Zoning and Platting CommissionSept. 1, 2020

B-03 (Victoria Cantu Exhibits).pdf — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 23 pages

B-031 of 23 B-032 of 23 B-033 of 23 B-034 of 23 B-035 of 23 B-036 of 23 B-037 of 23 B-038 of 23 B-039 of 23 B-0310 of 23 B-0311 of 23 B-0312 of 23 B-0313 of 23 B-0314 of 23 B-0315 of 23 CITY OF AUSTIN –DEVELOPMENT SERVICES DEPARTMENT SUBDIVISION APPLICATION – MASTER COMMENT REPORT CASE NUMBER: REVISION #: UPDATE: CASE MANAGER: Cesar Zavala PHONE #: C8-2019-0100.0A 00 U0 512-974-3404 PROJECT NAME: Westover Hills Section Four Phase Two Resubdivision of Lot 3 Block ''E'', LOCATION: 4201 HYRIDGE DR SUBMITTAL DATE: July 12, 2019 REPORT DUE DATE: August 9, 2019 FINAL REPORT DATE: Sept 13, 2019 STAFF REPORT: 35 DAYS HAVE BEEN ADDED TO THE UPDATE DEADLINE This report includes all staff comments received to date concerning your most recent subdivision application submittal. The comments may include requirements, recommendations, or information. The requirements in this report must be addressed by an updated submittal. The subdivision application will be approved when all requirements from each review discipline have been addressed. However, until this happens, your application is considered disapproved. Additional comments may be generated as a result of information or design changes provided in your update. If you have any questions, problems, concerns, or if you require additional information about this report, please do not hesitate to contact your case manager at the phone number listed above or by writing to the City of Austin, Development Services Department, P.O. Box 1088, Austin, Texas 78704. UPDATE DEADLINE (LDC 25-4-56; 25-4-82): It is the responsibility of the applicant or his/her agent to update this subdivision application. The final update to clear all comments must be submitted by the update deadline, which is July 25, 2020. Otherwise, the application will automatically be denied. If this date falls on a weekend or City of Austin holiday, the next City of Austin workday will be the deadline. UPDATE SUBMITTALS: A formal update submittal is required. Please bring a copy of this report with you upon submittal to Intake. Please submit 10.0 of the plans and 10.0 copies of a letter that address each comment for distribution to the following reviewers. Clearly label information or packets with the reviewer’s name that are intended for specific reviewers. No distribution is required for the Planner 1. Updates may be submitted between the hours of 8:30 am and 4:00 pm. Updates submitted after 3 pm may be processed on the following business day. Please note: if Austin Water rejects a plan on Update 2, a fee is due at or before resubmittal. Please contact Intake for the fee amount. REVIEWERS: Planner 1 : Cindy Edmond 911 Addressing : Cathy Winfrey City Arborist : Caitlin Campbell PARD / Planning & Design : Scott Grantham Subdivision : Cesar Zavala Water Quality : Christine Perez Electric : Karen Palacios Drainage Engineering : Christine Perez Environmental : Hank Marley Site Plan Plumbing : Brad Ward AW Utility Development Services : Bradley Barron Transportation Planning : Jaron Hogenson B-0316 of 23 Subdivision Review - Cesar Zavala - 512-974-3404 SR 1. Provide the plat on 18 x 24 inch sheets and remove the area or border showing a revision table, engineer’s information, and property address. Additional comments may be generated after the plat is provided on 18 x 24 inch sheets. SR 2. Include a scale on the plat. SR 3. Annotate the 25 foot building line inside the lots with a dashed line. SR 4. Add the application submittal date on the plat, June 20, 2019. SR 5. Update the case number on the plat o read as C8-2019-0100.0A. SR 6. On Sheet 2 in the director’s approval block, remove J. Rodney Gonzalez as Director and list Denise Lucas as Director. SR 7. Update the commission approval block to reference the Zoning & Platting Commission. Accepted and authorized for record by the Zoning & Platting Commission of the City of Austin, Texas, on this, the ______day of ______20__. ___________________________ ________________________ Jolene Kiolbassa, Chair Ana Aguirre, Secretary SR 8. On Note #28 the document number in the blank field will be needed prior to the recording of the plat. SR 9. Submit a scaled drawing that shows the existing structures and the new lot lines with annotated setbacks. The structures must meet zoning setbacks from the new lot lines. SR 10. Contact the Intake Department to verify the application fees, the case currently shows an outstanding balance. SR 11. The following items that are needed to approve and record the plat at Travis County. After the plat has been approved by the Commission, the plat is sent to Millers to have a mylar copy made (this takes 1-3 working days). Recording fees will be calculated after the plat is approved and all related documents are available. • Plat containing original signatures, with appropriate seals and dates. The seals must be legible and in black ink. • 8 ½“ x 11” paper copy of the plat • Original tax certificate(s) showing all taxes paid for the previous year. • Any document to be recorded with the plat such as a Subdivision construction agreement (SCA), easement document, etc. • Check for the plat recordation fee and any document to be recorded with the plat. B-0317 of 23 Electric Review - Karen Palacios - 512-322-6110 EL 1. The shown 10’ Elec/Telecomm shown needs to be labled in the legend with wording below. (Ten foot electric distribution, electric telecommunications, and electric fiber easement) Show the easement on the face of the plat. If additional ROW is required by the City of Austin the easement must be from the new ROW. 911 Addressing Review - Cathy Winfrey - 512-974-2398 AD1: This plat review is rejected for the following reasons. AD2: Please include the street type in the labels for the dedicated rights of way included on your plat: WESTOVER CLUB DR, MARTINDALE DR. Drainage Engineering Review - Christine Perez - 512-974-3568 Release of this application does not constitute a verification of all data, information, and calculations supplied by the applicant. The engineer of record is solely responsible for the completeness, accuracy, and adequacy of his/her submittal, whether or not the application is reviewed for code compliance by city engineers. DE 1. DCM 1.2.2(D) states, “Stormwater runoff peak flow rates shall not be increased at any point of discharge from a site for the two (2), ten (10), 25 and 100-year storm frequency events.” Please provide the information necessary to verify compliance. How are flow increases from Lot 3A being addressed? DE 2. Detention or RSMP participation will be required for the increase in runoff from existing to developed conditions. DCM 1.2.2(E) states, “Regulation of peak flows to allowable levels, as determined by the provisions of this policy, shall be achieved by storage on-site or off-site or by participation in an approved Regional Stormwater Management Program. The Stormwater Management Section of this manual provides a guide to acceptable methods, but does not limit the designer to the methods presented therein. Guidelines for participation in the Regional Stormwater Management Program are contained in the Stormwater Management Section of this manual.” DE 3. If the applicant desires to participate in the Regional Stormwater Management Program (RSMP), please request participation at RSMP@austintexas.gov and copy this reviewer. A feasibility meeting will be set; please include this reviewer. DE 4. For the RSMP process, please visit http://www.austintexas.gov/RSMP for more information including the meeting request form, application, participation guidance. DE 5. To request the City’s existing HEC-HMS models please email floodpro@austintexas.gov or obtain them online at atxfloodpro.com. DE 6. To request the City’s existing StormCAD models please contact Rupali Sabnis, P.E. at rupali.sabnis@austintexas.gov. DE 7. If detention is elected, the following items will be required: B-0318 of 23 1. A drainage plan including runoff calculations, detention pond design and analysis including an electronic model of the pond for pre-developed and post-developed runoff conditions; 2. A Drainage Easement With Required Maintenance for the stormwater management facilities; Please show the easement on the plat. 3. Provide a sealed engineer’s fiscal estimate for construction of the stormwater management facilities; 4. Once the fiscal estimate has been approved, please post fiscal with the Fiscal Surety office prior to filing the exemption and prior to approval of the final plat. Once posted, please provide a receipt of payment to this reviewer. Fiscal surety is for construction of the stormwater management facilities and is required for these improvements. (Fiscal may be returned to the applicant after an engineer’s concurrence letter is received by the City of Austin that states that the stormwater management facilities have been constructed according to City of Austin standards); 5. Coordinate exemption with DAC. After approval, the pond design will need to be submitted to DAC for a site plan exemption. This reviewer will let the applicant know when they can move forward with submittal. Additional comments may be generated once the information from the above comments is provided. DE 8. Engineer's seal, signature and date required DE 9. For resubdivision of platted lots a copy of the existing recorded plat must be provided with the resubdivision submittal. Please provide a copy of the existing recorded final plat. DE 10. Please add the following note: [LDC 25-5-1] "Prior to construction, except detached single family on any lot in this subdivision, a site development permit must be obtained from the City of Austin." DE 11. Please add the following note: For maintenance of facility, see agreement #___________________, official public records, Travis County, Texas. the detention filed in document DE 12. Please revise Note 5 as follows: "Prior to construction on lots in this subdivision, drainage plans will be submitted to the City of Austin for review. Rainfall run-off shall be held to the amount existing at undeveloped status by ponding or other approved methods. All proposed construction or site alteration on Lot(s) _____ Block(s) ______ requires approval of a separate Development Permit." DE 13. The Floodplain Note must be certified with signature and seal of registered engineer. DE 14. Please clearly delineate the offsite drainage area on the drainage area map and provide the fully developed flows and the corresponding acreage of the contributing offsite area. Drainage easements are required for conveyance of offsite flows [LDC 25-7-61 & 25-7-151]. DE 18. Remove or clarify the use of Note 27. Provide supporting documentation. DE 15. Remove Note 22. DE 16. Remove Note 23. DE 17. Remove Note 24. DE 19. Remove Note 28. B-0319 of 23 Environmental Review - Hank Marley - 512-974-2067 Endangered Species EV 01 According to COA GIS, this site is located within the endangered species area. Notify the following individuals via email of the proposed development and cc this EV reviewer: Travis County: BCCP@traviscountytx.gov US Fish and Wildlife: Tanya Sommer tanya_sommer@fws.gov (512)490-0057 X222 Kimberlee Harvey at BCCP: kimberlee.harvey@austintexas.gov [LDC 25-8-691 through 696] Slopes & Impervious Cover EV 02 and comment regarding LDC 25-8-301 & 302 are pending. Revise the slope map shown on sheet 6 based on a 2 foot contour interval. Additional review EV 03 comment are pending. [LDC 25-8-423] Revise the Q1 table based on a 2 foot contour interval. Additional Q1 and Q2 table review and EV 04 not 25%. Update the Q2 table as necessary. [LDC 25-8-423] The allowable impervious cover in the Water Supply Suburban watershed classification is 30%, EV 05 The total proposed impervious cover shown in the Q2 table must be based on the sum of the impervious cover assumptions provided in LDC 25-8-64 for lot 3A and lot 3B. Based on LDC 25-8-64, the assumed impervious cover for lot 3A is 3500 square feet and the assumed impervious cover for lot 3B is 2500 square feet. Revise the Q2 table such that the total proposed impervious cover is 6000 square feet. Notes EV 06 Edit plat note #26 to state the following: “This project is subject to the Void and Water Flow Mitigation Rule (City of Austin Environmental Criteria Manual and City of Austin Standard Specifications Manual).” EV 07 The final plat proposes single family residential lot(s) with slopes in excess of 15%. Per LDC 25- 8-303, add a plat note stating: “Slopes in excess of 15% exist on Lot 3A & 3B. Construction on slopes is limited per the Land Development Code.” PARD / Planning & Design Review - Scott Grantham - 512-974-9457 PR 1: Parkland dedication and park development fees are required (City Code 25-1-601) and must be paid prior to approval. Based on SF-3 zoning and the size of the proposed lots, a total of 4 residential units could be allowed, 2 per lot. However, no parkland fees will be collected for the existing residence, so the fee for 3 units is required at this time. An invoice will issued in AMANDA with the next update. Please confirm that there is currently one unit on the site. PR 2: Add the following note to the plat: A fee-in-lieu of parkland dedication and park development has been paid for 3 residences. No fee was charged for the existing residence. B-0320 of 23 AW Utility Development Services - Bradley Barron - 512-972-0078 WW1. The proposed subdivision is currently served with City of Austin water and wastewater utilities. Each lot must have a separate water and wastewater utility connection and no existing or proposed plumbing may cross lot lines. The landowner, at own expense, will be responsible for providing any future water and wastewater utility improvements, offsite main extensions, system upgrades, utility relocations and or abandonments to serve each lot. WW2. Obtain copies of your current tap records from the AW TAPs office at 512-972-0000 and contact Brad Ward at 512-972-0339 to determine if any non-compliant tap or private plumbing violations will be created by the proposed subdivision and obtain his approval. Written approval from Mr. Ward will be required for successful plat release. FYI. The landowner must pay the tap and impact fee once the landowner makes an application for a City of Austin water and wastewater utility tap permit. Water Quality Review - Christine Perez - 512-974-3568 Release of this application does not constitute a verification of all data, information, and calculations supplied by the applicant. The engineer of record is solely responsible for the completeness, accuracy, and adequacy of his/her submittal, whether or not the application is reviewed for code compliance by city engineers. WQ 1. Please demonstrate compliance with Environmental Criteria Manual (ECM) 1.6.8 and Land Development Code (LDC) LDC 25-7-61(B)(3) regarding the on- site control of the 2-yr storm for erosion control purposes. ECM 1.6.8 states, “On-site control of the two-year storm is achieved when the developed- conditions peak runoff rate leaving the site for a given drainage area is less than or equal to the existing-conditions runoff rate. The flow rates can be considered equal if the developed rate is no more than one-half (0.5) cfs greater than the existing rate or if the developed rate is no more than one-half (0.5) percent greater than the existing rate and there are no existing erosion problems downstream of the site” (LDC 25-7-61). Please provide data and calculations necessary to verify compliance. WQ 2. Please provide compliance with § 25-1-83 which requires all commercial and multi-family applications for subdivision, site plan, and building permit on tracts greater than one acre or on tracts one acre or less, but within an abandoned landfill buffer as shown on the City of Austin closed landfill map to provide a: 1. City of Austin Certification of Compliance Form; 2. Certificate sealed by a Professional Engineer certifying the site is not over a closed landfill and describing the basis for that determination, or; 3. Development permit from the TCEQ, or; 4. Letter from TCEQ stating that the project is not subject to the requirements of TAC Ch. 330, Subchapter T. The form is on the City of Austin website at http://www.austintexas.gov/sites/default/files/files/Watershed/regulations/Landfill_Verification_ Form.pdf. B-0321 of 23 City Arborist Review - Caitlin Campbell - 512-974-1341 Please be advised that additional comments may be generated as update information is reviewed. If an update has been rejected, reviewers are not able to clear comments based on phone calls, emails, or meetings, but must receive formal updates in order to confirm positive plan set changes. CA 1: Please provide a tree survey for trees 19” and greater in diameter. The tree survey list must include the following: 1) 2) 3) Heritage trees must be indicated with an ‘H’ on the tree survey list; Multi-trunk trees must be indicated with an ‘M’ and each stem must be listed; List the particular species (such as Live Oak, Cedar Elm, Texas Ash, etc) for each tree. Indicating only Oak or only Ash for example, does not comply with ECM requirements. Indicate the date of the survey next to the tree list. The survey must not be older than 5 years. 4) CA 2: CA 3: Please provide a buildability study for the proposed second lot. Based on the maximum impervious cover allowed by code, please include conceptual building footprints, driveway, grading and utility route locations in relation to the protected and Heritage trees on the lot. Please be aware that resubdivisions cannot create a hardship that prevents reasonable use or access to the lot at the time of building permit submittals. The second lot will need to comply with tree preservation regulations at the time of building permit submittal. If there is a possibility that one or several of the trees on the proposed second lot may be considered dead, diseased or an imminent hazard, then I suggest having a third party arborist conduct a condition assessment of those trees to determine if they are worth designing around. Site Plan Plumbing - Brad Ward - 512-972-0339 Rejected Records indicate that there are possibly (2) Water and (2) Wastewater Taps on this property. One of each on the west side and one of each on the east side. Need field verification of which Taps are used by the existing structure, to determine whether a lot line crossing exists with the proposed lot line. Lot line crossing with private plumbing is prohibited by Plumbing Code, and re-subdivision may not cause a code violation. Industrial Waste Review - Rachel Reddig - 512-972-1074 Update #0 July 24, 2019 Approved IW1. The Industrial Waste signature line on the cover sheet is not needed. IW2. Based on the plans submitted, the requirements under Chapter 15-10 of the Austin City Code (Wastewater Regulations) do not apply. B-0322 of 23 Transportation Planning - Jaron Hogenson - 512-974-2253 TR1. TR2. On final plats, provide a plat note stating that streets will be constructed to City of Austin standards. LDC 25-6-171(a). If the fee for sidewalks has already been provided, provide the receipt. If not, the below comments will apply. • Sidewalks are required on the subdivision side of Hyridge Drive. Identify the location of the sidewalks by a dotted line on the final plat and include the sidewalk symbol within the Legend. LDC 25-6-351. TCM, 4.2.1. • Provide the following plat note: "Public sidewalks, built to City of Austin standards, are required along the following streets and as shown by a dotted line on the face of the plat: Hyridge Drive. These sidewalks shall be in place prior to the lot being occupied. Failure to construct the required sidewalks may result in the withholding of Certificates of Occupancy, building permits, or utility connections by the governing body or utility company." LDC 25-6- 351. • Remove note 17 regarding sidewalk payment. Sidewalk payment can be discussed during the time of residential review. TR3. The resubdivision of the site creates a sight distance issue for the proposed driveway, however it will be allowed due to the site being on a controlled intersection. Add the following note to the plat: • “The driveway for the site shall be located in a position that maximizes the visibility of a vehicle to the adjacent intersection.” End of report B-0323 of 23