Zoning and Platting CommissionDec. 6, 2022

05 CORRECT Backup - C8J-2022-0129.1A - Premier Logistics Park Subdivision_Part2.pdf — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 2 pages

1 3 8 0 . 5 8 4 . 2 1 5 : T 0 2 3 E T U S I , Y P X E C A P O M . N 1 0 7 8 0 0 0 8 0 0 0 1 - S L M R F G N Y E V R U S I I . G E R X T I 9 6 4 - F M R F G N R E E N G N E I I . G E R X T 9 5 7 8 7 X T , I N T S U A R E T N E C S C I T S I G O L 0 9 2 K R A P E N A L R E K C E D 3 5 6 1 1 S A X E T , Y T N U O C S I V A R T , N I T S U A F O Y T I C C S E 1 E S A H P N O I T C U R T S N O C GENERAL NOTES: IF DISTURBED AREA IS NOT TO BE WORKED ON FOR MORE THAN 14 DAYS, DISTURBED AREA NEEDS TO BE STABILIZED BY REVEGETATION MATTING. [ECM 1.4.4.B.3, SECTION 5,1.] ENVIRONMENTAL INSPECTOR HAS THE AUTHORITY TO ADD AND/OR MODIFY EROSION/SEDIMENTATION CONTROLS ON SITE TO KEEP PROJECT IN-COMPLIANCE WITH THE CITY OF AUSTIN RULES AND REGULATIONS. [LDC 25-8-183] CONTRACTOR SHALL UTILIZE DUST CONTROL MEASURES DURING SITE CONSTRUCTION SUCH AS IRRIGATION TRUCKS AND MULCHING AS PER ECM 1.4.5(A), OR AS DIRECTED BY THE ENVIRONMENTAL INSPECTOR. THE CONTRACTOR WILL CLEAN UP SPOILS THAT MIGRATE ONTO THE ROADS A MINIMUM OF ONCE DAILY.” [ECM 1.4.4.D.4] PROJECT LOCATION TRAVIS COUNTY VICINITY MAP DESIGN DRAWN DATE SHEET NO. 19 SP-2021-0095C 1 3 8 0 . 5 8 4 . 2 1 5 : T 0 2 3 E T U S I , Y P X E C A P O M . N 1 0 7 8 0 0 0 8 0 0 0 1 - S L M R F G N Y E V R U S I I . G E R X T I 9 6 4 - F M R F G N R E E N G N E I I . G E R X T 9 5 7 8 7 X T , I N T S U A R E T N E C S C I T S I G O L 0 9 2 K R A P E N A L R E K C E D 3 5 6 1 1 S A X E T , Y T N U O C S I V A R T , N I T S U A F O Y T I C C S E 2 E S A H P N O I T C U R T S N O C GENERAL NOTES: IF DISTURBED AREA IS NOT TO BE WORKED ON FOR MORE THAN 14 DAYS, DISTURBED AREA NEEDS TO BE STABILIZED BY REVEGETATION MATTING. [ECM 1.4.4.B.3, SECTION 5,1.] ENVIRONMENTAL INSPECTOR HAS THE AUTHORITY TO ADD AND/OR MODIFY EROSION/SEDIMENTATION CONTROLS ON SITE TO KEEP PROJECT IN-COMPLIANCE WITH THE CITY OF AUSTIN RULES AND REGULATIONS. [LDC 25-8-183] CONTRACTOR SHALL UTILIZE DUST CONTROL MEASURES DURING SITE CONSTRUCTION SUCH AS IRRIGATION TRUCKS AND MULCHING AS PER ECM 1.4.5(A), OR AS DIRECTED BY THE ENVIRONMENTAL INSPECTOR. THE CONTRACTOR WILL CLEAN UP SPOILS THAT MIGRATE ONTO THE ROADS A MINIMUM OF ONCE DAILY.” [ECM 1.4.4.D.4] PROJECT LOCATION TRAVIS COUNTY VICINITY MAP DESIGN DRAWN DATE SHEET NO. 20 SP-2021-0095C