B6.2 - Backup - Walnut Creek MWBE — original pdf
Backup
MBE/WBE Summary Public notice was given for this solicitation CLMC745 Walnut Creek Wastewater Treatment Plant Sludge Thickener Rehabilitation through the City’s Vendor Connection web portal. Four bids were received and opened on August 8, 2019. Of the four bids received, none of the firms submitting were certified MBE/WBE. PLW Waterworks, LLC submitted the lowest responsive bid of four bids received including allowances of $150,000: Base Bid Base Bid + Allowances PLW Waterworks LLC, The Woodlands, TX $9,005,900.00 $9,155,900.00 Peabody General Contractors LLC, Austin, TX $9,891,412.07 $10,041,412.07 Matous Construction Ltd., Belton, TX $10,556,400.00 $10,706,400.00 Prota Construction, Inc. and Prota, Inc. JV NON-RESPONSIVE The contractor’s choice of work methodology provides for 28 areas of subcontracting opportunities which are listed below. Project specific sub-goals stated in the solicitation were 1.33% African American; 3.52% Hispanic; 1.08% Native/Asian; and 0.61% WBE. Total participation estimated on base bid amount of $9,005,900: Base Bid:9,005,900.00PRIMENON M/WBE TOTAL2,914,984.7832.37%PLW Waterworks, LLC, The Woodlands, TXMBE TOTALS - SUBCONTRACTORS2,985,687.00$ 33.15%African American Subtotal176,942.00$ 1.96%(MB) E&T Masonry Construction & Remodeling, Manor, TX 168,216.00$ 1.87%(Masonry, Plastering)(MB) Lewis Clark Trucking, City, ST (Hauling services)8,726.00$ 0.10%Hispanic Subtotal2,668,000.00$ 29.63%(FH) T. Morales Co. Electric Controls, Ltd., Florence, TX 2,668,000.00$ 29.63%(Construction & upgrades water treatment plant)Native/Asian American Subtotal140,745.00$ 1.56%(MA) Alpha Paving Industries, Round Rock, TX (Paving/Resurfacing, highways and r17,745.00$ 0.20%(MA) Shah Systems & Technology Corporation, City, ST (Swichgears 123,000.00$ 1.37%WBE TOTALS - SUBCONTRACTORS64,500.00$ 0.72%(FB) All Points Inspection Services, Inc., Austin, TX (Construction photography)8,500.00$ 0.09%(FN) KLP Commercial, LLC, Manor, TX (Pipe, Iron)56,000.00$ 0.62% Base Bid:9,005,900.00NON MBE/WBE TOTALS - SUBCONTRACTORS3,040,728.22$ 33.76%JL Hardware, Tomball, TX (Doors and Windows)13,927.00$ 0.15%A&Y Painting, LLC (Painting, Maintenance & Repair Services)127,700.00$ 1.42%Texas Roofing Co. LP (Roofing)44,500.00$ 0.49%Sunstate Equipment (Truck, Lift, Powered Fork Lifts)23,356.22$ 0.26%Seguin Fabricators LTD (Gratings)25,906.00$ 0.29%Spec Ten (Fire extinguishers, cabinets & covers)1,925.00$ 0.02%Brandt Mechanical Services, Inc. (Plumbing)304,779.00$ 3.38%Rangeline Tapping Services, Inc. (Pipeline equipment, maintenance & repair)5,105.00$ 0.06%Conquest Industries (Demolition services)124,500.00$ 1.38%Environmental Allies GP (Erosion control)4,328.00$ 0.05%Wastewater Transport Services (Sludge removal, building)6,850.00$ 0.08%T. Morales Co. Electric & Controls (electrical)224,000.00$ 2.49% The Contractor submitted a MBE/WBE Compliance Plan that met the goals of the solicitation and was approved by the Small and Minority Business Resources Department. Second and third low bidder information is provided below. SECOND BIDDER - Peabody General Contractors, Austin, TX $9,891,412.07 33.97% NON M/WBE prime participation; 1.37% African American; 35.3% Hispanic; .36% Native/Asian; .94% WBE; 28.06% Non M/WBE subcontractor participation. THIRD BIDDER - Matous Construction, Ltd., Belton, TX $10,566,400.00 41.85% NON M/WBE prime participation; 1.69% African American; 25.27% Hispanic; 1.17% Native/Asian; .64% WBE; 29.38% Non M/WBE subcontractor participation.