Water and Wastewater CommissionMay 8, 2024

Item 10 — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 4 pages

Item 10 # 24-4488 Water & Wastewater Commission: May 8, 2024 Council: May 30, 2024 Posting Language Recommend approval to negotiate and execute a cost participation agreement with GP Decker, LLC for the City to reimburse the developer for an amount not to exceed $531,875.00 for costs associated with the design and construction of an oversized water main and appurtenances related to Service Extension Request No. 5713R that will provide water service to a proposed multi-family and light industrial development located at 9500 Decker Lane. Lead Department Austin Water Client Department Austin Water Assistant Director of Environmental Planning and Development Services, Kevin Critendon Amount and Source of Funding Funding is available in the Fiscal Year 2023-2024 Capital Budget of Austin Water. Council Committee, Boards and Commission Action: May 8, 2024 - To be reviewed by the Water & Wastewater Commission. Additional Backup Information: The Decker General Subdivision project consists of approximately 58.33 acres of land located at 9500 Decker Lane (the “Property”). The Property is located entirely within the City of Austin’s (the “City”) 2-mile Extra-Territorial Jurisdiction, Impact Fee Boundary, Austin Water’s service area for water and wastewater, the Desired Development Zone, and the Decker Watershed. A map of the property location is attached. GP Decker, LLC (the “Owner”) is proposing to develop approximately 425 multi-family units and 175,000 sq. ft. of office warehouse for light industrial use. The Owner requested that the City provide water utility service to the Property as proposed in Service Extension Request (SER) No. 5713R. Austin Water will provide retail wastewater service to the Property as proposed in SER No. 5714R. In accordance with Chapter 25-9 of the City Code, the City has asked the Owner to oversize the water main in order to serve additional properties within the North and North Reduced water pressure zones consistent with the City’s long range planning goals for this area. If approved by City Council, the City will cost participate in this construction project only to the extent of the City’s proportionate share of the oversized water main. The proposed oversized improvements include construction of approximately 2,955 feet of 16-inch water main from the existing 16-inch water main located in Decker Ln. to the existing 16-inch water main in Decker Ln. at Central Austin Dr. Item 10 # 24-4488 Water & Wastewater Commission: May 8, 2024 Council: May 30, 2024 The City will reimburse the Owner for an overall total amount not to exceed $531,875.00 for hard costs and soft costs. Hard costs include, but are not limited to, construction and materials. Soft costs include, but are not limited to, preliminary engineering reports, surveying, geotechnical studies, design, and project management. The City’s cost participation by project component is as follows: • For costs of the 16-inch water main (the minimum pipe diameter of 12-inches required to serve the Property to an oversized 16-inch) and appurtenances, the City’s maximum participation consists of: (1) hard costs, in an amount not to exceed 25% of the hard costs of the 16-inch water main and appurtenances, and (2) soft costs, in an amount not to exceed 15% of the City’s hard cost participation amount. Other terms of the agreement will require that the Owner: • Pay all costs for financing, interest, fiscal security, accounting, insurance, inspections, permitting, easement acquisition, legal services, and other non-reimbursable soft costs associated with the project; • Conform to the City’s design criteria and construction standards; • Construct all improvements at their cost and, after the City’s final approval of the construction, dedicate the facilities to the City for ownership, operation, and maintenance; • Allow the City to use the project plans and specifications approved by the City to solicit and publish invitations for bids for the construction of the improvements; and • Follow the City’s standard bidding practices and procedures, including the minority-owned business enterprise procurement program found in Title 2 of the City Code, and Texas Local Government Code Chapters 212 and 252. The proposed project will be managed through Austin Water staff and is located in zip code 78724. P29 Q29 LOCATION MAP Decker General Subdivision Water and Wastewater SER-5713 5714 R29 B L U E G O O S E R D R28 S28 P28 Q28 DECKER CREEK E U S 2 9 0 H W Y S V R D W B P27 Q27 LINDELL LN R27 N S H 1 3 0 S S27 B T O B L U E B L U F F R A M P TRAVIS COUNTY Q26 P26 D A FF A N L N N R L E K C E D P25 Q25 GRID Subject Tract County Boundary Surfacewater Feature (Lakes) Full-Purpose City Limit 2-Mile ETJ 5-Mile ETJ P24 Limited-Purpose City Limit Other City Limit ELM CREEK Other ETJ / 0 R26 S26 D F R F U L E B U L B B L O O R R D R25 S25 Q24 R24 S24 1,000 2,000 4,000 Feet 6,000 This product is for informational purposes and may not have been prepared for or be suitable for legal, engineering, or surveying purposes. It does not represent an on-the-ground survey and represents only the approximate relative location of property boundaries. This product has been produced by the City of Austin for the sole purpose of geographic reference. No warranty is made by the City of Austin regarding specific accuracy or completeness. 4/2/2024 !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!ÍÎ$³ÍÎ$³DÍÎ$³ÍÎ$³ÍÎ$³·(·(·(·(·(·(·(·(·(È(·(·(·(È(·(·(·(·(·(·(È(·(·(·(·(È(·(·(·(·(·(È(È(È(È(È(È(È(È(È(È(È(È(È(È(È(È(È(È(È(È(È(È(È(È(È(È(È(È(·(·(·(È(È(È(È(È(È(È(È(È(È(È(È(·(·(·(·(È(È(È(·(·(·(·(·(·(·(·(·(·(·(·(·(·(·(È(·(È(·(·(È(·(È(·(·(·(·(·(·(·(·(·(·(È(·(·(È(È(È(È(·(È(È(È(·(È(È(·(·(È(È(·(È(·(·(·(·(È(È(È(·(·(·(·(È(È(È(È(È(È(È(È(È(È(È(È(È(È(È(DECKER LNE US 290 HWY EBDAFFAN LNE US 290 HWY WBE US 290 HWY SVRD EBE US 290 HWY SVRD WBGILES LNLINDELL LNCENTRAL AUSTIN DRBEETHOVEN RUNCAMI LNCROFFORD LNZOEY LNDALMATIAN LNBRAXTON ROBERT RDLASSIE GIRL LNSUPONA STBENJI PATHE US 290 WB RAMPE US 290 WB RAMPJOHNNY MORRIS RDE US 290 EB RAMPE US 290 EB RAMPWB 290 TO EB 290 AT JOHNNY MORRIS TRNEB 290 TO WB 290 AT JOHNNY MORRIS TRNEB 290 TO WB 290 AT DECKER TRNWB 290 TO EB 290 AT DECKER TRNHARRIS BRANCH PKWYSTAFF PROPOSEDAPPROXIMATELY2,955 FEET OFOVERSIZED 16-INCHWATER MAIN(NORTH PRESSURE ZONE)KOCH PETROLEUM GROUP, L.P.600610590620580630570640560530650660620600630590620640590630600600590630640570570590620590580560590580630640610630600560610570650600580620580610600580620570650590610610580600610600580640590630610Q27Q26R27Q28R26R286"8"16"4"24"12"8"12"16"8"12"8"4"8"16"4"24"8"16"8"8"8"16"4"12"16"12"12"12"8"16"4"12"24"12"12"8"16"4"8"12"12"8"12"24"8"8"16"16"16"8"8"8"6"8"4"24"8"24"WALTER E. LONG METRO PARKW. S.E.R. Name: Decker General Subdivision (Revised)W. S.E.R. Number: 5713ROversized Improvements Map.Utility Development Services Plotted 4/2/202401,0002,0003,000500FeetNorth PZ Water MainNorth Reduced PZ Water Main!!!PrivateSubject Tract100-Year COA FloodplainFull-Purpose City Limit2-Mile ETJThis product is for informational purposes and may not have been prepared for or be suitable for legal, engineering, or surveying purposes. It does not represent an on-the-ground survey and represents only the approximate relativelocation of the property boundaries. This product has been produced by the City of Austin for the sole purpose of geographic reference. No warranty is made by the City of Austin regarding specific accuracy or completeness.