Urban Transportation CommissionApril 1, 2025

02 Presentation - 2016 Bond Corridor Construction Update — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 14 pages

CORRIDOR PROGRAM Construction Update Urban Transportation Commission April 1, 2025 Eric Bailey, PE Deputy Director Capital Delivery Services Building the City of Austin in collaboration with the community to enrich the experience of all who live, work, and play here. 1 PROGRAM TIMELINE 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Community Engagement Planning Design Construction City of Austin | Capital Delivery Services Department | One City, One Team, One Approach 2 CORRIDOR MOBILTY PROGRAM OVERVIEW RESOURCES • Corridor Program Construction Updates 2016 Mobility Bond website (AustinTexas.gov/2016Bond) • What’s New: Mobility Annual Plan, upcoming public engagement opportunities, press releases (AustinTexas.gov/WhatsNew) • 2016 Mobility Bond monthly e-Newsletter UPCOMING HIGHLIGHTS Construction Complete on: • Burnet AE Drainage ($14M) Construction Continues on: • Airport Blvd. – N. Lamar Blvd. to 55th St. • Bike/Pedestrian improvements across corridors • Signal and Pedestrian Hybrid Beacons across corridors • William Cannon Drive – Running Water to McKinney Falls Pkwy (CAMPO grant) Upcoming Bids: • US 183 to Bright Verde Way – April 2025 ($17M) • White Horse Trail to US 183 (IDIQ) – May 2025 ($15M) • Bright Verde Way to Loop 1 – May 2025 ($29M) Recently Awarded: • Slaughter – Mopac to Brodie ($13M) $255M completed, in construction or awaiting notice to proceed • Bike and Pedestrian improvement projects • Signal and Pedestrian Hybrid Beacon improvement projects • Multi-modal improvement projects $100-130M in leveraged funds • Grants • Private sector development • Partnering with Local Mobility Programs for greater impact • Partnering with Utility departments for dig-once opportunities $146M to Construction in 2025 AIRPORT BLVD Completed • Intersection @ Oak Springs Dr • Intersection @ Gunter St • North Lamar Blvd to 55th • Intersection @ E 40th St • Intersection @ Harvey St In construction • 55th St to 45th St Construction upcoming • E. MLK Blvd to Mokan Trail Bridge • Mokan Trail Bridge to US 183 • 45th St to E. MLK Blvd 5 N LAMAR BLVD Completed • Signal @ West Grady Dr • Signal @ Cooper Dr • Signal @ Fairfield Dr • Signal @ Powell Ln Construction upcoming • North of Parmer Ln to Howard Ln • Howard Ln Contraflow Bus Lane • US 183 to south of Rundberg Ln • Braker Ln to south of Parmer Ln • Fill Sidewalk Gaps from Rundberg to Parmer 6 BURNET RD Completed • Koenig Ln to White Horse Trail • Intersection @ Braker Ln In construction • AE Kramer draining site – Final Completion in April 2025 Construction upcoming •US 183 to Bright Verde Way – April 2025 Bid •White Horse Trail to US 183 – May 2025 Bid • Bright Verde Way to Loop 1 – May 2025 Bid 7 E RIVERSIDE BLVD Completed • Montopolis Dr to SH 71 • Signal @ Tinnin Ford Rd/Burton Dr • Signal @ Willow Creek St • Signal @ Wickersham Ln • Signal @ Coriander Dr • Signal @ Vargas Rd • Signal @ Airport Commerce Dr. In construction • Signal @ Frontier Valley Dr – Completion in May 8 GUADALUPE ST Completed • Contraflow Transit Lane • Nueces St from 24th St to Guadalupe • 24th St from Guadalupe to N Lamar 9 WILLIAM CANNON DR Completed • Signal @McCarty Ln • Signal @ Bannockburn Dr • Signal @ Lost Valley • Signal @ Elm Creek Dr • Signal @Rock Ridge Dr • Signal @ Onion Creek Soccer Field • Signal @ Rialto Blvd • Signal @ Vega Ave • Signal @ Stephenson Nature Preserve • Signal @ Sunstrip Dr In construction • Running Water Dr to McKinney Falls Pkwy Pending • US 290 to east of Brodie Ln • East of Brodie Ln to I-35 • I-35 to Running Water Dr 10 SLAUGHTER LN Completed • FM 1826 to Barstow Ave • Brodie Ln to Menchaca Rd • Menchaca Rd to west of S Congress Ave • Signal @ Vinemont Dr • Signal @ Narrow Glen Pkwy (Stillwaters Apt) In construction • Signal at Bilbrook Pl. Construction upcoming • Loop 1 to east of Brodie Ln – NTP in May • Signal @ Briar Ridge Dr – NTP in April 11 S LAMAR BLVD Construction upcoming • Barton Springs Rd to US 290 – BID Summer 2025 • W Mary St / Evergreen Ave • Bluebonnet Ln / Del Curto Rd 12 E MLK BLVD Construction upcoming (183 to Decker Ln) • TxDOT construction of City design Improved sidewalks/bike paths/sup’s for full length, intermittent medians • 90% Design in review, 100% in August • Construction Start Estimated for early 2026 13 Questions Building the City of Austin in collaboration with the community to enrich the experience of all who live, work, and play here. 14