Water and Wastewater Commission - July 15, 2020

Water and Wastewater Commission Regular Meeting of the Water and Wastewater Commission - remote, via videoconferencing

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

Regular Meeting of the Water and Wastewater Commission July 15, 2020 Water and Wastewater Commission to be held Wednesday, July 15, 2020 with Social Distancing Modifications Public comment will be allowed via telephone; no in-person input will be allowed. All speakers must register in advance by Tuesday, July 14, 2020 at Noon. All public comment will occur at the beginning of the meeting. To speak remotely at the July 15, 2020 Water and Wastewater Commission Meeting, residents must: •Call or email the board liaison at (512) 972-0115 or Blanca.Madriz@austintexas.gov no later than noon, Tuesday, July 14, 2020. The information required is the speaker name, item number(s) they wish to speak on, whether they are for/against/neutral, and a telephone number or email address. •Once a request to speak has been called in or emailed to the board liaison, residents will receive either an email or phone call providing the telephone number to call on the day of the scheduled meeting. •Speakers must call in at least 15 minutes prior to meeting start in order to speak, late callers will not be accepted and will not be able to speak. •Speakers will be placed in a queue until their time to speak. •Handouts or other information may be emailed to Blanca.Madriz@austintexas.gov by Noon, Tuesday, July 14, 2020. This information will be provided to Board and Commission members in advance of the meeting. •If this meeting is broadcast live, residents may watch the meeting here: http://www.austintexas.gov/page/watch- atxn-live Water and Wastewater Commission July 15, 2020 – 1:00 PM VIA VIDEOCONFERENCING http://www.austintexas.gov/page/watch-atxn-live For more information go to: http://www.austintexas.gov/wwc Commissioners: William Moriarty, (Mayor) Chien Lee, Chair (District 4) Jesse Penn (District 1) Nhat Ho (District 2) Travis Michel (District 3) CALL TO ORDER A. APPROVAL OF MINUTES Christianne Castleberry, Vice Chair (District 5) Grant Fisher (District 9) Mia Parton (District 6) Vacant (District 7) Susan Turrieta (District 10) Christy Williams (District 8) Approval of minutes from the June 8, 2020 Water & Wastewater Commission Special Called Meeting. B. ITEMS FOR COMMISSION’S REVIEW AND RECOMMENDATION FOR APPROVAL TO CITY COUNCIL 1. Recommend approval to award two multi-term contracts with Texas Disposal Systems, Inc. and Balcones Recycling Inc., to provide trash, recycling, and organics collection services for City facilities, each for up to five years for total contract amounts not to exceed $7,500,000, divided between the contractors. Austin Water’s requested authorization is $480,000. 2. Recommend approval to award …

Scraped at: July 11, 2020, 1 a.m.

B1 original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Water & Wastewater Commission Review and Recommendation COA Strategic Direction: Government That Works For All Health and Environment July 15, 2020 Commission Meeting Date: Council Meeting Date: Department: Purchasing July 30, 2020 Client: Danielle Lord, Anna Bryan-Borja Agenda Item Recommend approval to award two multi-term contracts with Texas Disposal Systems, Inc. and Balcones Recycling Inc., to provide trash, recycling, and organics collection services for City facilities, each for up to five years for total contract amounts not to exceed $7,500,000, divided between the contractors. Austin Water’s requested authorization is $480,000. Amount and Source of Funding Funding in the amount of $250,000 is available in the Fiscal Year 2019-2020 Operating Budget of various City departments. (need funding amount for AW FY19-20 Operating Budget) The Purchasing Office issued an Invitation for Bids (IFB) 1500 SLW1035 for these services. The solicitation issued on March 9, 2020 and it closed on April 7, 2020. Of the three offers received, the recommended contractors submitted the lowest responsive offers. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s Financial Services website, Austin Finance. Link: Solicitation Documents. N/A July 8, 2020 – To be reviewed by the Zero Waste Advisory Commission. July 13, 2020 – To be reviewed by the Electric Utility Commission. July 15, 2020 – To be reviewed by the Water and Wastewater Commission. This solicitation was reviewed for subcontracting opportunities in accordance with City Code Chapter 2-9C Minority Owned and Women Owned Business Enterprise Procurement Program. For the services required for this solicitation, there were no subcontracting opportunities; therefore, no subcontracting goals were established. Purchasing Language: Prior Council Action: Boards and Commission Action: MBE/WBE: These contracts will provide collection, transportation, processing, and disposal of refuse, recycling, brush, and compostable materials generated by City facilities including all dumpsters/containers, staff labor, vehicles, and equipment. The contractors will also cover additional collection needs for City co-sponsored events. Per the direction of the City Council on February 20, 2020, none of the waste from these contracts will be disposed of at the Austin Community Landfill. Austin Resource Recovery does not provide waste collection services to City facilities due to the type of equipment required. Under these contracts most collection containers will be serviced on a weekly basis, with some sites utilizing roll-off containers, compactors, and balers that will be serviced as needed. Collection services for landfill waste and organics …

Scraped at: July 11, 2020, 1 a.m.

B2 original pdf

Thumbnail of the first page of the PDF
Page 1 of 5 pages

Water & Wastewater Commission Review and Recommendation Health and Environment July 15, 2020 Commission Meeting Date: Council Meeting Date: Department: Capital Contracting Office July 30, 2020 COA Strategic Direction: Client: Aldo Ranzani, Dedurie Kirk, Kevin Koeller, Shay Roalson, Tomas Rodriguez Agenda Item Recommend approval to award and execute a construction contract with Santa Clara Construction Ltd. (MBE) for Harmon Avenue Area Water and Wastewater System Renewal project in the amount of $3,153,642 plus a $315,364 contingency, for a total contract amount not to exceed $3,469,006. (Districts 4 and 9) Funding is available in the Fiscal Year 2019-2020 Capital Budget of Austin Water. Amount and Source of Funding Lowest responsive bid of seven bids received through a competitive Invitation for Bid solicitation. N/A July 15, 2020 – To be reviewed by the Water and Wastewater Commission. This contract will be awarded in compliance with City Code Chapter 2-9A (Minority Owned and Women Owned Business Enterprise Procurement Program) by meeting the goals with 72.95% MBE and 0.83% WBE participation. Purchasing Language: Prior Council Action: Boards and Commission Action: MBE/WBE: The Harmon Avenue Area Water & Wastewater Renewal Project is part of the Renewing Austin Program. Renewing Austin is an ongoing program to replace and upgrade deteriorated and aging water lines with a documented history of multiple breaks. In addition, the program coordinates and includes wastewater lines in need of replacement within the project area. The project will reduce further expenditures from the Operating and Maintenance budget of Austin Water by preventing repeat water main breaks, sewer leaks and sewer overflows. The work consists of removing and replacing existing water and wastewater mains in the Harmon Avenue Area, bound by Koenig (north), Airport Blvd. (west), East 48th Street (south) and IH-35 (east). Water system upgrades include approximately 8,660 linear feet of 6-inch and 8-inch Ductile Iron and PVC pipe along with all services and appurtenances. Wastewater system upgrades include approximately 5,580 linear feet of 8-inch PVC pipe, manholes, and service connections. This item includes one allowance. The allowance of $20,000 will be used to address contaminated soil and water removal encountered during construction. An allowance is an amount that is specified and included in the construction contract or specifications for a certain item(s) of work whose details are not yet determined at the time of bidding. The project proposes lane closures and/or detours during off-peak traffic hours (9 a.m. to 4 p.m. Monday …

Scraped at: July 11, 2020, 1 a.m.

B3 original pdf

Thumbnail of the first page of the PDF
Page 1 of 5 pages

Water & Wastewater Commission Review and Recommendation July 15, 2020 Commission Meeting Date: Council Meeting Date: Department: Capital Contracting Office July 30, 2020 Safety COA Strategic Direction: Client: Tiger Davis, Gareth Nicely, Shay Roalson, Micheal Singleton Agenda Item Recommend approval to award and execute a construction contract with Westar Construction, Inc., for the Glenlake Pump Station Bypass Improvements project in the amount of $672,760.50 plus a $67,276.05 contingency, for a total contract amount not to exceed $740,036.55. (Districts 6, 10). Funding is available in the Fiscal Year 2019-2020 Capital Budget of Austin Water. Amount and Source of Funding Lowest responsive bid of four bids received through a competitive Invitation for Bid solicitation N/A July 15, 2020 – To be reviewed by the Water and Wastewater Commission. This contract will be awarded in compliance with City Code Chapter 2-9A (Minority Owned and Women Owned Business Enterprise Procurement Program) by meeting the goals with 11.12% MBE and 27.44% WBE participation. Purchasing Language: Prior Council Action: Boards and Commission Action: MBE/WBE: Glenlake MUD was acquired by the City of Austin and the current facility does not meet Austin Water standards. Austin Water has determined that a new connection with the River Place System will allow this site to be decommissioned. The project consists of the construction of a ductile iron water main connecting two different water pressure zones to provide redundant water service to the area. Currently, sixteen residents receive water from the pump station. A back loop to this area provides flow to those residents and backup flow to the other residents downstream. Flow meters are proposed as part of the Austin Water’s leak detection program. Instrumentation, supervisory control and data acquisition, and appurtenances are proposed to provide automatic digital data transmission to Austin Water Central Command Station to help quickly identify unusual high-water demand which indicate potential breaks. The existing water tanks and pump house will be decommissioned and removed from the property. This project is primarily in the City of Austin right-of-way. During construction, detours are proposed for lane and intersection closures. Delaying execution of this contract would prolong use of aged or substandard facilities and could result in the disruption of water service to the residents. Due to the potential for unknown subsurface conditions, a 10% contingency in funding has been included to allow for the expeditious processing of any change orders. A contingency is an additional amount of …

Scraped at: July 11, 2020, 1 a.m.

B4 original pdf

Thumbnail of the first page of the PDF
Page 1 of 7 pages

Water & Wastewater Commission Review and Recommendation Health and Environment July 15, 2020 Commission Meeting Date: Council Meeting Date: Department: Capital Contracting Office July 30, 2020 COA Strategic Direction: Client: Bill Stauber, Shay Roalson, Erik Kunkel Agenda Item Recommend approval to negotiate and execute a professional services agreement with AECOM Technical Services, Inc. (staff recommendation) or one of the other qualified responders for Request for Qualifications Solicitation No. CLMP300 to provide engineering services for the Walnut Creek Wastewater Treatment Plant Expansion to 100 Million Gallons Per Day project in an amount not to exceed $15,000,000. (District 1) Funding is available in the Fiscal Year 2019-2020 Capital Budget of Austin Water. Amount and Source of Funding Staff recommendation is the most qualified firm out of three firms evaluated through the City’s qualification-based selection process. N/A July 15, 2020 – To be reviewed by the Water and Wastewater Commission. This contract will be awarded in compliance with City Code Chapter 2-9B (Minority Owned and Women Owned Business Enterprise Procurement Program) by meeting the goals with 15.80% MBE and 15.80% WBE participation. Purchasing Language: Prior Council Action: Boards and Commission Action: MBE/WBE: Walnut Creek Wastewater Treatment Plant Expansion is permitted to treat and discharge an average daily flow of 75 million gallons per day (MGD) and a 2-hour peak flow of 165 MGD. The treated plant effluent discharges into Segment No. 1428 of the Colorado River Basin. A portion of the plant’s effluent is used for non-potable water on the plant site and supplies much of the City’s growing Reclaimed Water Program. The Texas Commission on Environmental Quality (TCEQ) regulates the quality of effluent discharged into the Colorado River and the quality of reclaimed water. This project will expand the plant to treat and discharge an annual average daily flow of 100 MGD and a 2-hour peak flow of 300 MGD. The expansion is needed based on projected future flows of wastewater into the plant. Wastewater treatment plant expansions are regulated by TCEQ. Rule 305.126 of the Texas Administrative Code states: “Whenever flow measurements for any sewage treatment plant facility in the state reaches 75% of the permitted average daily or annual average flow for three consecutive months, the permittee must initiate engineering and financial planning for expansion and/or upgrading of the wastewater treatment and/or collection facilities. Whenever the average daily or annual average flow reaches 90% of the permitted average daily flow …

Scraped at: July 11, 2020, 1 a.m.

B5 original pdf

Thumbnail of the first page of the PDF
Page 1 of 5 pages

Water & Wastewater Commission Review and Recommendation Safety, Mobility July 15, 2020 Commission Meeting Date: Council Meeting Date: Department: Public Works Department July 30, 2020 COA Strategic Direction: Client: Greg Kirton, Kevin Koeller, Shay Roalson, Paulinda Lanham Agenda Item Recommend approval to execute an amendment to the professional services agreement with URS Corporation for engineering services for the Redbud Trail Bridge over Lady Bird Lake project in the amount of $9,279,993, for a total contract amount not to exceed $11,293,575. (District 10) Amount and Source of Funding Funding in the amount of $8,491,617 is available in the Fiscal Year 2019-2020 Capital Budget of the Public Works Department. Funding in the amount of $788,376 is available in the Fiscal Year 2019-2020 Capital Budget of Austin Water. Original contract was awarded through a qualifications-based selection process. March 7, 2019 – Council approved a Supplemental Amendment to support a second phase of preliminary engineering services. May 21, 2015 – Council approved a professional services agreement with URS Corporation for the Redbud Trail Bridge over Lady Bird Lake project. July 15, 2020 – To be reviewed by the Water and Wastewater Commission. This amendment will be awarded in compliance with City Code Chapter 2-9B (Minority Owned and Women Owned Business Enterprise Procurement Program). Current participation to date is 4.17% MBE and 2.74% WBE. Purchasing Language: Prior Council Action: Boards and Commission Action: MBE/WBE: in and both bicycle increase directions; The Redbud Trail (Emmett Shelton) Bridge, built in 1948, consists of two bridges (400 feet and 120 feet long) linking the east and west banks of Lady Bird Lake with Red Bud Isle in the middle. The bridges carry over 16,000 vehicles per day and provide the exclusive route for construction and operational truck traffic to and from the City’s Ullrich Water Treatment Plant. Contributing factors requiring its replacement include increased traffic loads; steel fatigue life; history of scour remediation; narrow traffic lanes; and insufficient bicycle/pedestrian paths and roadway shoulders. The western roadway approach has a steep, sharp curve and is unaligned with the bridge, and has significant traffic collision history. In order to meet current standards, the City desires the one replacement bridge to be longer, higher (low chord above the 100-year flood event), and with an expanded cross-section. The bridge will also maintain access to Red Bud Isle. The benefits of a replacement bridge are as follows: provide a 100-year life for this …

Scraped at: July 11, 2020, 1 a.m.

B6 original pdf

Thumbnail of the first page of the PDF
Page 1 of 6 pages

Recommendation for Water & Wastewater Commission Government That Works For All COA Strategic Direction: July 15, 2020 Commission Meeting Date: Council Meeting Date: Department: Austin Water July 30, 2020 Client: Colleen Kirk, Kevin Critendon Agenda Item Recommend approval to increase the City’s participation in the cost participation agreement with Philip Boghosian Living Trust to a maximum amount not to exceed $6,797,190 for costs associated with the design and construction of an oversized wastewater interceptor, lift station and force main related to Service Extension Request No. 4038R that will provide wastewater service to a proposed mixed use development located at Slaughter Lane and Thaxton Road. AMOUNT AND SOURCE OF FUNDING Funding is available in the Fiscal Year 2019-2020 Capital Budget of Austin Water. August 22, 2019 – Council authorized the negotiation and execution of a cost reimbursement agreement. July 15, 2020 - To be reviewed by the Water and Wastewater Commission. Purchasing Language: N/A Prior Council Action: Boards and Commission Action: N/A MBE/WBE: The 116 Ac Thaxton Road Tract project consists of approximately 116.47 acres of land located north and south of Slaughter Lane and west of Thaxton Road (the “Property”). The Property is located entirely within the City of Austin’s (the “City”) 2-mile Extra- Territorial Jurisdiction, Impact Fee Boundary, Austin Water’s service area for wastewater, the Desired Development Zone, and the Marble Watershed. A map of the property location is attached. Philip Boghosian Living Trust (the ”Applicant”) is proposing to develop approximately 340 single-family homes, 350 multi-family units, and 30,000 sq. ft. office space. Service Extension Request (SER) No. 4038 was approved to extend City wastewater utility service to the Property; however, that wastewater service plan is now being amended as proposed in SER No. 4038R. Additionally, the Applicant is proposing to develop an adjacent 90 acre tract with approximately 217 single-family homes and 500 multi-family units and has requested the City provide wastewater utility service as proposed in SER No. 4616, which includes the same wastewater improvements as proposed in SER No. 4038R. Austin Water will provide retail water service to both of the Applicant’s projects. Prior Council Action: City Council on August 22, 2019 authorized the negotiation and execution of a Cost Reimbursement Agreement (“Agreement”) between the City and the Applicant to allow for reimbursement up to $5,388,877.00 for hard costs and soft costs for the oversized portion of the wastewater improvements required in the original SER-4038. The …

Scraped at: July 11, 2020, 1 a.m.

B7 original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

Water & Wastewater Commission Review and Recommendation Government That Works For All COA Strategic Direction: July 15, 2020 Commission Meeting Date: Council Meeting Date: Department: Austin Water July 30, 2020 Client: Michael Carolan, Jay Porter, Rick Coronado Agenda Item Recommend approval of an ordinance amending Chapter 15-10 of the Austin City Code regarding Wastewater Pretreatment Regulations to maintain compliance with federal and state regulations. There is no anticipated fiscal impact. Amount and Source of Funding July 31, 2003 – City Council approved on a 5-0 vote. July 15, 2020 – To be reviewed by the Water and Wastewater Commission. Purchasing Language: N/A Prior Council Action: Boards and Commission Action: MBE/WBE: N/A Under federal EPA regulations [Title 40, Code of Federal Regulations, Part 403 (40 CFR 403] and state Texas Commission on Environmental Quality (TCEQ) regulations (Title 30, Texas Administrative Code, Part 1, Chapter 315), Austin Water’s wastewater collection system and treatment plants are designated as a Publicly Owned Treatment Works (POTW). These regulations mandate that a POTW must modify its pretreatment program periodically and submit the program modification to TCEQ for approval. These required periodic updates are intended to make sure that regular studies of pollutant loadings to POTWs are conducted to assure that appropriate Technically Based Local Limits (TBLL) are in place to prevent upsets, interference or pass through at the POTW’s treatment plants or within its collection systems. These mandated local updates are also intended to make sure that POTWs continue to have legal authority to enforce pretreatment regulations in a manner consistent with updates to federal and state regulations. In response to numerous changes made to the federal regulations in 40 CFR 403 as a part of EPA’s Pretreatment Streamlining Rules, Austin Water submitted proposed changes to TCEQ for its approved pretreatment program in 2011. These proposed changes included numerous updates to Chapter 15-10 of the Austin City Code and a highly detailed TBLL evaluation report. The review and approval process for the program re-authorization by TCEQ has been unprecedently long and this has been a state-wide issue for TCEQ. After submitting the proposed changes to TCEQ in 2011, Austin Water finally received prerequisite approval from TCEQ on May 11, 2020, to proceed with adopting the attached proposed changes to Chapter 15-10 of the Austin City Code. The proposed changes fall into one of four categories as described below (a much more detailed stakeholders’ meeting presentation of …

Scraped at: July 11, 2020, 1 a.m.

B8 original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Recommendation for Water & Wastewater Commission July 15, 2020 Government That Works For All COA Strategic Outcome: Commission Meeting Date: Council Meeting Date: Department: Client: July 30, 2020 Austin Water David Anders, Rick Coronado Agenda Item Recommend approval to negotiate and execute a financing agreement with the Texas Water Development Board (TWDB) for a 20-year low-interest loan in the amount of $16,995,000 through TWDB’s State Water Implementation Fund for Texas (SWIFT) loan program, for the implementation of Austin Water’s Advanced Metering Infrastructure (AMI) program, aka Austin’s Smart Water Meter System (My ATX Water). AMOUNT AND SOURCE OF FUNDING The option for funding the $80,195,000 commitment is included in the Proposed Fiscal Year 2020-2021 Capital Budget Appropriation and included in the Fiscal Year 2021-2025 Capital Improvement Spending Plan for Austin Water. The option for funding the $16,995,000 is included in the Proposed Fiscal Year 2020- 2021 Operating Budget. Purchasing Language: N/A Prior Council Action: April 21, 2016 - Council authorized the City Manager to apply for funding from the TWDB for a 20-year SWIFT loan, not to exceed $80,195,000, for the development and implementation of Austin Water’s AMI project. December 7, 2017 - Council approved a consulting services contract with West Monroe Partners, LLC for advanced metering infrastructure program management. February 20, 2020 - Council approved an amendment to the consulting services contract West Monroe Partners, LLC for three additional phases of consulting for the advanced metering infrastructure program. March 26, 2020 – Council authorized execution of a ten-year multi-term contract with Aclara Technologies, LLC and a five-year multi-term contract with Watersmart Software, Inc. for the advanced metering infrastructure program. Boards and Commission Action: July 15, 2020 - To be reviewed by the Water and Wastewater Commission. MBE/WBE: N/A On July 21, 2016 the Texas Water Development Board (TWDB) approved the City of Austin’s application for a low interest, multi-year loan in the amount of $80,195,000 through the State Water Implementation Fund for Texas (SWIFT) for the implementation of Austin Water’s Advanced Metering Infrastructure (AMI) project. On December 7, 2017, Council authorized Austin Water to negotiate and execute a consulting services agreement with West Monroe Partners, LLC. The consultant assisted in identifying the best value AMI program options and in the production of AMI system solicitation documents. On February 20, 2020 Council authorized an amendment to the existing contract with West Monroe Partners LLC, for continued consulting services to provide program …

Scraped at: July 11, 2020, 1 a.m.

B9 original pdf

Thumbnail of the first page of the PDF
Page 1 of 4 pages

Water & Wastewater Commission Review and Recommendation Government That Works For All COA Strategic Direction: July 15, 2020 Commission Meeting Date: Council Meeting Date: Department: Austin Water David Anders Client: August 12, 2020 Recommend approval of Austin Water’s FY 2020-2021 proposed Operating Budget, Capital Budget, new appropriations, 5-Year CIP spending plan and system-wide rate revenue changes. Agenda Item Amount and Source of Funding July 15, 2020 – To be reviewed by the Water and Wastewater Commission. N/A Purchasing Language: Prior Council Action: Boards and Commission Action: MBE/WBE: N/A N/A N/A This action authorizes approval of Austin Water’s FY 2021 Operating Budget, capital budget appropriations and 5-year spending plan, and the proposed system-wide rate revenue changes. Council is scheduled to adopt the budget on August 12, 2020. The City Code in Section 15-9-3 specifically requires a public hearing prior to the City Council approving any changes in electric, water, wastewater, and garbage collection rates. Austin Water’s proposed changes to the Fiscal Year 2020-21 Budget includes the following changes to the current water and wastewater rates for all retail Non-CAP Residential customers, blocks 1-3 for water and blocks 1-2 for wastewater: CITY OF AUSTIN, TEXAS AUSTIN WATER PROPOSED WATER & WASTEWATER RATES FY 2020-21 PROPOSED RATES EFFECTIVE NOVEMBER 1, 2020 Rate Information Pending CITY OF AUSTIN, TEXAS AUSTIN WATER PROPOSED WATER & WASTEWATER RATES FY 2020-21 PROPOSED RATES EFFECTIVE NOVEMBER 1, 2020 Rate Information Pending CITY OF AUSTIN, TEXAS AUSTIN WATER UTILITY PROPOSED RECLAIMED WATER RATES FY 2020-21 PROPOSED RATES EFFECTIVE NOVEMBER 1, 2020 Backup Pending

Scraped at: July 11, 2020, 1:01 a.m.

E2. Briefing Presentation original pdf

Thumbnail of the first page of the PDF
Page 1 of 24 pages

Water and Wastewater Commission Austin Water Proposed FY2021 Budget July 15, 2020 Presentation Outline • Proposed Budget Overview • Sources - Revenue • Uses - Expenses • Significant Budget Changes • Debt Management Strategies • Average Residential Bills / CAP Customer Bills • Capital Improvement Budget • Affordability Metrics • Fund Summary 2 Proposed Budget Overview • 0% Rate Revenue Increase for 2021 – Continued improvements to affordability – CAP customer rate reduction for COVID-19 extended for all of 2021 • $4.38 average bill reduction • Continued debt management strategies – Debt defeasances and refinancing – $40 million debt defeasance in FY 2020 resulting in $40.2 million in debt savings – $46.5 million decrease in FY 2021 debt service requirements due to all previous defeasances and refundings since 2016 • 18 new full-time positions – 4 operations positions, 1 engineering program position, 3 environmental planning & development program positions, 5 support services positions, 3 positions supporting AMI and 2 positions supporting Water Forward 3 Sources of Funds Austin Water Revenue and Transfers In: FY 20 Amended: $ 630.0 million FY 21 Proposed: $ 614.2 million $290.5 $296.8 $269.9 $256.7 $350 $300 $250 $200 $150 $100 $50 $0 $2.3 $2.3 $14.5 $12.2 Water Services Wastewater Services Reclaimed Water Other Revenue Transfers In Services FY 20 Amended FY 21 Proposed 52.8 46.2 4 $300 $250 $200 $150 $100 $50 $0 Uses of Funds Austin Water Expenses and Transfers Out: FY 2021 Positions: 1,236 FY 20 Amended: $620.8 million FY 21 Proposed: $616.3 million 18.0 $236.7 $221.9 $186.5 $173.7 $190.0 $184.7 $22.4 $21.2 Operations Other Programs and Requirements Debt Service Transfers FY 20 Amended FY 21 Proposed 5 Significant Budget Changes Description Increase in cash transfers for pay-as-you-go CIP financing Increase in Balcones Canyon Preserve and Longhorn Dam operating costs by decreasing in Expense Refunds from the General Fund 18 new full-time positions Increase in employee wages enhancement (2%) Increase in AMI metering contract warranty and annual maintenance costs New On-site Reuse Incentive Grant Increase in building inspections, maintenance and repairs Increase in City Administrative Support Costs Decrease in General Fund Transfer Decrease in debt service requirements Decrease in transfers for debt defeasance Amount $10.0 million $2.1 million $2.0 million $1.9 million $1.2 million $1.0 million $0.9 million $0.9 million ($0.9 million) ($12.8 million) ($15.0 million) 6 Debt Management Strategies • Capital Recovery Fees (“CRF”) – Projected CRF net revenues of $32 million …

Scraped at: July 14, 2020, 4 p.m.

E3 Briefing Update original pdf

Thumbnail of the first page of the PDF
Page 1 of 10 pages

Water Forward Update Marisa Flores Gonzalez Water Resources Program Manager 7/15/2020 Current Water Supplies Water Forward Strategies Advanced Metering Infrastructure Austin’s Smart Water Meter System Onsite Reuse  Planning and Development Center pilot commissioning ongoing through Fall 2020  Staff has developed a draft Onsite Reuse Regulatory Framework  Stakeholder engagement currently planned for Fall 2020 Centralized Reclaimed Water  Staff is continuing work on the Centralized Reclaimed Master Plan update Protecting our Core Colorado River Supplies  Region K Initially Prepared Plan moving towards adoption in early Fall 2020 Aquifer Storage and Recovery  Austin’s ASR project will consist of a pilot and full-scale ASR  AW in the final phases of procuring a pilot and program management consultant Timeline of ASR Implementation FY20-23: Identify where to pilot FY28-29: Preliminary engineering for full- scale ASR FY31-35: Construction of full- scale ASR 2020 2025 2030 2035 FY24-27: Design, construct, and test ASR pilot. Develop recommendations for full-scale ASR FY29-30: Design for full- scale ASR Questions and Discussion

Scraped at: July 15, 2020, 9 p.m.

C1. Annual Internal Review Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 7 pages

Approved: July 15, 2020 Annual Internal Review This report covers the time period of 7/1/2019 to 6/30/2020 Water and Wastewater Commission 1. The Board/Commission mission statement is set forth in 2-1-186 of the Code of the City of Austin, Texas which states: (A) The Water and Wastewater Commission members should reside inside the utility's service area. Not more than two members should be involved in development or development-related activities. (B) The purpose of the Water and Wastewater Commission is to: (1) review, analyze, and advise the City Council on the policies and resources relating to the city water and wastewater utility and water quality; and (2) assist the City Council in ensuring that the City's residents are provided with an adequate, economical, and potable supply of water and a stable, economical and environmentally safe system of wastewater disposal. (C) The Commission shall act as an advisory body to the City Council and shall review programs and make recommendations regarding: (1) the protection and integrity of the water resources for the City; (2) minimization of water quality impacts to downstream areas; (3) implementation of programs that achieve goals and objectives relating to water supply management, water demand management, and land water quality control; (4) the fiscal solvency of said programs; and (5) the fiscal health of the utility. 7/1/2019 – 6/30/2020 Annual Internal Review (D) The Commission may conduct an annual review of the commission’s goals and objectives, and the activities needed to achieve these goals and objectives in the following areas, for the year covered by the program: (1) water supply distribution; (2) water demand and conservation management; (3) wastewater treatment and collection; (4) water quality; (6) utility operating budget; (7) rates and fees; and (8) citizen education. (5) service area master planning and capital improvement project development; (E) The Commission may review and make reports and recommendations to the City Council, or other appropriate Boards and Commissions, concerning the following matters: (1) water and wastewater capital improvement program proposals; (2) water and wastewater bond programs; (3) monitoring of capital recovery fee revenues on a quarterly basis, and review of capital recovery fee dollar amount on an annual basis from the effective date of capital recovery fee ordinance; (4) review of the City's annual budget proposal for the water and wastewater utility; (5) quarterly review of water and wastewater ending balances; (6) cost effectiveness and financial impact on water supply …

Scraped at: July 16, 2020, 11:30 a.m.

C2. Budget Committee Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

WATER & WASTEWATER COMMISSION BUDGET COMMITTEE REPORT Overview A P P R O V E D : J U L Y 1 5 , 2 0 2 0 The Committee appreciates the opportunity to review Austin Water Utility’s FY 2020-2021 (FY21) budget material and provide the following summary to the Water and Wastewater Commission.** Budget Committee Members: Susan Turrieta, Chair Travis Michel, Vice Chair Grant Fisher William Moriarty Jesse Penn Budget Review Executive Summary The ramifications of COVID 19 has and continues to impact the revenue stream of the water utility. The financial services program area is monitoring the situation and has adjusted the budget for the remainder of FY20 and the proposed FY21 to adapt to these unprecedented circumstances. The stay at home and social distancing practices has caused an increase in residential revenue, and a decrease in multifamily and commercial revenue. With the most current available data (April and May of 2020), the financial staff has used a programmatic yet conservative approach to forecast revenue for the remainder of FY20 and adjust the proposed budget for FY21. The FY20 forecast and FY21 budget also considers the additional onetime $5,925,000 transfer to the customer assistance program that took place in FY20, and the 10% utility bill rate reduction that has been implemented from April-October 2020. However, Austin Water has proposed the extension of the CAP customer 10% rate reduction to blocks 1-3 for water and 1-2 for wastewater throughout FY21. With the recent adjustments made to the revenue stream the utility is projected to still maintain adequate reserves and maintain a debt service coverage ratio that is within the industry standard. As the COVID 19 situation is extremely dynamic and unpredictable it will be important for the Utility to consistently review, forecast and adjust and budget as we move forward in FY 2021. Budget Review The Budget Committee reviewed the Utility’s revenue and expenditure history and forecasts through FY25. The Committee also reviewed a draft of proposed modifications to the FY21 budget. All of this information is based on actuals as of May, 2020 and is subject to change with more current projections, updates and possible directives from the Budget Office. The following items represent the key items reviewed and highlights of each. 1. FY 2019-20 (FY120) Budget a. Budget vs Actual i. Water revenues for FY20 are currently estimated to be 0.38% less than budgeted ii. Water consumption …

Scraped at: July 16, 2020, 11:30 a.m.

Approved Minutes original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

Water & Wastewater Commission Regular Meeting Minutes Approved August 21, 2020 July 15, 2020 The Water and Wastewater Commission convened in a regular meeting on July 15, 2020 via videoconference in Austin, Texas. AGENDA Christianne Castleberry, Vice Chair (District 5) Mia Parton (District 6) Commissioners: William Moriarty, (Mayor) Chien Lee, Chair (District 4) Jesse Penn (District 1) Nhat Ho (District 2) Travis Michel (District 3) Vacant (District 7) Commissioners in Attendance: William Moriarty, Jesse Penn, Nhat Ho, Travis Michel, Chien Lee, Christiane Castleberry, Christy Williams, Grant Fisher, Susan Turrieta CALL TO ORDER Christy Williams (District 8) Grant Fisher (District 9) Susan Turrieta (District 10) The meeting was called to order at 1:02 pm by Chair Chien Lee. CITIZEN COMMUNICATION None. A. APPROVAL OF MINUTES The minutes from the June 8, 2020 Water and Wastewater Commission special called meeting were approved on a 9-0 vote on Commissioner Turrieta’s motion and Commissioner Penn’s second with Commissioner Parton absent. B. ITEMS FOR COMMISSION’S REVIEW AND RECOMMENDATION FOR APPROVAL TO CITY COUNCIL 1. Recommend approval to award two multi-term contracts with Texas Disposal Systems, Inc. and Balcones Recycling Inc., to provide trash, recycling, and organics collection services for City facilities, each for up to five years for total contract amounts not to exceed $7,500,000, divided between the contractors. Austin Water’s requested authorization is $480,000. Recommended by the Water and Wastewater Commission on a 9-0 vote on Commissioner Ho’s Motion and Commissioner Castleberry’s Second with Commissioner Parton absent. 2. Recommend approval to award and execute a construction contract with Santa Clara Construction Ltd. (MBE) for Harmon Avenue Area Waste and Wastewater System Renewal in the amount of $3,153,642 plus a $315,364 contingency, for a total contract amount not to exceed $3,469,006. (Districts 4 and 9) Recommended by the Water and Wastewater Water & Wastewater Commission Regular Meeting Minutes July 15, 2020 Commission on a 6-0 vote on Commissioner Ho’s Motion and Commissioner Michel’s Second with Commissioners Lee, Turrieta and Penn recusing and Commissioner Parton absent. 3. Recommend approval to award and execute a construction contract with Westar Construction, Inc. for the Glenlake Pump Station Bypass Improvements project in the amount of $672,760.50 plus a $67,276.05 contingency, for a total contract amount not to exceed $740,036.55 (Districts 6 and 10). Recommended by the Water and Wastewater Commission on a 9-0 vote on Commissioner Ho’s Motion and Commissioner Castleberry’s Second with Commissioner Parton absent. 4. Recommend approval …

Scraped at: Aug. 25, 2020, 11 p.m.