Parks and Recreation BoardMarch 27, 2024

20240327-005: Duct Bank at Waller Beach — original pdf

Recommendation
Thumbnail of the first page of the PDF
Page 1 of 1 page

PARKS AND RECREATION BOARD RECOMMENDATION 20240327-5 March 27, 2024 Duct Bank at Waller Beach at Town Lake Metropolitan Park Date: Subject: Motioned By: Kathryn Flowers Recommendation The Parks and Recreation Board recommends to Austin City Council to approve the permanent use and temporary use, not to exceed 160 days, of parkland located at Waller Beach at Town Lake Metropolitan Park (30 East Ave). Total mitigation fee is $1,774,993. Vote Seconded By: Lane Becker The motion to recommend to Austin City Council to approve the permanent use and temporary use, not to exceed 160 days, of parkland located at Waller Beach at Town Lake Metropolitan Park (30 East Ave). Total mitigation fee is $1,774,993 was approved on Vice Chair Flowers’ motion, Board Member Becker’s second on a 9-0 vote with one vacancy. Board Member Bazan absent. For: Pedro Villalobos, Kathryn Flowers, Lane Becker, Jennifer Franklin, Julie Hayes, Nicole Merritt, Shelby Orme, Holly Reed, Kim Taylor. Against: None. Abstain: None. Absent: Stephanie Bazan. Attest: Tim Dombeck, Board and Council Liaison, Parks and Recreation Department.