Agenda Item B7.1 - Wastewater Collection System original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

Recommendation for Water & Wastewater Commission Commission Meeting Date: January 8, 2020 Council Meeting Date: January 23, 2020 Department: Public Works Client: Kevin Koeller, Bill Stauber, Tony Lopez SUBJECT Authorize award and execution of a construction contract with Facilities Rehabilitation, Inc. (MBE), for Wastewater Collection System Replacement Lines - North in the amount of $4,373,958 plus a $437,395.80 contingency, for a total contract amount not to exceed $4,811,353.80. AMOUNT AND SOURCE OF FUNDING Funding is available in the Fiscal Year 2019-2020 Capital Budget of Austin Water. Purchasing Language: Lowest responsive bid of four bids received through a competitive Invitation for Bid solicitation. Prior Council Action: N/A Boards and Commission Action: To be reviewed by the Water and Wastewater Commission on January 8, 2020. MBE/WBE: This contract will be awarded in compliance with City Code Chapter 2-9A (Minority Owned and Women Owned Business Enterprise Procurement Program) by meeting the goals with 2.74% MBE and 0.80% WBE participation. The project contains seven locations in the City of Austin identified for wastewater infrastructure replacement through TV inspection and a Sanitary Sewer Evaluation Survey (SSES) of low performing basins. The wastewater lines in each of these locations are over 300 linear feet in length and required production of design documents and permit approval issued by the City’s Development Services Department. These locations were selected based upon a ranking system which includes condition of pipe, location, Sanitary Sewer Overflow (SSO) count, SSO volume, and Inflow and Infiltration (I&I). The wastewater collection system is essential for transporting wastewater to the treatment plants. Due to growth in Austin and deterioration from the harsh wastewater environment, existing collection system assets require repair and replacement. Austin Water’s wastewater collection system is a large and complex system, consisting of approximately 2,900 miles of wastewater line and serves approximately 1 million customers. This project is for the repair and replacement of nearly 7600 linear feet of deteriorated wastewater mains and accessories. The work requires some lane closures and detours at residential locations, but traffic control will provide for continuous access and effective traffic flow. The Darlington location will have a flagging operation due to more restricted traffic flow but will be open during non-working hours. Marathon Alley will close one block at a time, but residences have access though the front of their lots. The Riverside location will have detours during the boring operation and nightly closures afterward. This construction contract …

Scraped at: Jan. 20, 2020, 12:18 a.m.
Jan. 8, 2020

B1.2 - Backup - Davis WTP SCADA - MWBE original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

M/WBE Summary Participation goals stated in the solicitation were 1.90% African American; 9.00% Hispanic; 4.90% Native Asian; and 15.80% WBE. The recommended firm provided a MBE/WBE Compliance Plan that met the goals of the solicitation and was approved by the Small and Minority Business Resources Department. The Second Ranked firm provided a MBE/WBE Compliance Plan that met the goals of the solicitation and was approved by the Small and Minority Business Resources Department. Public notice was given for this Request for Qualifications CLMP276 Davis Water Treatment Plant SCADA System Improvements through the City’s Vendor Connection web portal. Two firms submitted qualifications statements and responses were opened on September 11, 2019. Of the two submittals received one submittal was from a MBE/WBE certified firm. RECOMMENDED FIRM: Harutunian Engineering, Inc. – Total Participation: WBE TOTAL – PRIME 84.00% (FW) Harutunian Engineering, Inc., Austin, TX 84.00% MBE TOTAL – SUBCONSULTANTS 16.00% African American Subtotal 2.00% (MB) All Points Inspection Services, Inc., Austin, TX (Underground Utility Locator Service) 2.00% Hispanic Subtotal 9.00% (MH) CaddStudio, Inc., Round Rock, TX (Drafting Services, Computer Aided Design Services) 5.50% (MH) Zamora, LLC, Buda, TX (Surveying Services, Land Surveying) 3.50% Native/Asian Subtotal 5.00% (MA) CAS Consulting & Services, Inc., Austin, TX (Civil Engineering, Permitting Services, Environmental) 5.00% SECOND RANKED FIRM: Stanley Consultants, Inc. – Total Participation: NON M/WBE TOTAL – PRIME 68.40% Stanley Consultants, Inc., Austin, TX 68.40% MBE TOTAL – SUBCONSULTANTS 15.80% African American Subtotal 1.90% (MB) HVJ Associates, Inc., Austin, TX (Civil Engineering) 1.90% Hispanic Subtotal 9.00% (MH) Signature Automation, LLC, Addison, TX (Control Systems Engineering) 9.00% Native/Asian Subtotal 4.90% (MA) Encotech Engineering Consultants, Inc., Austin, TX (Structural Engineering) 4.90% WBE TOTAL – SUBCONSULTANTS 15.80% (FW) Watearth, Inc., Austin, TX (Permitting Services, Environmental) 15.80%

Scraped at: Jan. 20, 2020, 12:18 a.m.
Jan. 8, 2020

B1.3- Backup Matrix - Davis WTP SCADA original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

Capital Contracting OfficeEvaluation of Consultant QualificationsCOMPOSITEReceived:EVALUATION MATRIXProject:Davis Water Treatment Plant SCADA System ImprovementsProject Manager: Item 1Item 2Item 3aItem 3bItem 5Item 6Item 7Item 8[Yes or No][Yes or No][10]20][15][15][10][10][100]FirmMBE/WBETurned inTeam'sTeam'sPrimeMajor ScopesTeam'sCOATOTALRANK(or Joint Venture)Procurementall RequiredStructureApproachFirm'sof WorkExperienceExperiencePOINTS ProgramDocumentsComparableComparablewithwithProjectProjectAustinPrimePMgrPProfPprinc.ExperienceExperienceIssues[4][12][4]Harutunian Engineering Inc. (WBE/FW)YY9.0018.803.8012.004.0014.4014.409.409.5095.31Stanley ConsultantsYY8.4016.403.209.603.4013.2013.409.008.3884.982Project Professionaland Project PrincipalExperienceSeptember 11, 2019James KingItem 4[20]Project ManagerREVISED 06/01/12Stand Alone Evaluation Matrix

Scraped at: Jan. 20, 2020, 12:18 a.m.
Jan. 8, 2020

B1.4 - Davis WTP SCADA - Map original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

Backup

Scraped at: Jan. 20, 2020, 12:18 a.m.
Jan. 8, 2020

B2.2 - Backup AW PWD Highland Park Phase 1 MWBE original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

MBE/WBE Summary Public notice was given for this solicitation CLMC762, Highland Park Water and Wastewater Improvements Phase 1 & WL-C1), through the City’s Vendor Connection web portal. Four bids were received and opened on October 17, 2019. Of the four bids received, all four bids were from MBE/WBE certified firms. Santa Clara Construction, Ltd. submitted the lowest responsive bid of four bids, including an allowance totaling $72,000: Base Bid Base Bid + Allowances Santa Clara Construction, Ltd., Austin, Texas (MH) $5,749,470.10 $5,821,470.10 Austin Underground Inc, Lago Vista, Texas (MH) $5,907,928.00 $5,979,928.00 D Guerra Construction, LLC, Austin, Texas (MH) $7,303,590.50 $7,375,590.50 Prota Inc., Austin, Texas (FH) $7,318,620.00 $7,390,620.00 The contractor’s choice of work methodology provides for 16 areas of subcontracting opportunities which are listed below. Participation Subgoals stated in the solicitation were 1.17% African American; 6.32% Hispanic; 0.34% Native/Asian; 1.42% WBE. Total participation estimated on base bid amount: Base Bid:5,749,470.10$ PRIMEMBE TOTAL3,679,792.00$ 64.00%Santa Clara Construction, Ltd., Austin, TXMBE TOTALS - SUBCONTRACTORS1,108,512.10$ 19.28%African American Subtotal72,765.00$ 1.27%(MB) Unism Development Co, Inc., Austin, TX (gate valves)72,765.00$ 1.27%Hispanic Subtotal36,800.00$ 0.64%(MH) Central Texas Road Boring, Buda, TX (boring)36,800.00$ 0.64%Native/Asian American Subtotal998,947.10$ 17.37%(MA) Alpha Paving Industries, LLC, Round Rock, TX (asphalt )998,947.10$ 17.37%WBE TOTALS - SUBCONTRACTORS82,650.00$ 1.44%(FW) S&R Investments Inc. dba Arrow Oil, Austin, TX (diesel)82,650.00$ 1.44%NON MBE/WBE TOTALS - SUBCONTRACTORS878,516.00$ 15.28%Ferguson Enterprises, Inc., Georgetown, TX (PVC pipe, valves)691,412.00$ 12.03%G&R Surveying, LLC, Austin, TX (surveying)13,630.00$ 0.24%Fuquay, Inc., New Braunfels, TX (manhole coatings)21,719.00$ 0.38%Custom Crete, Austin, TX (concrete)500.00$ 0.01% Base Bid:5,749,470.10$ Centex Materials, LLC, Austin, TX (concrete)500.00$ 0.01%Texas Concrete Material, LTD (APAC-Texas), Del Valle, TX ()500.00$ 0.01%TRP Construction Group, LLC, Austin, TX (barricades)42,445.00$ 0.74%DIJ Construction, Inc., Bertram, TX (striping)17,080.00$ 0.30%TAS Environmental Services, L.P., San Marcos, TX (hazardus il d )11,475.00$ 0.20%IPR - South Central, Pasadena, TX (CIPP)61,030.00$ 1.06%Chlor-Serv, Inc., Hutto, TX (water treatment services)6,875.00$ 0.12%Environmental Allies, Houston, TX (erosion control)11,350.00$ 0.20% The Contractor submitted an MBE/WBE Compliance Plan that met the goals of the solicitation and was approved by the Small and Minority Business Resources Department. Second and third low bidder information is provided. SECOND BIDDER – (MH) Austin Underground Inc., Lago Vista, Texas $5,907,928.00 96.99% MBE prime participation; 1.17% African American; 0.00% Hispanic; 0.42% Native/Asian; 1.42% WBE THIRD BIDDER – (MH) D Guerra Construction, LLC, Austin, Texas $7,303,590.50 96.00% MBE prime participation; 1.22% African American; 0.00% Hispanic; 1.12% Native/Asian; 1.66% WBE

Scraped at: Jan. 20, 2020, 12:18 a.m.
Jan. 8, 2020

B2.3 Backup Highland Park Phase 1_CERT_BID_TAB original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

CERTIFIED - BID TABprelimi PROJECT SPONSOR: BID CERTIFICATION & CONTRACT REP: BID OPENING DATE: 10/17/2019PROJECT MANAGER:TIME: 2:00 PMPROJECT CONSULTANTS:LOCATION: OTC Suite 1045C505 Barton Sprgs, Ste 1045-CDURATION:PRICE EXPIRATION: 90 CAL DAYSLIQUIDATED DAMAGES: $2,950 CAL/DAYSPROJECT: SUB ID#:6935.037CLMC762RESPONSES: 44570 2307 4952 / 3960 2207 6480BIDDER(S):LOCATION:3BID ITEMQTYUNITITEM DESCRIPTIONUNIT PRICEAMOUNTUNIT PRICEAMOUNTUNIT PRICEAMOUNTUNIT PRICEAMOUNT104S-AW332LFRemove P.C Concrete Curb$3.00$996.00$14.00$4,648.00$10.00$3,320.00$12.00$3,984.00210S-AW1322CYFlexible Base, 12 in thick$85.00$112,370.00$100.00$132,200.00$86.00$113,692.00$61.00$80,642.00315S-A2W4021SYSurface Milling, 2-inch thickness$3.00$12,063.00$5.00$20,105.00$6.00$24,126.00$10.00$40,210.00340S-B2W4021SYHot Mix Asphaltic Concrete Pavement, 2-inch, Type D (Overlay)$30.00$120,630.00$16.00$64,336.00$17.00$68,357.00$19.00$76,399.00402S-A149CYControlled Low Strength Material$150.00$22,350.00$280.00$41,720.00$150.00$22,350.00$210.00$31,290.00430S-AW332LFP.C Concrete Curb and Gutter (Excavation)$29.00$9,628.00$50.00$16,600.00$40.00$13,280.00$36.50$12,118.00432SR-4W1060SFReconstruct Concrete Sidewalks to 4 inch thickness, including removal of existing sidewalk.$8.00$8,480.00$16.00$16,960.00$15.00$15,900.00$8.75$9,275.00501S36-A60LFJacking or Boring 36 in. Steel Pipe (Minimum thickness 0.50 in "Through Soil")$750.00$45,000.00$1,100.00$66,000.00$905.00$54,300.00$979.00$58,740.00501S36-B55LFJacking or Boring 36 in. Steel Pipe (Minimum thickness 0.50 in "Through weathered Limestone")$800.00$44,000.00$1,200.00$66,000.00$905.00$49,775.00$983.00$54,065.00504S-3W1EAAdjusting Water Valve Boxes to Grade$1,000.00$1,000.00$1,600.00$1,600.00$1,500.00$1,500.00$1,124.00$1,124.00505S-B1815LFEncasement Pipe 18" Dia., Type Steel 3/8" Thick per ASTM A134$230.00$3,450.00$190.00$2,850.00$286.00$4,290.00$94.00$1,410.00505S-B3618LFEncasement Pipe 36" Dia., Type Steel 3/8" Thick per ASTM A134$305.00$5,490.00$400.00$7,200.00$336.00$6,048.00$164.00$2,952.00509S-1W8366LFTrench Excavation Safety Protective Systems (all depths)$1.00$8,366.00$1.00$8,366.00$20.00$167,320.00$2.00$16,732.00510-AW218LFPipe, 2" Dia. Copper (all depths), including Excavation and Backfill$167.00$3,006.00$240.00$4,320.00$120.00$2,160.00$70.00$1,260.00510-AW-6346LFPipe, 6" Dia. D.I. Class 350 (all depths), including Excavation and backfill$174.00$60,204.00$140.00$48,440.00$130.00$44,980.00$107.00$37,022.00510-AW-6-PVC11LFPipe, 6" Dia. PVC, C900 (all depths), including Excavation and Backfill$161.00$1,771.00$120.00$1,320.00$120.00$1,320.00$90.00$990.00510-AW-8370LFPipe, 8-in Dia., Class 350 Ductile Iron, (all depths) including Excavation and backfill$187.00$69,190.00$130.00$48,100.00$170.00$62,900.00$134.00$49,580.00510-AW-12-PVC373LFPipe, 12-in Dia., PVC C900 DR14, (all depths) including Excavation and backfill$191.00$71,243.00$130.00$48,490.00$175.00$65,275.00$122.00$45,506.00510-AW-167255LFPipe, 16" Dia. D.I. Class 250 (all depths), including Excavation and Backfill$219.00$1,588,845.00$248.00$1,799,240.00$265.00$1,922,575.00$234.00$1,697,670.00510-KW18.8TONDuctile Iron Fittings$4,000.00$75,200.00$4,500.00$84,600.00$3,500.00$65,800.00$7,250.00$136,300.00510-JH2220LF2" Jumper Hose (for Water Line)$35.00$7,700.00$34.00$7,480.00$75.00$16,500.00$48.50$10,670.00510-JW8x81EAWet Connections, 8 Dia. X 8 Dia.$5,000.00$5,000.00$4,200.00$4,200.00$10,200.00$10,200.00$3,091.00$3,091.00510JW12x81EAWet Connections, 12 Dia. X 8 Dia.$5,000.00$5,000.00$4,700.00$4,700.00$9,800.00$9,800.00$2,529.00$2,529.00510-JW12x125EAWet Connections, 12 Dia. X 12 Dia.$5,000.00$25,000.00$4,300.00$21,500.00$10,600.00$53,000.00$2,361.00$11,805.00511S-A617EAValves, Gate Type, 6 in Dia.$1,200.00$20,400.00$1,600.00$27,200.00$4,550.00$77,350.00$1,901.00$32,317.00511S-A83EAValves, Gate Type, 8 in Dia.$1,600.00$4,800.00$1,900.00$5,700.00$4,850.00$14,550.00$1,967.00$5,901.00511S-A125EAValves, Gate Type, 12 in Dia.$2,500.00$12,500.00$3,800.00$19,000.00$5,650.00$28,250.00$3,260.00$16,300.00511S-A1614EAValves, Gate Type, 16 in Dia.$7,500.00$105,000.00$9,000.00$126,000.00$9,500.00$133,000.00$7,888.00$110,432.00511S-B15EAFire Hydrants (see standard No. 511S-17)$3,000.00$45,000.00$5,000.00$75,000.00$6,700.00$100,500.00$6,482.00$97,230.00511S-C11EAPressure Reducing Valve Assemblies, 1 inch$1,000.00$1,000.00$1,100.00$1,100.00$3,300.00$3,300.00$4,075.00$4,075.00511S-C1.51EAPressure Reducing Valve Assemblies, 1.5 inch$1,200.00$1,200.00$1,600.00$1,600.00$3,450.00$3,450.00$4,215.00$4,215.003PROTA INCAUSTIN, TXBBGUARANTEE: BB-Bid Bond CC-Cashiers Check CTC-Cert. Chk.BBBBBBADDENDA ACKNOWLEDGED33SANTA CLARA CONST. LTDAUSTIN UNDERGROUNDD GUERRA CONST., LLCAUSTIN, TXLAGO VISTA, TXAUSTIN, TXThu Cao, P.E / City of Austin780 CAL. DAYSBID INVITATION NO: PROJECT NUMBER(S): CONTRACT AMOUNT:$7,400,711.00Highland Park Water & Wastewater Improvements Phase 1 & WL-C1BID TABULATIONShobana AngiaCITY OF AUSTINPublic WorksJoe Lopez CERTIFIED - BID TABprelimiBIDDER(S):PROTA INCSANTA CLARA CONST. LTDAUSTIN UNDERGROUNDD GUERRA CONST., LLC511S-F111EAAutomatic Combination Air/Vacuum Release Valve Assembly, 1" Dia.$3,000.00$33,000.00$6,000.00$66,000.00$6,600.00$72,600.00$7,268.00$79,948.00511S-F223EAAutomatic Combination Air/Vacuum Release Valve Assembly, 2" Dia.$3,300.00$75,900.00$6,900.00$158,700.00$6,750.00$155,250.00$8,057.00$185,311.00511S-G12Vert. Ft.16" Gate Valve Additional Bury Depth (>5.5')$50.00$600.00$310.00$3,720.00$650.00$7,800.00$222.50$2,670.00511S-H31Vert. Ft.Fire Hydrant Barrel Extensions (>5.5')$300.00$9,300.00$660.00$20,460.00$850.00$26,350.00$811.00$25,141.00602S-BW194SYSt. Augustine Block Sodding$5.00$970.00$7.00$1,358.00$7.00$1,358.00$62.00$12,028.00701S-T150LFTemporary Safety Fence, 6' Ft. High, Chain Link Type (for Bore Pits) $5.00$750.00$7.50$1,125.00$10.00$1,500.00$24.50$3,675.00863S-415EAReflectorized Pavement Markers (Type II-B-B)$30.00$450.00$19.00$285.00$20.00$300.00$10.00$150.00SP433S-C2080SFRemove and Rpair Type II P.C. Concrete Driveway (Water Location)$9.00$18,720.00$15.00$31,200.00$25.00$52,000.00$13.50$28,080.00SP510AR6-PVC90LFRemove and Disposal Existing Water Pipe, 6" Dia., Type PVC$35.00$3,150.00$49.00$4,410.00$38.00$3,420.00$8.00$720.00SP510AR6CI280LFRemove and Disposal Existing Water Pipe, 6" Dia., Type CI$35.00$9,800.00$32.00$8,960.00$16.00$4,480.00$9.50$2,660.00SP510AR6DI37LFRemove and Disposal …

Scraped at: Jan. 20, 2020, 12:18 a.m.
Jan. 8, 2020

B2.4 - Backup Highland Park Phase 1 Map original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

Backup

Scraped at: Jan. 20, 2020, 12:18 a.m.
Jan. 8, 2020

B3.2 - Backup Howard Lane Water Main Extension - WMBE original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

M/WBE Summary Public notice was given for this solicitation, CLMC748 Howard Lane Water Main Extension, through the City’s Vendor Connection web portal. Eight bids were received and opened on October 24, 2019. Of the eight bids received three bids were from MBE/WBE certified firms. Smith Contracting Co. submitted the lowest responsive bid of eight bids received: Smith Contracting Co., Austin, TX $1,057,821.75 Austin Underground, Inc., Jonestown, TX (MH) $ 1,135,288.50 Atlas Construction, Corp., Granite Shoals, TX $ 1,230,330.00 Santa Clara Construction, Ltd., Austin, TX (MH) $1,233,860.00 Aaron Concrete Contractors, LP., Austin, TX $ 1,364,793.15 Austin Constructors, LLC., Austin, TX (FH) $ 1,473,794.01 Cash Construction Company, Inc., Pflugerville, TX $1,507,932.00 DeNucci Constructors LLC, Austin, TX $1,849,541.00 The contractor’s choice of work methodology provides for four areas of subcontracting opportunities which are listed below. Project specific subgoals stated in the solicitation were 2.07% African American; 6.12% Hispanic; .54% Native/Asian; 1.96% WBE. Total participation estimated on base bid amount: Base Bid:1,057,821.75$ PRIMENON M/WBE943,821.75$ 89.22%Smith Contracting Co., Inc., Austin, TXMBE TOTALS - SUBCONTRACTORS93,000.00$ 8.79%African American Subtotal22,000.00$ 2.08%(MB) Sammie J Kellough, Austin, TX (hauling services)22,000.00$ 2.08%Hispanic Subtotal65,000.00$ 6.14%(MH) Industry Junction, Inc., Garland, TX (pipe, iron)65,000.00$ 6.14%Native/Asian American Subtotal6,000.00$ 0.57%(MA) Alpha Paving Industries LLC, City, ST (paving/resurfacing, highway & road)6,000.00$ 0.57%WBE TOTALS - SUBCONTRACTORS21,000.00$ 1.99%(FW) Champion Fuel Solutions, Bedford, TX (fuel, oil, diesel)21,000.00$ 1.99% The Contractor submitted a MBE/WBE Compliance Plan that met the goals of the solicitation and was approved by the Small and Minority Business Resources Department. Second and third low bidder information is provided. SECOND BIDDER - Austin Underground, Inc., Jonestown, TX $ 1,135,288.50 95.24%M/WBE prime participation; 2.12% African American; 0% Hispanic; .57% Native/Asian; 1.98% WBE; .09% Non M/WBE subcontractor participation. THIRD BIDDER – Atlas Construction, Corp., Granite Shoals, TX $1,230,330.00 62.72% NON M/WBE, 0% African American; 36.58% Hispanic; 0.49% WBE; 2.11 % Non M/WBE subcontractor participation.

Scraped at: Jan. 20, 2020, 12:19 a.m.
Jan. 8, 2020

B3.3 - Backup Howard Lane Water Main Extension - CERT BID TAB original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

Backup

Scraped at: Jan. 20, 2020, 12:19 a.m.
Jan. 8, 2020

B3.4 - Backup Howard Lane Water Main Extension - Project Map original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

Backup

Scraped at: Jan. 20, 2020, 12:19 a.m.
Jan. 8, 2020

B4.2 - Ullrich Lime Feed Loop MWBE original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

MBE/WBE Summary Public notice was given for this solicitation CLMC750, Ullrich Water Treatment Plant Lime Feed Loop), through the City’s Vendor Connection web portal. One bid was received and opened on Thursday, October 31, 2019. The one bid received was not a certified MBE/WBE. Matous Construction, Ltd submitted a responsive bid including an allowance of $1,792,000. Base Bid Base Bid + Allowances Matous Construction, Ltd, Belton, TX $9,682,000 $11,474,000 The contractor’s choice of work methodology provides for twenty areas of subcontracting opportunities which are listed below. Project specific subgoals stated in the solicitation were 1.30% African American; 2.77% Hispanic; 0.77 Native/Asian; 3.26 %WBE. Total participation is estimated on base bid amount: Base Bid:$9,682,000PRIMENON M/WBE4,349,233.09$ 44.92%Matous Construction, Belton, TXMBE TOTALS - SUBCONTRACTORS2,339,000.00$ 24.16%African American Subtotal146,000.00$ 1.51%(M/B) Unism Development Co Inc., Austin, TX (Pipe, aluminum; bends)146,000.00$ 1.51%Hispanic Subtotal2,108,000.00$ 21.77%(FH) T Morales Company Electric & Controls, Ltd (Constuction water system, Main & service line)2,108,000.00$ 21.77%Native/Asian American Subtotal85,000.00$ 0.88%(MA) Shah Systems and Technology Corporation, Austin, TX (Circuit Breakers, Load Centers, Boxes, Panelboards)$85,0000.88%WBE TOTALS - SUBCONTRACTORS549,550.00$ 5.68%(FW) Stephanie Braun Clayton LLC, Austin, TX (Photography, Construction)15,050.00$ 0.16%(FW) Liquid Waste Solutions, LLC (Portable Toilets)7,200.00$ 0.07%(FN) KLP Commercial, LLC, Round Rock, TX (Misc Fabricated items)480,000.00$ 4.96%(FW) Macaulay Controls Co. (Valves, Iron body)47,300.00$ 0.49% Base Bid:$9,682,000NON MBE/WBE TOTALS - SUBCONTRACTORS2,444,216.91$ 25.24%Fuquay Inc., Austin, TX (Erosion control services, construction)9,500.00$ 0.10%Penhall Company, Austin, TX (Boring, drilling, testing and soundings)8,000.00$ 0.08%Jimsco Glass & Window,Temple, TX (Windows)105,440.91$ 1.09%Vera Environmental Solutions, LLC, Cedar Park, TX (Water supply)186,701.00$ 1.93% The Contractor submitted a MBE/WBE Compliance Plan that met the goals of the solicitation and was approved by the Small and Minority Business Resources Department.

Scraped at: Jan. 20, 2020, 12:19 a.m.
Jan. 8, 2020

B4.3 - Backup -Ullrich Lime Feed Loop_CERT_BID_TAB original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

Backup

Scraped at: Jan. 20, 2020, 12:19 a.m.
Jan. 8, 2020

B4.4 - Ullrich WTP Lime Feed Loop - Location Map original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

Ullrich Water Treatment Plant 1000 Forest View Dr.; Austin, TX 78746 District 8

Scraped at: Jan. 20, 2020, 12:19 a.m.
Jan. 8, 2020

B5.2 - Backup Ullrich WTP Conversion WMBE original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

M/WBE Summary Participation subgoals stated in the solicitation were 1.90% African American; 9.00% Hispanic; 4.90% Native Asian; 15.80% WBE. The recommended firms provided a MBE/WBE Compliance Plan that met the goals of the solicitation and was approved by the Small and Minority Business Resources Department. The Second Ranked firm provided a MBE/WBE Compliance Plan that met the goals of the solicitation was approved by the Small and Minority Business Resources Department. Public notice was given for this Request for Qualifications CLMP280 Ullrich Water Treatment Plant Conversion, through the City’s Vendor Connection web portal. Four firms submitted qualifications statements and responses were opened on September 11, 2019. Of the four submittals received none of the firms submitting were certified MBE/WBE. RECOMMENDED FIRM: CDM Smith Inc. – Total Participation: NON M/WBE TOTAL – PRIME 57.90% CDM Smith Inc., Austin TX 57.90% MBE TOTAL – SUBCONSULTANTS 15.80% African American Subtotal 1.90% (MB) All Points Inspection Services, Inc., Austin TX Quality Assurance/Control 1.90% Hispanic Subtotal 9.00% (MH) Azcarate & Associates Consulting Engineers, LLC, Austin TX Engineering Services, Air Conditioning, Heating And Ventilating Engineer, HVAC System Testing, Balancing, Troubleshooting 5.00% (MH) CasaBella Architects, LLC. Austin, TX Architect Services, Professional 3.00% (MH) Flores Geotechnical, LLC., Round Rock, TX Foundation Engineering, Geotechnical-Soils 0.25% (MH) I.T. Gonzalez Engineers, Austin TX Surveying Services 0.50% (MH) The Rios Group, Inc., Austin TX Utility Locater Service 0.25% Native/Asian Subtotal 4.90% (GE) Encotech Engineering Consultants, Inc. Austin, TX Structural Engineering 4.90% WBE TOTAL – SUBCONSULTANTS 15.80% (WF) CDS Graphics, LLC., Wimberly TX Designing Services, Drafting Services, Administrative Services, All Kinds 1.00% (WF) Harutunian Engineering, Inc., Austin TX Electrical Engineering, Instrumentation Engineering, Control Systems Engineering 14.80% NON M/WBE TOTAL - SUBCONSULTANTS 10.50% JH Engineering, LLC., Austin, TX Engineering Services, Professional, Civil Engineering, Commissioning Of Facility Services 10.00% Specialized Response Solutions, Fort Worth, TX Monitoring Equipment And Gas, Engineering Consulting, Chemical Processing, Storage/Engineering, Environmental Engineering 0.50% SECOND RANKED FIRM: Carollo Engineers, Inc. – Total Participation: NON M/WBE TOTAL – PRIME 58.10% Carollo Engineers, Inc., Austin TX 58.10% MBE TOTAL – SUBCONSULTANTS 15.90% African American Subtotal 1.90% (MB) TSIT Engineering & Consulting, LLC, Leander TX Geotechnical Engineering - Soils 1.00% (MB) HVJ Associates, Inc., Austin TX Civil Engineering 1.00% Hispanic Subtotal 9.00% (GE) Maldonado-Burkett, LLP, Austin, TX Surveying Services 1.00% (GE) Jaime Beaman, AIA, Inc., Austin TX Architect Services 2.00% (GE) Azcarate & Associates Consulting Engineers, LLC, Dallas, TX Air conditioning, Heating, and Ventilating Engineering, …

Scraped at: Jan. 20, 2020, 12:19 a.m.
Jan. 8, 2020

B5.3 - Ullrich WTP Conversion Composite Evalution Matrix CLMP280 original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

Capital Contracting OfficeEvaluation of Consultant QualificationsCOMPOSITEReceived:EVALUATION MATRIXProject:Ullrich Water Treatment Plant ConversionProject Manager: Item 1Item 2Item 3aItem 3bItem 5Item 6Item 7Item 8[Yes or No][Yes or No][10]20][15][15][10][10][100][15][115]FirmMBE/WBETurned inTeam'sTeam'sPrimeMajor ScopesTeam'sCOATOTALINTERVIEWTOTALRANK(or Joint Venture)Procurementall RequiredStructureApproachFirm'sof WorkExperienceExperiencePOINTSPOINTSPOINTS ProgramDocumentsComparableComparablewithwithWITHProjectProjectAustinPrimeINTERVIEWSPMgrPProfPprinc.ExperienceExperienceIssues[10][6][4]CDM SmithYY8.7016.708.365.312.9611.4813.609.318.8185.2313.999.131CarolloYY8.1014.858.365.013.3112.5513.608.909.0783.7510.6594.42Black & VeatchYY7.3513.605.365.162.4613.0512.257.468.3375.02075.023ArcadisYY6.0513.708.564.462.0611.4011.458.688.3374.69074.694Project Professionaland Project PrincipalExperienceSeptember 11, 2019Nicholas SybilleProject Manager[20]Item 4REVISED 06/01/12Stand Alone Evaluation Matrix

Scraped at: Jan. 20, 2020, 12:19 a.m.
Jan. 8, 2020

B6.2 - Backup - Walnut Creek MWBE original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

MBE/WBE Summary Public notice was given for this solicitation CLMC745 Walnut Creek Wastewater Treatment Plant Sludge Thickener Rehabilitation through the City’s Vendor Connection web portal. Four bids were received and opened on August 8, 2019. Of the four bids received, none of the firms submitting were certified MBE/WBE. PLW Waterworks, LLC submitted the lowest responsive bid of four bids received including allowances of $150,000: Base Bid Base Bid + Allowances PLW Waterworks LLC, The Woodlands, TX $9,005,900.00 $9,155,900.00 Peabody General Contractors LLC, Austin, TX $9,891,412.07 $10,041,412.07 Matous Construction Ltd., Belton, TX $10,556,400.00 $10,706,400.00 Prota Construction, Inc. and Prota, Inc. JV NON-RESPONSIVE The contractor’s choice of work methodology provides for 28 areas of subcontracting opportunities which are listed below. Project specific sub-goals stated in the solicitation were 1.33% African American; 3.52% Hispanic; 1.08% Native/Asian; and 0.61% WBE. Total participation estimated on base bid amount of $9,005,900: Base Bid:9,005,900.00PRIMENON M/WBE TOTAL2,914,984.7832.37%PLW Waterworks, LLC, The Woodlands, TXMBE TOTALS - SUBCONTRACTORS2,985,687.00$ 33.15%African American Subtotal176,942.00$ 1.96%(MB) E&T Masonry Construction & Remodeling, Manor, TX 168,216.00$ 1.87%(Masonry, Plastering)(MB) Lewis Clark Trucking, City, ST (Hauling services)8,726.00$ 0.10%Hispanic Subtotal2,668,000.00$ 29.63%(FH) T. Morales Co. Electric Controls, Ltd., Florence, TX 2,668,000.00$ 29.63%(Construction & upgrades water treatment plant)Native/Asian American Subtotal140,745.00$ 1.56%(MA) Alpha Paving Industries, Round Rock, TX (Paving/Resurfacing, highways and r17,745.00$ 0.20%(MA) Shah Systems & Technology Corporation, City, ST (Swichgears 123,000.00$ 1.37%WBE TOTALS - SUBCONTRACTORS64,500.00$ 0.72%(FB) All Points Inspection Services, Inc., Austin, TX (Construction photography)8,500.00$ 0.09%(FN) KLP Commercial, LLC, Manor, TX (Pipe, Iron)56,000.00$ 0.62% Base Bid:9,005,900.00NON MBE/WBE TOTALS - SUBCONTRACTORS3,040,728.22$ 33.76%JL Hardware, Tomball, TX (Doors and Windows)13,927.00$ 0.15%A&Y Painting, LLC (Painting, Maintenance & Repair Services)127,700.00$ 1.42%Texas Roofing Co. LP (Roofing)44,500.00$ 0.49%Sunstate Equipment (Truck, Lift, Powered Fork Lifts)23,356.22$ 0.26%Seguin Fabricators LTD (Gratings)25,906.00$ 0.29%Spec Ten (Fire extinguishers, cabinets & covers)1,925.00$ 0.02%Brandt Mechanical Services, Inc. (Plumbing)304,779.00$ 3.38%Rangeline Tapping Services, Inc. (Pipeline equipment, maintenance & repair)5,105.00$ 0.06%Conquest Industries (Demolition services)124,500.00$ 1.38%Environmental Allies GP (Erosion control)4,328.00$ 0.05%Wastewater Transport Services (Sludge removal, building)6,850.00$ 0.08%T. Morales Co. Electric & Controls (electrical)224,000.00$ 2.49% The Contractor submitted a MBE/WBE Compliance Plan that met the goals of the solicitation and was approved by the Small and Minority Business Resources Department. Second and third low bidder information is provided below. SECOND BIDDER - Peabody General Contractors, Austin, TX $9,891,412.07 33.97% NON M/WBE prime participation; 1.37% African American; 35.3% Hispanic; .36% Native/Asian; .94% WBE; 28.06% Non M/WBE subcontractor participation. THIRD BIDDER - Matous Construction, Ltd., Belton, TX $10,566,400.00 41.85% NON M/WBE prime participation; 1.69% …

Scraped at: Jan. 20, 2020, 12:19 a.m.
Jan. 8, 2020

B6.3 - Backup - Walnut Creek Site Map original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

Walnut Creek Wastewater Treatment Plant 7113 FM 969, Austin, Texas 78724 (District 1)

Scraped at: Jan. 20, 2020, 12:19 a.m.
Jan. 8, 2020

B6.4 - Backup Walnut Creek_CERT_BID_TAB original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

Backup

Scraped at: Jan. 20, 2020, 12:19 a.m.
Jan. 8, 2020

B7.2 - Backup WW Collection System MWBE original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

M/WBE Summary Public notice was given for this solicitation, CLMC738 Wastewater Collection System Replacement Lines - North, through the City’s Vendor Connection web portal. Four bids were received and opened on November 7, 2019. Of the four of bids received, three bids were from MBE/WBE certified firms. Facilities Rehabilitation, Inc. submitted the lowest responsive bid of four bids received: Facilities Rehabilitation, Inc., Austin, TX, (MBE/MH) $4,373,958.00 D Guerra Construction, LLC, Austin, TX, (MBE/MH) $4,469,776.10 Smith Contracting, Co., Inc., Austin, TX $4,684,131.75 Santa Clara Construction, Ltd, Austin, TX, (MBE/MH) $4,722,964.00 The contractor’s choice of work methodology provides for three areas of subcontracting opportunities which are listed below. Project specific subgoals stated in the solicitation were 1.93% African American; 5.3% Hispanic; 0.57% Native/Asian; 0.73% WBE. Total participation estimated on base bid amount: Base Bid:4,373,958.00$ PRIMEMBE/MH TOTAL4,218,958.00$ 96.46%Facilities Rehabilitation, Inc., Austin, TX,MBE TOTALS - SUBCONTRACTORS120,000.00$ 2.74%African American Subtotal90,000.00$ 2.06%(MB) Sammy J. Kellough, Austin, TX (Hauling)90,000.00$ 2.06%Hispanic Subtotal-$ 0.00%(Gender/Ethnicity Code) Firm, City, ST (scope of work)-$ 0.00%Native/Asian American Subtotal30,000.00$ 0.68%(MA) Benquest, LLC,Austin, TX (Fuel)30,000.00$ 0.68%WBE TOTALS - SUBCONTRACTORS35,000.00$ 0.80%(FH) CL Concrete Construction Corporation, Taylor, TX (Manhole Construction)35,000.00$ 0.80% The Contractor submitted an MBE/WBE Compliance Plan that met the goals of the solicitation and was approved by the Small and Minority Business Resources Department. Second and third low bidder information is provided. SECOND BIDDER - D Guerra Construction, LLC, Austin, TX $4,469,776.10 96.67% M/WBE prime participation; 2.01% African American; 0.58% Native/Asian; 0.74% WBE subcontractor participation. THIRD BIDDER - Smith Contracting, Co., Inc., Austin, TX $4,684,131.75 91.42% NON-M/WBE prime participation; 1.94% African American; 5.32% Hispanic; 0.58% Native/Asian; 0.75% WBE subcontractor participation.

Scraped at: Jan. 20, 2020, 12:19 a.m.
Jan. 8, 2020

B7.3 - Backup - Wastewater Collection System_CERT_BID_TAB original pdf

Thumbnail of the first page of the PDF
Page 1 of None page

Backup

Scraped at: Jan. 20, 2020, 12:19 a.m.