HANDCOX Water Treatment Plant Resilience Improvements Charles Celauro, P.E. Engineering Services Assistant Director Water & Wastewater Commission February 14, 2024 Austin’s Water Supply: 325,000 Acre Feet Per Year Centralized Reclaimed System 2 Drinking Water Treatment Davis Plant (1954) – 118 MGD Ullrich Plant (1968) – 167 MGD Handcox Plant (2014) – 50 MGD ___________________________ Combined Water Treatment Capacity up to 335 Million Gallons per Day Handcox Resilience Improvements Provides baseline maintenance capacity of 50MGD: Allows a minimum of 235MGD combined from all AW WTPs Prepares AW for climate change impacts Increases available treatment capacity during maintenance activities Increases ability to handle solids Does NOT rerate the plant for additional capacity beyond 50MGD Addresses: Winter Storm Uri After Action Report and supported recommendations from the Winter Storm Working Group Recommendations from the External Review 4 Winter Storm Working Group The WSWG was formed with members of this Commission to support AW in developing a thorough and objective review following Winter Storm Uri. The WSWG reviewed and prioritized the following recommendations: Maintain available water production capacity at WTPs to meet demand planning criteria (CP-5). Implement improvements at the WTPs to provide additional flexibility in maintenance scheduling (CP-6). Increase sludge storage and disposal capabilities at treatment plants (CP-8). 5 Austin Water External Review Recommended planning to offset hot and cold climate change impacts: Identify possible future scenarios, study such scenarios, identify possible solutions, and plan implementation programs for possible and probable future water quality and treatment challenges (2.7-3). Prepare for sudden requests for additional water treatment (2.8-2). 6 Handcox WTP 7 Resilience Improvements Baseline Maintenance Capacity of 50 MGD Improvements Additional up-flow clarifier Additional sludge thickener Additional sludge holding tank Additional washwater settling basin New treated water pumping 8 Resilience Improvements Additional Improvements: New potable water pipeline between plant and the low-service pump station Replacing Programmable Logic Controllers and network switches throughout the plant Freight elevator for lime building (O&M) 9 Resilience Improvements Additional washwater settling basin Additional sludge thickener New treated water pumping 10 Programmable Logic Controllers Additional sludge holding tank Additional up-flow clarifier Freight Elevator Lime Building Resilience Improvements Proposed Potable Water Line 11 Questions?