E1 — original pdf
Backup
Zebra Mussel Mitigation Update Stephanie Sue, P.E., Water Treatment Operations Manager Water & Wastewater Commission | June 8, 2022 Last Update: September 9, 2020 W&WW Commission 09.09.2020 - ZM Briefing Update Agenda Zebra Mussel Activity and Public Outreach Ongoing Treatment of Zebra Mussels (Copper Sulfate) Water Treatment Plant Intake Cleaning and Inspection Copper Ion Generation Treatment and Next Steps Zebra Mussel Activity July 2018 September 2018 January 2019 Zebra Mussel Activity Zebra Mussel Activity 9/22/2017 300 Tom Miller Dam Mansfield Dam Water Temperature 4/10/2018 10/27/2018 5/15/2019 12/1/2019 6/18/2020 1/4/2021 7/23/2021 2/8/2022 35 ) L / S R E G I L E V ( Y T I S N E D R E G I L E V 250 200 150 100 50 0 C ° , E R U T A R E P M E T R E T A W 30 25 20 15 10 5 0 Zebra Mussel Public Outreach Press Release issued October 26, 2020 Copper Sulfate Treatment Copper Sulfate Treatment Remove growth and accumulation within treatment plant infrastructure without impacting water source Handcox Copper Sulfate System operational since summer 2019 Ullrich and Davis Copper Sulfate System operational since summer 2020 Copper sulfate systems are located outdoors (Ullrich and Davis) and reliant on chemical deliveries Validation of Effectiveness Control (No Copper Sulfate) Copper Sulfate Added Intake Cleaning and Inspection Water treatment plant cleanings and inspections have occurred annually since 2019 Cleaning occurs within intake structures, pump casings, pump pits, etc. Inspections have shown that cleanings are effective in reducing the accumulation of zebra mussels Ullrich WTP – Bay 1 Sluice Gate Sluice Gate – Pre-Removal Sluice Gate – Post-Removal Bay 1 Sluice Gate Stem – Pre-Removal Bay 1 Sluice Gate Stem – Post-Removal Ullrich WTP – Pump 2 and 3 Pump 2 Casing– Pre-Removal Pump 2 Casing– Post-Removal Pump 3 Casing– Pre-Removal Pump 3 Casing– Post-Removal Ullrich WTP – Bay 1 Bay 1 Trash Rack– Pre-Removal 2019 Bay 1 Trash Rack– Pre-Removal 2020 Bay 1 Trash Rack– Pre-Removal Apr 2021 Bay 1 Trash Rack– Pre-Removal Oct 2021 Bay 1 Trash Rack– Post-Removal Oct 2021 Davis WTP – Sluice Gate Stem Sluice Gate Stem – Pre-Removal Sluice Gate Stem – Post-Removal Handcox WTP – Upper Intake Screen 2019 Upper Intake Screen – Pre-Removal Spring 2021 Upper Intake Screen – Pre-Removal Fall 2021 Upper Intake Screen – Pre-Removal Spring 2021 Upper Intake Screen – Pre-Removal Copper Ion Generation (CIG) Electrolysis of copper rods Brine tank solution Located within Low Service PS Construction: Fall 2022 – Winter 2023 Modify copper sulfate systems for sodium permanganate feed Questions?