Construction Advisory Committee Homepage

RSS feed for this page

Feb. 8, 2022

Agenda in English original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Construction Advisory Committee Tuesday, February 8, 2022 One Texas Center 505 Barton Springs Road, 3rd Floor Congress Conference Room 10:00 a.m. – 11:30 a.m. Some members of the Construction Advisory Committee may be participating by videoconference AGENDA CURRENT BOARD MEMBERS: Mayoral – Vacant District 1 – Calvin Williams, Committee Member District 2 – Juan Pedro Munoz, Committee Member District 3 – Bob Batlan, Committee Member District 4 – Lyn Nance-Hendricks, Chair District 5 – Candelario Vazquez, Committee Member District 6 – Drew Hanish, Committee Member District 7 – Vacant District 8 – Sean Forkner, Committee Member District 9 – Anna Bocchini, Committee Member District 10 – Jeff Musgrove, Vice Chair LIAISONS: Executive Liaison – Eric Bailey Staff Liaison – Shelley Franklin CALL TO ORDER CITIZENS COMMUNICATION Public comment will be allowed in-person or remotely by telephone. Speakers may only register to speak on an item once, either in-person or remotely, and will be allowed up to three minutes to provide their comments. Registration no later than noon the day before the meeting is required for remote participation. To register, please contact Shelley Franklin at 512-974-3957. 1. APPROVAL OF MINUTES (5 min) a. January 11, 2022 2. DIRECTOR’S REPORT (10 min) a. Update on Public Works Projects – Richard Mendoza 3. NEW BUSINESS (60 min) a. Update and discussion regarding the 2016 Mobility Bond b. Discussion regarding the Better Builder Program c. Update and discussion regarding the Contractor Payment Process 4. NEXT MEETING: March 8, 2022 5. ADJOURNMENT The City of Austin is committed to compliance with the American with Disabilities Act. Reasonable modifications and equal access to communications will be provided upon request. Meeting locations are planned with wheelchair access. If requiring Sign Language Interpreters or alternative formats, please give notice at least 2 days (48 hours) before the meeting date. Please call Shelley Franklin with the Public Works Department, at 512-974-3957, for additional information; TTY users route through Relay Texas at 711. For more information on the Construction Advisory Committee, please contact Shelley Franklin at 512-974-3957.

Scraped at: Feb. 3, 2022, 5:10 a.m.
Jan. 11, 2022

Agenda in English original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Construction Advisory Committee Tuesday, January 11, 2022 One Texas Center 505 Barton Springs Road, 3rd Floor Congress Conference Room 10:00 a.m. – 11:30 a.m. AGENDA CURRENT BOARD MEMBERS: Mayoral – Vacant District 1 – Calvin Williams, Committee Member District 2 – Juan Pedro Munoz, Committee Member District 3 – Bob Batlan, Committee Member District 4 – Lyn Nance-Hendricks, Chair District 5 – Candelario Vazquez, Committee Member District 6 – Drew Hanish, Committee Member District 7 – Vacant District 8 – Sean Forkner, Committee Member District 9 – Anna Bocchini, Committee Member District 10 – Jeff Musgrove, Committee Member LIAISONS: Executive Liaison – Eric Bailey Staff Liaison – Shelley Franklin CALL TO ORDER CITIZENS COMMUNICATION 1. APPROVAL OF MINUTES (5 min) a. December 14, 2021 2. DIRECTOR’S REPORT (10 min) 3. NEW BUSINESS (60 min) a. Update on Public Works Projects – Richard Mendoza a. Update and discussion regarding bid solicitation process b. Update and discussion regarding contractor relevant experience c. Discussion of possible sub-committees d. Nomination and election of new Committee Vice-Chair 4. NEXT MEETING: January 11, 2022 5. ADJOURNMENT The City of Austin is committed to compliance with the American with Disabilities Act. Reasonable modifications and equal access to communications will be provided upon request. Meeting locations are planned with wheelchair access. If requiring Sign Language Interpreters or alternative formats, please give notice at least 2 days (48 hours) before the meeting date. Please call Shelley Franklin with the Public Works Department, at 512-974-3957, for additional information; TTY users route through Relay Texas at 711. For more information on the Construction Advisory Committee, please contact Shelley Franklin at 512-974-3957.

Scraped at: Jan. 8, 2022, 5:40 a.m.
Jan. 11, 2022

Agenda in Spanish original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Comité Asesor de Construcción martes, 11 de enero, 2022 One Texas Center 505 Barton Springs Drive Tercer Piso Congress Sala de Conferencias 10:00 a.m. – 11:30 a.m. AGENDA MIEMBROS ACTUALES DE LA JUNTA: Mayoral – Vacante Distrito 1 – Calvin Williams, Miembro del Comité Distrito 2 – Juan Pedro Muñoz, Miembro del Comité Distrito 3 – Bob Batlan, Miembro del Comité Distrito 4 – Lyn Nance-Hendricks, Presidente Distrito 5 – Candelario Vázquez, Miembro del Comité Distrito 6 – Drew Hanish, Miembro del Comité Distrito 7 – Vacante Distrito 8 – Sean Forkner, Miembro del Comité Distrito 9 – Anna Bocchini, Miembro del Comité Distrito 10 – Jeff Musgrove, Miembro del Comité ENLACES: Enlace Ejecutivo – Eric Bailey Enlace del personal – Shelley Franklin LLAMADA AL PEDIDO COMUNICACIÓN CIUDADANA 1. APROBACIÓN DE ACTAS (5 min) a. Diciembre, 2021 2. INFORME DEL DIRECTOR (10 min) 3. NUEVOS NEGOCIOS (60 min) a. Actualización sobre Proyectos de Obras Públicas – Richard Mendoza a. Actualización y discusión sobre proceso solicitud de oferta b. Actualización y discusión sobre experiencia relevante del contratista c. Discusión sobre posibles subcomité d. Nombramiento y elección de nuevo Vicepresidente del Comité 4. PRÓXIMA REUNIÓN: 8 de febrero de 2022 5. APLAZAMIENTO La Ciudad de Austin está comprometida con el cumplimiento de la Ley de Estadounidenses con Discapacidades. Se proporcionarán modificaciones razonables y acceso equitativo a las comunicaciones previa solicitud. Los lugares de reunión están planificados con acceso para sillas de ruedas. Si requiere intérpretes de lenguaje de señas o formatos alternativos, notifíte al menos 2 días (48 horas) antes de la fecha de la reunión. Llame a Shelley Franklin con el Departamento de Obras Públicas, al 512-974-3957, para obtener información adicional; Los usuarios de TTY se enrutan a través de Relay Texas en 711. Para obtener más información sobre el Comité Asesor de Construcción, comuníquese con Shelley Franklin al 512- 974-3957.

Scraped at: Jan. 8, 2022, 5:40 a.m.
Dec. 14, 2021

Agenda in English original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Construction Advisory Committee Tuesday, December 14, 2021 One Texas Center 505 Barton Springs Road, 3rd Floor Congress Conference Room 10:00 a.m. – 11:30 a.m. AGENDA CURRENT BOARD MEMBERS: Mayoral – Jolsna Thomas, Vice Chair District 1 – Calvin Williams, Committee Member District 2 – Juan Pedro Munoz, Committee Member District 3 – Bob Batlan, Committee Member District 4 – Lyn Nance-Hendricks, Chair District 5 – Candelario Vazquez, Committee Member District 6 – Drew Hanish, Committee Member District 7 – Vacant District 8 – Sean Forkner, Committee Member District 9 – Anna Bocchini, Committee Member District 10 – Jeff Musgrove, Committee Member LIAISONS: Executive Liaison – Eric Bailey Staff Liaison – Susan Delgado CALL TO ORDER CITIZENS COMMUNICATION 1. APPROVAL OF MINUTES (5 min) a. November 9, 2021 2. DIRECTOR’S REPORT (10 min) 3. NEW BUSINESS (60 min) a. Update on Public Works Projects – Richard Mendoza a. Update and discussion regarding the Construction Training Program b. Update and discussion regarding the Prevailing Wage Performance c. Update and discussion regarding the Contractor Evaluation Program 4. NEXT MEETING: January 11, 2022 5. ADJOURNMENT The City of Austin is committed to compliance with the American with Disabilities Act. Reasonable modifications and equal access to communications will be provided upon request. Meeting locations are planned with wheelchair access. If requiring Sign Language Interpreters or alternative formats, please give notice at least 2 days (48 hours) before the meeting date. Please call Shelley Franklin with the Public Works Department, at 512-974-3957, for additional information; TTY users route through Relay Texas at 711. For more information on the Construction Advisory Committee, please contact Shelley Franklin at 512-974-3957.

Scraped at: Dec. 10, 2021, 8:10 p.m.
Dec. 14, 2021

Agenda in Spanish original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Comité Asesor de Construcción martes, 14 de diciembre, 2021 One Texas Center 505 Barton Springs Drive Tercer Piso Congress Sala de Conferencias 10:00 a.m. – 11:30 a.m. AGENDA MIEMBROS ACTUALES DE LA JUNTA: Mayoral – Jolsna Thomas, Vicepresidente Distrito 1 – Calvin Williams, Miembro del Comité Distrito 2 – Juan Pedro Muñoz, Miembro del Comité Distrito 3 – Bob Batlan, Miembro del Comité Distrito 4 – Lyn Nance-Hendricks, Presidente Distrito 5 – Candelario Vázquez, Miembro del Comité Distrito 6 – Drew Hanish, Miembro del Comité Distrito 7 – Vacante Distrito 8 – Sean Forkner, Miembro del Comité Distrito 9 – Anna Bocchini, Miembro del Comité Distrito 10 – Jeff Musgrove, Miembro del Comité ENLACES: Enlace Ejecutivo – Eric Bailey Enlace del personal – Susan Delgado LLAMADA AL PEDIDO COMUNICACIÓN CIUDADANA 1. APROBACIÓN DE ACTAS (5 min) a. Noviembre 9, 2021 2. INFORME DEL DIRECTOR (10 min) 3. NUEVOS NEGOCIOS (60 min) a. Actualización sobre Proyectos de Obras Públicas – Richard Mendoza a. Actualización y discusión sobre el Programa de Formación en Construcción b. Actualización y discusión sobre el Desempeño de Salario Prevaleciente c. Actualización y discusión sobre el Programa de Evaluación de Contratistas 4. PRÓXIMA REUNIÓN: 11 de enero de 2022 5. APLAZAMIENTO La Ciudad de Austin está comprometida con el cumplimiento de la Ley de Estadounidenses con Discapacidades. Se proporcionarán modificaciones razonables y acceso equitativo a las comunicaciones previa solicitud. Los lugares de reunión están planificados con acceso para sillas de ruedas. Si requiere intérpretes de lenguaje de señas o formatos alternativos, notifíte al menos 2 días (48 horas) antes de la fecha de la reunión. Llame a Shelley Franklin con el Departamento de Obras Públicas, al 512-974-3957, para obtener información adicional; Los usuarios de TTY se enrutan a través de Relay Texas en 711. Para obtener más información sobre el Comité Asesor de Construcción, comuníquese con Shelley Franklin al 512- 974-3957.

Scraped at: Dec. 10, 2021, 8:10 p.m.
Nov. 9, 2021

Agenda - English original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Construction Advisory Committee Tuesday, November 09, 2021 One Texas Center 505 Barton Springs Road, 3rd Floor Congress Conference Room 10:00 a.m. – 11:30 a.m. AGENDA CURRENT BOARD MEMBERS: Mayoral – Jolsna Thomas, Vice Chair District 1 – Calvin Williams, Committee Member District 2 – Juan Pedro Munoz, Committee Member District 3 – Bob Batlan, Committee Member District 4 – Lyn Nance-Hendricks, Chair District 5 – Candelario Vazquez, Committee Member District 6 – Drew Hanish, Committee Member District 7 – Vacant District 8 – Sean Forkner, Committee Member District 9 – Anna Bocchini, Committee Member District 10 – Jeff Musgrove, Committee Member LIAISONS: Executive Liaison – Eric Bailey Staff Liaison – Shelley Franklin CALL TO ORDER CITIZENS COMMUNICATION 1. APPROVAL OF MINUTES (5 min) a. August 10, 2021 2. DIRECTOR’S REPORT (10 min) 3. NEW BUSINESS (60 min) a. Update on Public Works Projects – Richard Mendoza a. Update and discussion regarding Economic Development incentives b. Update and discussion regarding expeditated permitting process c. Update and discussion regarding 2020 Bond d. Update and discussion regarding the 2021/2022 Committee Work Plan e. Discussion and vote on 2022 Construction Advisory Committee meeting schedule 4. NEXT MEETING: December 14, 2021 5. ADJOURNMENT The City of Austin is committed to compliance with the American with Disabilities Act. Reasonable modifications and equal access to communications will be provided upon request. Meeting locations are planned with wheelchair access. If requiring Sign Language Interpreters or alternative formats, please give notice at least 2 days (48 hours) before the meeting date. Please call Shelley Franklin with the Public Works Department, at 512-974-3957, for additional information; TTY users route through Relay Texas at 711. For more information on the Construction Advisory Committee, please contact Shelley Franklin at 512-974-3957.

Scraped at: Nov. 5, 2021, 8:10 p.m.
Nov. 9, 2021

Agenda - Spanish original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Comité Asesor de Construcción martes, 9 de noviembre, 2021 One Texas Center 505 Barton Springs Drive Tercer Piso Congress Sala de Conferencias 10:00 a.m. – 11:30 a.m. AGENDA MIEMBROS ACTUALES DE LA JUNTA: Mayoral – Jolsna Thomas, Vicepresidente Distrito 1 – Calvin Williams, Miembro del Comité Distrito 2 – Juan Pedro Muñoz, Miembro del Comité Distrito 3 – Bob Batlan, Miembro del Comité Distrito 4 – Lyn Nance-Hendricks, Presidente Distrito 5 – Candelario Vázquez, Miembro del Comité Distrito 6 – Drew Hanish, Miembro del Comité Distrito 7 – Vacante Distrito 8 – Sean Forkner, Miembro del Comité Distrito 9 – Anna Bocchini, Miembro del Comité Distrito 10 – Jeff Musgrove, Miembro del Comité ENLACES: Enlace Ejecutivo – Eric Bailey Enlace del personal – Shelley Franklin LLAMADA AL PEDIDO COMUNICACIÓN CIUDADANA 1. APROBACIÓN DE ACTAS (5 min) a. agosto 10, 2021 2. INFORME DEL DIRECTOR (10 min) 3. NUEVOS NEGOCIOS (60 min) a. Actualización sobre Proyectos de Obras Públicas – Richard Mendoza a. Actualización y discusión sobre los incentivos de Desarrollo Económico b. Actualización y discusión sobre el proceso de permisos acelerados c. Actualización y discusión sobre el Bono 2020 d. Actualización y discusión sobre el Plan de Trabajo del Comité 2021/2022 e. Discusión y votación sobre el calendario de reuniones del Comité Asesor de Construcción de 2022 4. PRÓXIMA REUNIÓN: 14 de diciembre de 2021 5. APLAZAMIENTO La Ciudad de Austin está comprometida con el cumplimiento de la Ley de Estadounidenses con Discapacidades. Se proporcionarán modificaciones razonables y acceso equitativo a las comunicaciones previa solicitud. Los lugares de reunión están planificados con acceso para sillas de ruedas. Si requiere intérpretes de lenguaje de señas o formatos alternativos, notifíte al menos 2 días (48 horas) antes de la fecha de la reunión. Llame a Shelley Franklin con el Departamento de Obras Públicas, al 512-974-3957, para obtener información adicional; Los usuarios de TTY se enrutan a través de Relay Texas en 711. Para obtener más información sobre el Comité Asesor de Construcción, comuníquese con Shelley Franklin al 512- 974-3957.

Scraped at: Nov. 5, 2021, 8:10 p.m.
Oct. 12, 2021

Agenda in English original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Construction Advisory Committee Tuesday, October 12, 2021 Bergstrom Tech Center 6800 Burleson Road, Building 312, Suite 225 Zilker Conference Room 10:00 a.m. – 11:30 a.m. AGENDA CURRENT BOARD MEMBERS: Mayoral – Jolsna Thomas, Vice Chair District 1 – Calvin Williams, Committee Member District 2 – Juan Pedro Munoz, Committee Member District 3 – Bob Batlan, Committee Member District 4 – Lyn Nance-Hendricks, Chair District 5 – Candelario Vazquez, Committee Member District 6 – Vacant District 7 – Vacant District 8 – Sean Forkner, Committee Member District 9 – Anna Bocchini, Committee Member District 10 – Jeff Musgrove, Committee Member LIAISONS: Executive Liaison – Eric Bailey Staff Liaison – Shelley Franklin CALL TO ORDER CITIZENS COMMUNICATION 1. APPROVAL OF MINUTES (5 min) a. August 10, 2021 2. DIRECTOR’S REPORT (10 min) 3. NEW BUSINESS (60 min) a. Update on Public Works Projects – Eric Bailey a. Update and discussion regarding Economic Development incentives b. Update and discussion regarding expeditated permitting process c. Update and discussion regarding 2020 Bond 4. NEXT MEETING: November 9, 2021 5. ADJOURNMENT The City of Austin is committed to compliance with the American with Disabilities Act. Reasonable modifications and equal access to communications will be provided upon request. Meeting locations are planned with wheelchair access. If requiring Sign Language Interpreters or alternative formats, please give notice at least 2 days (48 hours) before the meeting date. Please call Shelley Franklin with the Public Works Department, at 512-974-3957, for additional information; TTY users route through Relay Texas at 711. For more information on the Construction Advisory Committee, please contact Shelley Franklin at 512-974-3957.

Scraped at: Oct. 9, 2021, 1:10 a.m.
Oct. 12, 2021

Agenda in Spanish original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Comité Asesor de Construcción martes, 12 de octubre, 2021 Bergstrom Tech Center 6800 Burleson Road, Edificio 312, Cuarto 225 Zilker Sala de Conferencias 10:00 a.m. – 11:30 a.m. AGENDA MIEMBROS ACTUALES DE LA JUNTA: Mayoral – Jolsna Thomas, Vicepresidente Distrito 1 – Calvin Williams, Miembro del Comité Distrito 2 – Juan Pedro Muñoz, Miembro del Comité Distrito 3 – Bob Batlan, Miembro del Comité Distrito 4 – Lyn Nance-Hendricks, Presidente Distrito 5 – Candelario Vázquez, Miembro del Comité Distrito 6 – Vacante Distrito 7 – Vacante Distrito 8 – Sean Forkner, Miembro del Comité Distrito 9 – Anna Bocchini, Miembro del Comité Distrito 10 – Jeff Musgrove, Miembro del Comité ENLACES: Enlace Ejecutivo – Eric Bailey Enlace del personal – Shelley Franklin LLAMADA AL PEDIDO COMUNICACIÓN CIUDADANA 1. APROBACIÓN DE ACTAS (5 min) a. agosto 10, 2021 2. INFORME DEL DIRECTOR (10 min) 3. NUEVOS NEGOCIOS (60 min) a. Actualización sobre Proyectos de Obras Públicas – Eric Bailey a. Actualización y discusión sobre los incentivos de Desarrollo Económico b. Actualización y discusión sobre el proceso de permisos acelerados c. Actualización y discusión sobre el Bono 2020 4. PRÓXIMA REUNIÓN: 9 de noviembre de 2021 5. APLAZAMIENTO La Ciudad de Austin está comprometida con el cumplimiento de la Ley de Estadounidenses con Discapacidades. Se proporcionarán modificaciones razonables y acceso equitativo a las comunicaciones previa solicitud. Los lugares de reunión están planificados con acceso para sillas de ruedas. Si requiere intérpretes de lenguaje de señas o formatos alternativos, notifíte al menos 2 días (48 horas) antes de la fecha de la reunión. Llame a Shelley Franklin con el Departamento de Obras Públicas, al 512-974-3957, para obtener información adicional; Los usuarios de TTY se enrutan a través de Relay Texas en 711. Para obtener más información sobre el Comité Asesor de Construcción, comuníquese con Shelley Franklin al 512- 974-3957.

Scraped at: Oct. 9, 2021, 1:10 a.m.
Aug. 10, 2021

Agenda - English and Spanish original pdf

Thumbnail of the first page of the PDF
Page 1 of 6 pages

Versión en español a continuación Construction Advisory Committee Meeting August 10, 2021 Construction Advisory Committee to be held August 10, 2021 with Social Distancing Modifications Public comment will be allowed via telephone; no in-person input will be allowed. All speakers must register in advance (August 9, 2021 by noon). All public comment will occur at the beginning of the meeting. To speak remotely at the Construction Advisory Committee Meeting, members of the public must: •Call or email the board liaison at 512-974-3957 and shelley.franklin@austintexas.gov no later than noon, August 9, 2021. The following information is required: speaker name, item number(s) they wish to speak on, whether they are for/against/neutral, email address and telephone number (must be the same number that will be used to call into the meeting). •Once a request to speak has been made to the board liaison, the information to call on the day of the scheduled meeting will be provided either by email or phone call. •Speakers must call in at least 15 minutes prior to meeting start time in order to speak, late callers will not be accepted and will not be able to speak. •Speakers will be placed in a queue until their time to speak. •Handouts or other information may be emailed to shelley.franklin@austintexas.gov by noon the day before the scheduled meeting. This information will be provided to Board and Commission members in advance of the meeting. •If the meeting is broadcast live, it may be viewed here: http://www.austintexas.gov/page/watch-atxn- live Reunión del Comité Asesor de Construcción 10 de agosto de 2021 La junta se llevará con modificaciones de distanciamiento social Se permitirán comentarios públicos por teléfono; no se permitirá ninguna entrada en persona. Todos los oradores deben registrarse con anticipación (9 de agosto de 2021 antes del mediodía). Todos los comentarios públicos se producirán al comienzo de la reunión. Para hablar de forma remota en la reunión, los miembros del público deben: • Llame o envíe un correo electrónico al enlace de la junta en 512-974-3957 y shelley.franklin@austintexas.gov a más tardar al mediodía (el día antes de la reunión). Se requiere la siguiente información: nombre del orador, número (s) de artículo sobre el que desean hablar, si están a favor / en contra / neutral, dirección de correo electrónico (opcional) y un número de teléfono (debe ser el número que se utilizará para llamar ). • Una vez que se haya realizado una …

Scraped at: Aug. 7, 2021, 5:10 a.m.
June 15, 2021

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 6 pages

Versión en español a continuación Construction Advisory Committee Meeting June 15, 2021 Construction Advisory Committee to be held June 15, 2021 with Social Distancing Modifications Public comment will be allowed via telephone; no in-person input will be allowed. All speakers must register in advance (June 14, 2021 by noon). All public comment will occur at the beginning of the meeting. To speak remotely at the Construction Advisory Committee Meeting, members of the public must: •Call or email the board liaison at 512-974-3957 and shelley.franklin@austintexas.gov no later than noon, June 14, 2021. The following information is required: speaker name, item number(s) they wish to speak on, whether they are for/against/neutral, email address and telephone number (must be the same number that will be used to call into the meeting). •Once a request to speak has been made to the board liaison, the information to call on the day of the scheduled meeting will be provided either by email or phone call. •Speakers must call in at least 15 minutes prior to meeting start time in order to speak, late callers will not be accepted and will not be able to speak. •Speakers will be placed in a queue until their time to speak. •Handouts or other information may be emailed to shelley.franklin@austintexas.gov by noon the day before the scheduled meeting. This information will be provided to Board and Commission members in advance of the meeting. •If the meeting is broadcast live, it may be viewed here: http://www.austintexas.gov/page/watch-atxn- live Reunión del Comité Asesor de Construcción 15 de junio de 2021 La junta se llevará con modificaciones de distanciamiento social Se permitirán comentarios públicos por teléfono; no se permitirá ninguna entrada en persona. Todos los oradores deben registrarse con anticipación (14 de junio de 2021 antes del mediodía). Todos los comentarios públicos se producirán al comienzo de la reunión. Para hablar de forma remota en la reunión, los miembros del público deben: • Llame o envíe un correo electrónico al enlace de la junta en 512-974-3957 y shelley.franklin@austintexas.gov a más tardar al mediodía (el día antes de la reunión). Se requiere la siguiente información: nombre del orador, número (s) de artículo sobre el que desean hablar, si están a favor / en contra / neutral, dirección de correo electrónico (opcional) y un número de teléfono (debe ser el número que se utilizará para llamar ). • Una vez que se haya realizado una …

Scraped at: June 12, 2021, 12:40 a.m.
May 11, 2021

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 6 pages

Versión en español a continuación Construction Advisory Committee Meeting May 11, 2021 Construction Advisory Committee to be held May 11, 2021 with Social Distancing Modifications Public comment will be allowed via telephone; no in-person input will be allowed. All speakers must register in advance (May 10, 2021 by noon). All public comment will occur at the beginning of the meeting. To speak remotely at the Construction Advisory Committee Meeting, members of the public must: •Call or email the board liaison at 512-974-7613 and zachary.ortiz@austintexas.gov no later than noon, May 10, 2021. The following information is required: speaker name, item number(s) they wish to speak on, whether they are for/against/neutral, email address and telephone number (must be the same number that will be used to call into the meeting). •Once a request to speak has been made to the board liaison, the information to call on the day of the scheduled meeting will be provided either by email or phone call. •Speakers must call in at least 15 minutes prior to meeting start time in order to speak, late callers will not be accepted and will not be able to speak. •Speakers will be placed in a queue until their time to speak. •Handouts or other information may be emailed to zachary.ortiz@austintexas.gov by noon the day before the scheduled meeting. This information will be provided to Board and Commission members in advance of the meeting. •If the meeting is broadcast live, it may be viewed here: http://www.austintexas.gov/page/watch-atxn- live Reunión del Comité Asesor de Construcción 11 de mayo de 2021 La junta se llevará con modificaciones de distanciamiento social Se permitirán comentarios públicos por teléfono; no se permitirá ninguna entrada en persona. Todos los oradores deben registrarse con anticipación (10 de mayo de 2021 antes del mediodía). Todos los comentarios públicos se producirán al comienzo de la reunión. Para hablar de forma remota en la reunión, los miembros del público deben: • Llame o envíe un correo electrónico al enlace de la junta en 512-974-7613 y zachary.ortiz@austintexas.gov a más tardar al mediodía (el día antes de la reunión). Se requiere la siguiente información: nombre del orador, número (s) de artículo sobre el que desean hablar, si están a favor / en contra / neutral, dirección de correo electrónico (opcional) y un número de teléfono (debe ser el número que se utilizará para llamar ). • Una vez que se haya realizado una …

Scraped at: May 7, 2021, 11:40 p.m.
May 11, 2021

Minutes in English original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

(Construction Advisory Committee) REGULAR MEETING MINUTES (May 11, 2021) CALL TO ORDER The Construction Advisory Committee convened in a Regular meeting on May 11th via Video Conference. Chair Lyn Nance-Hendricks called the Committee Meeting to order at 10:39 AM LIAISONS Eric Bailey– Executive Liaison CURRENT BOARD MEMBERS: (P) Mayoral – Jolsna Thomas, Committee Member (P) District 1 – Calvin Williams, Committee Member (P) District 2 – Juan Pedro Munoz, Committee Member (A) District 3 – Bob Batlan, Vice Chair (P) District 4 – Lyn Nance-Hendricks, Chair (A) District 5 – Candelario Vazquez, Committee Member (A) District 6 – Vacant (A) District 7 – Bobby Smith, Committee Member (P) District 8 – Sean Forkner, Committee Member (A) District 9 – Anna Bocchini, Committee Member (P) District 10 – Jeff Musgrove, Committee Member City Staff Richard Mendoza, Director, Public Works Susan Delgado, Admin Manager, Public Works Melissa Pool, Admin & Finance Manager, Capital Contracting Office Jennifer Golech, Project Connect Deputy Officer CITIZENS COMMUNICATION a. No citizen communications 1. APPROVAL OF MINUTES a. Committee Member Jolsna Thomas motioned to approve the April 13th meeting Minutes. Committee Member Jeff Musgrove Seconds-Unanimous agreement. 2. DIRECTOR’S REPORT a. Update on Public Works Projects i. Public Works Director, Richard Mendoza shared a presentation on Public Works Capital Project Delivery, and active ongoing construction. 3. NEW BUSINESS a. Update and discussion regarding contractor evaluation program i. Melissa Pool, Division Manager, Capital Contracting Office, presented on evaluations to date, history of program, process b. Update and discussion regarding CapMetro and Project Connect i. Due to loss of quorum, item was postponed to next month. Dave Couch will present then. 4. FUTURE AGENDA ITEMS a. CapMetro and Project Connect, June b. Budget discussion, June c. Construction training program update, September 5. NEXT MEETING: June 8, 2021 6. ADJOURNMENT Committee Member Jolsna Thomas needed to leave the meeting, so we no longer had a quorum. Chair Lyn Nance-Henricks adjourned the meeting at 11:12 AM. The City of Austin is committed to compliance with the American with Disabilities Act. Reasonable modifications and equal access to communications will be provided upon request. Meeting locations are planned with wheelchair access. If requiring Sign Language Interpreters or alternative formats, please give notice at least 2 days (48 hours) before the meeting date. Please call Shelley Franklin with the Public Works Department, at 512-974-3957, for additional information; TTY users route through Relay Texas at 711. For …

Scraped at: June 16, 2021, 8:40 p.m.
May 11, 2021

Minutes in Spanish original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

REUNIÓN ORDINARIA 11 de mayo, 2021) (Comité Asesor de Construcción) Minutas LLAMADA AL ORDEN El Comité Asesor de Construcción se reunió en una reunión ordinaria el 11 de mayo través de videoconferencia. La Presidenta Lyn Nance-Hendricks convocó la reunión del Comité a las 10:39 AM Enlaces Eric Bailey– Enlace Ejecutivo MIEMBROS ACTUALES DE LA JUNTA DIRECTIVA: (P) Mayoral – Jolsna Thomas, Miembro del Comité (P) Distrito 1 – Calvin Williams, Miembro del Comité (P) Distrito 2 – Juan Pedro Muñoz, Miembro del Comité (A) Distrito 3 – Bob Batlan, Vicepresidente (P) Distrito 4 – Lyn Nance-Hendricks, Presidente (a) Distrito 5 – Candelario Vázquez, Miembro del Comité (A) Distrito 6 – Vacante (A) Distrito 7 – Bobby Smith, Miembro del Comité (P) Distrito 8 – Sean Forkner, Miembro del Comité (A) Distrito 9 – Anna Bocchini, Miembro del Comité (P) Distrito 10 – Jeff Musgrove, Miembro del Comité Personal de la ciudad Richard Mendoza, Director, Obras Públicas SusanDelgado, Gerente Administrativo, Obras Públicas Melissa Pool, Administradora y Gerente de Finanzas, Oficina de Contratación deCapital Jennifer Golech, Oficial Adjunta de Project Connect COMUNICACIÓN CIUDADANA a. Sin comunicaciones ciudadanas 1. APROBACIÓN DE MINUTAS a. La miembro del Comité Jolsna Thomas motó para aprobar las mintas de la reunión del 13 de abril. Miembro del Comité Jeff Musgrove Secundo-Acuerdo unánime. 2. INFORME DEL DIRECTOR a. Actualización sobre proyectos de obras públicas i. El Director de Obras Públicas, Richard Mendoza, compartió una presentación sobre la entrega de proyectos de capital de obras públicas y la construcción activa en curso. 3. NUEVOS NEGOCIOS a. Actualización y discusión sobre el programa de evaluación de contratistas i. MelissaPool, Gerente de División, Oficina de Contratación de Capital, presentó sobre evaluaciones hasta la fecha, historial del programa, proceso b. Actualización y discusión sobre CapMetro y Project Connect i. Debido a la pérdida de quórum, el tema se pospuso para el próximo mes. Dave Couch presentará entonces. 4. FUTUROS PUNTOS DEL ORDEN DEL DÍA a. CapMetro y Project Connect, junio b. Debate sobre el presupuesto, junio c. Actualización del programa de capacitación en construcción, septiembre 5. PRÓXIMA REUNIÓN: 8 de junio de 2021 6. CIERRE La miembro del Comité Jolsna Thomas necesitaba abandonar la reunión, por lo que ya no teníamos quórum. La presidenta Lyn Nance-Henricks levantó la reunión a las 11:12 AM. La Ciudad de Austin está comprometida con el cumplimiento de la Ley de Estadounidenses con Discapacidades. Las modificaciones razonables …

Scraped at: June 16, 2021, 8:40 p.m.
April 13, 2021

Agenda - English and Spanish original pdf

Thumbnail of the first page of the PDF
Page 1 of 6 pages

Versión en español a continuación Construction Advisory Committee Meeting April 13, 2021 Construction Advisory Committee to be held April 13, 2021 with Social Distancing Modifications Public comment will be allowed via telephone; no in-person input will be allowed. All speakers must register in advance (April 12, 2021 by noon). All public comment will occur at the beginning of the meeting. To speak remotely at the Construction Advisory Committee Meeting, members of the public must: •Call or email the board liaison at 512-974-3957 and shelley.franklin@austintexas.gov no later than noon, April 12, 2021. The following information is required: speaker name, item number(s) they wish to speak on, whether they are for/against/neutral, email address and telephone number (must be the same number that will be used to call into the meeting). •Once a request to speak has been made to the board liaison, the information to call on the day of the scheduled meeting will be provided either by email or phone call. •Speakers must call in at least 15 minutes prior to meeting start time in order to speak, late callers will not be accepted and will not be able to speak. •Speakers will be placed in a queue until their time to speak. •Handouts or other information may be emailed to shelley.franklin@austintexas.gov by noon the day before the scheduled meeting. This information will be provided to Board and Commission members in advance of the meeting. •If the meeting is broadcast live, it may be viewed here: http://www.austintexas.gov/page/watch-atxn- live Reunión del Comité Asesor de Construcción 13 de abril de 2021 La junta se llevará con modificaciones de distanciamiento social Se permitirán comentarios públicos por teléfono; no se permitirá ninguna entrada en persona. Todos los oradores deben registrarse con anticipación (12 de abril de 2021 antes del mediodía). Todos los comentarios públicos se producirán al comienzo de la reunión. Para hablar de forma remota en la reunión, los miembros del público deben: • Llame o envíe un correo electrónico al enlace de la junta en 512-974-3957 y shelley.franklin@austintexas.gov a más tardar al mediodía (el día antes de la reunión). Se requiere la siguiente información: nombre del orador, número (s) de artículo sobre el que desean hablar, si están a favor / en contra / neutral, dirección de correo electrónico (opcional) y un número de teléfono (debe ser el número que se utilizará para llamar ). • Una vez que se haya realizado una …

Scraped at: April 8, 2021, 11:40 p.m.
April 13, 2021

Approved Minutes original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

(Construction Advisory Committee) REGULAR MEETING MINUTES (April 13, 2021) CALL TO ORDER The Construction Advisory Committee convened in a Regular meeting on April 13th via Video Conference. Chair Lyn Nance-Hendricks called the Committee Meeting to order at 10:33 AM LIAISONS Eric Bailey– Executive Liaison Shelley Franklin – Staff Liaison CURRENT BOARD MEMBERS: (P) Mayoral – Jolsna Thomas, Committee Member (A) District 1 – Calvin Williams, Committee Member (P) District 2 – Juan Pedro Munoz, Committee Member (P) District 3 – Bob Batlan, Vice Chair (P) District 4 – Lyn Nance-Hendricks, Chair (P) District 5 – Candelario Vazquez, Committee Member (A) District 6 – Vacant (A) District 7 – Bobby Smith, Committee Member (P) District 8 – Sean Forkner, Committee Member (P) District 9 – Anna Bocchini, Committee Member (P) District 10 – Jeff Musgrove, Committee Member City Staff Richard Mendoza, Director, Public Works Shelley Franklin, Executive Assistant, Public Works John Hale, Austin Code Department Michelle Pierre, Program Compliance Coordinator, Capital Contracting Office CITIZENS COMMUNICATION a. No citizen communications 1. APPROVAL OF MINUTES a. Committee Member Jolsna Thomas motioned to amend the Minutes to reflect that Bobby Smith was absent, not present, for the March 9th meeting. With that amendment, Jolsna Thomas moved to approve the March 9th Amended Minutes, Committee Member Sean Forkner Seconds-Unanimous agreement. 2. DIRECTOR’S REPORT a. Update on Public Works Projects 3. NEW BUSINESS i. Public Works Director, Richard Mendoza shared a presentation on Public Works Capital Project Delivery, and active ongoing construction. a. Discussion and possible revisions of 2021 Work Plan i. The Chair discussed the Work Plan and shared that she added Project Connect and 2020 Prop B Mobility Bond items and asked for feedback. b. Discussion and election of officers for May 1, 2021 – April 30, 2022 term i. Nominations for Chair: Jolsna Thomas nominated Lyn Nance-Henricks, Bob Batlan seconds, unanimous agreement ii. Nominations for Vice Chair: Lyn Nance-Hendricks nominated Jolsna Thomas, Bob Batlan seconds, unanimous agreement c. Update and discussion of rest break program i. John Hale, Austin Code Department, presented on the Rest Break Ordinance. During COVID, have responded to complaints, versus proactive inspection. d. Update and discussion of construction training program i. Michelle Pierre, Program Compliance Coordinator, Capital Contracting Office, presented on the Contractor Program overview and statistics. 4. FUTURE AGENDA ITEMS a. Budget discussion, June b. Construction training program update, September 5. NEXT MEETING: May 11, 2021 6. ADJOURNMENT …

Scraped at: June 16, 2021, 8:40 p.m.
March 9, 2021

Agenda - English & Spanish original pdf

Thumbnail of the first page of the PDF
Page 1 of 6 pages

Versión en español a continuación Construction Advisory Committee Meeting March 9, 2021 Construction Advisory Committee to be held March 9, 2021 with Social Distancing Modifications Public comment will be allowed via telephone; no in-person input will be allowed. All speakers must register in advance (March 8, 2021 by noon). All public comment will occur at the beginning of the meeting. To speak remotely at the Construction Advisory Committee Meeting, members of the public must: •Call or email the board liaison at 512-974-3957 and shelley.franklin@austintexas.gov no later than noon, February 8, 2021. The following information is required: speaker name, item number(s) they wish to speak on, whether they are for/against/neutral, email address and telephone number (must be the same number that will be used to call into the meeting). •Once a request to speak has been made to the board liaison, the information to call on the day of the scheduled meeting will be provided either by email or phone call. •Speakers must call in at least 15 minutes prior to meeting start time in order to speak, late callers will not be accepted and will not be able to speak. •Speakers will be placed in a queue until their time to speak. •Handouts or other information may be emailed to shelley.franklin@austintexas.gov by noon the day before the scheduled meeting. This information will be provided to Board and Commission members in advance of the meeting. •If the meeting is broadcast live, it may be viewed here: http://www.austintexas.gov/page/watch-atxn- live Reunión del Comité Asesor de Construcción 9 de marzo de 2021 La junta se llevará con modificaciones de distanciamiento social Se permitirán comentarios públicos por teléfono; no se permitirá ninguna entrada en persona. Todos los oradores deben registrarse con anticipación (8 de marzo de 2021 antes del mediodía). Todos los comentarios públicos se producirán al comienzo de la reunión. Para hablar de forma remota en la reunión, los miembros del público deben: • Llame o envíe un correo electrónico al enlace de la junta en 512-974-3957 y shelley.franklin@austintexas.gov a más tardar al mediodía (el día antes de la reunión). Se requiere la siguiente información: nombre del orador, número (s) de artículo sobre el que desean hablar, si están a favor / en contra / neutral, dirección de correo electrónico (opcional) y un número de teléfono (debe ser el número que se utilizará para llamar ). • Una vez que se haya realizado una …

Scraped at: March 6, 2021, 2:40 a.m.
March 9, 2021

Minutes in English original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

(Construction Advisory Committee) REGULAR MEETING MINUTES (March 9, 2021) CALL TO ORDER The Construction Advisory Committee convened in a Regular meeting on March 9th via Video Conference. Chair Lyn Nance-Hendricks called the Committee Meeting to order at 10:30 AM LIAISONS Eric Bailey– Executive Liaison Shelley Franklin – Staff Liaison CURRENT BOARD MEMBERS: (P) Mayoral – Jolsna Thomas, Committee Member (P) District 1 – Calvin Williams, Committee Member (P) District 2 – Juan Pedro Munoz, Committee Member (P) District 3 – Bob Batlan, Vice Chair (P) District 4 – Lyn Nance-Hendricks, Chair (P) District 5 – Candelario Vazquez, Committee Member (A) District 6 – Vacant (A) District 7 – Bobby Smith, Committee Member (P) District 8 – Sean Forkner, Committee Member (P) District 9 – Anna Bocchini, Committee Member (P) District 10 – Jeff Musgrove, Committee Member City Staff Richard Mendoza, Director, Public Works Eric Bailey, Assistant Director, Public Works Shelley Franklin, Executive Assistant, Public Works Baldemar Maldonado, Contract Management Supervisor, Capital Contracting Office Melissa Pool, Division Manager, Capital Contracting Office Ronaldo Fernandez, Capital Contracting Officer Edward Campos, Interim Director, Small and Minority Business Resources Department CITIZENS COMMUNICATION a. No citizen communications 1. APPROVAL OF MINUTES a. Committee Member Bob Batlan motioned to approve February 9th Minutes, Committee Member Calvin Williams Seconds-Unanimous agreement 2. DIRECTOR’S REPORT a. Update on Public Works Projects 3. NEW BUSINESS i. Public Works Director, Richard Mendoza shared a presentation on Public Works Capital Project Delivery, and active ongoing construction. a. Update and discussion of airport audit summary i. Baldemar Maldonado, Capital Contracting Office, presented on the Wage Compliance Program b. Update and discussion of contractor evaluation program i. Melissa Pool, Capital Contracting Office, presented on Contractor Performance Evaluation and Program Enhancements. c. Update and discussion on SMBR program i. Edward Campos, Small and Minority Business Resources Department, presented on the Corridor Mobility Program MBE/WBE Outreach Plan d. Update and discussion of rest break program i. Tabled until next meeting e. Discussion and possible reviews of 2021 Work Plan i. Tabled until next meeting 4. FUTURE AGENDA ITEMS a. 2021 Work Plan (April 2021) b. CTP (April 2021) c. Rest break program (April 2021) d. Budget process (April 2021) e. Contractor evaluation scores (May 2021 meeting) f. Airport audit – final (June 2021) 5. NEXT MEETING: April 13, 2021 6. ADJOURNMENT Committee Member Anna Bocchini moved to adjourn, Committee Member Bob Batlan Seconds, unanimous agreement. The City …

Scraped at: June 16, 2021, 8:40 p.m.
March 9, 2021

Minutes in Spanish original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

REUNIÓN (9 de marzo, 2021) (Comité Asesor de Construcción) MINUTAS CONVOCATORIA El Comité Asesor de Construcción se reunió en una reunión convocada el 9 de marzo a través de una videoconferencia. El presidente Lyn Nance-Hendricks dio inicio a la reunión del comité a las 10:30 AM Coordinadores: Eric Bailey – Coordinador ejecutivo Shelley Franklin – Coordinador de personal MIEMBROS DEL COMITÉ (P = Presente, A = Ausente, X = Ausencia justificada) (P) Delegado del Alcalde – Jolsna Thomas, miembro del Comité (P) Distrito 1 – Calvin Williams, miembro del Comité (P) Distrito 2 – Juan Pedro Munoz, miembro del Comité (P) Distrito 3 – Bob Batlan, miembro del Comité (P) Distrito 4 – Lyn Nance-Hendricks, Presidente (P) Distrito 5 – Candelario Vazquez, miembro del Comité (A) Distrito 6 – VACANTE (A) Distrito 7 – Bobby Smith, miembro del Comité (P) Distrito 8 – Sean Forkner, miembro del Comité (P) Distrito 9 – Anna Bocchini, miembro del Comité (P) Distrito 10 – Jeff Musgrove, miembro del Comité Personal de la Ciudad Richard Mendoza, Director de Obras Públicas Eric Bailey, subdirector de Obras Públicas Shelley Franklin, Asistente ejecutiva Obras Públicas Baldemar Maldonado, Supervisor de Gestión de Contratos, Oficina de Contratación de Capital Melissa Pool, Gerente de División, Oficina de Contratación de Capital Ronaldo Fernandez, Oficial de Contrataciones de Capital Edward Campos, director interino, Departamento de Recursos para Pequeñas Empresas y Minorías 1. COMUNICACIÓN DE LOS CIUDADANOS a. No hubo comunicaciones de los ciudadanos. 2. APROBACION DE MINUTAS (5 min) a. La miembro del comité Bob Batlan hizo la moción para aprobar las minutas del 9 de febrero, el miembro del comité Calvin Williams Secundo-Acuerdo unánime 3. REPORTE DEL DIRECTOR (10 min) a. Actualización sobre Proyectos de Obras Públicas i. El Director de Obras Públicas, Richard Mendoza, compartió información sobre la Entrega de Proyectos de Capital de Obras Públicas y la construcción activa en curso. 4. ASUNTOS ANTERIORES (10 min) a. No asuntos anteriores 5. ASUNTOS NUEVOS (50 min) a. Actualización y discusión del resumen de auditoría aeroportuaria i. Baldemar Maldonado, Oficina de Contratación de Capitales, presentado sobre el Programa de Cumplimiento Salarial b. Actualización y discusión del programa de evaluación de contratistas i. Melissa Pool, Oficina de Contratación de Capital, presentó la Evaluación del Desempeño del Contratista y las Mejoras del Programa. c. Actualización y discusión sobre el programa SMBR i. Edward Campos, Departamento de Recursos para Empresas Pequeñas y Minorías, presentado …

Scraped at: June 16, 2021, 8:40 p.m.
Feb. 9, 2021

Agenda - English and Spanish original pdf

Thumbnail of the first page of the PDF
Page 1 of 6 pages

Versión en español a continuación Construction Advisory Committee Meeting February 9, 2021 Construction Advisory Committee to be held February 9, 2021 with Social Distancing Modifications Public comment will be allowed via telephone; no in-person input will be allowed. All speakers must register in advance (February 8, 2021 by noon). All public comment will occur at the beginning of the meeting. To speak remotely at the Construction Advisory Committee Meeting, members of the public must: •Call or email the board liaison at 512-974-3957 and shelley.franklin@austintexas.gov no later than noon, February 8, 2021. The following information is required: speaker name, item number(s) they wish to speak on, whether they are for/against/neutral, email address and telephone number (must be the same number that will be used to call into the meeting). •Once a request to speak has been made to the board liaison, the information to call on the day of the scheduled meeting will be provided either by email or phone call. •Speakers must call in at least 15 minutes prior to meeting start time in order to speak, late callers will not be accepted and will not be able to speak. •Speakers will be placed in a queue until their time to speak. •Handouts or other information may be emailed to shelley.franklin@austintexas.gov by noon the day before the scheduled meeting. This information will be provided to Board and Commission members in advance of the meeting. •If the meeting is broadcast live, it may be viewed here: http://www.austintexas.gov/page/watch-atxn- live Reunión del Comité Asesor de Construcción 9 de febrero de 2021 La junta se llevará con modificaciones de distanciamiento social Se permitirán comentarios públicos por teléfono; no se permitirá ninguna entrada en persona. Todos los oradores deben registrarse con anticipación (8 de febrero de 2021 antes del mediodía). Todos los comentarios públicos se producirán al comienzo de la reunión. Para hablar de forma remota en la reunión, los miembros del público deben: • Llame o envíe un correo electrónico al enlace de la junta en 512-974-3957 y shelley.franklin@austintexas.gov a más tardar al mediodía (el día antes de la reunión). Se requiere la siguiente información: nombre del orador, número (s) de artículo sobre el que desean hablar, si están a favor / en contra / neutral, dirección de correo electrónico (opcional) y un número de teléfono (debe ser el número que se utilizará para llamar ). • Una vez que se haya realizado una …

Scraped at: Feb. 5, 2021, 5:10 p.m.