Zoning and Platting CommissionDec. 15, 2020

B-03 and B-04 (Part 2 - SP-2020-0321C - Applied Materials Logistics Service Center; District 1).pdf — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 42 pages

1 ENVIRONMENTAL COMMISSION MOTION 20201120 003b Subject: Albert H. Ullrich Water Treatment Plant, Revision 2, SPC-03-0005C(R2) Motion by: Kevin Ramberg Seconded by: Perry Bedford Date: November 20, 2020 RATIONALE: WHEREAS, the Environmental Commission recognizes the applicant is requesting seven variances from code including: 1) LDC 25-8-261 to allow development in the Critical Water Quality Zone, and by extension in the Water Quality Transition Zone of a Water Supply Rural watershed in the Edwards Aquifer Recharge Zone South [LDC 25-8-452] for: a) Phase 2: switchgear enclosure, duct bank and access drive, and b) Phase 3: containment basin, electric building and related duct banks, sludge changeover facility, 6” water line; 2) LDC 25-8-281 to allow construction within a rimrock Critical Environmental Feature buffer for: a) Phase 2: duct bank and access drive; 3) LDC 25-8-301 to allow construction of a driveway on a slope with a gradient of more than 15 percent for: a) Phase 2: duct bank and access drive; 4) LDC 25-8-302(A)(1) to allow construction of a building on a slope with a gradient of more than 25 percent for: a) Phase 2: switchgear enclosure and b) Phase 3: sludge change-over facility; 5) LDC 25-8-341 to allow cut to sixteen (16) feet for: a) Phase 3: containment basin; 6) LDC 25-8-342 to allow fill to twelve (12) feet for: a) Phase 2: duct bank and access drive; and 7) LDC 25-8-423(C)(1)(a) to allow impervious cover to exceed the 20 percent limit for development in the uplands of a Water Supply Suburban watershed. WHEREAS, the Environmental Commission recognizes that Staff recommends this variance (with conditions) having determined the required Findings of Fact have been met. THEREFORE, the Environmental Commission recommends the variance request with the following; 1 of 42 Staff Conditions: electric station. VOTE 9-0 1. Applicant has designed permanent diversion and dissipation for the existing concentrated flow from the 2. Applicant has designed the rain gardens to avoid and preserve significant trees and has agreed to revegetate the rain gardens with native plants. 3. Applicant has redesigned the proposed road to preserve the wetland at the base of the rimrock. For: Gordon, Nill, Neely, Bedford, Thompson, Smith, Guerrero, Coyne, Ramberg Against: None Abstain: None Recuse: None Absent: Creel, Maceo Approved By: Linda Guerrero, Environmental Commission Chair 2 2 of 42 MEMORANDUM TO: Linda Guerrero, Chair, Environmental Commission FROM: Pamela Abee-Taulli, Environmental Review, DSD DATE: October 21, 2020 SUBJECT: Albert H. Ullrich Water Treatment Plant, Revision 2 Variances Dear Chair Guerrero, Ullrich Water Treatment Plant, operated by Austin Water Utility, is critical to providing the City with safe drinking water. The site plan under review is a revision to the original site plan, which was approved in 2003. The plan includes multiple projects and will require seven Environmental variances, largely due to the site’s location in an environmentally sensitive area with numerous environmental constraints. Because of the unusually high number of variances, I have taken the uncommon step of providing a single set of findings for all the variances, rather than one set of findings for each variance. Additionally, I am including this memo to introduce the list of proposed projects. The overall purpose of the plan revision under review is to improve operator and environmental safety by eliminating potential hazards and to upgrade miscellaneous plant processes to ensure the plant can reliably deliver drinking water. The sludge change-over structure replaces existing structures that require confined space entry. Other improvements provide safety washdown areas and a looped, potable water supply to the facility. The spill containment structure will contain fugitive spills that may enter the existing storm drain system from chemical delivery areas and will prevent their discharge into Little Bee Creek. The Low Service Pump Station Electrical Feed Renewal project includes construction of a new electrical building, retaining walls, electrical and mechanical equipment, parking areas, access road, and duct bank routing. Thank you for your consideration. Sincerely, Pamela Abee-Taulli, DSD Radmon Rice, WPD 13 of 42 Page 2 of 2 a. Phase 2: duct bank and access drive. 4. LDC 25-8-302(A)(1) to allow construction of a building on a slope with a gradient of more than 25 percent for a. Phase 2: switchgear enclosure, and b. Phase 3: sludge change-over facility. 5. LDC 25-8-341 to allow cut to sixteen (16) feet for: a. Phase 3: containment basin. 6. LDC 25-8-342 to allow fill to twelve (12) feet for: a. Phase 2: duct bank and access drive. 7. 25-8-453(D)(1)(a) to allow impervious cover to exceed the 20 percent limit for development in the uplands of a Water Supply Rural watershed. STAFF RECOMMENDATION: Staff recommends these variances, having determined the findings of fact to have been met. STAFF CONDITION: 1. Applicant has designed permanent diversion and dissipation for the existing concentrated flow from the electric station. 2. Applicant has designed the rain gardens to avoid and preserve significant trees and has agreed to revegetate the rain gardens with native plants. 3. Applicant has redesigned the proposed road to preserve the wetland at the base of the rimrock. 34 of 42 Development Services Department Staff Recommendations Concerning Required Findings Project Name: Ordinance Standard: Watershed Protection Ordinance Variance Request: Albert H. Ullrich Water Treatment Plant, Revision 2 Applicant requests to vary the following regulations: 1. LDC 25-8-261 to allow development in the Critical Water Quality Zone, and by extension in the Water Quality Transition Zone of a Water Supply Rural watershed in the Edwards Aquifer Recharge Zone South [LDC 25-8-452] for: a. Phase 2: switchgear enclosure, duct bank and access drive, and b. Phase 3: containment basin, electric building and related duct banks, sludge changeover facility, 6” water line. 2. LDC 25-8-281 to allow construction within a rimrock Critical Environmental Feature buffer for: a. Phase 2: duct bank and access drive. 3. LDC 25-8-301 to allow construction of a driveway on a slope with a gradient of more than 15 percent for: a. Phase 2: duct bank and access drive. 4. LDC 25-8-302(A)(1) to allow construction of a building on a slope with a gradient of more than 25 percent for a. Phase 2: switchgear enclosure, and b. Phase 3: sludge change-over facility. 5. LDC 25-8-341 to allow cut to sixteen (16) feet for: a. Phase 3: containment basin. 6. LDC 25-8-342 to allow fill to twelve (12) feet for: a. Phase 2: duct bank and access drive. 7. 25-8-453(D)(1)(a) to allow impervious cover to exceed the 20 percent limit for development in the uplands of a Water Supply Rural watershed. y 45 of 42 Land Use Commission variance determinations as required by Chapter 25-8-41 A. of the City Code: 1. The requirement will deprive the applicant of a privilege available to owners approximately contemporaneous development subject to similar code requirements. property with similarly situated of 2. The variance: a) Yes The project site is an existing Austin Water Utility water treatment plant. The variances are necessary to allow critical upgrades to replace old and outdated equipment, provide improved environmental controls, and increase safety for plant staff. The upgrades are necessary for Austin Water Utility to continue to provide clean drinking water for its customers. Owners approximately contemporaneous development subject to similar code requirements have been allowed to develop with commensurate variances. utilities with similarly situated of Is not necessitated by the scale, layout, construction method, or other design decision made by the applicant, unless the design decision provides greater overall environmental protection than is achievable without the variance; Yes All proposed improvements have been located and sized as necessary to provide their designed functions. The site is in an environmentally sensitive area, in the Drinking Water Protection Zone, and has multiple environmental constraints, including slopes, wetland and rimrock Critical Environmental Features, Heritage trees, and creek and lake buffers. The applicant considered multiple design alternatives to achieve code compliance but was not able to design all of the upgrades without variances. b) Is the minimum deviation from the code requirement necessary to allow a reasonable use of the property; Yes All projects have been designed to be the minimum deviation from code and still provide the functions for which they are intended. Moreover, the applicant does not have the option to provide these functions on another site. In the absence of reasonable opportunities to build elsewhere, location of these projects on this site is the minimum deviation. c) Does not create a significant probability of harmful environmental consequences. 56 of 42 no Yes During construction, the project will use the maximum erosion and sedimentation controls necessary and should consequences. have Additionally, existing environmental conditions by providing a control to contain and treat contaminated runoff and by diverting and dispersing concentrated flow that currently causes erosion. the project will environmental improve harmful 3. Development with the variance will result in water quality that is at least equal to the water quality achievable without the variance. Yes The project will increase water quality by providing a control to contain and treat contaminated runoff that currently drains untreated into Little Bee Creek, and by diverting and dispersing existing concentrated flow that drains into Lake Austin and causes erosion. B. The Land Use Commission may grant a variance from a requirement of Section 25-8-422 (Water Supply Suburban Water Quality Transition Zone), Section 25-8- 452 (Water Supply Rural Water Quality Transition Zone), Section 25-8-482 (Barton Springs Zone Water Quality Transition Zone), Section 25-8-368 (Restrictions on Development Impacting Lake Austin, Lady Bird Lake, and Lake Walter E. Long), or Article 7, Division 1 ( Critical Water Quality Zone Restrictions ), after determining that:: 1. The criteria for granting a variance in Subsection (A) are met; Yes All criteria in Subsection A are met. 2. The requirement for which a variance is requested prevents a reasonable, economic use of the entire property; Yes Without the the variances, requirements would prevent improvements that are necessary for the continued operations of this Austin Water Utility. Moreover, given the existing investment in infrastructure on the site, development without the variances would prevent a reasonable, economic use of the property. 3. The variance is the minimum deviation from the code requirement necessary to allow a reasonable, economic use of the entire property. Yes All projects have been designed to be the minimum deviation from code and still provide the functions for which they are intended. 67 of 42 Staff Determination: Staff determines that the findings of fact have / have not been met. Staff recommends the following condition: Environmental Reviewer (DSD) ________________________ (Pamela Abee-Taulli) Date 10/21/20 Environmental Review (DSD) Manager _____________________________ (Mike McDougal) Date 10-14-2020 Hydrogeologist Reviewer (WPD) _____________________________ (Radmon Rice) Date 10/19/2020 Environmental Officer (WPD) _____________________________ (Chris Herrington) Date 10/26/2020 ________________ 78 of 42 Black & Veatch Corporation 4009 Banister Lane, Austin, Texas 78704 P +1 512-402-5930 E stigginsm@bv.com TBPE F-258 CAS Consulting & Services, Inc. 7908 Cameron Road, Austin, Texas 78754 O 512-836-2388 E Thomas.rohlack@casengineers.com TBPE F-3572 Zebra Mussel Mitigation Techniques (8207.009) Ullrich LSPS Electrical Feed Renewal Project (5335.016) October 9, 2020 Development Services Department City of Austin 505 Barton Springs Road Austin, Texas 78704 Environmental Commission Environmental Variance Application – Ullrich Low Service Pump Station Electrical Feed Attn: Subject: Renewal Project (Phase II) & Ullrich WTP PD&SSI Project (Phase III) CAS Consulting & Services, Inc. is submitting an environmental variance application for the Ullrich Low Service Pump Station Electrical Feed Renewal Project (referred to as the Phase II Project) at the City of Austin’s Ullrich Water Treatment Plant for Austin Water. Black & Veatch is submitting an environmental variance application for the Process Drain and Support Systems Improvements Project (referred to as the Phase III Project) at City of Austin’s Ullrich Water Treatment Plant for Austin Water. The two projects are being submitted together as separate phases in the same site plan revision application. The case number for this application is SP-03-005C (R2). The water treatment plant provides drinking water for much of south and central Austin. The Low Service Pump Station (LSPS) provides the conveyance of water to be treated by the main water treatment plant. The Phase II project is located north of Red Bud Trail near the LSPS. The Phase III Project is located at the main water treatment plant south of Red Bud Trail. In this submittal, improvements are made to the plant to address specific process and maintenance issues required by plant operations. The locations below are labeled as #.A, the number will be either 2 or 3 and refers to the applicable project phase. Location 2.A: Electrical Equipment Enclosure, Access Drive with Duct Bank, and Equipment Pads (Phase II Project) Proposed Structure: The proposed electrical equipment enclosure will be constructed on piers and will house electrical equipment. The existing private access drive is filled with existing utilities; therefore, the new large primary duct banks must be routed elsewhere, and must remain above the Lake Austin normal pool elevation. To minimize disturbance, the new access drive is proposed to be located over the new primary duct banks. The access drive will provide a looped route for large maintenance vehicles to access the existing Low Service Pump Station (LSPS). New concrete 19 of 42 Black & Veatch Corporation 4009 Banister Lane, Austin, Texas 78704 P +1 512-402-5930 E stigginsm@bv.com TBPE F-258 CAS Consulting & Services, Inc. 7908 Cameron Road, Austin, Texas 78754 O 512-836-2388 E Thomas.rohlack@casengineers.com TBPE F-3572 equipment pads will also be constructed around the proposed enclosure for condensers and transformers. Watershed: Lake Austin classified as Water Supply Rural Type of Development: Upgrading aged electrical equipment infrastructure essential to providing reliable power to the LSPS in order to minimize the likelihood of power outages that could prevent water intake resulting in the disruption of water service to many Austin Water customers. Project Phasing: None Storm Water Run-off: The runoff from the proposed electrical enclosure will be treated with a proposed partial sedimentation filtration pond adjacent to the structure. The design initially included a water quality pond to treat the proposed access drive impervious cover, but the pond was removed at the request of project reviewers due to environmental restrictions and the proposed access drive’s proximity to Lake Austin. Instead, three rain gardens will treat an equivalent amount of existing impervious cover within the northern parcel of the plant site. Effect structure will have on existing and future drainage: Currently, there are no water quality controls within the northern parcel of the plant site. This project will improve the quality of stormwater runoff by treating more existing impervious cover within the northern parcel of the plant site than is being added with the project. Impact on Water Quality: This project will improve water quality once construction is complete by treating more impervious cover than is being added with the proposed improvements. To minimize the potential for sediment laden stormwater runoff from leaving the site during construction, a double row of perimeter erosion and sedimentation controls are proposed during construction. The City inspector will ensure that these erosion control devices are implemented correctly and maintained through the duration of construction. To maintain the natural drainage patterns at the base of the rimrock, the proposed culverts under the access drive and primary duct banks was raised by a foot to allow runoff upstream of the limits of construction to pond before draining out the Lake Austin through the culverts. Justification for exemption from the watershed protection regulations: The proposed enclosure and access drive are essential to maintaining reliable power for the operation of the City’s water treatment plant. Dam Safety and Landfill Certification Requirements: None Variance Request (Section 25-8-342 of the Land Development Code): We are requesting a variance to construct the access drive using fill over 4’. Variance Request (Section 25-8-301 of the Land Development Code): We are requesting a variance to construct the access drive and primary duct banks on a slope with a gradient of more than 15%. 210 of 42 Black & Veatch Corporation 4009 Banister Lane, Austin, Texas 78704 P +1 512-402-5930 E stigginsm@bv.com TBPE F-258 CAS Consulting & Services, Inc. 7908 Cameron Road, Austin, Texas 78754 O 512-836-2388 E Thomas.rohlack@casengineers.com TBPE F-3572 Variance Request (Section 25-8-302 of the Land Development Code): We are requesting a variance to construct the electrical enclosure on a slope with a gradient of more than 25%. Variance Request (Section 25-8-261 of the Land Development Code): We are requesting a variance to construct the access drive and primary duct banks within in the Critical Water Quality Zone (CWQZ). Variance Request (Section 25-8-281 of the Land Development Code): We are requesting a variance to construct the access drive and primary duct banks within the rim rock CEF buffer zone. Variance Request (Section 25-8-423(C)(1)(a) of the Land Development Code): We are requesting a variance to exceed the allowable 20% impervious cover in a Water Supply Rural watershed by constructing the access drive and primary duct banks as well as the electrical enclosure. Location 2.B: Water Quality Controls - Rain Gardens to treat existing access road and Austin Energy Bee Creek Substation (Phase II Project) Proposed Structure: Existing Asphalt Access road with concrete laydown curb. Watershed: Town Lake/Lady Bird Lake classified as Water Supply Suburban Type of Development: Water Project Phasing: None Storm Water Run-off: The runoff from the existing private access drive will be treated with two proposed rain gardens, associated drainage swales to convey runoff from the road to the ponds, and interceptor swales and bypass culverts to divert upstream flow around the impervious cover and rain gardens and discharge through level spreaders. Runoff from a portion of the AE Bee Creek substation will also be treated with a rain garden and discharged through a level spreader. This alternative for treating existing impervious cover on the site was recommended by the reviewers in order to remove a water quality pond adjacent to Lake Austin in an environmentally sensitive area. Instead, the rain gardens will treat more than an equivalent amount of existing impervious cover compared to the impervious cover proposed with the project. Effect structure will have on existing and future drainage: The existing access road currently has no existing water quality controls. This project will improve the quality of stormwater runoff by treating the most heavily traveled existing impervious cover on the northern parcel of the plant site. Also, concentrated flows from the Austin Energy Bee Creek substation are currently causing erosion at the site. With the project these flows will be captured at the edge of the substation fence before erosion can occur and routed to a rain garden for water quality treatment and through a level spreader to discharge in a non-erosive way. 311 of 42 Black & Veatch Corporation 4009 Banister Lane, Austin, Texas 78704 P +1 512-402-5930 E stigginsm@bv.com TBPE F-258 CAS Consulting & Services, Inc. 7908 Cameron Road, Austin, Texas 78754 O 512-836-2388 E Thomas.rohlack@casengineers.com TBPE F-3572 Impact on Water Quality: This project will improve water quality once construction is complete by treating more impervious cover than is being added with the proposed improvements. The cross culverts will also route upstream impervious cover under the existing access drive which further enhances water quality at the site. Also, concentrated flows from the Austin Energy Bee Creek substation are currently causing erosion at the site. With the project these flows will be captured at the edge of the substation fence before erosion can occur and routed to a rain garden for water quality treatment and through a level spreader to discharge in a non-erosive way. To minimize the potential for sediment laden stormwater runoff from leaving the site during construction, a double row of perimeter erosion and sedimentation controls are proposed during construction. The City inspector will ensure that these erosion control devices are implemented correctly and maintained through the duration of construction. Justification for exemption from the watershed protection regulations: Water quality controls will be provided to treat more than an equivalent amount of impervious cover proposed with the project. Dam Safety and Landfill Certification Requirements: None Variance Request (Section 25-8-341 of the Land Development Code): We are requesting a variance to construct the rain gardens using cuts over 4’. Location 3.A: Containment Basin (Phase III Project) Proposed Structure: The proposed stormwater containment basin will capture stormwater from areas of the plant that are likely to contain contaminants that get washed into the storm drains. The basin will capture the stormwater and contain it long enough that the plant operators can review the water quality and determine if the water can be released to the outfall. If not, operators arrange to have the water disposed of per state and local regulations. Watershed: Little Bee Watershed classified as water supply rural Type of Development: Water infrastructure essential to protect the Bee Creek from receiving contaminated runoff. Project Phasing: None Storm Water Run-off: The existing stormwater drainage system will be used. Effect structure will have on existing and future drainage: This project will improve the quality of the stormwater runoff but will not limit overall capacity to drain to the outfall. Impact on Water Quality: This project will not impact water quality once installation is complete. During construction, silt fences, mulch socks, inlet protection and filter dikes will prevent sedimentation from contaminating the stormwater runoff. The City inspector will ensure that these erosion control devices are maintained and implemented correctly. 412 of 42 Black & Veatch Corporation 4009 Banister Lane, Austin, Texas 78704 P +1 512-402-5930 E stigginsm@bv.com TBPE F-258 CAS Consulting & Services, Inc. 7908 Cameron Road, Austin, Texas 78754 O 512-836-2388 E Thomas.rohlack@casengineers.com TBPE F-3572 Justification for exemption from the watershed protection regulations: The basin will protect the adjacent waterway from contaminants from a plant that already exists in the watershed. Dam Safety and Landfill Certification Requirements: None Variance Request (Section 25-8-341 of the Land Development Code): We are requesting a variance to construct the containment basin using cuts over 4’. Variance Request (Section 25-8-302 of the Land Development Code): We are requesting a variance to construct the containment basin on a slope > 25%. Variance Request (Section 25-8-452 of the Land Development Code): We are requesting a variance to construct the containment basin in the WQTZ that lies over the South Edwards Aquifer Recharge Zone in a Water Supply Rural Watershed. Location 3.B: 6-inch Waterline (Phase III Project) Proposed Structure: A 6-inch waterline will be installed in the northwest access roadway (beneath asphalt pavement) in order to provide potable water to the Centrifuge Building and to provide a complete loop for the plant waterline. Watershed: Little Bee Watershed classified as water supply rural Type of Development: Water infrastructure essential to efficient and effective plant operation and safety. Project Phasing: None Storm Water Run-off: The existing stormwater drainage system will be used. Effect structure will have on existing and future drainage: None. Impact on Water Quality: This project will not impact water quality once installation is complete. During construction, silt fences, mulch socks, inlet protection and filter dikes will prevent sedimentation from contaminating the stormwater runoff. The City inspector will ensure that these erosion control devices are maintained and implemented correctly. Justification for exemption from the watershed protection regulations: The waterline is essential to the operation of the City’s water treatment plant. Dam Safety and Landfill Certification Requirements: None Variance Request (Section 25-8-452 of the Land Development Code): We are requesting a variance to construct the 6-inch waterline in the WQTZ that lies over the South Edwards Aquifer Recharge Zone in a Water Supply Rural Watershed. 513 of 42 Black & Veatch Corporation 4009 Banister Lane, Austin, Texas 78704 P +1 512-402-5930 E stigginsm@bv.com TBPE F-258 CAS Consulting & Services, Inc. 7908 Cameron Road, Austin, Texas 78754 O 512-836-2388 E Thomas.rohlack@casengineers.com TBPE F-3572 Location 3.C: Sludge Change-Over Facility (Phase III Project) Proposed Structure: The proposed sludge change-over facility will relocate the sludge change-over valves from an underground vault in middle of the plant road to a safe-from-traffic, off-road location. Currently the plant staff face traffic risk just to be able to enter the vault and redirect sludge flow. Watershed: Little Bee Watershed classified as water supply rural Type of Development: Water infrastructure essential to the safe operation of the water treatment plant. Project Phasing: None Storm Water Run-off: The existing stormwater drainage system will be used. Effect structure will have on existing and future drainage: Approximately 700 SF of impervious area will be added to the site. Stormwater flow will be directed around the facility via a concrete gutter, dissipate on a rock splash pad and infiltrate into the grassy area to the east of the proposed facility. Impact on Water Quality: This project will not impact water quality once installation is complete. During construction, silt fences, mulch socks, inlet protection and filter dikes will prevent sedimentation from contaminating the stormwater runoff. The City inspector will ensure that these erosion control devices are maintained and implemented correctly. Justification for exemption from the watershed protection regulations: The sludge change-over facility is essential to the safe operation of the water treatment plant. Dam Safety and Landfill Certification Requirements: None Variance Request (Section 25-8-341 of the Land Development Code): We are requesting a variance to construct the sludge change-over facility using cuts over 4’. Variance Request (Section 25-8-302 of the Land Development Code): We are requesting a variance to construct the sludge change-over facility on a slope >25%. Variance Request (Section 25-8-452 of the Land Development Code): We are requesting a variance to construct the sludge change-over facility in the WQTZ that lies over the South Edwards Aquifer Recharge Zone in a Water Supply Rural Watershed. Location 3.D: New Electrical Building and related Ductbanks (Phase III Project) 614 of 42 Black & Veatch Corporation 4009 Banister Lane, Austin, Texas 78704 P +1 512-402-5930 E stigginsm@bv.com TBPE F-258 CAS Consulting & Services, Inc. 7908 Cameron Road, Austin, Texas 78754 O 512-836-2388 E Thomas.rohlack@casengineers.com TBPE F-3572 Proposed Structure: A proposed electrical building will be constructed adjacent to the Sludge Thickener and across from the Sludge Handling Facility. The electrical building will house a new motor control center (MCC) needed to accommodate the new pumps proposed for the Sludge Handling Facility. The new electrical building needs to be close to the Sludge Handling Facility because the new MCC will become the primary control center for the entire Sludge Handling Facility. Watershed: Little Bee Watershed classified as water supply rural Type of Development: Water infrastructure essential to efficient and effective plant operation and safety. Project Phasing: None Storm Water Run-off: The existing stormwater drainage system will be used. Effect structure will have on existing and future drainage: None. Impact on Water Quality: This project will not impact water quality once installation is complete. During construction, silt fences, mulch socks, inlet protection and filter dikes will prevent sedimentation from contaminating the stormwater runoff. The City inspector will ensure that these erosion control devices are maintained and implemented correctly. Justification for exemption from the watershed protection regulations: The new electrical building and ductbanks are essential to the safe and useful operation of the water treatment plant. Dam Safety and Landfill Certification Requirements: None Variance Request (Section 25-8-452 of the Land Development Code): We are requesting a variance to construct the electrical building and ductbanks in the WQTZ that lies over the South Edwards Aquifer Recharge Zone in a Water Supply Rural Watershed. If any further information regarding the projects is required, please feel free to contact the following engineers for each project: • Phase II Project – Thomas Rohlack, PE at either (512) 222-1264 or Thomas.rohlack@casengineers.com • Phase III Project – Monica Stiggins, PE at either (512) 402-5930 or stigginsm@bv.com. Very Truly Yours, Black & Veatch Corporation and CAS Consulting & Services, Inc. Monica Stiggins, P.E. Engineering Manager Thomas Rohlack, P.E. Senior Engineer 715 of 42 October 9, 2020 ENVIRONMENTAL COMMISSION VARIANCE APPLICATION FORM PROJECT DESCRIPTION Applicant Contact Information Name of Applicant Robyn Haasch (Phase II) & Nick Sybille (Phase III), Austin Public Works Street Address 6800 Burleson Road, Building 312, Ste 200 City State ZIP Code Austin, Texas 78744 Robyn (Phase II): 512-974-2624 Nick (Phase III): 512-673-8791 Robyn.haasch@austingtexas.gov Nicholas.sybille@austintexas.gov Work Phone E-Mail Address Case Name Variance Case Information Ullrich Low Service Pump Station Electrical Feed Renewal Project (Phase II of the site plan revision) Ullrich WTP Process Drain & Support Systems Improvements Project (Phase III of the site plan revision) Case Number SPC-03-0005C (R2) Address or Location 1000 Forest View Drive Pamela Abee-Taulli Environmental Reviewer Name Environmental Resource Management Reviewer Name Applicable Ordinance Liz Johnston (Wetland Biologist) and Radmon Rice (Hydrogeologist) Watershed Protection Ordinance LDC 25-8-301; LDC 25-8-341; LDC 25-8-452 Watershed Names Lake Austin, Bee Creek, Little Bee Creek (Water Supply Rural) Lady Bird Lake (Water Supply Suburban) City of Austin | Environmental Commission Variance Application Guide 1 816 of 42 October 9, 2020 Watershed Classification Edwards Aquifer Recharge Zone ☐Urban ☐ Suburban ☐Water Supply Suburban ☐Water Supply Rural ☐ Barton Springs Zone ☐ Barton Springs Segment ☐ Northern Edwards Segment ☐ Not in Edwards Aquifer Zones Edwards Aquifer Contributing Zone Distance to Nearest Classified Waterway ☐ Yes ☐ No Phase II is adjacent to the waterways. Phase III is 500 ft to the nearest waterway. Water and Waste Water service to be provided by City of Austin The variance request for Phases II & III projects are as follows (Cite code references): 1. LDC 25-8-261 to allow development in the Critical Water Quality Zone (CWQZ), and by extension in the Water Quality Transition Zone (WQTZ) of a Water Supply Rural watershed in the Edwards Aquifer Recharge Zone South [LDC 25-8-452]. a. Ph II: switchgear enclosure, duct bank and access drive b. Ph III: containment basin, electric building & related duct banks, sludge changeover facility, 6” water line 2. LDC 25-8-281 to allow construction within a rimrock CEF buffer a. Ph II: duct bank and access drive 3. LDC 25-8-301 to allow construction of a roadway or driveway on a slope with a gradient of more than 15 percent, a. Ph II: duct bank and access drive 4. LDC 25-8-302(A)(1) to allow construction of a building or parking lot on a slope with a gradient of more than 25 percent a. Ph II: switchgear enclosure b. Ph III: sludge change-over facility 5. LDC 25-8-341 to allow cut to sixteen (16) feet a. Ph III: containment basin City of Austin | Environmental Commission Variance Application Guide 2 Request 917 of 42 October 9, 2020 6. LDC 25-8-342 to allow fill to twelve (12) feet a. Ph II: duct bank and access drive 7. 25-8-423(C)(1)(a) to allow impervious cover to exceed the 40 percent limit for development in the uplands of a Water Supply Suburban watershed. 8. 25-8-453(D)(1)(a) to allow impervious cover to exceed the 20 percent limit for development in the uplands of a Water Supply Rural watershed. Q1/Q2 Table Total Imp Total Imp Gross Imp Net NSA Imp Cover Cover Cover Cover Impervious cover square footage: acreage: percentage: (Acres) Little Bee Creek Lady Bird Lake (Town Lake) Lake Austin Bee Creek Total 4.19 4.30 0.99 0.31 9.79 (Sq Feet) 182,516.40 187,308.00 42,931.70 13,503.60 426,259.70 % % 5.71% 37.41% 7.95% 10.91% 11.2% 87.39% 6.2% 6.9% 30.67% 18.55% Phase II – Ullrich Low Service Pump Station Electrical Feed Renewal Project Provide general description of the property (slope range, elevation range, summary of vegetation / trees, summary of the geology, CWQZ, WQTZ, CEFs, floodplain, heritage trees, any other notable or outstanding characteristics of the property) The following general description is for the portion of the property where the proposed project improvements will be taking place (near the low service pump station). Slopes in the area vary between 0-35%. Proposed improvements as part of the electrical feed renewal project are constructed on slopes ranging from 0-25%, see attached Slope Map exhibit. Elevations range from approximately 492 feet MSL at the existing low service pump station where the proposed project will take place, to 820 feet MSL at the main treatment plant south of Redbud Trail. Per the 2003 expansion report, the non-developed areas of the property contain primarily native vegetation and dense tree cover. There are a variety of hardwood trees as well as Cedar (Juniper) trees. Class 1 hardwood species include live oak, cedar elm, red oak, and Spanish oak City of Austin | Environmental Commission Variance Application Guide 3 1018 of 42 Phase III – Process Drain and Support Systems Improvements (PD&SSI) October 9, 2020 Provide general description of the property (slope range, elevation range, summary of vegetation / trees, summary of the geology, CWQZ, WQTZ, CEFs, floodplain, heritage trees, any other notable or outstanding characteristics of the property) trees. Other species include hackberry, cottonwood, Arizona ash, and chinaberry. A tree list detailing trees to be removed and retained within and adjacent to the project limits is included in the construction plan set. Soils in the area are generally characterized by thin surface layers of clay and loam overlying weathered limestone and marl. The underlying material is generally limestone rock. The valleys and canyons are dominated by Tarrant soils, according to USDA Soil Survey of Travis County. The limits of construction lie within the CWQZ, WQTZ, and 100-year floodplain. Location 1 – Containment Basin: The site terrain slopes (~22%) from the plant access road on the northwest side of the plant site in the Little Bee Watershed, WQTZ and Edwards Aquifer Recharge Zone. The terrain slopes towards Little Bee Creek. The first 6” of soil is a dark brown, soft fat clay fill that is moist with organics. The next 18” are brown, dense clayey gravel fill that is moist with abundant limestone fragments. Limestone was encountered at 2’ of depth. The basin will be located against the access road at the top of the slope. The work includes three new manholes, one replacement manhole and replacement of stormwater lines. The purpose of the basin is to capture storm water runoff from the plant site that may be contaminated with lime or other site contamination. The operators will have the opportunity to review the water for contaminants before releasing the water to the outfall. If contaminants are identified in the basin water, the plant staff will arrange to have the contaminated water removed and disposed of per state and local regulations. Location 2 – 6-inch Waterline: A 6” waterline will be installed in the northwest access roadway (beneath the asphalt pavement) in the Little Bee Watershed, WQTZ and Edwards Aquifer Recharge Zone. The first 6” of soil is a dark brown, soft fat clay fill that is moist with organics. The next 18” are brown, dense clayey gravel fill that is moist with abundant limestone fragments. Limestone was encountered at 2’ of depth. The line will provide potable water to the Centrifuge Building and will loop the potable waterline in the plant. The line will also improve plant fire safety by adding 2 fire hydrants. The waterline’s route represents the shortest, least disruptive path. Location 3 – Sludge Change-Over Facility: The site terrain slopes (~39%) from a central plant access road towards the sludge holding tanks in the Little Bee Watershed, WQTZ and Edwards Aquifer Recharge Zone. The first 12” of soil is a dark brown, stiff gravelly lean clay fill that is moist City of Austin | Environmental Commission Variance Application Guide 4 1119 of 42 October 9, 2020 with organics. The next 12” are brown, dense clayey gravel fill. Limestone was encountered at 2’ of depth. The proposed sludge change-over facility will attach to the existing Sludge Thickener Pump Station and be constructed into the limestone slope. The backwall of the structure will be incorporated into the existing retaining wall of the access road. The facility replaces a sludge change over vault whose access hatch is in the middle of the access road, creating a safety hazard for operations staff. Work includes a new water meter vault west of the Sludge Handling Facility. No work is proposed in the 100-year floodplain. Location 4 – New Electrical Building and related Ductbanks: A site is a concrete apron on the west side of the Sludge Thickener. The ductbanks will be installed beneath the concrete pavement and beneath the asphalt access road. The work will be installed in the Little Bee Watershed, WQTZ and Edwards Aquifer Recharge Zone. The terrain is 8” of concrete over 3’ of silty, clayey gravel with sand over limestone. The building will provide power to the new pumps in the Sludge Handling Facility, the Containment Basin gates and improve motor controls capacity for the plant. Phase II – Ullrich Low Service Pump Station Electrical Feed Renewal Project Clearly indicate in what way the proposed project does not comply with current Code (include maps and exhibits) • • • • • • • • Structures will be constructed in the CWQZ in the Edwards Aquifer Recharge Zone South. Construction within a rimrock CEF buffer. Construction of a roadway or driveway on a slope with a gradient of more than 15 percent. Construction of a building or parking lot on a slope with a gradient of more than 25 percent. Construction will cut more than 4’ into the existing terrain. Construction will fill more than 4’ into the existing terrain. Impervious cover will exceed 40% in the Water Supply Suburban watershed. Impervious Cover will exceed 20% in the Water Supply Rural watershed. Maps and exhibits are included as attachments to this form. City of Austin | Environmental Commission Variance Application Guide 5 1220 of 42 October 9, 2020 Phase III – PD&SSI Project Clearly indicate in what way the proposed project does not comply with current Code (include maps and exhibits) • Construction will cut more than 4’ into the existing terrain. • Structures will be constructed on slopes that exceed 25%. • Structures will be constructed in the WQTZ that lies over the South Edwards Aquifer Recharge Zone in a Water Supply Rural watershed. • • Impervious cover will exceed 40% in the Water Supply Suburban watershed. Impervious Cover will exceed 20% in the Water Supply Rural watershed. City of Austin | Environmental Commission Variance Application Guide 6 1321 of 42 October 9, 2020 FINDINGS OF FACT As required in LDC Section 25-8-41, in order to grant a variance the Land Use Commission must make the following findings of fact: Include an explanation with each applicable finding of fact. Project: Ullrich LSPS Electrical Feed Renewal Project (Phase II) & Ullrich WTP Process Drain & Support Systems Improvements Project (Phase III) Ordinance: Watershed Protection Ordinance; LDC 25-8-302; LDC 25-8-341; LDC 25-8-452 A. Land Use Commission variance determinations from Chapter 25-8-41 of the City Code: 1. The requirement will deprive the applicant of a privilege available to owners of similarly situated property with approximately contemporaneous development subject to similar code requirements. Yes Phase II – All Proposed Improvements: The WTP requires immediate upgrades to its critical electrical service and equipment that provides power to the plant’s Low Service Pump Station. New equipment must be installed at a new location due to an increased footprint and code requirements to provide climate control and protection from the environment. The development is necessary for the health and safety for the citizens of the City of Austin. The denial of requested variances for the proposed project will preclude construction of facilities necessary to efficiently power, operate and maintain the raw water pumping station. The raw water pumping station is critical to divert source water for treatment and delivery to Austin Water customers. The variance is being requested for Reasonable Use and Access of the site for continued maintenance and operation. Yes Yes Yes Phase III – Containment Basin: The basin must be directly located downstream of the plant stormwater drains but before the outfall in order to intercept contaminated flows for capture, evaluation and proper disposal. Phase III – 6” Waterline: The best way to provide potable water to the Centrifuge Building is to extend the existing waterline to the building and connect to the waterline on the opposite side of the plant, creating a looped waterline system. Phase III – Sludge Change-Over Facility: The facility must be located adjacent to the vault in order to connect to all the existing sludge piping. City of Austin | Environmental Commission Variance Application Guide 7 1422 of 42 October 9, 2020 2. The variance: a) Yes Yes Phase III – New Electrical Building: The facility must be located adjacent to the existing MCC and the new raw water pumps in order to provide power to all the new services. Is not necessitated by the scale, layout, construction method, or other design decision made by the applicant, unless the design decision provides greater overall environmental protection than is achievable without the variance; Phase II – New Electrical Equipment Enclosure: The WTP requires immediate upgrades to its critical electrical service and equipment that provides power to the plant’s Low Service Pump Station. New equipment must be installed at a new location due to an increased footprint and code requirements to provide climate control and protection from the environment. The development is necessary for the health and safety of the citizens of the City of Austin. The enclosure will be built on drilled piers to minimize impact to the environment. Due to environmentally sensitive areas at the LSPS , the location of the enclosure could was moved south near the AE Bee Creek Substation. The building could not be located any further south or west of the existing road due to both topographical constraints and existing underground utility corridors preventing the installation of connecting duct banks (service) to the Low Service Pump Station. Phase II – Proposed Access Drive and Duct Banks: The existing private access drive is filled with existing utilities; therefore, the new primary duct banks must be routed elsewhere, and must remain above the Lake Austin normal pool elevation. To minimize disturbance, the new access drive is proposed to be located over the new primary duct banks. The access drive will provide a looped route for large maintenance vehicles to access the existing Low Service Pump Station (LSPS). The access drive and duct banks have been redesigned to minimize impacts to the surrounding environment, including adjacent wetlands, rimrock, and heritage trees. The original project design included a water quality pond adjacent to Lake Austin to treat the impervious cover of the proposed access drive. However, this pond was eliminated to minimize impacts to the shoreline and nearby heritage trees. Instead, the project provides water quality treatment of existing impervious cover on the northern parcel of the plant using rain gardens. Phase III – Containment Basin: The basin will protect Little Bee Creek from contaminated stormwater runoff, representing greater environmental protections than is achievable without the variance. The basin must be located between the stormwater lines and the plant outfall. Yes Yes City of Austin | Environmental Commission Variance Application Guide 8 1523 of 42 October 9, 2020 ] Yes Yes Yes Phase III – 6” Waterline: Locating the waterline in the access road limits excavation in grassy areas and is the shortest, feasible waterline route. Phase III – Sludge Change-Over Facility: The facility will protect plant operations staff from having to access a vault in a busy roadway every day to direct sludge flow. The facility must be located next to the sludge lines that are valve-controlled by the facility. Phase III – New Electrical Building: The WTP requires on-going upgrades to its motor control centers and electrical service to provide the power to the existing and new equipment at the plant. b) Is the minimum deviation from the code requirement necessary to allow a reasonable use of the property; Phase II – All Proposed Improvements: The means by which the property was originally developed was necessary and unavoidable given the use of the facilities on the property, i.e., the pumping of source water to one of the City’s largest drinking water production facilities. Deviation from the code requirement is necessary to allow for replacement of aging facilities necessary to efficiently power, operate and maintain the raw water pumping station.. Significant redesigns to limit the electrical equipment expansion, roadway alignments, and locations of all facilities and underground infrastructure were attempted and evaluated. Due to the site topography and requirements to maintain properly operating electrical equipment during all phases of construction, the final locations were chosen to minimize the overall environmental impact to the site while maintaining the critical functionality of the equipment and infrastructure. Phase III – All Proposed Improvements: The facilities were sized specifically to provide their designed function. Yes Yes Yes c) Does not create a significant probability of harmful environmental consequences. Phase II – Proposed Electrical Enclosure, Duct Banks, and Access Drive: The proposed improvements have been specifically designed to minimize impacts to and the probability of harming the environment during and after construction. The proposed improvements provide essential operation and maintenance requirements for the raw water pumping station. The proposed enclosure will be constructed on piers to minimize impacts to the environment. The drive alignment has been optimized to avoid impacting nearby heritage trees and to City of Austin | Environmental Commission Variance Application Guide 9 1624 of 42 October 9, 2020 minimize impacts to the wetland. Wetlands mitigation is being provided to compensate from the unavoidable impacts to wetland adjacent to Lake Austin. The mitigation will include removal of invasive and exotic species, removal of trash and debris, and the replanting of native trees and vegetation. Additionally, the proposed culverts under the access have been designed to maintain the natural drainage patterns at the base of the rimrock by raising the flowline one foot to allow runoff upstream of the limits of construction to pond before draining out to Lake Austin through the culverts. Yes Phase III – All Proposed Improvements: None of the proposed improvements have a significant probability of harming the environment. The containment basin protects Little Bee Creek from contaminated runoff and the new sludge change-over facility protects workers from an unsafe facility access. The proposed 6” waterline adds 2 fire hydrants, improving access to water to fight fires. 3. Development with the variance will result in water quality that is at least equal to the water quality achievable without the variance. Yes Yes Phase II – All Proposed Improvements: The project includes providing a diversion berm and level spreader to reduce erosion caused by existing concentrated flow flowing from the Bee Creek Substation toward the proposed access drive. A sedimentation filtration pond and rain garden will also be provided to improve water quality in the Lake Austin watershed. The project will treat greater than an equal impervious cover to the proposed enclosure and access drive with rain gardens along the existing access road. The cross culverts will also route upstream impervious cover under the existing access drive which further enhances water quality at the site. The existing site does not currently include water quality controls, whereas the proposed improvements will include multiple rain gardens and a sedimentation filtration pond to treat impervious cover on the most heavily traveled impervious cover on the norther parcel of the site. This will improve water quality in the Town Lake watershed. Phase III – All Proposed Improvements: The proposed containment basin is designed to improve water quality in Little Bee Creek. Neither the proposed 6” waterline or the sludge change-over facility will change the site’s water quality. During construction, SWPPP best practices will be employed to prevent construction sediment and debris from entering stormwater runoff. City of Austin | Environmental Commission Variance Application Guide 10 1725 of 42 October 9, 2020 B. 1. Additional Land Use Commission variance determinations for a requirement of Section 25-8-422 (Water Quality Transition Zone), Section 25-8-452 (Water Quality Transition Zone), Article 7, Division 1 (Critical Water Quality Zone Restrictions), or Section 25-8-368 (Restrictions on Development Impacting Lake Austin, Lady Bird Lake, and Lake Walter E. Long): The criteria for granting a variance in Subsection (A) are met; Phase II – All Proposed Improvements: The WTP requires immediate upgrades to its critical electrical service and equipment that provides power to the plant’s Low Service Pump Station. New equipment must be installed at a new location due to an increased footprint and code requirements to provide climate control and protection from the environment. Phase III – Containment Basin: Construction of the proposed containment basin is permitted per Article 11 Section 25-8-452 A.1 (Article 7 Division 1) as an in-channel detention basin designed in accordance with the ECM. The basin is also a water quality control facility in accordance with Article 11 Section 25-8-452 A.2. Phase III – 6” Waterline: Installing a utility line in the WQTZ is permitted per Article 7 Division 1 (D) as long as the utility line follows the most direct path to minimize disturbance, which is true for the proposed waterline. Phase III – Sludge Change-Over Facility: Construction of the proposed sludge-change over facility is permitted per Article 11 Section 25-8-452 A.2 – a water quality control facility that does not modify or impact the floodplain. Phase III – New Electrical Building: Construction of the proposed sludge-change over facility is permitted per Article 11 Section 25-8-452 A.2 – a water quality control facility that does not modify or impact the floodplain. Yes Yes Yes Yes Yes Yes 2. The requirement for which a variance is requested prevents a reasonable, economic use of the entire property; Phase II – All Proposed Improvements: The WTP requires immediate upgrades to its critical electrical service and equipment that provides power to the plant’s Low Service Pump Station. New equipment must be installed at a new location due to an increased footprint and code requirements to provide climate control and protection from the environment. The means by which the property was originally developed was necessary and unavoidable given the use of the facilities on the property, i.e., the pumping of source water to one of the City’s water production facilities. The denial of requested variances for the proposed project will preclude construction of facilities necessary to efficiently operate and maintain the raw water pumping station. The City of Austin | Environmental Commission Variance Application Guide 11 1826 of 42 October 9, 2020 3. The variance is the minimum deviation from the code requirement necessary to allow a reasonable, economic use of the entire property. Yes Yes Yes Yes Yes Yes location of the raw water pumping station is critical to divert source water for treatment and delivery to Austin Water customers. Phase III – Containment Basin: The proposed containment basin will be used to protect the plant outfall from receiving contaminated stormwater runoff. Phase III – 6” Waterline: The waterline is needed to provided potable water to the Centrifuge Building and improve plant fire safety. Phase III – Sludge Change-Over Facility: The proposed sludge-change over facility will protect the safety of plant operations staff from having to access the facility through a hatch on a busy plant access roadway. The proposed facility will be located out of the roadway. Phase III – New Electrical Building: The WTP requires on-going upgrades to its motor control centers and electrical service to provide the power to the existing and new equipment at the plant. New MCCs must be installed at a second location before upgrades can be made to the existing one. Phase II – All Proposed Improvements: The proposed access drive was designed to minimize impacts to nearby heritage trees and the existing wetlands. The access drive was designed on the flattest slopes available in the area, where possible. The access drive is critical to delivering and accessing the equipment at the Low Service Pump Station and associated duct bank. Water quality treatment is being provided for more impervious cover than is proposed and is provided on the portion of the site with the heaviest traffic volume. An existing concentrated flow causing erosion is being routed through a level spreader to minimize future erosion. Upstream undeveloped flows are being routed around existing impervious cover. Existing site drainage patterns at the base of the rimrock are being maintained. Improvements have been designed to preserve all of the heritage trees within the limits of construction, decompaction of tree critical roots zones for preserved trees is required, along with a remedial tree care program. A double barrier of erosion and sediment controls are proposed to control stormwater runoff during construction. Wetlands mitigation is included to remove invasive species, trach and debris, and new plantings are proposed within the disturbed and undisturbed areas. Phase III – Containment Basin: The proposed basin was designed with the minimum footprint required to reasonably protect the plant from contaminated stormwater runoff. The basin was designed to contain the maximum anticipated spill volume plus the runoff volume from a 5-year storm event. City of Austin | Environmental Commission Variance Application Guide 12 1927 of 42 October 9, 2020 Yes Yes Yes Phase III – 6” Waterline: The waterline route is the shortest, feasible route to close the loop of the plant and connect to the Centrifuge Building. Phase III – Sludge Change-Over Facility: The proposed sludge change- over facility was designed to house only the sludge valve and piping being relocated out of the roadway. Phase III – New Electrical Building: The new electrical building is sized only for the equipment it houses. **Variance approval requires all above affirmative findings. City of Austin | Environmental Commission Variance Application Guide 13 2028 of 42 October 9, 2020 A Exhibits for Commission Variance o Aerial photos of the site o Site photos o Aerial photos of the vicinity o Context Map—A map illustrating the subject property in relation to developments in the vicinity to include nearby major streets and waterways o Topographic Map - A topographic map is recommended if a significant grade change on the subject site exists or if there is a significant difference in grade in relation to adjacent properties. o For cut/fill variances, a plan sheet showing areas and depth of cut/fill with topographic elevations. o Site plan showing existing conditions if development exists currently on the property o Proposed Site Plan – full size electronic or at least legible 11x17 showing proposed development, include tree survey if required as part of site or subdivision plan o Environmental Map – A map that shows pertinent features including Floodplain, CWQZ, WQTZ, CEFs, Setbacks, Recharge Zone, etc. o An Environmental Resource Inventory pursuant to ECM 1.3.0 (if required by 25-8-121) o Applicant’s variance request letter City of Austin | Environmental Commission Variance Application Guide 14 2129 of 42 L A K E A U S TIN L a k eshore Dr N I T S U A E K A L W e s t l a k e D r TIN S U L A K E A LITT L E BEECREEK Redbud Trl Forest View Dr r D d r o f t a r t S µ Feet 200 Limits of Construction Assessment Area (150-ft) 0 400 Baer Project No. 172081.02 Date: September 25, 2020 TBPE Firm No. F-3181 TBPG Firm No. 50030 Base Map: Austin West SE 1996 L A D Y B I R D L A K E L A D Y B I R D L A K E Figure 2 Historical Aerial Photograph Ullrich Water Treatment Plant Low Service Pump Station Improvements 1000 Forest View Drive Austin, Texas 78746 30 of 42 No Texas Water Development Board Wells are located wtihin the Assessment Area. L A K E A U S TIN L a k eshore Dr W e s t l a k e D r TIN S U L A K E A LITT L E BEECREEK W-2 N I T S U A E K A L W-1 Redbud Trl Forest View Dr L A D Y B I R D L A K E L A D Y B I R D L A K E Figure 4 Critical Environmental Features and Well Location Map with 2-ft Topography Ullrich Water Treatment Plant Low Service Pump Station Improvements 1000 Forest View Drive Austin, Texas 78746 r D d r o f t a r t S µ Feet 200 Baer-identified Rimrock COA Elevation Contour (2-ft) Baer-identified Wetland (W-#) 0 400 Limits of Construction Baer Project No. 172081.02 Date: September 25, 2020 Assessment Area (150-ft) TBPE Firm No. F-3181 TBPG Firm No. 50030 Base Map: World Imagery September 28, 202031 of 42 L A K E A U S TIN L a k eshore Dr N I T S U A E K A L W e s t l a k e D r TIN S U L A K E A LITT L E BEECREEK Redbud Trl Forest View Dr FEMA 100-year Floodplain FEMA 500-year Floodplain (Atlas 14) r D d r o f t a r t S µ Feet 200 Critical Water Quality Zone 0 400 TCEQ Edwards Aquifer Recharge Zone Baer Project No. 172081.02 Date: September 25, 2020 Limits of Construction TBPE Firm No. F-3181 TBPG Firm No. 50030 Assessment Area (150-ft) Base Map: World Imagery L A D Y B I R D L A K E L A D Y B I R D L A K E Figure 5 Critical Water Quality Zone, Floodplains and Edwards Aquifer Recharge Zone. Ullrich Water Treatment Plant Low Service Pump Station Improvements 1000 Forest View Drive Austin, Texas 78746 32 of 42 39633 of 42 1 2 3 4 5 6 7 8 W D C B A CAS CONSULTING & S E R V I C E S , I N C . CIVIL ENGINEERING | PROGRAM MANAGEMENT | CONSTRUCTION MANAGEMENT 7908 Cameron Road | Austin, TX 78754 |REG. NO. F-003572 Main: 512.836.2388 | Fax: 512.836.4515 Texas P.E. Firm Registration No. F-754 B - A A 10/09/2020 ADDENDUM 3 07/13/2020 10/09/2020 - - ADDENDUM 3 ISSUED FOR BIDS ISSUE DATE DESCRIPTION PROJECT MANAGER DESIGNED BY DG DRAWN BY DCH CHECKED BY DG DATE Oct. 9, 20 PROJECT NUMBER ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL SLOPE MAP 0 1" 2" FILENAME 1126SLOPE01 SCALE 1"=40' SHEET C05-106 87 OF 149 87 OF 174SPC-03-005C (R2)34 of 42 1 2 3 4 5 6 7 8 FOREST VIEW DR (PRIVATE ACCESS DRIVE) FOREST VIEW DR (PRIVATE ACCESS DRIVE) F (PRIV O R A EST VIE TE A C C W D ESS D R RIV E) W W D C B A CAS CONSULTING & S E R V I C E S , I N C . CIVIL ENGINEERING | PROGRAM MANAGEMENT | CONSTRUCTION MANAGEMENT 7908 Cameron Road | Austin, TX 78754 |REG. NO. F-003572 Main: 512.836.2388 | Fax: 512.836.4515 Texas P.E. Firm Registration No. F-754 - Oct. 8, 20 - ISSUE DATE DESCRIPTION PROJECT MANAGER DESIGNED BY DRAWN BY TR JC CHECKED BY TR DATE PROJECT NUMBER ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL CUT & FILL MAP 0 1" 2" FILENAME 1126SITE01_CUTFILL SCALE 1" = 80' SHEET C05-107 88 OF 174SPC-03-005C (R2)35 of 42 1 LEGEND 2 3 4 5 6 7 8 W W W W D C B A CAS CONSULTING & S E R V I C E S , I N C . CIVIL ENGINEERING | PROGRAM MANAGEMENT | CONSTRUCTION MANAGEMENT 7908 Cameron Road | Austin, TX 78754 |REG. NO. F-003572 Main: 512.836.2388 | Fax: 512.836.4515 Texas P.E. Firm Registration No. F-754 B - A A 10/09/2020 ADDENDUM 3 Oct. 9, 20 07/13/2020 10/09/2020 - ADDENDUM 3 ISSUED FOR BIDS ISSUE DATE DESCRIPTION PROJECT MANAGER DESIGNED BY DRAWN BY TR JC CHECKED BY TR DATE PROJECT NUMBER ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL 0 1" 2" FILENAME 1126SITE01_CEF SCALE 1" = 40' SHEET 89 OF 174SPC-03-005C (R2)36 of 42 Photograph 1: Wetland W-1 – A view of the wetland, dominated by bald cypress along the bank of the Colorado River. Photograph 2: Wetland W-1 – Photo through perimeter fence of taro at river bank. ERI Photolog Page 1 of 6 37 of 42 Photograph 3: Wetland W-2 – Wetland observed on northern side of assessment area along bank of the Colorado River, outside of perimeter fence. Bald cypress and American sycamore can be seen. Photograph 4: Wetland W-2 – View of wetland vegetation at the river bank outside of perimeter fence, including sedges and shortspike false nettle. Page 2 of 6 ERI Photolog 38 of 42 Photograph 5: Ullrich Rimrock, Solution Recharge Feature – This depression was observed east of the paved driveway and at the foot of the rimrock. Rimrock Depressed area recharge feature adjacent to the rimrock Photograph 6: Ullrich Rimrock, Solution Recharge Feature – The figure below depicts the location of the feature in blue. ERI Photolog Page 3 of 6 39 of 42 Photograph 7: Example of Juniper Woodland, west of paved driveway. Photograph 8: Example of Juniper Woodland, east of paved driveway and above floodplain bluff. ERI Photolog Page 4 of 6 40 of 42 Photograph 9: Grassy opening in Juniper Woodland, east of paved driveway. Photograph 10: Example of Deciduous Floodplain Forest between the river bank and Ullrich Rimrock. Page 5 of 6 ERI Photolog 41 of 42 Photograph 11: Example of Mowed Grasses along paved driveway. ERI Photolog Page 6 of 6 42 of 42