Water and Wastewater CommissionNov. 13, 2024

#13 Redbud Trail Bridge — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 4 pages

..Body Item 13 Water & Wastewater Commission: November 13, 2024 Council: November 21, 2024 Posting Language ..Title Recommend approval to authorize negotiation and execution of an amendment to the contract for engineering services for the Design of Redbud Trail Bridge over Lady Bird Lake project with URS Corporation, in the amount of $4,492,670 for a revised total contract amount not to exceed $15,787,775. Funding in the amount of $3,692,670 is available in the Capital Budget of the Transportation and Public Works Department. Funding in the amount of $800,000 is available in the Capital Budget of Austin Water. Lead Department Financial Services Department. Managing Department Capital Delivery Services. Purchasing Language: Contract Amendment. MBE/WBE: This contract was awarded in compliance with City Code 2-9B (Minority-Owned and Women-Owned Business Enterprise Procurement Program). Current participation to date is 5.09% MBE and 7.30% WBE. Prior Council Action: July 30, 2020 – Council approved a professional service agreement with URS Corporation for the Redbud Trail Bridge over Lady Bird Lake design phase engineering services. March 7, 2019 – Council approved a professional service agreement with URS Corporation for the Redbud Trail Bridge over Lady Bird Lake project to support a second phase of preliminary engineering services. May 21, 2015 – Council approved a professional service agreement with URS Corporation for the Redbud Trail Bridge over Lady Bird Lake preliminary engineering services. Council Committee, Boards and Commission Action: November 13, 2024 – To be reviewed by the Water and Wastewater Commission. July 15, 2020 – Recommended by the Water and Wastewater Commission on an 8-0 vote with Commissioner Penn recusing and Commissioner Parton absent. April 29, 2015 – Recommended by the Mobility Committee on a 4-0 vote. Additional Backup Information: The Redbud Trail (Emmett Shelton) Bridge, built in 1948, consists of two bridges (400 feet and 120 feet long) linking the east and west banks of Lady Bird Lake with Red Bud Isle in the middle. The bridges carry over 16,000 vehicles per day and provide the exclusive route for construction and operational truck traffic to and from the City’s Ullrich Water Treatment Plant. Contributing factors requiring its replacement include increased traffic loads; steel fatigue life; history of scour remediation; narrow traffic lanes; and insufficient bicycle/pedestrian paths and roadway shoulders. The western approach has a steep, sharp curve and is unaligned with the bridge, and has significant traffic collision history. In order to meet current standards, the City desires the replacement bridge to be longer and higher (low chord above the 100-year flood event), with an expanded cross-section. The bridge will also maintain access to Red Bud Isle. Item 13 Water & Wastewater Commission: November 13, 2024 Council: November 21, 2024 The benefits of a replacement bridge include providing a 100-year life for this critical roadway, bridge, and utility infrastructure; elevating driving lanes and critical utilities above 100-year flood events; providing long- term operation access to the Ullrich Water Treatment Plant; eliminating the dangerous western roadway geometry; adding shoulders in both directions; increasing bicycle and pedestrian connectivity, mobility, and safety with a protected shared-use path; reducing congestion at the Redbud Trial, Lake Austin Boulevard intersection; increasing multi-modal access at Red Bud Isle; and providing a bridge aesthetic with contextual sensitivity. Three public meetings were held to present project information and request feedback, one in June 2016, one in June 2019, and another in January 2020. The January 2020 meeting solicited public input used to refine the roadway, bridge, architectural, roadway elements, and aesthetic theme(s) and treatment. This amendment is needed for additional services required for completion of design phase, permitting assistance, and Bid Phase. Delay in approving this amendment will delay the design and construction of the Redbud Trail Bridge project. M/WBE Summary - Redbud Trail over Lady Bird Lake Participation goals stated in the original approved compliance plan for the agreement were 1.90% African American; 9.0% Hispanic; 4.90% Native/Asian American; and 15.80% WBE. Participation for this amendment: NON M/WBE TOTAL – PRIME URS Corporation, Austin, TX MBE TOTAL – SUBCONSULTANTS Hispanic Subtotal (MH) Edge Engineering, PLLC Austin, TX Native/Asian American Subtotal (MA) CAS Consulting & Services Austin, TX (Civil Engineering, Utilities Engineering) (Drainage Engineering) $3,598,843.12 84.56% $3,598,843.12 84.56% $693,826.88 15.44% 6.46% $290,311.44 6.46% $290,311.44 8.98% $403,515.44 8.98% $403,515.44 Overall participation based on expenditure for the entire project as of August 27, 2024, (not including this amendment): PRIME: 78.87% Non M/WBE SUBCONSULTANTS: 0.79% African American; 2.60% Hispanic; 5.68% Native/Asian American; 12.06% WBE; and 0.00% Non M/WBE TOTAL: 0.79% African American; 2.60%Hispanic; 5.68% Native/Asian American; 12.06% WBE; and 78.87% Non M/WBE AUTHORIZATION HISTORY – Redbud Trail over Lady Bird Lake AMOUNT $875,000.00 DATE DESCRIPTION 05/21/2015 (Council) – Engineering services for the Redbud Trail Bridge over Lady Bird Lake $58,000.00 05/21/2015 Project (Administrative Authority) – Supplemental Amendment (SA) #1 – Additional Services: Preliminary Engineering $1,082,111.00 $9,279,994.00 $4,492,670.00 $15,787,775.00 Total Contract Authorization 03/07/2019 07/30/2020 11/21/2024 Proposed (Council) – SA#7 Additional Services: Final Design (Council) – SA #4 – Preliminary engineering Phase II Additional Services (Council) – SA #5 Final Design Services CONTRACT HISTORY AMOUNT $859,635.23 05/21/2015 Engineering services for the Redbud Trail Bridge over Lady Bird Lake Project $58,910.02 08/05/2016 SA #1 – Additional Services: Critical Environmental Feature, Heritage Tree Survey & DATE DESCRIPTION $13,781.25 09/20/2018 SA #2 – Additional Services: Origin Destination Study Karst invertebrate Assessment $0.00 01/15/2019 SA #3 – Rate Revision $1,082,076.36 02/22/2019 SA #4 – Additional Services: Phase II $9,279,082.00 $0.00 $4,292,667.56 $15,586,152.42 Total Contract History SA #5 – Final Design Services SA #6 – Rate Revision Proposed SA #7 – Additional Services: Final Design 07/30/2020 03/08/2021