Urban Transportation CommissionDec. 7, 2021

Item 2A Project Connect Lady Bird Bridge Presentation — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 22 pages

Project Connect Update Blue Line Bridge December 2021 Project Components 2 INTEGRATED PROGRAM DELIVERY PARTNERSHIP Utilities Relocations Permitting Right of Way 3 3 Blue Line – Corridor Overview Note: Station locations and names subject to change Blue Line Project – Corridor Overview 4 ORANGE & BLUE LINE – KEY MILESTONES (2021 – 2022) April 2021 Summer 2021 Spring 2022 Spring – Summer 2022 National Environmental  Policy Act (NEPA)  Notice of Intent  Complete 15% Design Enter FTA  Project  Development Summer 2022 Winter 2022 Initial FTA  Rating Complete 30% Design and  Cost Estimate Draft Environmental  Impact Statement  (DEIS), Draft 30%  Design and Cost  Estimates 2023 ‐ Beyond End of EIS and 30%  Design Comment  Phase Final EIS (FEIS) Complete FTA NEPA Record  of Decision (ROD)  5 Blue Line Bridge Rail (underground) Rainey/MACC Station platform (underground) Rail Portal Rainey/MACC Station Entrances Lady Bird Lake Bridge Rail / Ped / Bike Waterfront Station    Rail (at‐grade) 6 Key Rail Connections: • South Shore: Above‐ground station  (“Waterfront”) • North Shore: underground station  (“Rainey/MACC””) Bridge modes: 1. Light rail (Blue Line) – electric vehicles 2. Cyclists 3. Pedestrians  Other considerations: • Connections to Butler Hike and Bike Trail  and Waterloo Greenway • Waller Creek Tunnel outfall structure • Waller Creek Boathouse impacts Blue Line Bridge: Connections 10 minutes 5 minutes 2 minutes Pedestrian Connections Walking time across the bridge: <5 minutes • Within 2 minutes walking distance from bridge: Rainey/MACC & Waterfront Station Entrances South Central Waterfront • Waterloo Greenway Trails Butler Hike/Bike Trail • Within 5 minutes walking distance from bridge: • • • • • • • • • • • • • ESB‐MACC Rainey Street District Convention Center Palm School Long Center Auditorium Shores Sanchez Elementary School City Hall Downtown Jobs and Retail 6th Street & Congress Avenue • Within 10 minutes walking distance from bridge: 10 minutes 5 minutes 2 minutes 7 Blue Line Bridge: Landscape Waterfront Station Waterloo Greenway 8 Context: Waterloo Greenway and Pontoon Bridge* *included in Council Approved Waller Creek Design Plan 9 Opportunity • In addition to being an  important mobility  corridor connecting north  and south Austin, this  new bridge can be a  community connector ‐ an inclusive PLACE  serving the community  broadly. • A rare chance to create a  new symbol for our  community and our  community’s values. 10 History: Lady Bird Lake Downtown Austin Flood (1935) Congress & Drake Bridges (1981) Town Lake Hike & Bike Trail (1972) 11 Context: Natural Elements 12 Context: Human Use 13 Context: Bats! 14 Context: Austin's Pedestrian Bridges New Longhorn Dam Pedestrian Bridge Pfluger Pedestrian Bridge 15 The Bridge: North Lake Shore Portal Rail Circulation (underground) Rainey/MACC Station (underground) Station Entrance North Lake  Shore Waterfront Station 16 The Bridge: North Shore Connections Butler Hike and Bike Trail (direct access) Rainey/MACC Station Entrance Waterloo Greenway 2 minutes Rail Portal Rainey Street District 5 minutes Butler Hike/Bike Trail Bridge New Waterloo Greenway Bridge 2 minutes ESB‐MACC 6 minutes 17 The Bridge: North Portal Rainey / MACC  Station Entrance Pedestrian access to  underground station Pedestrian / Bike connection to  South Shore L A D Y   B I R D   L A K E Overlook 18 Landscape Opportunities: Overview Precedents Enhanced Pedestrian & Bike Path Enhanced Waterfront  Landscape Rainey / MACC  Station Entrance Green Roofed  Portal &  Landscape Waterloo Landing Portal Overlook 19 Blue & Orange Line Working Groups North: Orange Line •North Line •North Lamar East: Blue Line •South Shore •East Riverside •North Guadalupe •Metro Center/Airport •Drag South: Orange Line Central Alignment: •St. Edward's to Stassney •Downtown (BL/OL) •South Line •SoCo (OL) 20 Lady Bird Lake Bridge Workshop – High‐level recap • 10/12/21 from 5:30 – 7:00 p.m. • Approximately 135 participants   • Many participants, including Austin Rowing Club members, expressed concerns about the  Blue Line Project impact to the Waller Creek Boathouse and want more information about its  potential relocation • Other questions related to: • Use of buses on bridge • Congress Avenue Bridge bats   • Noise level • Consideration of tunnel under Lady Bird Lake • Tunnel construction method and impacts • Parking availability 21 • Mapping exercise indicated that people would access the bridge using a variety of means,  including by bicycle, on foot and by boat Thank you! 22