Item 03 - North Austin Pipeline Renewal — original pdf
Backup

Item 3 Water & Wastewater Commission: May 21, 2025 Council: May 22, 2025 ..Title Posting Language Recommend approval to authorize a contract for construction services for the North Austin CIPP Wastewater Renewal Project for Capital Delivery Services with Insituform Technologies, LLC in the amount of $2,772,892 plus a $277,290 contingency for a total contract amount not to exceed $3,050,182. Funding: $3,050,182 is available in the Capital Budget of Austin Water. ..Body Lead Department Financial Services Department. Managing Department Capital Delivery Services. Purchasing Language: The Financial Services Department issued an Invitation for Bids solicitation IFB 6100 CLMC1083 for these services. The solicitation was issued January 6, 2025, and closed February 20, 2025. Of the three bids received, the recommended contractor submitted the lowest responsive bid. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s website. This information can currently be found at https://financeonline.austintexas.gov/afo/account_services/solicitation/solicitation_details.cfm?sid=141716 . MBE/WBE: This contract will be awarded in compliance with City Code Chapter 2-9A (Minority-Owned and Women- Owned Business Enterprise Procurement Program) by meeting the goals with 9.31%MBE and 0.74%WBE participation. Council Committee, Boards and Commission Action: May 21, 2025 – To be reviewed by the Water and Wastewater Commission. Additional Backup Information: Austin Water’s (AW) wastewater collection system is fundamental for transport of wastewater to wastewater treatment plants. AW’s wastewater collection system is a large and complex system, consisting of approximately 3,000 miles of wastewater mains and serving approximately one million customers. Due to deterioration from the harsh conditions of the wastewater environment, the system requires ongoing repair and replacement to prevent sanitary sewer overflows. The North Austin CIPP Wastewater Renewal Project will repair 9,766 linear feet of deteriorated wastewater main with cured-in-place-pipe (CIPP) and repair or replace all associated accessories. This project consists of CIPP installation within existing wastewater lines at three locations in the City. This infrastructure was selected for replacement based upon the following physical condition of the main, number of sanitary sewer overflows, estimated volume of wastewater discharged during overflows, and amount of inflow and infiltration, which is the estimated amount of groundwater or rainwater leaking into a wastewater main. The project consists of the following three groups: Item 3 Water & Wastewater Commission: May 21, 2025 Council: May 22, 2025 • Group 1: 4,432 linear feet of CIPP of 8-inch and 12-inch diameter pipeline in an area along Greater Anderson Lane between Burnet Road and Shoal Creek Boulevard. • Group 2: 2,800 linear feet of CIPP of 15-inch and 16-inch diameter pipeline in an area along Parkfield Drive between Mearns Meadow Boulevard and South Meadows Drive. • Group 3: 2,534 linear feet of CIPP of 15-inch and 16-inch diameter pipeline in an area along Marlborough Drive and Faylin Drive between Meadowmear Drive and Marston Circle. Work within each project group also includes bypass pumping, wastewater service connections, erosion and sedimentation controls, traffic controls, and removal and disposal of abandoned asbestos cement pipe where encountered. This item includes one allowance of $50,000 which will be used to fund any potholing or other sub-surface utility engineering required prior to a required excavation not included in the plans. An allowance is an amount that is specified and included in the construction contract or specifications for a certain item(s) of work when details are not determined at the time of bidding. Due to the potential for unexpected conditions, a 10% contingency in funding has been included to allow for the expeditious processing of any change orders to cover any unforeseen construction costs associated with the project. By authorizing the additional contingency funding, Council is authorizing any change orders within the contingency amount. The project includes lane closures and detours. The contractor will install appropriate traffic detour signs and barricades to direct traffic and will work to ensure that residents and businesses always have access to their driveways. If access cannot be maintained, written notice of limited access will be provided to the affected property owner(s) at least 24 hours in advance. In addition, there will be planned temporary wastewater service interruptions during pipeline tie-in and service reconnections. Residents will be notified at least 48 hours in advance of planned service interruptions. This construction contract is time-sensitive and critical to improvement to the infrastructure stability of Austin’s wastewater collection system. The contract allows 120 calendar days for the completion of this project. This project is located within zip codes 78757 (District 7) and 78758 and 78753 (District 4). City of Austin Council Meeting Backup: May 22, 2025 Item 3 File ID: 25-0752 Page 1 of 1 Item 3 Water & Wastewater Commission: May 21, 2025 Council: May 22, 2025 MBE/WBE Summary Public notice was given for this solicitation CLMC1083 North Austin CIPP Wastewater Renewal, through the City’s Financial Services website, Austin Finance Online. Three bids were received and opened on February 20, 2025. Of the three bids received none of the firms submitting were certified MBE/WBE. Insituform Technologies, LLC submitted the lowest responsive bid including an allowance of $50,000.00: Insituform Technologies, LLC, Chesterfield, MO Texas Pride Utilities, LLC, Houston, TX DeNucci Constructors, LLC, Austin, TX Base Bid + Allowance(s) Base Bid $2,722,892.00 $2,772,892.00 $2,944,016.00 $2,994,016.00 $3,708,720.00 $3,758,720.00 The contractor’s choice of work methodology provides for six areas of contracting opportunities which are listed below Participation specific goals stated in the solicitation were 1.32% African American; 7.35% Hispanic; 0.23% Native/Asian American; 0.72% WBE. Total participation estimated on base bid amount: Base Bid: $ 2 ,7 2 2 ,8 9 2 .0 0 PRIME NON M/WBE Insituform Technologies, LLC., Chesterfield, MO $ 2,421,482.00 88.93% MBE TOTALS - SUBCONTRACTORS $ 253,350.00 9.31% African American Subtotal (M/AA) Lewis Clark Trucking LLC, Austin, TX (Hauling Services) $ $ 36,400.00 36,400.00 Hispanic Subtotal (M/H) Austin Formula Utilities, Austin, TX (Excavation Services) $ $ 210,200.00 89,200.00 (M/H) Primetex Materials, LLC, Jerrell, TX (Traffic Control Services (F/H) Lewis Concrete Restoration, Buda, TX (Manhole Rehabilitat $ $ 70,600.00 50,400.00 Native/Asian American Subtotal (F/NA) Marie's Trucking Services, Co., Austin, TX (Hauling Services) $ $ 6,750.00 6,750.00 1.34% 1.34% 7.72% 3.28% 2.59% 1.85% 0.25% 0.25% WBE TOTALS - SUBCONTRACTORS (F/W) Jecker Field Services, Inc., San Marcos, TX (Erosion Control) $ $ 20,050.00 20,050.00 0.74% 0.74% NON MBE/WBE TOTALS - SUBCONTRACTORS National Works, Inc, Luling, TX (Sewer Cleaning) $ $ 28,010.00 28,010.00 1.02% 1.02% Page 1 of 2 Item 3 Water & Wastewater Commission: May 21, 2025 Council: May 22, 2025 The Contractor submitted an MBE/WBE Compliance Plan that met the goals of the solicitation and was approved by the Small and Minority Business Resources Department. Second and third low bidder information is provided. SECOND BIDDER – Texas Pride Utilities, LLC, Houston TX 90.35% NON M/WBE prime participation; 1.32% African American; 7.37% Hispanic; 0.23% Native/Asian American; 0.72% WBE; 0.00% Non M/WBE subcontractor participation. $2,944,016.00 THIRD BIDDER - DeNucci Constructors, LLC, Austin, TX 87.44% NON M/WBE prime participation; 1.33% African American; 7.54% Hispanic; 0.24% Native/Asian American; 0.72% WBE; 2.73% Non M/WBE subcontractor participation. $3,708,720.00 Page 2 of 2