Item 03 - Central East Austin Water and Wastewater Pipeline Renewal Project — original pdf
Backup
Item 3 Water & Wastewater Commission: July 15, 2026 Council: July 23, 2026 Posting Language ..Title Recommend approval to authorize a contract for construction services for the Central East Austin Water and Wastewater Pipeline Renewal Project for Austin Water with Underground Water Solutions, Co., in the amount of $4,067,015 plus a $406,702 contingency for a total contract amount not to exceed $4,473,717. Funding: $4,473,717 is available in the Capital Budget of Austin Water. ..Body Lead Department Austin Financial Services. Managing Department Austin Capital Delivery Services. Fiscal Note Funding is available in the Capital Budget of Austin Water. Procurement Language: Austin Financial Services issued an Invitation for Bids solicitation IFB 6100 CLMC1122 for these goods and services. The solicitation was issued on February 23, 2026, and closed on April 16, 2026. Of the nine offers received, the bids submitted by the recommended contractors were the lowest responsive bids received. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s website. This information can currently be found at https://financeonline.austintexas.gov/afo/account_services/solicitation/solicitation_details.cfm?sid=1426 44. MBE / WBE: This contract will be awarded in compliance with City Code Chapter 2-9A (Minority-Owned and Women- Owned Business Enterprise Procurement Program) by meeting the goals with 67.62% MBE and 1.30% WBE participation. Council Committee, Boards and Commission Action: July 15, 2026 – To be reviewed by the Water and Wastewater Commission. Additional Backup Information: The Central East Austin Water and Wastewater Pipeline Rehabilitation Project is part of the Renewing Austin Program. The Renewing Austin Program is an ongoing effort to replace, and upgrade deteriorated and aging water mains with a documented history of multiple breaks and are in poor condition, and impact service delivery. In addition, the program coordinates and includes in the project area wastewater lines in poor condition that need replacement. This project consists of replacing existing water and wastewater mains located within Chicon (west), Rosewood (north), Northwestern (east), and East 7th Street (south). Water system renewal includes approximately 4,255 linear feet of main lines, service lines to individual properties, and associated accessories. Wastewater system renewal includes approximately 2,940 linear feet of main, maintenance holes, and service lines to individual properties. This item includes one allowance of $32,000 to be used to address fees for a Railroad Worker in Charge, who must be present during active work adjacent to the CapMetro Rail right-of-way. An allowance is an amount specified in the construction contract or specifications for a certain item(s) of work when details are not determined at the time of bidding. Item 3 Water & Wastewater Commission: July 15, 2026 Council: July 23, 2026 Due to the potential for encountering unknown subsurface conditions, a 10% contingency in funding has been included to allow for the expeditious processing of any change orders to cover any unforeseen construction costs associated with the project. The project will require various lane closures to facilitate progress. An approved traffic control plan will be used to minimize the inconvenience to neighborhood residents. The contractor will work to ensure that residents always have access to their driveways. If access cannot be maintained, written notice of limited access will be provided to the affected property owner(s) at least 24 hours in advance. In addition, there will be planned temporary water and wastewater service interruptions, primarily during pipeline tie-in and service reconnections. Residents will be notified at least 48 hours in advance of planned service interruptions. This construction contract is time-sensitive and a critical component of improving the infrastructure stability of the wastewater collection and water distribution systems. Delay or deferral of this contract will require additional time and cost for City construction crews to conduct maintenance and repairs. The contract allows 380 calendar days for completion of this project. This project is located within zip code 78702 (District 1). BOGGY CREEKE 7TH STCHICON STE 8TH STE 9TH STE 6TH STE 11TH STE 10TH STNORTHWESTERN AVELINCOLN STPROSPECT AVESALINA STE 5TH STROSEWOOD AVESWENSON AVEHARVARD STNILE STPOQUITO STWEBBERVILLERDMILL STSAN SABA STLEONA STPEDERNALES STGREGORY STHAMILTON AVEHIDALGO STCHALMERS AVEPEOPLESSTMORELOS STDIAZ STCONCHO STBRYAN STCOLLEGE ROWWALTERSTROBERT T MARTINEZ JR STYALE STHARVARD STHIDALGO STWater Approx: 4255 LFWastewater Approx: 2940 LF¯0200400600800FeetProject Location: 2231.310 - Central East Austin Water & Wastewater Pipeline RenewalItem:WAYMAKER WAYWESTLAKE DRWESTLAKE DRPLAZA ON THE LAKEAirport BlvdLamar Blvd.183WHITE ROCK DR351Project Limits35HARRIS BRANCH PKWY183WAYMAKER WAYWESTLAKE DRWESTLAKE DRPLAZA ON THE LAKEAirport BlvdManor Rd.WHITE ROCK DRHARRIS BRANCH PKWYAirport Blvd.MLK Blvd71MLK Blvd.MLK Blvd.Lamar Blvd.Compliance Plan Calculator File ID: 26-2000 Bidder: Underground Water Solutions Co. (MBE/MH) Sol#: IFB 6100 CLMC1122 Project: Central East Austin Water & Wastewater Pipeline Renewal $4,035,014.15 Base Bid Amount City of Austin Council Meeting Backup: July 23, 2026 PROJECT GOALS OR SUBGOALS MBE (use only if MBE/WBE goal) AFRICAN AMERICAN HISPANIC AMERICAN NATIVE/ASIAN AMERICAN WBE 0.00% 0.86% 6.27% 0.36% 1.29% SUBGOALS: PROPOSED PARTICIPATION AFRICAN AMERICAN HISPANIC NATIVE/ASIAN AMERICAN WBE NON-CERTIFIED Total Subcontractor Participation Bidder (Own Participation minus Subs) TOTAL CP Summary 1.04% 0.00% 0.37% 1.30% 31.08% 33.79% 66.21% 100.00% $41,806.80 $0.00 $15,000.00 $52,500.00 $1,254,272.97 $1,363,579.77 $2,671,434.38 $4,035,014.15 INDIVIDUAL SUBCONTRACTORS PARTICIAPTION Cert Y/N? Comm Code Comm Description Avery Williamson / Avery'S Lawn Care & Landscaping Llc AA HIS Benqwest L L C / Benqwest L L C N/A $41,806.80 $41,806.80 $0.00 $0.00 $15,000.00 $15,000.00 Mcgray & Mcgray Land Surveyors Inc WBE $22,500.00 Marie'S Trucking Core & Main Lp / L&M Supply Travis Materials Group Ltd Centex Materials L L C WBE WBE WBE NON NON NON $30,000.00 $0.00 $0.00 $52,500.00 $748,649.39 $35,000.00 $30,000.00 Texas Materials Group, Inc. / Texas Materials NON $10,000.00 Stripe It Up, Llc Alpha Paving Industries Llc Azuria Water Solutions, Inc. / Insituform Technologies, Llc National Works Inc NON NON NON NON ALL SUBCONTRACTORS TOTAL $72,890.14 $281,152.44 $39,725.00 $36,856.00 $1,254,272.97 $1,363,579.77 BIDDER'S OWN PARTICIPATION IN BASE BID (LESS AY AMOUNT SUBCONTRACTED): $2,671,434.38 TOTAL PARTICIPATION $4,035,014.15 Yes Yes Yes Yes 98814 Erosion Control Services 40509 Fuel Oil, Diesel 90779 Surveying Services (Not Aerial Or Research) 40509 Hauling Water and Wastewater Pipe Material Aggregate Supply Flex Base Controlled Low Strength Material (CLSM) Traffic Control Equipment And Accessories Rental O, Rental Of Traffic Control Signs Paving/Resurfacing Construction, Sewer And Storm Drain Protective Coatings For Concrete 1.04% 1.04% 0.00% 0.00% 0.37% 0.37% 0.56% 0.74% 0.00% 0.00% 1.30% 18.55% 0.87% 0.74% 0.25% 1.81% 6.97% 0.98% 0.91% 31.08% 33.79% 66.21% 100.00%