Page 1 of 4 pages

Item 4 # 24-4619 Water & Wastewater Commission: May 8, 2024 Council: May 30, 2024 Posting Language Recommend approval to amend the contract for engineering services for the Walnut Creek Wastewater Treatment Plant Headworks Improvements with Carollo Engineers, Inc., in the amount of $9,000,000 for a revised total contract amount not to exceed $14,700,000. (District 1) MBE/WBE This contract will be awarded in compliance with City Code 2-9B (Minority-Owned and Women- Owned Business Enterprise Procurement Program). Current participation to date is 5.28% MBE and 9.66% WBE. Lead Department Financial Services Department Client Department Austin Water Assistant Director of Engineering Services, Charles Celauro Amount and Source of Funding Funding is available in the Capital Budget of Austin Water. Purchasing Language: Contract Amendment. Prior Council Action: July 29, 2021 – Council approved the contract amendment with Carollo Engineers, Inc for the Walnut Creek Wastewater Treatment Plant Headworks Improvements project. October 17, 2019 – Council approved the original contract with Carollo Engineers, Inc for the Walnut Creek Wastewater Treatment Plant Headworks Improvements project. Council Committee, Boards and Commission Action: May 8, 2024 - To be reviewed by the Water & Wastewater Commission. Additional Backup Information: Walnut Creek Wastewater Treatment Plant (WWTP) is permitted to treat and discharge an average daily flow of 75 million gallons per day (MGD) and a 2-hour peak flow of 165 MGD. A portion of the plant effluent is used for non-potable water (NPW) at the plant site and to supply much of the City’s growing Water Reclamation Initiative (WRI) program. The remainder plant effluent is discharged into the Colorado River. The purpose of this project is to rehabilitate and make improvements to Headworks No. 1 at Walnut Creek WWTP. The Headworks (preliminary treatment) is the first step in the wastewater treatment process, where large debris and grit is removed from the raw wastewater. The mechanical and electrical components of Headworks No. 1 are original to the 1977 construction and are at or reaching the end of their useful life. To increase process reliability and to prepare the plant for future flows, Headworks No. 1 will need to be improved and modified to treat 75 MGD average and 150 MGD peak flow, with Item 4 # 24-4619 Water & Wastewater Commission: May 8, 2024 Council: May 30, 2024 a 190 MGD wet weather flow (hydraulic) capacity. The project will also directly improve the wastewater treatment plant’s electrical resiliency. An amendment to the professional services agreement is required to move the project forward into bid and construction phase. This amendment is for additional services for Carollo Engineers, Inc. to provide professional services for Walnut Creek Wastewater Headworks Improvements including construction phase services for construction oversight, submittal reviews, responding to contractor questions during construction, reviewing modifications and preparing as-built drawings. The majority of the work will take place in non-public areas of the plant. A small portion of the work may minimally impact the operation of the septic receiving station, which accepts liquid waste from the public. If authorization is not given to execute an amendment, the rehabilitation of Headworks No. 1 will not be able to move forward. When future flows exceed the capacity of Headworks No. 1, the plant will not adequately accept and treat the influent flows and would pose a greater risk for a wastewater spill. The project is located within zip code 78724, District 1. M/WBE Summary Participation goals stated in the original approved compliance plan for the agreement were 1.9% African American; 9.0% Hispanic; 4.9 Native/Asian American; and 15.8% WBE. Participation for this amendment: Additional authorization has been listed under the Prime consultant. Subconsultant participation for this authorization is unknown. Prior to issuance of a notice to proceed, the Prime consultant will submit their subconsultant utilization plan that will demonstrate how they will use their approved subconsultants in accordance with the established procedures and the MBE/WBE Procurement Ordinance and Rules. NON M/WBE TOTAL – PRIME Carollo Engineers, Austin, Tx Overall participation based on expenditure for the entire project as of April 19, 2024 (not including this amendment): PRIME: 85.35% Non M/WBE SUBCONSULTANTS: 0.22% African American; 3.75% Hispanic; 1.21% Native/Asian American; 9.47% WBE TOTAL: 5.18% MBE; 9.47% WBE; 85.35% Non M/WBE $9,000,000.00 $9,000,000.00 100.00% AUTHORIZATION HISTORY AMOUNT $1,000,000.00 $61,000.00 $4,700,000.00 $9,000,000.00 DATE DESCRIPTION 10/17/19 (Council) - Award of the Walnut Creek WWTP Headworks Improvement Contract – Preliminary Phase (Council) - Administrative Authority (Council) - Design and Bid Phase Services 10/17/19 07/29/21 05/30/24 Proposed (Council) – CMR Coordination and Bid & Construction Phase $14,761,000.00 Total Contract Authorization Services CONTRACT HISTORY AMOUNT DATE DESCRIPTION $981,693.50 $4,625,065.05 $5,606,758.55 Total Contract History 03/02/20 Preliminary Phase Services 09/23/21 SA #1 – Design and Bid Phase Services