Electric Utility Commission - June 13, 2022

Electric Utility Commission Regular Meeting of the Electric Utility Commission

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

Electric Utility Commission June 13, 2022  6:00 PM Austin Energy Headquarters; 1st Floor; Shudde Fath Conference Room 4815 Mueller Blvd, Austin TX 78723 Some members of the Electric Utility Commission maybe participating by videoconference. The meeting may be viewed online at: http://www.austintexas.gov/page/watch-atxn-live Public comment will be allowed in-person or remotely by telephone. Speakers may only register to speak on an item once either in-person or remotely and will be allowed up to three minutes to provide their comments. Registration no later than noon the day before the meeting is required for remote participation. To register contact Natasha Goodwin at Natasha.Goodwin@austinenergy.com or 512-322-6505. AGENDA Members: Marty Hopkins, Chair (Vela) Dave Tuttle, Vice Chair (Alter) Marshall Bowen (Kelly) Randy Chapman (Pool) Cary Ferchill (Mayor) Erik Funkhouser (Fuentes) Karen Hadden (Kitchen) Makenna Jonker (Harper-Madison) Cyrus Reed (Tovo) Kay Trostle (Ellis) Vacant (Renteria) For more information, please visit: www.austintexas.gov/euc CALL MEETING TO ORDER PUBLIC COMMUNICATION: GENERAL Speaker must be present and will be allowed up to three minutes to provide their comments. APPROVAL OF MINUTES 1. Approve minutes of the May 9, 2022 meeting. NEW BUSINESS – CONSENT ( ) = Target Council Meeting Date; [ ] = RCA Type 2. (7/28) [AE- Tract 1] Approve a resolution authorizing the filing of eminent domain proceedings and payment to acquire the property interest for the Circuit 811 Transmission Electric Line upgrade project from Justin Lane Substation to McNeil Lane Substation for the public use of providing reliable, safe electricity service, which require acquisition of real property rights consisting of an Electric Transmission and Distribution Easement consisting of approximately 0.028 of an acre (1,233 square feet), and a Temporary Construction Easement consisting of approximately 0.187 of an acre (8,131 sq.ft) being a portion of Lots 10 through 16, Block A, North Gate Addition, a subdivision in Travis County, Texas, according to the plat recorded in Plat Cabinet 3, Page 196, Plat Records Travis County, Texas and being a part of that called 0.555 acres, which is part of the said lots 10 through 16, Block A, of the said subdivision, as described to R&K Investments, A Texas General Partnership in that certain Warranty Deed with Vendor’s Lien as recorded in Volume 12132, page 2123, Real Property Records of Travis County Texas for the Austin Energy Transmission Circuit 811 JL-MC 138kV upgrade project, currently appraised at $98,410 subject to an increase in value based on updated …

Scraped at: June 10, 2022, 4:30 p.m.

Item 6: Base Rate Review Process and Community Outreach Update original pdf

Thumbnail of the first page of the PDF
Page 1 of 14 pages

Austin Energy Base Rate Review Status and Process Update Tammy Cooper, Sr. Vice President – Regulatory, Communications, and Compliance June 13, 2022 © 2018 Austin Energy Process Timeline Update 2 Austin Energy Base Rate Review Timeline AEUOC Presentation April 5, 2022 End of Discovery on Rebuttal July 8, 2022 Base Rate Filing Package Published April 18, 2022 Request to Participate Deadline May 18, 2022 IHE Recommendation August 31, 2022 Council Work Session/ Set Public Hearing November 3, 2022 Council Public Hearing November 17, 2022 Public Outreach Public Participation, Discovery, Conferences & Review Approval JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC Unaudited financial data completed January 2022 6/13 EUC Presentation March 21, 2022 End of Briefing August 1, 2022 Final Conference July 14-15, 2022 End of Discovery on Direct June 1, 2022 EUC Review of IHE Recommendation October 17, 2022 Effective Date January 1, 2023 Participant Response to IHE Recommendation September 15, 2022 3 Austin Energy Base Rate Review Formal Participants • Independent Consumer Advocate (ICA) • Homeowners United for Rate Fairness • Coalition for Clean Affordable and • Data Foundry, LLC Reliable Energy (CCARE) • Victor Martinez, Austin Energy • 2WR Customer • Paul Robbins • Texas Industrial Energy Consumers (TIEC) • NXP Semiconductor • Austin Regional Manufacturers Association (ARMA) • National Instruments • Sierra Club and Public Citizen • Solar United Neighbors (SUN) • Solar and Storage Coalition 4 Community Outreach 5 Customer Outreach to Promote Community Meetings • Websites:  Austinenergy.com  Speakupaustin.org in multiple languages  Banner on COA Utilities payment portal • Flyers, posters and paper feedback forms in libraries and Utility Customer Service Centers • All-customer emails • Social media:  NextDoor posts for each in-person meeting  Facebook and Twitter posts • Posters at recreation centers • Utility News on-bill messaging • Council office outreach  Office meetings  Content for electronic newsletters • News release and news interviews in English and Spanish 6 Austin Energy Base Rate Review Email Samples Residential 7 Content Across City of Austin Channels Austin Utilities Now Monthly City of Austin Utilities newsletter Utility News Monthly on-bill messaging April 2022 Austin Energy is preparing for a base rate review that will impact residential and business customers. Learn more starting April 5 at austinenergy.com/go/rates. May - July 2022 Austin Energy is proposing base rate changes through a base rate review that will impact residential and …

Scraped at: June 10, 2022, 4:30 p.m.

Item 7: Budget and Audit Working Group Draft Recommendations original pdf

Thumbnail of the first page of the PDF
Page 1 of 1 page

Austin Electric Utility Commission Budget and Audit Workgroup Purpose: To review Austin energy financial documents including budgets, expenditures, audits, and to develop recommendations to the EUC and City Council. Meeting Schedule: The workgroup will establish meeting times in conjunction with scheduled meetings of the Electric Utility Commission Discussion Items and Recommendations: June 2022 1. To ensure that City Council receives a broad cross-section of input from residential customers, Austin Energy should conduct a customer poll prior to the EUC and City Council review of rate changes proposed by the Independent Hearing Officer. 2. Recommend that AE rate review Include consideration of the underlying rationale for the budget deficit. The rate review should include an examination of expenses associated with system growth and the proper assignment of those expenses. 3. The EUC should receive a presentation from AE and have an opportunity to provide input and a recommendation to City Council on several proposed tariffs that are not being fully considered as part of the rate review, including the proposed EES tariff, budget and make-up of the programs related to consumer energy solutions, including residential and commercial solar, demand response and energy efficiency programs, the Community Solar Assessment tariff, and the Green Choice tariff. EUC has a role in ensuring that the EES and Community Solar Assessment and Green Choice tariff and resulting budget and programs support the demand reduction, energy efficiency and solar and renewable goals approved in the 2030 Resource Plan. 4. That the EUC and City Council should timely receive AE recommendations on residential customer equity programs to ensure that funding is available to maintain low-income discounts, fee waivers, and for low-income weatherization. Unspent funds collected for weatherization assistance should be budgeted and spent during the 2022-2023 budget cycle. 5. That EUC 2022 Agendas include regular updates from the Independent Consumer Advocate.

Scraped at: June 10, 2022, 4:30 p.m.

Items 2-5 Draft RCAs original pdf

Thumbnail of the first page of the PDF
Page 1 of 8 pages

Item 2 Posting Language ..Title Approve a resolution authorizing the filing of eminent domain proceedings and payment to acquire the property interest for the Circuit 811 Transmission Electric Line upgrade project from Justin Lane Substation to McNeil Lane Substation for the public use of providing reliable, safe electricity service, which require acquisition of real property rights consisting of an Electric Transmission and Distribution Easement consisting of approximately 0.028 of an acre (1,233 square feet), and a Temporary Construction Easement consisting of approximately 0.187 of an acre (8,131 sq.ft) being a portion of Lots 10 through 16, Block A, North Gate Addition, a subdivision in Travis County, Texas, according to the plat recorded in Plat Cabinet 3, Page 196, Plat Records Travis County, Texas and being a part of that called 0.555 acres, which is part of the said lots 10 through 16, Block A, of the said subdivision, as described to R&K Investments, A Texas General Partnership in that certain Warranty Deed with Vendor’s Lien as recorded in Volume 12132, page 2123, Real Property Records of Travis County Texas for the Austin Energy Transmission Circuit 811 JL-MC 138kV upgrade project, currently appraised at $98,410 subject to an increase in value based on updated appraisals or a Special Commissioner’s award. The owner of the needed property is R&K Investments, A Texas General Partnership. The property is located at 7544 N. Lamar Blvd, Austin, Texas 78752. The general route of the project is along the east side of North Lamar from HWY 183 to the McNeil Substation. Fiscal Note Funding in the amount of $98,410 is available in the Fiscal Year 2022-2023 Capital Budget of Austin Energy. ..De Lead Department Austin Energy Prior Council Action: For More Information: Thomas Pierpoint, VP Electric Service Delivery, (512) 972-9507; Pamela England, Manager, Public Involvement & Real Estate Services, (512) 322-6442. Council Committee, Boards and Commission Action: To be reviewed by the Electric Utility Commission on June 13, 2022. Additional Backup Information: The project includes upgrade of the 4.0 mile transmission line with bundled 795 ACSS Drake conductor rated for 3000 amps, and to reinsulate the line and make-ready for ultimate operation at 138kV. The project will provide redundancy and increase reliability. The downtown service area could be seriously jeopardized if one of Austin Energy’s four autotransformers fails and is unavailable for an extended period of time while a replacement unit is being secured. In that …

Scraped at: June 10, 2022, 4:30 p.m.

20220613-07a: Budget & Audit Workgroup Recommendation original pdf

Thumbnail of the first page of the PDF
Page 1 of 1 page

BOARD/COMMISSION RECOMMENDATION Electric Utility Commission Recommendation No. 20220613-07a Budget & Audit Workgroup June 13, 2022 Budget & Audit Workgroup Date: Subject: Motioned: Kay Trostle Seconded: Makenna Jonker Recommendation: To ensure the Independent Hearing Examiner and the City Council are able to consider the broad cross section of input from residential customer forms received by Austin Energy, the Electric Utility Commission recommends that Austin Energy present to the Independent Hearing Examiner as part of the formal hearing process, all feedback forms received. Vote: For: Chair Marty Hopkins, Vice Chair Dave Tuttle, Commissioners Marshall Bowen, Makenna Jonker, Cyrus Reed, Cary Ferchill, and Kay Trostle 7-0 Against: None Abstentions: Commissioner Randy Chapman Absences: Commissioners Funkhauser and Hadden Vacancies: One Attest: Robin Otto, Staff Liaison

Scraped at: July 26, 2022, 2:30 p.m.

20220613-07b: Budget & Audit Workgroup Recommendation original pdf

Thumbnail of the first page of the PDF
Page 1 of 1 page

BOARD/COMMISSION RECOMMENDATION Electric Utility Commission Recommendation No. 20220613-07b Budget & Audit Workgroup June 13, 2022 Budget & Audit Workgroup Date: Subject: Motioned: Marshall Bowen Seconded: Chair Marty Hopkins Recommendation: City Council should review the contribution in aid of construction policy and Austin Energy should present a presentation to the Electric Utility Commission regarding the contribution in aid of construction policy for the Electric Utility Commission’s consideration. Vote: For: Chair Marty Hopkins, Vice Chair Dave Tuttle, Commissioners Marshall 6-0 Bowen, Cyrus Reed, Cary Ferchill, and Kay Trostle Against: None Abstentions: Commissioners Randy Chapman and Makenna Jonker Absences: Commissioners Funkhauser and Hadden Vacancies: One Attest: Robin Otto, Staff Liaison

Scraped at: July 26, 2022, 2:30 p.m.

Approved Minutes original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

ELECTRIC UTILITY COMMISSION MEETING MINUTES Monday, June 13, 2022 The Electric Utility Commission convened a hybrid meeting on Monday, June 13, 2022 in accordance with social distancing protocols necessitated by the COVID 19 pandemic. Commissioners in Attendance (In-person): Marty Hopkins, Chair (District 4), Marshall Bowen (District 6); Randy Chapman (District 7); Makenna Jonker (District 1); Cyrus Reed (District 9) Commissioners in Attendance (Virtual): Cary Ferchill (Mayor); Kay Trostle (District 8), Dave Tuttle, Vice Chair (District 10) Commissioners Absent: Erik Funkhauser (District 2), Karen Hadden (District 5), CALL TO ORDER – Chair Hopkins called the meeting to order at 6:07 p.m. CITIZEN COMMUNICATION: Dale Bulla - spoke on various topics such as storage, electrification, curbside charging, and solar on rooftops. APPROVAL OF MINUTES 1. Approve minutes of the May 9, 2022 Regular Meeting of the Electric Utility Commission. There was a change requested and they will be taken up at the July meeting for action. NEW BUSINESS – CONSENT ( ) = Target Council Meeting Date; [ ] = RCA Type 2. Motion (Chapman) to recommend Items 2-5; seconded (Reed); passed on a vote of 8-0, with Commissioners Funkhauser and Hadden absent. (7/28) [AE- Tract 1] Approve a resolution authorizing the filing of eminent domain proceedings and payment to acquire the property interest for the Circuit 811 Transmission Electric Line upgrade project from Justin Lane Substation to McNeil Lane Substation for the public use of providing reliable, safe electricity service, which require acquisition of real property rights consisting of an Electric Transmission and Distribution Easement consisting of approximately 0.028 of an acre (1,233 square feet), and a Temporary Construction Easement consisting of approximately 0.187 of an acre (8,131 sq.ft) being a portion of Lots 10 through 16, Block A, North Gate Addition, a subdivision in Travis County, Texas, according to the plat recorded in Plat Cabinet 3, Page 196, Plat Records Travis County, Texas and being a part of that called 0.555 acres, which is part of the said lots 10 through 16, Block A, of the said subdivision, as described to R&K Investments, A Texas General Partnership in that certain Warranty Deed with Vendor’s Lien as recorded in Volume 12132, page 2123, Real Property Records of Travis County Texas for the Austin Energy Transmission Circuit 811 JL-MC 138kV upgrade project, currently appraised at $98,410 subject to an increase in value based on updated appraisals or a Special Commissioner’s award. The …

Scraped at: Aug. 11, 2022, 10 p.m.