Water and Wastewater CommissionNov. 9, 2022

Item 12 — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 4 pages

Item 12 # 22-3409 Water &Wastewater Commission: November 9, 2022 Council: December 1, 2022 Posting Language Recommend approval to negotiate and execute an amendment to the professional services agreement with Halff Associates, Inc., for engineering services for the Fallwell Lane Capital Renewal project in the amount of $5,000,000, for a total contract amount not to exceed $8,000,000. MBE/WBE This amendment will be awarded in compliance with the requirements of 49 CFR Part 26 (Disadvantaged Business Enterprise Program) and City Code 2-9B (Minority Owned and Women Owned Business Enterprise Procurement Program). Current participation to date is 29.57% DBE. Lead Department Financial Services Department Client Department Austin Water Assistant Director of Engineering Services, Shay Ralls Roalson Fiscal Note Funding in the amount of $500,000 is available in the Capital Budget of Austin Water for local match against a total grant of $5,000,000. Purchasing Language: Original contract was awarded through a qualifications-based selection process. Prior Council Action: August 3, 2017 – Council approved a professional services agreement with Halff Associates, Inc. for the Fallwell Lane Capital Renewal Project for a total contract amount of $3,000,000. Council Committee, Boards and Commission Action: November 9, 2022 - To be reviewed by the Water & Wastewater Commission. Additional Backup Information: On October 31, 2013, and again on October 30, 2015, flood waters severely damaged Fallwell Lane and threatened the raw water intake structure at Austin Energy’s substation, Sand Hill Electrical Center. Austin Water’s South Austin Regional Wastewater Treatment Plant in the area east of SH130 also suffered serious damage. Onion Creek flood waters inundated low areas as they flowed into the Colorado River. Bank erosion was severe, and extensive restoration and stabilization are required. Temporary measures have been put in place to allow local traffic to utilize Fallwell Lane. A permanent solution to reconstruct or realign key access roads, retrofit water intake structures, and stabilize berms and channels to guard against flood overflows from Onion Creek are needed to protect critical City infrastructure from future flood events. Based on the Preliminary Engineering Report, a decision was made to separate the project into two phases. Phase A will realign Fallwell Lane, relocate and extend water lines, and protect the Colorado Riverbank from damaging the adjacent Fallwell Lane caused by Onion Creek overflows. Phase B will Item 12 # 22-3409 Water &Wastewater Commission: November 9, 2022 Council: December 1, 2022 provide berms, levees, and floodwalls to protect critical City infrastructure against Onion Creek overflows. Phase A of the project is at 90% design phase, but Phase B of the project is not yet funded. There are available grant programs that could provide up to 90% of the design cost for Phase B. The purpose of this amendment is to authorize the design firm to proceed with Phase B design, which will provide a “shovel ready” project that will benefit from additional grant programs. Halff Associates, Inc. is located in Austin, Texas. Strategic Outcome(s): Safety, Health and Environment, Mobility Disadvantaged Business Enterprise Summary Participation goals stated in the original approved compliance plan for the agreement was 15.00% DBE. Additional authorization has been listed under the Prime consultant. Subconsultant participation for this amendment is unknown. Prior to issuance of a notice to proceed, the Prime consultant will submit their subconsultant utilization plan that will demonstrate how they will use their approved subconsultants in accordance with the established procedures and the M/WBE Procurement Ordinance and Rules. Participation for this amendment: NON M/WBE– PRIME Halff Associates, Inc., Austin, TX Overall participation based on expenditure for the entire project as of November 1, 2022, (not including this amendment): PRIME: 29.29% Non DBE SUBCONSULTANTS: 29.57% DBE; and 41.14% Non DBE TOTAL: 29.57% DBE; and 70.43% Non DBE 100% 100% AUTHORIZATION HISTORY CONTRACT HISTORY DATE DESCRIPTION AMOUNT $3,000,000.00 $59,000.00 $5,000,000.00 $8,059,000.00 Total Contract Authorization 08/03/17 08/03/17 12/01/22 Proposed (Council) – Professional Engineering Services, Phase B (Council) – Professional Engineering Services (Administrative Authority) – Professional Engineering Services AMOUNT DATE DESCRIPTION $765,433.23 $998,430.49 $269,076.67 $77,124.94 $170,895.51 10/26/17 Preliminary Engineering Report 08/21/19 SA #01 – Design Phase Services 05/29/20 SA #02 – Additional Phase A Design Services 11/06/20 SA #03 – Additional Phase A Design Services 09/08/21 SA #04 – Additional Phase A Design Services $2,280,960.84 Total Contract History