Urban Transportation Commission - Oct. 1, 2024

Urban Transportation Commission Regular Meeting of the Urban Transportation Commission

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

REGULAR MEETING of the URBAN TRANSPORTATION COMMISSION TUESDAY OCTOBER 1, 2024, at 5:00pm BOARDS AND COMMISSIONS ROOM 1101 CITY HALL – 301 W 2nd St. AUSTIN, TEXAS Some members of the Urban Transportation Commission may be participating by videoconference. The meeting may be viewed online at: http://www.austintexas.gov/page/watch- atxn-live. Public comment will be allowed in-person or remotely by telephone. Speakers may only register to speak on an item once either in-person or remotely and will be allowed up to three minutes to provide their comments. Registration no later than noon the day before the meeting is required for remote participation. To register please call or email the staff liaison in advance at (512)-974-3428 or natalie.leone@austintexas.gov no later than noon on Monday September 30, 2024 with the following information: name, item number(s) to speak on, telephone number, and email address. CURRENT BOARD MEMBERS/COMMISSIONERS: Heather Buffo - (District 1) Melissa Ortiz-(District 2) Arlin Alvarez-(District 3) Susan Somers, Chair-(District 4) Daniel Kavelman-(District 5) Edward Smith- (District 6) Diana Wheeler- (District 7) Vacant- (District 8) Spencer Schumacher- (District 9) Ruven Brooks, Vice Chair-(District 10) Deshon Brown- (Mayoral Appointee) AGENDA CALL TO ORDER PUBLIC COMMUNICATION: GENERAL The first 10 speakers signed up prior to the meeting being called to order will each be allowed a three-minute allotment to address their concerns regarding items not posted on the agenda. APPROVAL OF MINUTES 1. Approve the minutes of the Urban Transportation Commission REGULAR MEETING on September 3, 2024. 2. Staff briefing regarding Resolution 20240718-092 relating to safety barriers at medical DISCUSSION ITEMS facilities Presenter: Amber Hutchens DISCUSSION AND ACTION ITEMS planning Presenter: Adam Greenfield Facilitator: Susan Somers Presenter: Mikey Goralnik Facilitator: Susan Somers prioritization and funding streams Facilitator: Ruven Brooks Facilitator: Susan Somers COMMITTEE UPDATES 3. Discussion and approval of a recommendation on including CityLeap in future bond 4. Discussion and approval of a recommendation on a partnership with Great Springs Project 5. Discussion and approval of a recommendation on transit enhancement plan regarding 6. Discussion and approval of 2025 Urban Transportation Commission meeting dates. 7. Update from Commissioner Schumacher from the Downtown Commission regarding actions taken at the September 18, 2024 meeting 8. Update from Commissioner Wheeler from the Joint Sustainability Commission regarding actions taken at the September 25, 2024 meeting 9. Update from Commissioner Schumacher from the Bicycle Advisory Council regarding actions taken at the September 17, 2024 meeting 10. Update from Commissioner Kavelman from the …

Scraped at: Sept. 27, 2024, 4:50 p.m.

02.01: Staff Presentation original pdf

Thumbnail of the first page of the PDF
Page 1 of 9 pages

C20-2024-039 Bollard Installation For Medical Facilities Amber Hutchens | Capital Program Consultant | October 1, 2024 Presentation Overview • Background • Council Resolution • Code Amendment • Criteria/Rule • Schedule • Questions/Answers 9/26/2024 2 City Council Resolution 20240718-092 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF AUSTIN: City Council initiates amendments to City Code, including Title 25 (Land Development), to require the installation of crash-rated bollards or other similar safety barriers to prevent vehicle-into-building crashes at the pedestrian entrances of medical facilities with nearby vehicular traffic. City Council Resolution 20240718-092 “BE IT FURTHER RESOLVED: When proposing amendments initiated by this Resolution, the City Manager is directed to explore: 1. the feasibility of requiring safety barriers in public right-of-way areas adjacent to medical facilities to enhance pedestrian safety and prevent vehicle crashes; 2. whether permit applications to expand, remodel, or upgrade existing facilities can trigger this requirement to install safety bollards; incentives for existing facilities to voluntarily comply with new City requirements to install bollards; 3. 4. 5. recommendations for the City's state and federal legislative agenda; and any other necessary changes that achieve the objectives of this resolution. BE IT FURTHER RESOLVED: The City Manager is directed to engage with stakeholders, including medical facility operators, with the goal of bringing about compliance with any new requirements City Council adopts.” LDC Chapter 25-6, Transportation Changes to Title 25 • Modify § 25-6-1 (Definitions) • Medical Facility: Hospitals, Stand alone ER facilities, Urgent Care Clinics • Pedestrian Entrance: Publicly accessible; designed for pedestrians • Create a new Section 25-6-324 (Pedestrian Safety Barriers for Medical Facilities) • Applies to all new construction • Requires installation on site and in right of way if necessary • Language allowing for alternative compliance • TPW approval required for installation within right of way • Technical guidance will be provided in Transportation Criteria Manual Changes to Title 25 • Applicability • New site plans or site plan revisions/corrections • Incentives for compliance • Waive review fees • Ordinance adoption outreach • Voluntary compliance Transportation Criteria Manual New TCM rule to include design and construction criteria: Installation requirements • PROWAG/TAS/ADA compliant • Crash rated/materials requirements • • Location and placement guidance • Accepted alternatives and review process • Fire/EMS coordination Schedule for Adoption • City Council Resolution: July 18 (Approved on Consent 11-0) • Stakeholder Meetings: September 9 & September 18 • Urban Transportation Commission: …

Scraped at: Sept. 27, 2024, 4:50 p.m.

03.01: CityLeap Presentation original pdf

Thumbnail of the first page of the PDF
Page 1 of 18 pages

CityLeap ATX Urban Transportation Commission October 1st 2024 The Plan Convert one or more vehicle lanes on every City of Austin-owned arterial to either bus lanes with shared use paths, or protected bike lanes, in five years. CityLeap Study Recommended Aspects to Include • Compatibility with ASMP modeshift goals (50% non-drive alone by 2039) • People-carrying capacity • Safety impacts • Comprehensive crash cost impacts on society • Carbon emissions & air pollution • Traffic evaporation / reduced demand Thank you! Adam Greenfield Director of Advocacy, Safe Streets Austin adam@safestreetsaustin.org

Scraped at: Sept. 27, 2024, 4:50 p.m.

04.01: Great Springs Project Presentation original pdf

Thumbnail of the first page of the PDF
Page 1 of 10 pages

GUIDING LOCAL // REGIONAL PLANS GREAT SPRINGS PROJECT GREAT SPRINGS PROJECT URBAN TRANSPORTATION COMMISSION // 10.1.24 URBAN TRANSPORTATION COMMISSION // 10.1.24 WHAT WE DO 50,000 ACRES OF 50,000 ACRES OF CONSERVATION IN THE CONSERVATION IN THE RECHARGE ZONE RECHARGE ZONE 100+ MILES OF TRAIL 100+ MILES OF TRAIL FROM THE ALAMO TO THE FROM THE ALAMO TO THE CAPITOL CAPITOL + WHAT WE DO 50,000 ACRES OF 50,000 ACRES OF CONSERVATION IN THE CONSERVATION IN THE RECHARGE ZONE RECHARGE ZONE 100+ MILES OF TRAIL 100+ MILES OF TRAIL FROM THE ALAMO TO THE FROM THE ALAMO TO THE CAPITOL CAPITOL AQUIFER AQUIFER RECHARGE RECHARGE PUBLIC PUBLIC ACCESS ACCESS ACTIVE ACTIVE TRANSPORTATION TRANSPORTATION RECREATIONAL RECREATIONAL USEUSE HABITAT HABITAT CONSERVATION CONSERVATION WORKFORCE WORKFORCE DEVELOPMENT DEVELOPMENT + CARBON CARBON SEQUESTRATION SEQUESTRATION CLIMATE CHANGE CLIMATE CHANGE MITIGATION MITIGATION STORYTELLING + STORYTELLING + PLACEMAKING PLACEMAKING JUSTICE + JUSTICE + COMMUNITY COMMUNITY WHERE WE WORK T1T1 T2T2 H3H3 H2H2 H1H1 T3T3 CH2CH2 CH1CH1 C1C1 C4C4 C3C3 C2C2 B2B2 C0C0 B3B3 B1B1 BEXARCOMALHAYSTRAVIS WHERE WE WORK WILLIAMSON CREEK CORRIDOR O NIO N CREEK CORRIDOR ColoradoRiverBartonCreekOnion Creek3535183183290290457171RM-2244RM-1826FM - 812FM - 973FM - 1625FM-2304FM-1626EWilliamCannonDrWalshTarltonEscarpmentBlvdThaxtonRdWestbankDrELiveOakStHollySlaughterLnScenicBrookMckinneyFallsPkwyOldBeeCavesBeckettRdGroveBlvdBluffSpringsDrWestgateBlvdJainLnLedesmaW 12Th StElmontDrDeerLnSuburbanRiddleRdPoncianaDrTodd LnSilvermineJones RdColorado StComalStBartonSkwyBerkettDrBluebonnetW St Elmo RdBanisterLnEberhartLnBurtonDrSLakeshoreFitzhughRdOakSpringsDrWest StMatthews LnPalacePkwyBlueMeadowMccartyLnThraxtonRdWichershamLnFrate BarkerWMaryStBurleson RdShady LnManchacaKinneyAveWebbervilleRdColtonBluffSpringsRdBartonHillsReddStLattaCooperLnTrinity StWoodlandAveE 6Th StNuckles XingVargasRdRosewoodRedRiverStTeriRdBrodieLnBartonCreekBlvdEmeraldForestDrE St Elmo RdRepublicOfTexasBlvdTravisCountyCirAbilene/WagonTrainTillery StWWilliamCannonDrNuttyBrownLostOasisHolwS 5Th StParkerLnChiconWoodwardStDavisLnS1StStW Dittmar RdDeeGabrielCollinsSpringdale RdEOltorfStSouthwestPkwyCesar ChavezSPleasantValleyRdLostCreekBlvdWStassneyLnMontopolisE 12Th StConvictHillRdEStassneyLnCircleDrSwParkwayHAYSBEAR CREEKSAN LEANNAROLLINGWOODSUNSET VALLEYWESTLAKE HILLSHays CountyTravis CountySanAntonioNewBraunfelsSanMarcosAustinTRAIL STATUSExisting TrailsTrails In-Development*Potential Future GSP Trail AlignmentTRAIL TYPEShared Use TrailOn-Road (bike lanes, sidewalks, and/orneighborhood routes)Hiking TrailGSP Trail CorridorDESTINATIONSThe Great SpringsPublic Water AccessCommercial HubCommunity LandmarkParkTexas State CapitolEl Camino Real de Los Tejas NationalHistoric TrailBASE FEATURESExisting TrailsI-35RailroadMajor RiversRivers/StreamsOpen/Restricted Access Public LandsWaterbodiesEdwards Aquifer Recharge Zone1% Annual Chance Flood HazardCounties012MILESUpdates in the 2024 GSP Trails Plan for Travis County include the following:• The alternate on-street alignment has been removed from the map• A connection to the Capitol has been added along Shoal Creek Trail, 3rd Street, and Congress Avenue• A new segment has been added along Onion Creek from the Hays/Travis County Line to the confluence of the Colorado River - new segment map created (see Area G)BARTON SPRINGS45 S Sidepath45 S Sidepath Violet Crown Trail Violet Crown Trail Barton Creek Greenbelt Trail Barton Creek Greenbelt TrailLady Bird Johnson Lady Bird Johnson Wildflower CenterWildflower CenterSendera Mesa Sendera Mesa Neighborhood ParkNeighborhood ParkSunset Sunset ValleyValleyTexas Texas State State CapitolCapitolTom Lasseter Tom Lasseter South Lamar South Lamar Neighborhood ParkNeighborhood ParkDick Dick Nichols Nichols District District ParkParkZilker ParkZilker ParkTo Buda and KyleTo Buda and KyleTo Blanco RiverTo Blanco …

Scraped at: Sept. 27, 2024, 4:50 p.m.

04.02: Great Spring Project Draft Recommendation original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

BOARD/COMMISSION RECOMMENDATION Urban Transportation Commission Recommendation Number 20241001-004: Great Springs Project Partnership WHEREAS, the purpose of the Urban Transportation Commission (UTC) “to serve as an advisory body to the city council, the city manager, and all other transportation-related departments concerning transportation-related matters including…pedestrian and bikeway programs and projects; and WHEREAS, among the UTC’s responsibilities are “to promote close cooperation between the city council, other city boards and commissions, city departments, and individuals, institutions, and agencies concerned with transportation-related activities so that all similar activities in the City may be coordinated to secure the greatest public welfare.;” and WHEREAS, Great Springs Project (GSP) is an Austin-based non-profit organization with a demonstrated capacity to support local governments and other partners in the region with implementing priority trail and conservation projects; and WHEREAS, Trails and Transportation Planner for Great Springs Project Mikey Goralnik has engaged with UTC members to introduce the Great Springs Project, its history, resources, and plans for supporting local efforts to implement priority trail projects in the City of Austin, and WHEREAS, GSP has diverse expertise in a range of topics that align with the UTC’s mandate to support the City’s connectivity and active transportation culture, including supporting urban trail implementation through right-of-way acquisition, designing and permitting priority trails, and programming trails with activities and events; and WHEREAS, the Austin Strategic Mobility Plan identifies the Urban Trails System, highlighted by the Tier I and Tier II Urban Trails, as “an integral part of the transportation network” to “connect the street grid [and] provide additional pedestrian and bicycle connectivity and shorten walking and bicycling distances…[that] increase connectivity between lifestyles and outdoor neighborhoods, facilitate active trips, promote healthy experiences, and strengthen our community’s connection to nature and our ecosystem; and WHEREAS, numerous local and regional planning efforts, including the Austin Strategic Mobility Plan, Climate Equity Plan, Green Infrastructure Strengths and Gaps Assessment, and Central Texas Regional Air Quality Plan, state the importance of partnerships between the city and non-profit partners for rapidly and fully implementing the community’s vision of a connected, resilient, healthy, and prosperous Austin, and WHEREAS, GSP has a mission to support the City’s connectivity, mobility, resiliency, vitality, and equity objectives in the organization’s project area, and the capacity and resources necessary to implement these stated priorities; and WHEREAS, the City of Austin must direct City staff to approve formal collaboration between external not-for-profit partners such as Great Springs Project …

Scraped at: Sept. 27, 2024, 4:51 p.m.

06.01: Draft 2025 UTC Meeting Dates original pdf

Thumbnail of the first page of the PDF
Page 1 of 1 page

Urban Transportation Commission 2025 Proposed Dates 1. Jan. 7, 2025 2. Feb. 4, 2025 3. March 4, 2025 4. April 1, 2025 5. May 6, 2025 6. June 3, 2025 7. July 1, 2025 8. August 5, 2025 9. September 2, 2025 10. October 7, 2025 11. November 11, 2025 12. December 2, 2025

Scraped at: Sept. 27, 2024, 4:51 p.m.

03.02 Draft CityLeap Recommendation original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

BOARD/COMMISSION RECOMMENDATION Urban Transportation Commission Recommendation Number 20241001-003: CityLeap WHEREAS, the Austin Strategic Mobility Plan (ASMP) sets forth a goal of reaching a 50/50 mode share (50% drive-alone, 50% taking transit, riding a bicycle, walking, carpooling, or teleworking) by 2039 and identifies infrastructure updates to our pedestrian, public transportation, and bicycle systems as paramount to that goal; WHEREAS, the City of Austin is lagging behind on the ASMP goals of 14% of Austinites commuting by transit, 4% commuting by bicycling, and 4% commuting by walking; WHEREAS, the Austin Climate Equity Plan noted that “our transportation system is already the primary source of local air pollution and will soon become the largest emitter of greenhouse gases;” WHEREAS, in its August 8th, 2019 resolution, Austin City Council declared a climate emergency and called “for an immediate emergency mobilization to restore a safe climate.” WHEREAS, the CityLeap plan would accelerate Austin’s transportation and climate goals by providing transit lanes (with bicycle-pedestrian pathways at sidewalk level) or protected bicycle lanes on every City of Austin-owned arterial within five years; WHEREAS, converting one general travel lane in each direction on Barton Springs Road between Azie Morton Road and South Lamar Blvd to protected bicycle lanes and transit enhancements led to a 64% reduction in speeding, 67% reduction in crashes, and no discernable impact on motor vehicle travel times; WHEREAS, the cost of converting one general travel lane over the Longhorn Dam Bridge was recovered in four months through comprehensive crash cost savings to society; WHEREAS, lane conversions can also greatly improve transit reliability and speed, transportation choice, emergency response times, and air quality, while reducing carbon emissions; and WHEREAS, City Council Resolution Resolution No. 20240829-138 directed the City Manager to relay input from the Urban Transportation Commission regarding the Comprehensive Climate Implementation program to the Bond Election Advisory Task Force and City Council. NOW THEREFORE BE IT RESOLVED, that the Urban Transportation Commission recommends that the City Council initiate a planning and feasibility study of the CityLeap program that prioritizes safety, considers comprehensive crash cost savings to society, carbon emissions, air pollution, and both the impact of reduced demand and induced demand on our transportation network. BE IT FURTHER RESOLVED, that the Urban Transportation Commission recommends the Bond Election Advisory Task Force evaluate opportunities to include CityLeap in the next appropriate bond package. Motioned by: Seconded by: Date of Approval: Record of the vote:

Scraped at: Oct. 1, 2024, 10:20 p.m.

Recommendation 20241001-003: CityLeap original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

BOARD/COMMISSION RECOMMENDATION Urban Transportation Commission Recommendation Number 20241001-003: CityLeap WHEREAS, the Austin Strategic Mobility Plan (ASMP) sets forth a goal of reaching a 50/50 mode share (50% drive-alone, 50% taking transit, riding a bicycle, walking, carpooling, or teleworking) by 2039 and identifies infrastructure updates to our pedestrian, public transportation, and bicycle systems as paramount to that goal; WHEREAS, the City of Austin is lagging behind on the ASMP goals of 14% of Austinites commuting by transit, 4% commuting by bicycling, and 4% commuting by walking; WHEREAS, the Austin Climate Equity Plan noted that “our transportation system is already the primary source of local air pollution and will soon become the largest emitter of greenhouse gases;” WHEREAS, in its August 8th, 2019 resolution, Austin City Council declared a climate emergency and called “for an immediate emergency mobilization to restore a safe climate.” WHEREAS, the CityLeap plan would accelerate Austin’s transportation and climate goals by providing transit lanes (with bicycle-pedestrian pathways at sidewalk level) or protected bicycle lanes on every City of Austin-owned arterial within five years; WHEREAS, converting one general travel lane in each direction on Barton Springs Road between Azie Morton Road and South Lamar Blvd to protected bicycle lanes and transit enhancements led to a 64% reduction in speeding, 67% reduction in crashes, and no discernable impact on motor vehicle travel times; WHEREAS, the cost of converting one general travel lane over the Longhorn Dam Bridge was recovered in four months through comprehensive crash cost savings to society; WHEREAS, lane conversions can also greatly improve transit reliability and speed, transportation choice, emergency response times, and air quality, while reducing carbon emissions; and WHEREAS, City Council Resolution Resolution No. 20240829-138 directed the City Manager to relay input from the Urban Transportation Commission regarding the Comprehensive Climate Implementation program to the Bond Election Advisory Task Force and City Council. NOW THEREFORE BE IT RESOLVED, that the Urban Transportation Commission recommends that the City Council initiate a planning and feasibility study of the CityLeap program that prioritizes safety, considers comprehensive crash cost savings to society, carbon emissions, air pollution, and both the impact of reduced demand and induced demand on our transportation network. BE IT FURTHER RESOLVED, that the Urban Transportation Commission recommends that Transportation & Public Works Staff coordinate with CapMetro, Austin Transit Partnership, City of Austin Project Connect Office during the feasibility study, and consider effects on transit speed and …

Scraped at: Oct. 2, 2024, 12:50 p.m.

Recommendation 20241001-005: Transit Enhancement Plan original pdf

Thumbnail of the first page of the PDF
Page 1 of 4 pages

BOARD/COMMISSION RECOMMENDATION Urban Transportation Commission Recommendation 20241001-005: Transit Enhancement Plan WHEREAS, the Austin Strategic Mobility Plan calls for transit ridership to increase by a factor of four by 2039; WHEREAS, in July 2024 weekday boardings on Cap Metro transit exceeded 81,000 but Phase 1 of Project Connect light rail will only provide 28,500 boardings, and the vast majority of public transit capacity in Austin over the next few decades will continue to be provided by Cap Metro buses which share public streets with other vehicles; WHEREAS, the City of Austin and Cap Metro have jointly developed a Transit Enhancement Infrastructure Report which recommends 37 street improvement projects which will result in greater transit availability, accessibility, speed, and reliability within the City of Austin and which are not included in Project Connect; WHEREAS, the need for such projects will continue to grow as transit usage grows in Austin; WHEREAS, funding for these projects is likely to come from a variety of sources, such as 2020 Mobility Bond funds, CapMetro interlocal agreement funds, and potential future grant and bond funding opportunities, including a possible 2026 City of Austin mobility bond; NOW, THEREFORE BE, IT RESOLVED that the Urban Transportation Commission recommends Austin City Council direct the City Manager and the Transportation and Public Works Department to develop, maintain, and continuously update a long-range Transit Enhancement Plan, including a prioritized list of projects to be carried out by the City of Austin which would improve transit availability, accessibility, speed, and reliability and meeting the city's goal of 16% of Austinites commuting by Transit in 2039. • The Plan would continue the groundwork laid out in the Transit • • • • Enhancement Infrastructure Report; it should serve transit-supportive infrastructure in the same way the Sidewalks, Crossings and Shared Streets Plan does for pedestrian infrastructure or the Bicycle Plan does for bicycle infrastructure. The projects in the Plan may come from a variety of sources, including proposed service enhancements from Cap Metro, projects already identified in the City of Austin Transit Enhancement Infrastructure Report, requests from Austin Transit Partnership to facilitate construction of Austin Light Rail, Cap Metro projects for other components of Project Connect such as Metro Rapid lines and Pickup zones, and any other projects identified by City of Austin staff in collaboration with their partners at Cap Metro and Austin Transit Partnership. At a minimum, the Plan should include the 37 …

Scraped at: Oct. 3, 2024, 3:20 a.m.

06.02 Approved 2025 UTC Meeting Dates original pdf

Thumbnail of the first page of the PDF
Page 1 of 1 page

Urban Transportation Commission Approved 2025 Meeting Dates 1. Jan. 7, 2025 2. Feb. 4, 2025 3. March 4, 2025 4. April 1, 2025 5. May 6, 2025 6. June 3, 2025 7. July 1, 2025 8. August 5, 2025 9. September 2, 2025 10. October 7, 2025 11. November 11, 2025 12. December 2, 2025 Motioned by: Commissioner Somers Seconded by: Commissioner Schumacher Date of Approval: 10/1/24 Record of the vote: 9-0 Attest: Natalie Leone

Scraped at: Oct. 3, 2024, 3:20 a.m.

Recommendation 20241001-004: Great Springs Project Partnership original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

BOARD/COMMISSION RECOMMENDATION Urban Transportation Commission Recommendation Number 20241001-004: Great Springs Project Partnership WHEREAS, the purpose of the Urban Transportation Commission (UTC) “to serve as an advisory body to the city council, the city manager, and all other transportation-related departments concerning transportation-related matters including…pedestrian and bikeway programs and projects; and WHEREAS, among the UTC’s responsibilities are “to promote close cooperation between the city council, other city boards and commissions, city departments, and individuals, institutions, and agencies concerned with transportation-related activities so that all similar activities in the City may be coordinated to secure the greatest public welfare.;” and WHEREAS, Great Springs Project (GSP) is an Austin-based non-profit organization with a demonstrated capacity to support local governments and other partners in the region with implementing priority trail and conservation projects; and WHEREAS, Trails and Transportation Planner for Great Springs Project Mikey Goralnik has engaged with UTC members to introduce the Great Springs Project, its history, resources, and plans for supporting local efforts to implement priority trail projects in the City of Austin, and WHEREAS, GSP has diverse expertise in a range of topics that align with the UTC’s mandate to support the City’s connectivity and active transportation culture, including supporting urban trail implementation through right-of-way acquisition, designing and permitting priority trails, and programming trails with activities and events; and WHEREAS, the Austin Strategic Mobility Plan identifies the Urban Trails System, highlighted by the Tier I and Tier II Urban Trails, as “an integral part of the transportation network” to “connect the street grid [and] provide additional pedestrian and bicycle connectivity and shorten walking and bicycling distances…[that] increase connectivity between lifestyles and outdoor neighborhoods, facilitate active trips, promote healthy experiences, and strengthen our community’s connection to nature and our ecosystem; and WHEREAS, numerous local and regional planning efforts, including the Austin Strategic Mobility Plan, Climate Equity Plan, Green Infrastructure Strengths and Gaps Assessment, and Central Texas Regional Air Quality Plan, state the importance of partnerships between the city and non-profit partners for rapidly and fully implementing the community’s vision of a connected, resilient, healthy, and prosperous Austin, and WHEREAS, GSP has a mission to support the City’s connectivity, mobility, resiliency, vitality, and equity objectives in the organization’s project area, and the capacity and resources necessary to implement these stated priorities; and WHEREAS, the City of Austin must direct City staff to approve formal collaboration between external not-for-profit partners such as Great Springs Project …

Scraped at: Oct. 8, 2024, 1:50 p.m.