Water and Wastewater CommissionOct. 15, 2025

Item 02 - Pilot Knob Supply Water Transmission Main — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 4 pages

Item 2 Water & Wastewater Commission: October 15, 2025 Council: October 23, 2025 Posting Language ..Title Recommend approval to authorize a contract for engineering services for the Pilot Knob Supply Water Transmission Main Project for Austin Capital Delivery Services with Jacobs Engineering Group, Inc., in an amount not to exceed $20,000,000. Funding: $20,000,000 is available in the Capital Budget of Austin Water. ..Body Lead Department Austin Financial Services. Managing Department Austin Capital Delivery Services. Amount and Source of Funding Funding of $20,000,000 is available in the Capital Budget of Austin Water. Purchasing Language: Austin Financial Services issued a Request for Qualifications solicitation RFQS 6100 CLMP384 for these services. The solicitation was issued on April 16, 2025, and closed on May 28, 2025. Of the five responses received, the recommended consultant submitted the best evaluated response. A complete solicitation package, including a log of responses received, is available for viewing on the City’s website. This information can currently be found at https://financeonline.austintexas.gov/afo/account_services/solicitation/solicitation_details.cfm?sid=142367. MBE / WBE: This contract will be awarded in compliance with City Code Chapter 2-9A (Minority-Owned and Women- Owned Business Enterprise Procurement Program) by meeting the goals with 16.00% MBE and 3.00% WBE participation. Council Committee, Boards and Commission Action: October 15, 2025 – To be reviewed by the Water and Wastewater Commission. Additional Backup Information: This project is a 2021 Winter Storm Uri After Action Report recommendation. The proposed Pilot Knob Supply Water Transmission Main project will provide greater ability to serve Southeast Austin and supply water to the Pilot Knob Reservoir and Pump Station. With increasing projected growth in both the Central and South Pressure Zones, the ability to provide additional transmission capacity to the Pilot Knob Reservoir is needed to provide reliable service to Austin’s southeast service area. The Pilot Knob Supply Water Transmission Main project will install approximately 76,000 linear feet of water transmission main from a water transmission main north of the Colorado River near Longhorn Dam to the Pilot Knob Reservoir. A routing study will be performed to determine the project alignment. Construction of the transmission main may require lane closures or traffic detours, impacting public transportation. Any necessary water service outages will be communicated to allow customers sufficient notice and time to prepare. These outages are expected to be minimal in number and duration. Delay or deferral of this contract will impact Austin Water’s ability to provide water distribution to new development in the service area, will have a negative effect on infrastructure resilience and stability, and increase operational risk. This request allows for the development of an agreement with the selected firm. If the City is unsuccessful in negotiating a satisfactory agreement with the selected firm, negotiations will cease with that firm. Staff will return to Council so another qualified firm may be selected, authorizing new contract negotiations. This project is located within Districts 2 and 3. City of Austin Council Meeting Backup: October 23, 2025 1308129737TH71BURLESON183ELROYPEARCE969BEN WHITE5THROSSOLTORFPLATT1625BASTROPAIRPORTFINIALWILLIAM CANNONGROVEMETROPOLISHOTELKARA3RDBAINEDWINSERVICEEMMA BROWNINGSPIRITTESLAGOLFCOURSELYNNRAMIREZMCKINNEY FALLSCIRCUIT OF THE AMERICASANISEPLEASANT VALLEYSTASSNEYSHAWBESTRIDEFINCHERDIMECLUBAPPERSONMC ANGUSELLONJACEYSHERMANTOWERYLOWERLINGERANKENLOGISTICSNORWOODHESTERLYLETHAXTON130130973130Water Needs¯01234MilesProject Location: 6935.005 - Pilot Knob Supply Water Transmission MainFile ID: 25-1993WAYMAKER WAYWESTLAKEDRWESTLAKE DRPLAZA ON THELAKEAirport BlvdSpringdale RdMLK Jr. BlvdManor RdE.7th St71171290130WHITEROCKDR36035183183WHITE ROCKDR35Project Limits71130130130717171183183183 Item 2 Water & Wastewater Commission: October 15, 2025 Council: October 23, 2025 M/WBE Summary Participation subgoals stated in the solicitation were 1.62% African American; 3.98% Hispanic; 3.31% Native/Asian American; 2.76% WBE. The Top Ranked firm(s) provided an MBE/WBE Compliance Plan that met the goals of the solicitation and was approved by the Small and Minority Business Resources Department. The Second Ranked firm provided an MBE/WBE Compliance Plan that met the goals of the solicitation and was approved by the Small and Minority Business Resources Department. Public notice was given for this Request for Qualifications CLMP384 Pilot Knob Supply Water Transmission Main, through the City’s Financial Services website, Austin Finance Online. Five firms submitted qualification statements and responses were opened on May 28, 2025. Of the five submittals received none of the firms were certified MBE/WBE. TOP RANKED FIRM: Jacobs Engineering Group, Inc. – Total Participation: NON M/WBE TOTAL – PRIME Jacobs Engineering Group, Inc., Austin, TX MBE TOTAL – SUBCONSULTANTS African American Subtotal (MB) Foster CM Group, Inc., Austin, TX Hispanic Subtotal (MH) Atlas Design Services, Austin, TX (MH) Austin Survey Company, LLC, DBA Inland Geodetics, Round Rock, TX (FH) The Rios Group, Ft. Worth, TX (General Construction Management Schedule Cost) (Traffic & Transportation Engineering) (Surveying Services (Not Aerial or Research)) (Utility Locator Service, Underground) Native/Asian American Subtotal (MA) CAS Consulting and Services, Inc., Austin, TX (MA) HVJ South Central Texas - M&J, Inc., Austin, TX (Civil Engineering) (Geotechnical – Soils) WBE TOTAL – SUBCONSULTANTS (FW) McGray & McGray Land Surveyors, Inc., Austin, TX (Surveying Services (Not Aerial or Research) NON M/WBE TOTAL - SUBCONSULTANTS Hicks & Company Environmental/ Archaeological Consultants, Austin, TX Jose Guerra, Inc., Austin, TX CP&Y, Inc. dba STV Infrastructure, Austin, TX (Permitting Services Environmental) (Structural Engineering) (Civil Engineering, Utility Locator Services Underground) 64.50% 64.50% 16.00% 2.00% 2.00% 5.00% 1.00% 1.00% 3.00% 9.00% 5.00% 4.00% 3.00% 3.00% 16.50% 1.00% 0.50% 15.00% Item 2 Water & Wastewater Commission: October 15, 2025 Council: October 23, 2025 SECOND RANKED FIRM: Lockwood, Andrews & Newnam, Inc. – Total Participation: NON M/WBE TOTAL – PRIME Lockwood, Andrews & Newnam, Inc., Austin, TX MBE TOTAL – SUBCONSULTANTS African American Subtotal (MB) SE3, LLC, Austin, TX Hispanic Subtotal (FH) GGE Design & Consulting, Austin, TX (FH) The Rios Group, Inc., Round Rock, TX Native/Asian American Subtotal (MA) HVJ South Central Texas – M&J, Inc., Austin, TX (Traffic & Transportation Engineering) (Utility (Gas, Steam, Electric) Engineering) (Utility Locator Services (Underground)) (Traffic & Transportation Engineering, Geotech Soils) (Geotechnical Soils) (Surveying Services (Not Aerial or Research)) (Civil Engineering) (Surveying Services (Not Aerial or Research)) WBE TOTAL – SUBCONSULTANTS (FW) Balcones Geotechnical, LLC, Cedar Park, TX (FW) McGray & McGray Land Surveyors, Inc., Austin, TX (FW) Miller Gray, LLC dba Miller Gray, Austin, TX (FW) MWM DesignGroup, Inc., Austin, TX NON M/WBE TOTAL – SUBCONSULTANTS Aci environmental consulting, LLC, Austin, TX Schnabel, Inc. dba Schnabel Engineering, LLC, Austin, TX Weston Solutions, Inc., Austin, TX (Environmental Engineering, Environmental Consulting Services) 1.00% (Tunnels & Subways/ Engineering) (Environmental Engineering, Structural Engineering) 2.50% 2.50% 71.07% 71.07% 8.93% 1.62% 1.62% 4.00% 2.00% 2.00% 3.31% 3.31% 14.00% 2.00% 2.00% 8.00% 2.00% 6.00%