REGULAR MEETING OF THE HISTORIC LANDMARK COMMISSION ARCHITECTURAL REVIEW COMMITTEE WEDNESDAY, JULY 8, 2026, AT 4:00 P.M. PERMITTING AND DEVELOPMENT CENTER, CONFERENCE ROOM 1401 6310 WILHELMINA DELCO DR AUSTIN, TEXAS Some members of the Historic Landmark Commission may be participating by videoconference. Public comment will be allowed in-person or remotely via telephone. Speakers may only register to speak once either in-person or remotely and will be allowed up to three minutes to provide their comments. Registration no later than noon the day before the meeting is required for remote participation by telephone. To register to speak remotely, please use the QR code or link at the end of this document. For questions, please email preservation@austintexas.gov. KEVIN KOCH JAIME ALVAREZ HARMONY GROGAN CURRENT COMMISSIONERS AGENDA CALL TO ORDER PUBLIC COMMUNICATION: GENERAL The first 10 speakers signed up prior to the meeting being called to order are allowed three minutes to speak on items not posted to the agenda. APPROVAL OF MINUTES 1. Approve the minutes of the Architectural Review Committee regular meeting on June 10, 2026. DISCUSSION ITEMS 2. 3. 4. 5. 6. 7. 803 Pressler St. Smoot-Terrace Park Local Historic District Council District 9 Proposal: Construct a second story addition and renovate the first story of a non-contributing property. Applicant: Trey Farmer C14H-2013-0003 – 800 W. Cesar Chavez St. Seaholm Power Plant Council District 9 Proposal: Install one new rooftop mechanical unit and three types of security cameras on the building exterior. Applicant: Laurie Limbacher 4105 Avenue G Hyde Park Local Historic District Council District 9 Proposal: Restore the front and side elevations of a contributing building. Construct a new 2- story addition at the rear of the existing home, a new 2-story detached garage, and an accessory unit at the rear of the property with alley-access. Applicant: Tim Cuppett PR-2026-051667 – 4115 Avenue D Hyde Park Local Historic District Council District 9 Proposal: Remodel a contributing building. Applicant: Mike McHone HR-2026-071919 – 1106 Rio Grande St. West Downtown National Register Historic District Council District 9 Proposal: Renovate Pease Elementary School. Applicant: Laurie Limbacher 1511 Rainbow Bend Old West Austin National Register Historic District Council District 10 Proposal: Construct a new residence. Applicant: Clean Tag Permits 8. 9. 10. HR-2026-071919 – 705 West Lynn St. West Line National Register Historic District Council District 9 Proposal: Construct a new residence. Applicant: Dan Illescas 1209 W 8th St. West Line National Register …

Scraped at: July 5, 2026, 2:19 a.m.

03.0 - 800 W Cesar Chavez St - drawings original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

DN NEW ROOF TOP MECH UNIT 1 OVERALL ROOF PLAN - HIGH ROOF OVERALL ROOF PLAN - HIGH ROOF 3/32" = 1'-0" © 2026, STG Design, Inc. ALL RIGHTS RESERVED stgdesign.com FOR REFERENCE ONLY WIT Tech TI OVERALL ROOF PLAN - HIGH ROOF A-113 MECHANICAL UNIT DESIGN AND DIMENSIONS SYMBOL LEGEND SECURITY CAMERA SECURITY CAMERA TYPE 1 SECURITY CAMERA TYPE 2 SECURITY CAMERA TYPE 1 ALL WALL MOUNTED CAMERAS TO HAVE POWER SUPPLIED THROUGH WALL WITH MINIMAL FACE MOUNTED CONDUIT. ALL SECURITY CAMERAS MOUNTED TO STEEL BOILER STRUCTURE TO HAVE CONDUIT ROUTED TIGHT TO STEEL FLANGES. SECURITY CAMERA TYPE 2 SECURITY CAMERA TYPE 1 SECURITY CAMERA TYPE 1 SECURITY CAMERA TYPE 2, MOUNTED TO NEW 10' TALL METAL POLE SECURITY CAMERA TYPE 2 ATTACHED TO UNDERSIDE OF STEEL STRUCTURE SECURITY CAMERA TYPE 2 MOUNTED TO FACE OF BEAM ABOVE ENTRANCE TO LEVEL B1 A2 EXTERIOR ELEVATION - NORTH EXTERIOR ELEVATION - NORTH 3/32" = 1'-0" SECURITY CAMERA TYPE 3 EXISTING SECURITY CAMERA SECURITY CAMERA TYPE 2 ATTACHED TO UNDERSIDE OF STEEL STRUCTURE SECURITY CAMERA TYPE 2 ATTACHED TO STEEL BOILER STRUCTURE SECURITY CAMERA TYPE 3 SECURITY CAMERA TYPE 3 NEW MECHANICAL ROOF TOP UNIT SECURITY CAMERA TYPE 2 A1 EXTERIOR ELEVATION - EAST EXTERIOR ELEVATION - EAST 3/32" = 1'-0" SECURITY CAMERA TYPE 2 SECURITY CAMERA TYPE 2, MOUNTED TO NEW METAL POLE © 2026, STG Design, Inc. ALL RIGHTS RESERVED stgdesign.com FOR REFERENCE ONLY WIT Tech TI EXTERIOR ELEVATIONS 06/12/26 P-201a MOUNTING DETAIL AT CORNERS3Dimensions 5.52" W x 4.93" H x 4.41"DMOUNTING DETAIL AT SOUTH CANOPIESALL OTHER CAMERAS TO BE FACE MOUNTED SYMBOL LEGEND SECURITY CAMERA SECURITY CAMERA TYPE 1 SECURITY CAMERA TYPE 2 SECURITY CAMERA TYPE 1 ALL WALL MOUNTED CAMERAS TO HAVE POWER SUPPLIED THROUGH WALL WITH MINIMAL FACE MOUNTED CONDUIT. ALL SECURITY CAMERAS MOUNTED TO STEEL BOILER STRUCTURE TO HAVE CONDUIT ROUTED TIGHT TO STEEL FLANGES. SECURITY CAMERA TYPE 2 A2 EXTERIOR ELEVATION - WEST Copy 3 EXTERIOR ELEVATION - WEST 3/32" = 1'-0" SECURITY CAMERA TYPE 2 SECURITY CAMERA TYPE 2, CONDUIT ROUTED TIGHT TO UNDERSIDE OF CANOPY SECURITY CAMERA TYPE 1 SECURITY CAMERA TYPE 1 NEW MECHANICAL ROOF TOP UNIT SECURITY CAMERA TYPE 2 SECURITY CAMERA TYPE 2 A1 EXTERIOR ELEVATION - SOUTH EXTERIOR ELEVATION - SOUTH 3/32" = 1'-0" © 2026, STG Design, Inc. ALL RIGHTS RESERVED stgdesign.com FOR REFERENCE ONLY SECURITY CAMERA TYPE 2 ON ARM PROTRUDING FROM THE CANOPY, CONDUIT ROUTED …

Scraped at: July 5, 2026, 2:19 a.m.

06.0 - 1106 Rio Grande St - project summary original pdf

Thumbnail of the first page of the PDF
Page 1 of 7 pages

Project Summary: The Pease Elementary School building dates from 1876, one of the first schools built with public funds in Texas. The building was expanded in 1895, 1896, 1916 and 1926, and remodeled in 1949. The school building is three stories, load bearing masonry construction with a stucco exterior finish applied to the masonry walls. The building was designated as a Recorded Texas Historic Landmark in 2013 and is a contributing structure to the West Austin Downtown National Register Historic District, designated in 2024. The primary goals of the Pease Elementary School rehabilitation project are to prepare the building for use as an early childhood learning center on the lower two floors and as office space on the upper floor. Goodwill Austin will operate the early childhood learning center, and United Way for Greater Austin will occupy the office spaces. The project will be completed in two primary construction phases. Phase I, included in these review materials, addresses conditions at the building exterior. Phase II, not included in these review materials, addresses conditions at the building interior and the site and grounds. The exterior work to be done under the Phase I project includes: • Remove existing exterior fire stairs and replace with new exterior fire stairs • Window and exterior door replacement • Downspout replacement • Limited repairs to existing roof, in the areas of new penetrations through the existing roof • Limited repairs to existing stucco coating, in the areas where window, exterior door and fire stair replacement occurs • Exterior painting of stucco coating East Elevation North Elevation West Elevation South Elevation West Elevation, detail West Elevation, detail West Elevation, detail South Elevation, detail South Elevation, detail South Elevation, detail South Elevation, detail South Elevation, detail South Elevation, detail