Urban Transportation CommissionFeb. 8, 2022

Item 2B. Lady Bird Lake Bridge Presentation — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 6 pages

Project Connect Lady Bird Lake Bridge Update 2 Lady Bird Lake Bridge Rail (underground) Rainey/MACC Station platform (underground) Rail Portal Rainey/MACC Station Entrances Lady Bird Lake Bridge Rail / Ped / Bike Waterfront Station Rail (at-grade) 3 3 Key Rail Connections: • South Shore: Above-ground station (“Waterfront”) • North Shore: underground station (“Rainey/MACC””) Bridge modes*: 1. Light rail (Blue Line) – electric vehicles 2. Cyclists 3. Pedestrians *Capacity for bus service being studied Other considerations: • Connections to Butler Hike and Bike Trail and Waterloo Greenway • Waller Creek Tunnel outfall structure • Waller Creek Boathouse impacts Lady Bird Lake Bridge: Next Steps • Analysis of including capacity for buses on the Lady Bird Lake Bridge, in addition to LRT vehicles and bicyclist/pedestrians, is underway. • Public meeting on subject likely in April • Decision about how to proceed necessary by May 31, 2022 in order to meet current timelines for the program. • Impact on Design Competition process pending. 4 4 Lady Bird Lake Bridge: Next Steps Subject areas requiring further analysis: • Design and Engineering • Includes options both for separated, dedicated guideways for buses and LRT as well as a shared LRT/bus guideway • Potential impacts on north and south shores of lake • Operations, including safety and system risk analysis • Bus Service Planning framework • Blue Line FTA Project Development impacts • Environmental Impact Statement (EIS) • FTA Capital Investment Grant program (CIG) • Other infrastructure needs required to maximize efficiency of bus network • Potential cost impacts 5 5 Thank you! 6 6