Urban Transportation CommissionJan. 6, 2026

02 Corridor Program Presentation — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 14 pages

2016 Bond Corridor Program Update Austin Capital Delivery Services Eric Bailey, Deputy Director January 6, 2026 Program Timeline 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Community Engagement Planning Design Construction 2 Corridor Mobility Program Overview 2025 PROGRAM HIGHLIGHTS Construction Complete on: • Airport Blvd - Lamar to 45th St ($24.6M) • Slaughter Lane S Congress to Bluff Springs ($21.2M) • S Lamar W Mary/Evergreen Roundabout ($1.7M) • E Riverside Drive Signals ($4.3M) Construction Continues on: • Bike/Pedestrian improvements across corridors • Signal and Pedestrian Hybrid Beacons across corridors • Slaughter Lane – Brodie to Loop 1 • William Cannon Drive – Running Water to McKinney Falls Pkwy (CAMPO grant) Recently Awarded: • Slaughter – Mopac to Brodie ($13M) • Burnet Rd – Bright Verde Way to Loop 1 ($38.8M) • Burnet Rd – US 183 to Bright Verde Way ($26.2M Upcoming Bids: • South Lamar – Bluebonnet to US 290 – Spring/Summer 2026 ($30M) • North Lamar – Parmer to IH 35 Summer 2026 ($6M) RESOURCES • 2016 Mobility Bond website Local Mobility Annual Plan • 3 $360M completed, in construction or awaiting notice to proceed • Bike and Pedestrian improvement projects • Signal and Pedestrian Hybrid Beacon improvement projects • Multi-modal improvement projects $100-130M in leveraged funds • Grants • Private sector development • Partnering with Local Mobility Programs for greater impact • Partnering with Utility departments for dig-once opportunities $42M to Construction in 2026 AIRPORT BLVD Completed • Intersection @ Oak Springs Dr • Intersection @ Gunter St • North Lamar Blvd to 55th • Intersection @ E 40th St • Intersection @ Harvey St • North Lamar to 45th St Construction upcoming • E. MLK Blvd to Mokan Trail Bridge (Jan 26) • Mokan Trail Bridge to US 183 •Mokan Trail Bridge Replacement (by TxDOT) • 45th St to E. MLK Blvd (coordinating with TxDOT) 5 BURNET RD Completed • Koenig Ln to White Horse Trail • Intersection @ Braker Ln • Pedestrian and Bicycle Improvements north at Burnet and Twin Oaks Dr • AE Kramer Drainage Improvements Construction upcoming • US 183 to Bright Verde Way – Spring 2026 • White Horse Trail to US 183 – Spring 2026 • Bright Verde Way to Loop 1 – Spring 2026 6 E RIVERSIDE BLVD Completed • Montopolis Dr to SH 71 • Signal @ Tinnin Ford Rd/Burton Dr • Signal @ Willow Creek St • Signal @ Wickersham Ln • Signal @ Coriander Dr • Signal @ Vargas Rd • Signal @ Airport Commerce Dr. • Signal @ Frontier Valley Dr 7 E MLK BLVD Construction upcoming (183 to Decker Ln) • TxDOT construction of City design Improved sidewalks/bike paths/sup’s for full length, intermittent medians • Easement acquisition underway • 90% Design complete • Construction start pushed to March 2028 by TxDOT 8 GUADALUPE ST Completed • Contraflow Transit Lane • Nueces St from 24th St to Guadalupe • 24th St from Guadalupe to N Lamar 9 N LAMAR BLVD Completed • Signal @ West Grady Dr • Signal @ Cooper Dr • Signal @ Fairfield Dr • Signal @ Powell Ln • SUPs from Parmer to IH 35 and from Caddo St to On the Green Apartments In Construction • Sidewalk Gaps from Rundberg to Parmer Construction upcoming • North of Parmer Ln to Howard Ln • Howard Ln Contraflow Bus Lane • US 183 to south of Rundberg Ln • PHB’s north and South of Walnut Creek • Pedestrian Bridge at Walnut Creek 10 SLAUGHTER LN Completed • FM 1826 to Barstow Ave • Brodie Ln to Bluff Springs Rd • Signal @ Vinemont Dr • Signal @ Narrow Glen Pkwy (Stillwaters Apt) • Signal @ Bilbrook Pl • AIPP Installation at Mary Moore Searight Park • Escarpment, Brodie, and RM 1826 Intersection Improvements In construction • Signal at Briar Ridge Dr • Loop 1 to Brodie Ln Construction upcoming • Corridor wide APS Upgrades • Signal @ Briar Ridge Dr – NTP in April 11 S LAMAR BLVD Completed • W Mary St / Evergreen Ave In Construction • Bluebonnet Ln / Del Curto Rd Construction upcoming • Barton Springs Rd to US 290 12 WILLIAM CANNON DR Completed • Southwest Parkway to US 290 • Signal @McCarty Ln • Signal @ Bannockburn Dr • Signal @ Lost Valley • Signal @ Elm Creek Dr • Signal @Rock Ridge Dr • Signal @ Onion Creek Soccer Field • Signal @ Rialto Blvd • Signal @ Vega Ave • Signal @ Stephenson Nature Preserve • Signal @ Sunstrip Dr • Intersection Improvements at Pleasant Valley Road and Running Water Drive In construction • Running Water Dr to McKinney Falls Pkwy Pending • US 290 to east of Brodie Ln • East of Brodie Ln to I-35 • I-35 to Running Water Dr 13 2016 Bond Corridor Program Update