
Oct. 15, 2025

Item 07 - Austin Roadmap for Advancing Green Infrastructure in the Right of Way original pdf

Thumbnail of the first page of the PDF
Page 1 of 11 pages

Backup

Scraped at: Oct. 8, 2025, 6:38 p.m.
Oct. 15, 2025

Play video original link

Play video

Scraped at: Oct. 16, 2025, 11:21 p.m.
Sept. 17, 2025

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Regular Meeting of the Water and Wastewater Commission September 17, 2025 — 4:00 pm Austin Water Headquarters Waller Creek Center 625 East 10th Street, Austin, Texas Some members may be participating by videoconference. The meeting may be viewed online at: http://www.austintexas.gov/page/watch-atxn-live For more information go to: http://www.austintexas.gov/wwc Public comment will be allowed in-person or remotely by telephone. Speakers may only register to speak on an item once either in-person or remotely and will be allowed up to three minutes to provide their comments. Registration no later than noon the day before the meeting is required for remote participation. To register, call or email the board liaison Vicky Addie at 512-972-0332 or Vicky.Addie@austintexas.gov. To register to speak in person, people must sign up at least ten minutes before the meeting is called to order. Commissioners: William Moriarty (Mayor) Jesse Penn (District 1) Alex Navarro (District 2) Amanda Marzullo (District 3) CALL TO ORDER Mike Reyes (District 4) Evan Wolstencroft (District 5) Shwetha Pandurangi (District 6) Alex Ortiz (District 7) Christopher Maxwell-Gaines, Chair (District 8) Marcela Tuñón, Vice Chair (District 9) Shannon Trilli (District 10) PUBLIC COMMUNICATION: GENERAL APPROVAL OF MINUTES 1. Approval of minutes from the August 20, 2025 regular meeting of the Water and Wastewater Commission. DISCUSSION AND ACTION 2. Recommend approval of an ordinance regarding water rates proposed by Aqua Texas, Inc., an investor- owned utility, for its Travis County customers located in the City’s corporate limits in Council Districts 5, 8, and 10. Funding: This item has no fiscal impact. 3. Recommend approval to authorize two contracts for lab supplies and lab chemicals for Austin Water with Midland Scientific Inc. and VWR International LLC d/b/a VWR International, each for an initial term of three years with up to two one-year extension options in amounts not to exceed $5,000,000, divided between the contractors. Funding: $1,000,000 is available in the Operating Budget of Austin Water, funding for the remaining contract term is contingent upon available funding in future budgets. 4. Recommend approval to authorize a contract for Wastewater Line Renewal and Spot Rehab Service Contract Indefinite Delivery Indefinite Quantity (2026 to 2028) for Austin Water with Santa Clara Construction, LTD., in the amount of $3,200,000 for a term up to three years for a total not to exceed $9,600,000. Funding: $3,200,000 is available in the Capital Budget of Austin Water. Funding for the extension options is contingent upon available funding …

Scraped at: Sept. 12, 2025, 8:22 a.m.
Sept. 17, 2025

Item 01 - Draft Minutes from August 20, 2025 Meeting original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

WATER AND WASTEWATER COMMISSION REGULAR CALLED MEETING MINUTES Wednesday, August 20, 2025 The Water and Wastewater Commission convened in a regular called meeting on July 16, 2025 at Waller Creek Center, 625 E 10th Street, Austin, Texas. Commission Members in Attendance: Chair Chris Maxwell-Gaines, William Moriarty (remote), Alex Navarro (remote), Alex Ortiz (remote), Shwetha Pandurangi, Mike Reyes, Vice Chair Marcela Tuñón, and Evan Wolstencroft Commission Members Absent: Amanda Marzullo, Jesse Penn, and Shannon Trilli Chair Maxwell-Gaines called the Water and Wastewater Commission to order at 4:04 p.m. PUBLIC COMMUNICATION: GENERAL No speakers were registered. APPROVAL OF MINUTES 1. Approval of minutes from the July 16th, 2025 regular meeting of the Water and Wastewater Commission. The minutes were approved on Commissioner Pandurangi’s motion and Vice Chair Tuñón’s second on an 8-0 vote with three absences. DISCUSSION AND ACTION 2. Recommend approval to authorize a contract for a biogas membrane for Austin Water with EWT Holdings III Corp d/b/a Evoqua Water Technologies LLC, for a one-time purchase in an amount not to exceed $767,357. Funding: $767,357 is available in the Fiscal Year 2024-2025 Operating Budget of Austin Water. Recommended on Commissioner Wolstencroft’s motion and Vice Chair Tuñón’s second on an 8-0 vote with three absences. 3. Recommend approval to authorize an amendment to a contract for continued supervisory control and data acquisition equipment, software installation, and support services for Austin Water with Control Panels USA, Inc., to increase the amount by $1,100,000 for a revised total contract amount not to exceed $3,200,000. Funding: $1,028,733 is available in the Operating Budget of Austin Water, funding for the remaining contract term is contingent upon available funding in future budgets. Recommended on Commissioner Wolstencroft’s motion and Vice Chair Tuñón’s second on an 8-0 vote with three absences. 4. Recommend approval to authorize the negotiation and execution of a cost participation agreement with Lennar Homes of Texas Land & Construction, Ltd. for the City to reimburse the developer for an amount not to exceed $6,228,082.00 for costs associated with the design and construction of an oversized wastewater lift station, force main, and appurtenances related to Service Extension Request No. 5219R2 that will provide wastewater service to a proposed single-family development located at 13419 Gregg Manor Road. Funding is available in the Fiscal Year 2025-2026 Capital Budget of Austin Water. Recommended on Commissioner Wolstencroft’s motion and Vice Chair Tuñón’s second on an 8-0 vote with three absences. …

Scraped at: Sept. 12, 2025, 8:22 a.m.
Sept. 17, 2025

Item 03 - Lab Chemicals and Lab Supplies original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Item 3 Water & Wastewater Commission: September 17, 2025 Council: September 25, 2025 Posting Language ..Title Recommend approval to authorize two contracts for lab supplies and lab chemicals for Austin Water with Midland Scientific Inc. and VWR International LLC d/b/a VWR International, each for an initial term of three years with up to two one-year extension options in amounts not to exceed $5,000,000, divided between the contractors. Funding: $1,000,000 is available in the Operating Budget of Austin Water. Funding for the remaining contract term is contingent upon available funding in future budgets. ..Body Lead Department Financial Services Department. Client Department(s) Austin Water. Purchasing Language: The Financial Services Department issued a Request for Proposals solicitation (RFP) 2200 KMF3045 for these goods. The solicitation was issued on February 10, 2025, and closed on March 27, 2025. Of the 4 offers received, the recommended contractors submitted the best evaluated responsive offer. A complete solicitation package, including a log of offers received, is available for viewing on the City’s website. This information can currently be found at https://financeonline.austintexas.gov/afo/account_services/solicitation/solicitation_details.cfm?sid=141574 . MBE/WBE: This solicitation was reviewed for subcontracting opportunities in accordance with City Code Chapter 2-9B (Minority-Owned and Women-Owned Business Enterprise Procurement Program). For the goods required for this solicitation, there were no subcontracting opportunities; therefore, no subcontracting goals were established. Council Committee, Boards and Commission Action: September 17, 2025 – To be reviewed by the Water and Wastewater Commission. Additional Backup Information: The contractors will provide laboratory chemicals and supplies for Austin Water. The laboratory chemicals and supplies provided by the contractors meet the standards prescribed by the Environmental Protection Agency (EPA) and Texas Commission on Environmental Quality (TCEQ) approved testing methodology. The laboratories test the water quality of drinking water, raw surface water, wastewater, bio-solids, industrial waste samples, treatment chemical samples, and other environmental water samples. These are new contracts. The requested authorization is based on departmental estimates of future needs. An evaluation team with expertise in this area evaluated these offers and scored Midland Scientific Inc. and VWR International LLC d/b/a VWR International as the best to provide these goods and services based on online website/URL and ordering (system and process), online catalog, experience and qualifications, price proposal, account and order reporting, customer and product support, local business presence, and small business presence. If these contracts are not secured, the City will lack a dependable source for laboratory chemicals and supplies. Item 3 …

Scraped at: Sept. 12, 2025, 8:22 a.m.
Sept. 17, 2025

Item 04 - Wastewater Line Renewal and Spot Rehab Indefinite Delivery/Indefinite Quantity (IDIQ) original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

Item 4 Water & Wastewater Commission: September 17, 2025 Council: September 25, 2025 Posting Language ..Title Recommend approval to authorize a contract for Wastewater Line Renewal and Spot Rehab Service Contract Indefinite Delivery Indefinite Quantity (2026 to 2028) for Austin Water with Santa Clara Construction, LTD., in the amount of $3,200,000 for a term up to three years for a total not to exceed $9,600,000. Funding: $3,200,000 is available in the Capital Budget of Austin Water. Funding for the extension options is contingent upon available funding in future budgets. ..Body Lead Department Financial Services Department. Managing Department Austin Water. Purchasing Language: Austin Financial Services issued an Invitation for Bids solicitation IFB 6100 CLMC1127 for these services. The solicitation was issued on June 30th, 2025, and closed on July 31st, 2025. Of the six offers received, the recommended contractor submitted the lowest responsive offer. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s website. This information can currently be found at: https://financeonline.austintexas.gov/afo/account_services/solicitation/solicitation_details.cfm?sid=142619 . MBE/WBE: This contract will be awarded in compliance with City Code Chapter 2-9A (Minority-Owned and Women- Owned Business Enterprise Procurement Program) by meeting the goals with 6.46% MBE and 1.27% WBE participation. Council Committee, Boards and Commission Action: September 17, 2025 – To be reviewed by the Water and Wastewater Commission. Additional Backup Information: This contract is for the repair and replacement of deteriorated wastewater mains throughout the city as needed including performing emergency repairs on wastewater mains and the wastewater collection system. In general, projects are larger or more complex than Austin Water crews can complete, but too small, isolated, or time sensitive to competitively bid as individual construction contracts. This is an Indefinite Delivery/Indefinite Quantity (IDIQ) contract which provides for an indefinite quantity of services for a fixed time, usually an initial term with extension options. They are commonly used when precise quantities of supplies or services, above a specified minimum, cannot be determined. IDIQ contracts help streamline the contract process and service delivery and allow the City the flexibility to add work as needs arise or change. As each project is defined, a specific work assignment will be assigned to the contractor who will complete the scope of work for the unit prices included in the contract. Work deadlines will be established for each work assignment. The wastewater collection system is essential for conveying wastewater to …

Scraped at: Sept. 12, 2025, 8:22 a.m.