Local Mobility Annual Plan Briefing — original pdf
Backup
2024 Local Mobility Annual Plan Briefing URBAN TRANSPORTATION COMMISSION Anna Martin, Transportation and Public Works TUESDAY, JULY 9, 2024 About the Local Mobility Annual Plan • Began with 2016 Mobility Bond but adapted with add’l investments in 2018 and 2020 • A forecasting tool to provide transparent, accountable list of projects made possible by the Mobility Bond programs • Annualized frequency enables more flexible and opportunistic leveraging with other programs, private development and dynamic needs of the urban mobility network 2 2 Hold charrette with partners to identify coordination opportunities 1 Programs share data on planned projects. 6 Collect and prepare data for next cycle. 3 Develop DRAFT Local Mobility Annual Plan (LMAP) and share with Council offices 4 Release DRAFT LMAP to public for comment 5 Incorporate feedback and finalize plan Project Development and Delivery: Project specific design, public process, and/ or construction notification, installation. 3 Local Mobility Program Success • Flexible, small-scale delivery has allowed teams to move fast and meet 2016 Bond expectations for 8-year delivery: • $119M of $137M spent on projects on the ground • 2016 Sidewalks, Vision Zero, and Substandard Streets programs are complete • 2016 Safe Routes to School and Bikeways programs on track to complete this year • Urban Trails program moved under leadership of Sidewalks team with focus on speeding up delivery 4 2024 MOBILITY ANNUAL PLAN INTERACTIVE MAP 5 SIDEWALKS 6 SAFE ROUTES TO SCHOOL 7 URBAN TRAILS 8 STREET REHABILITATION 9 SAFETY/VISION ZERO 10 BIKEWAYS 11 2016, 2018, 2020 Mobility Bond Projects Completed and in Construction • The Local Mobility Programs have improvements at thousands of locations over the past 8 years • A map-based viewer is currently under development 7/9/2024 12 AUSTINTEXAS.GOV/mobilityannualplan 13