Mexican American Cultural Center Advisory Board Homepage

RSS feed for this page

June 5, 2024

Item 3. Phase 2 Construction Project Updates_Part3_Revised original pdf

Thumbnail of the first page of the PDF
Page 1 of 6 pages

South Wing - Zócalo Perspective CIP ID#5201.008 Mexican American Cultural Center / MACC Advisory Board Presentation 13 © Miró Rivera-Tatiana Bilbao LLC South Wing - Second Level Hallway CIP ID#5201.008 Mexican American Cultural Center / MACC Advisory Board Presentation 14 © Miró Rivera-Tatiana Bilbao LLC CONSTRUCTION UPDATE Construction Update Photo taken 05.2024 CIP ID#5201.008 Mexican American Cultural Center / MACC Advisory Board Presentation © Miró Rivera-Tatiana Bilbao LLC / 240523_ESB-MACC Phase II_MAB Presentation 16 Construction Update Photos taken 05.2024 CIP ID#5201.008 Mexican American Cultural Center / MACC Advisory Board Presentation © Miró Rivera-Tatiana Bilbao LLC / 240523_ESB-MACC Phase II_MAB Presentation 17 Construction Update Photos taken 05.2024 CIP ID#5201.008 Mexican American Cultural Center / MACC Advisory Board Presentation © Miró Rivera-Tatiana Bilbao LLC / 240523_ESB-MACC Phase II_MAB Presentation 18

Scraped at: June 5, 2024, 9:28 p.m.
June 5, 2024

Item 3. Phase 2 Construction Project Updates_Part4_Revised original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

Construction Update Photo taken 05.2024 CIP ID#5201.008 Mexican American Cultural Center / MACC Advisory Board Presentation © Miró Rivera-Tatiana Bilbao LLC / 240523_ESB-MACC Phase II_MAB Presentation 19 Project Milestones Ceremonial Groundbreaking: Winter 2022 GMP 1 Kick-off: Fall 2023 GMP 2 Kick-off: Spring 2024 Steel “Topping Out”: Fall 2024 Construction Ends: Late Summer 2025 Grand Re-Opening: Fall 2025 CIP ID#5201.008 Mexican American Cultural Center / MACC Advisory Board Presentation 20 © Miró Rivera-Tatiana Bilbao LLC

Scraped at: June 5, 2024, 9:28 p.m.
June 5, 2024

Play audio original link

Play audio

Scraped at: July 3, 2024, 4:20 p.m.
June 5, 2024

Approved Minutes original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

EMMA S. BARRIENROS MEXICAN AMERICAN CULTURAL CENTER REGULAR MEETING MINUTES WEDNESDAY, JUNE 5, 2024 The Emma S. Barrientos Mexican American Cultural Center convened in a Regular meeting on Wednesday, June 5, 2024, at Austin Energy Headquarters – Mueller Assembly Room 1111A located at 4815 Mueller Blvd in Austin, Texas 78723. (Some members of the ESB-MACC Advisory Board participated via videoconference.) Chair Navarro called the Emma S. Barrientos Mexican American Cultural Center Meeting to order at 6:06pm. Board Members in Attendance: Board Members in Attendance Remotely: Angelica Navarro, Chair Noemi Castro, Member Lily Zamarripa-Saenz, Vice Chair Cynthia “Cy” Herrera, Member (Arrived at 6:12pm) Hilario “Larry” Amaro, Member Anthony Martinez, Member John Estrada, Member Eduardo “Eddie” Rodriguez, Member Raul “Roy” Reyna, Member (Arrived at 6:13pm/Left at 7:32pm) Board Members Absent: Gerardo Gandy, Member Staff in Attendance: Michelle Rojas, ESB-MACC Culture and Arts Education Manager Marie Ortiz, ESB-MACC Culture and Arts Education Supervisor Tina Davila, ESB-MACC Administrative Specialist PUBLIC COMMUNICATION: GENERAL Speaker 1: Bertha Rendon Delgado, citizen and activist voiced her concern regarding the MACC’s mission statement. She stated she felt the MACC was not fulfilling their mission, commenting that there was a lack of arts and cultural advocating for the Latinx community in their programming and events by not providing musical experiences and cultural activities. She believed with the new budget, the board would have an opportunity to make sure they were implementing a way to bring back Chicano, Mexican American, and Tejano music when planning future events. She commented that they should start by creating working groups that would allow the community to be involved in sharing their ideas to provide transparency and inclusiveness and felt it was important not to make decisions based on statistics and surveys only. She also let the board know they were doing a great job and she supported them but felt there was a gap that needed to be fixed. Speaker 2: Anna Maciel, former ESB-MACC Advisory Board Member signed up to speak on agenda item 3, “Presentation by Heidi Tse, Capital Delivery Project Manager and Miro Rivera Architects in collaboration with Tatiana Bilbao Studios on Phase 2 Construction Project Updates” and item 5, “Update on Awards of Excellence Working Group”. Chair Navarro commented that Maciel would be called to speak on the item during each discussion. 1 APPROVAL OF MINUTES 1. The minutes from the Regular meeting of April 3, 2024, were approved on …

Scraped at: Sept. 17, 2024, 7:30 p.m.
April 3, 2024

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

REGULAR MEETING of the EMMA S. BARRIENTOS MEXICAN AMERICAN CULTURAL CENTER ADVISORY BOARD Wednesday, April 3, 2024, 6:00 PM City Hall – Boards and Commissions Room 301 W. Second St. Austin, TX 78701 Some members of the Emma S. Barrientos Mexican American Cultural Center Advisory Board may be participating by videoconference. Public comment will be allowed in-person or remotely by telephone. Speakers may only register to speak on an item once either in-person or remotely and will be allowed up to three minutes to provide their comments. To speak in person, registration is required at least 10 min prior to the start of the meeting. Registration no later than noon the day before the meeting is required for remote participation. To register call or email the board liaison at 512-974-3771 or michelle.rojas@austintexas.gov BOARD MEMBERS Angelica Navarro, Chair Hilario “Larry” Amaro, Vice Chair Noemi Castro, Member Anthony Martinez, Member Raul “Roy” Reyna, Member John Estrada, Member Gerardo Gandy, Member Eduardo “Eddie” Rodriguez, Member Cynthia “Cy” Herrera, Member Lillian “Lily” Zamarripa-Saenz, Member AGENDA CALL TO ORDER PUBLIC COMMUNICATION: GENERAL The first 10 speakers signed up prior to the meeting being called to order will each be allowed a (3) three-minute allotment to address their concerns regarding items not posted on the agenda. APPROVAL OF MINUTES 1. Approve the minutes of the Emma S. Barrientos Mexican American Cultural Center Regular Meeting of March 6, 2024. DISCUSSION AND ACTION ITEMS 2. Conduct officer elections for the Chair and Vice Chair of the Emma S. Barrientos Mexican American Advisory Board. Reyna, Zamarripa-Saenz STAFF BRIEFINGS 3. Staff Report by Olivia Tamzarian, ESB-MACC Culture and Arts Education Marketing & Outreach Representative on staffing updates, March and April programs, marketing and outreach efforts, and updates on signature event planning. DISCUSSION ITEMS 4. Presentation and discussion on Phase 2 Construction Project Updates. Navarro, Amaro WORKING GROUP DISCUSSION 5. Update on Awards of Excellence Working Group Reyna, Zamarripa-Saenz FUTURE AGENDA ITEMS ADJOURNMENT The City of Austin is committed to compliance with the American with Disabilities Act. Reasonable modifications and equal access to communications will be provided upon request. Meeting locations are planned with wheelchair access. If requiring Sign Language Interpreters or alternative formats, please give notice at least 2 days (48 hours) before the meeting date. Please call Michelle Rojas at the Parks and Recreation Department, at 512-974-3771, for additional information; TTY users’ route through Relay Texas at 711. For …

Scraped at: March 30, 2024, 5:20 a.m.
April 3, 2024

Play audio original link

Play audio

Scraped at: April 10, 2024, 2:20 a.m.
April 3, 2024

Item 1. ESB-MACC_Minutes_3.6.24_Draft original pdf

Thumbnail of the first page of the PDF
Page 1 of 4 pages

EMMA S. BARRIENROS MEXICAN AMERICAN CULTURAL CENTER REGULAR MEETING MINUTES WEDNESDAY, MARCH 6, 2024 The Emma S. Barrientos Mexican American Cultural Center convened in a Regular meeting on Wednesday, March 6, 2024, at City Hall – Board and Commissions Room located at 301 West Second Street in Austin, Texas 78701. (Some members of the ESB-MACC Advisory Board participated via videoconference.) Chair Navarro called the Emma S. Barrientos Mexican American Cultural Center Meeting to order at 6:01pm. Board Members in Attendance: Board Members in Attendance Remotely: Angelica Navarro, Chair John Estrada, Member Hilario “Larry” Amaro, Vice Chair Gerardo Gandy, Member Noemi Castro, Member Cynthia “Cy” Herrera, Member Raul “Roy” Reyna, Member Anthony Martinez, Member (Arrived at 6:07pm) Lily Zamarripa-Saenz, Member Board Members Absent: Eduardo “Eddie” Rodriguez, Member Staff in Attendance: Jodi Jay, PARD Assistant Director Laura Esparza, PARD Division Manager of Museums and Cultural Programs Michelle Rojas, ESB-MACC Culture and Arts Education Manager Marie Ortiz, ESB-MACC Culture and Arts Education Supervisor Tina Davila, ESB-MACC Administrative Specialist PUBLIC COMMUNICATION: GENERAL Leonard Davila introduced himself stating he was a concerned citizen who had grown up in the East Side of Austin and had heard of Parks and Recreations Budget cut. He commented that he would like to see funding considered for programming at Pan Am Hillside and for the Mexican American Experience when the MACC opens back up again. APPROVAL OF MINUTES 1. The minutes from the Regular meeting of February 7, 2024, were approved on Member Zamarripa- Saenz’s motion. Member Estrada seconded the motion. Unanimous vote (9.0). Motion passed. Member Rodriguez was absent. STAFF BRIEFINGS 1 2. Staff Report by Laura Esparza, Division Manager and Olivia Tamzarian, ESB-MACC Culture and Arts Education Marketing & Outreach Representative on staffing updates, February and March programs, marketing and outreach efforts, and updates on signature event planning. Olivia Tamzarian, ESB-MACC Culture and Arts Marketing and Outreach Representative gave a report on the Holistic Wellness programs, Education, Caminos Teen Leadership, and Academia Cuauhtli programming, sharing highlights for the month of February along with upcoming programs & events for the month of March. She also provided an update of current and upcoming marketing and outreach events and announced the MACC’s annual La Mujer event was confirmed for Sunday, April 21, 2024, located at 2403 E 16th St, Austin, TX 78702 in East Austin at the Cathedral. Laura Esparza, PARD Division Manager of Museums and Cultural Programs informed the …

Scraped at: April 10, 2024, 2:20 a.m.
April 3, 2024

Item 3. Staff Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 11 pages

MACC Staff Report – 4/3/24 Website - Facebook - Instagram Please share our social media posts, sign up for our newsletter, and check out our upcoming events! Holistic Wellness Programming HWP March: Taller Abierto - Painting/Drawing Workshop: 1st Thursday of each month, March 7 @ 10-11:30pm (Attendance: 18) George Morales Dove Springs Recreation Center Art classes for ages 15+. Includes exploration of different techniques. All materials provided! Pre-registration required. Yoga for All Levels: Saturdays @ 10:30am Saturdays (2nd, 16th, 30th) (Attendance: 25) George Morales Dove Springs Recreation Center Body, mind and soul will align as we move with intention through gentle movement guided by breath. We will incorporate meditation to regulate the nervous system. Family Yoga: 1st Saturday of each month, March 2nd @ 12pm (Attendance: 7) George Morales Dove Springs Recreation Center A space for kids and their adult to practice yoga together. Drumming Lessons: 2nd Sunday of each month, March 10 @ 1pm (Attendance: 8) George Morales Dove Springs Recreation Center Learn to play drums influenced by West African, Afro-Latin and contemporary styles. Class starts with a movement warm up, then use drums, bells, and shakers to learn basic rhythms and play as a group. Drums provided - feel free to bring your own drum or percussion instrument. Chair Yoga: 3rd Friday of each month, March 15 @ 10:30am (Attendance: 3) Yarborough Library A gentle form of yoga that can be done while seated in a chair. These modifications make yoga accessible to people with various physical capabilities. Gentle Flow Yoga (8+): 3rd Saturday of every month, March 17 @ 10:30am (Attendance: 3) Windsor Park Library Body, mind and soul will align as we move with intention through gentle movement guided by breath. We will incorporate meditation to regulate the nervous system. Chair Yoga: 3rd Wednesday of each month, March 20 @ 11am (Attendance: 4) George Morales Dove Springs Recreation Center A gentle form of yoga that can be done while seated in a chair. These modifications make yoga accessible to people with various physical capabilities. Rooted in Culture Workshop: Wednesday, March 20 @ 6-7:30pm (Attendance: 39) Central Library We will discuss seasonal plants native to the Tejas region rooted in the history of Indigenous folks and People of Color in our Austin lineage. Voice/Guitar/Songwriting Lessons - Beginner/Intermediate (15+) Mondays (4th, 18th, 25th) @ 4-5pm (Attendance: 13) Windsor Park Library Join award winning song-writer Javier Jara for voice, …

Scraped at: April 10, 2024, 2:20 a.m.
April 3, 2024

Item 4. Phase 2 Construction Project Updates original pdf

Thumbnail of the first page of the PDF
Page 1 of 5 pages

Emma S. Barrientos Mexican American Cultural Center Phase 2 Improvements Project Update April 3, 2024 Heidi Tse, Capital Delivery Project Manager CURRENT PROJECT PHASE: GMP1 (Guaranteed Maximum Price 1): Site Package GMP2 (Guaranteed Maximum Price 2): Building/Landscape Package • Construction (site) – is underway. • Permitting (building) – Approved on 3/4/24 • Bidding & Negotiation (GMP2) – Executed contract on 3/1/24 • A presentation packet or illustration of Phase 2 is being produced for the Board – target completion May 2024 CONSTRUCTION PROGRESS: • The heat exchanger, athe primary equipment responsible for cooling of the building, was delivered and placed safely in the mechanical room at the Central Utility Plant. • The pump room at the Central Utility Plant passed inspections which allowed for walls to be taped and floated. • The boiler room trench with new plumbing lines has also passed inspection. so Cconcrete pour back is scheduled in mid-March. • Significant progress has been made on the Lady Bird Lake outfall designed to curb erosion and preserve the riparian zones (an area aid to protect water quality). The installed outlet and riprap, or strategically placed stones, are a part of the storm water management system. • Demolition work includes removal of the exterior metal ceiling panels and dismantling of the • Drill piers, the foundation system for the new addition, began with the South Crescent are in exterior stairways at each end of the building. progress beginning with the South Crescent.. ANNOUNCEMENTS: Formatted: Space After: Auto, Bulleted + Level: 1 + Aligned at: 0" + Indent at: 0.25" Formatted: Normal, Space Before: Auto • Installation of a pier foundation system has started in March and will lasting approximately 40 days, weather permitting. The work will involve heavy equipment drilling and pouring concrete to form the piers. There will be noise associated with these activities and work hours will be limited to 7:00am-5:30pm. • Short term trail re-route for a portion of the south segment of the Ann and Roy Butler Hike and Bike Trail opened on January 16, 2024, and will continue until mid-April. View the map link here. • The Confluence, a separate public/private partnership project to stabilize and protect the ecology of Waller Creek, improve water quality, and create a continuous hike and bike trail along the creek has several concrete pours scheduled in April for the lattice bridge. Additional information can be found here. • …

Scraped at: April 10, 2024, 2:20 a.m.
April 3, 2024

Approved Minutes original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

EMMA S. BARRIENROS MEXICAN AMERICAN CULTURAL CENTER REGULAR MEETING MINUTES WEDNESDAY, APRIL 3, 2024 The Emma S. Barrientos Mexican American Cultural Center convened in a Regular meeting on Wednesday, April 3, 2024, at City Hall – Board and Commissions Room located at 301 West Second Street in Austin, Texas 78701. (Some members of the ESB-MACC Advisory Board participated via videoconference.) Chair Navarro called the Emma S. Barrientos Mexican American Cultural Center Meeting to order at 6:00pm. Board Members in Attendance: Board Members in Attendance Remotely: Angelica Navarro, Chair Noemi Castro, Member Hilario “Larry” Amaro, Vice Chair John Estrada, Member Lily Zamarripa-Saenz, Member Cynthia “Cy” Herrera, Member Anthony Martinez, Member Raul “Roy” Reyna, Member (Left at 6:19pm) Board Members Absent: Gerardo Gandy, Member Eduardo “Eddie” Rodriguez, Member Staff in Attendance: Michelle Rojas, ESB-MACC Culture and Arts Education Manager Marie Ortiz, ESB-MACC Culture and Arts Education Supervisor Tina Davila, ESB-MACC Administrative Specialist PUBLIC COMMUNICATION: GENERAL Anna Maciel, Former ESB-MACC Advisory Board Member signed up to speak on agenda item 4, “Presentation and discussion on Phase 2 Construction Project Updates” and item 5, “Update on Awards of Excellence Working Group”. Chair Navarro commented that Maciel would be called to speak on the item during each discussion. APPROVAL OF MINUTES 1. The minutes from the Regular meeting of March 6, 2024, were approved on Member Zamarripa-Saenz’s motion. Member Reyna seconded the motion. Unanimous vote (8.0). Motion passed. Member Gandy and Rodriguez were absent. DISCUSSION AND ACTION ITEMS 2. Conduct officer elections for the Chair and Vice Chair of the Emma S. Barrientos Mexican American Advisory Board. 1 Chair Navarro went over the role of responsibilities for Chair, Vice Chair, and Board Members before opening the floor for nominations. • Member Reyna moved to nominate Chair Navarro to serve as Chair for the ESB-MACC Advisory Board for a second term. Member Zamarripa-Saenz seconded. Chair Navarro consented to the nomination. Unanimous vote (8.0). Motion passed. Member Gandy and Rodriguez were absent. • Member Castro nominated Member Zamarripa-Saenz for Vice Chair. Member Estrada seconded. Member Zamarripa-Saenz consented to the nomination. Unanimous vote (8.0). Motion passed. Member Gandy and Rodriguez were absent. STAFF BRIEFINGS 3. Staff Report by Olivia Tamzarian, ESB-MACC Culture and Arts Education Marketing & Outreach Representative on staffing updates, March and April programs, marketing and outreach efforts, and updates on signature event planning. Olivia Tamzarian, ESB-MACC Culture and Arts Marketing and Outreach Representative gave a …

Scraped at: July 6, 2024, 2:20 a.m.
March 6, 2024

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

REGULAR MEETING of the EMMA S. BARRIENTOS MEXICAN AMERICAN CULTURAL CENTER ADVISORY BOARD Wednesday, March 6, 2024, 6:00 PM City Hall – Boards and Commissions Room 301 W. Second St. Austin, TX 78701 Some members of the Emma S. Barrientos Mexican American Cultural Center Advisory Board may be participating by videoconference. Public comment will be allowed in-person or remotely by telephone. Speakers may only register to speak on an item once either in-person or remotely and will be allowed up to three minutes to provide their comments. To speak in person, registration is required at least 10 min prior to the start of the meeting. Registration no later than noon the day before the meeting is required for remote participation. To register call or email the board liaison at 512-974-3771 or michelle.rojas@austintexas.gov BOARD MEMBERS Angelica Navarro, Chair Hilario “Larry” Amaro, Vice Chair Noemi Castro, Member Anthony Martinez, Member Raul “Roy” Reyna, Member John Estrada, Member Gerardo Gandy, Member Eduardo “Eddie” Rodriguez, Member Cynthia “Cy” Herrera, Member Lillian “Lily” Zamarripa-Saenz, Member AGENDA CALL TO ORDER PUBLIC COMMUNICATION: GENERAL The first 10 speakers signed up prior to the meeting being called to order will each be allowed a (3) three-minute allotment to address their concerns regarding items not posted on the agenda. APPROVAL OF MINUTES 1. Approve the minutes of the Emma S. Barrientos Mexican American Cultural Center Regular Meeting of February 7, 2024. STAFF BRIEFINGS 2. Staff Report by Laura Esparza, Division Manager and Olivia Tamzarian, ESB-MACC Culture and Arts Education Marketing & Outreach Representative on staffing updates, February and March programs, marketing and outreach efforts, and updates on signature event planning. 3. Presentation by Suzanne Piper, Chief Administrative Officer and David Hillers, Financial Manager, Kenneth Luu, Financial Analyst and Nicholas Johnson, Financial Analyst on the financial forecast process and draft elements of the Parks and Recreation FY25 proposal. DISCUSSION ITEMS 4. Discussion on Phase 2 Construction Project Updates. Navarro, Amaro DISCUSSION AND ACTION ITEMS 5. Approve a recommendation on the FY25 budget. Navarro, Amaro 6. Approve a recommendation to support funding for the Bronze Band Community Program. Navarro, Amaro 7. Approve a recommendation to request support for Academia Cuahutli’s fiscal year 24-25 budget. Navarro, Amaro FUTURE AGENDA ITEMS ADJOURNMENT The City of Austin is committed to compliance with the American with Disabilities Act. Reasonable modifications and equal access to communications will be provided upon request. Meeting locations are planned with …

Scraped at: March 1, 2024, 6:50 p.m.
March 6, 2024

Item 1. ESB-MACC_Minutes_2.7.24_Draft original pdf

Thumbnail of the first page of the PDF
Page 1 of 5 pages

EMMA S. BARRIENROS MEXICAN AMERICAN CULTURAL CENTER REGULAR MEETING MINUTES WEDNESDAY, FEBRUARY 7, 2024 The Emma S. Barrientos Mexican American Cultural Center convened in a Regular meeting on Wednesday, February 7, 2024, at City Hall – Board and Commissions Room located at 301 West Second Street in Austin, Texas 78701. (Some members of the ESB-MACC Advisory Board participated via videoconference.) Chair Navarro called the Emma S. Barrientos Mexican American Cultural Center Meeting to order at 6:00pm. Board Members in Attendance: Board Members in Attendance Remotely: Angelica Navarro, Chair John Estrada, Member (Left at 9:40pm) Hilario “Larry” Amaro, Vice Chair Noemi Castro, Member Cynthia “Cy” Herrera, Member (Arrived at 6:09/Left at 8:10pm) Raul “Roy” Reyna, Member Lily Zamarripa-Saenz, Member Board Members Absent: Gerardo Gandy, Member Anthony Martinez, Member Eduardo “Eddie” Rodriguez, Member Staff in Attendance: Jodi Jay, PARD Assistant Director Laura Esparza, PARD Division Manager of Museums and Cultural Programs Michelle Rojas, ESB-MACC Culture and Arts Education Manager Marie Ortiz, ESB-MACC Culture and Arts Education Supervisor Tina Davila, ESB-MACC Administrative Specialist PUBLIC COMMUNICATION: GENERAL None. APPROVAL OF MINUTES 1. The minutes from the Regular meeting of January 10, 2024, were approved on Member Zamarripa- Saenz’s motion. Vice Chair Amaro seconded the motion. Unanimous vote (6.0). Motion passed. Members Gandy, Herrera, Martinez, and Rodriguez were absent. STAFF BRIEFINGS 2. Staff Report by Marie Ortiz, ESB-MACC Culture and Arts Education Supervisor and Michelle Rojas, ESB-MACC Culture and Arts Education Manager on January and February programs, 1 marketing, scope of outreach efforts by ESB-MACC staff, La Mujer and Awards of Excellence planning report, and opportunities for Board participation at ESB-MACC programs for the month of February. Marie Ortiz, ESB-MACC Culture and Arts Education Supervisor gave a report on the Holistic Wellness programs, Education, Caminos Teen Leadership, and Academia Cuauhtli programming, sharing highlights for the month of January along with upcoming programs & events for the month of February. She also provided an update of current and upcoming marketing and outreach events and informed the Board they were currently in the process of securing a venue location for their annual La Mujer event. She also mentioned the Awards of Excellence event would take place June 29, 2024, at the Long Center and the MACC’s Event Coordinator, Estrella DeLeon would offer ways for the Advisory Board to assist with the event, such as securing donations, sponsorships, helping with event planning and having a role in the …

Scraped at: March 4, 2024, 7:20 p.m.
March 6, 2024

Item 2. Staff Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 10 pages

MACC Staff Report – 3/6/24 Website - Facebook - Instagram Please share our social media posts, sign up for our newsletter, and check out our upcoming events! Holistic Wellness Programming HWP February: Taller Abierto - Painting/Drawing Workshop: 1st Thursday of each month, February 1 @ 10-11:30pm (Attendance: 10) George Morales Dove Springs Recreation Center Art classes for all levels. Includes exploration of different techniques. All materials provided! Pre-registration required. Yoga for All Levels: Saturdays @ 10:30am (Attendance: 35) George Morales Dove Springs Recreation Center Body, mind and soul will align as we move with intention through gentle movement guided by breath. We will incorporate meditation to regulate the nervous system. Family Yoga: 1st Saturday of each month @ 12pm (Attendance: 6) George Morales Dove Springs Recreation Center A space for kids and their adult to practice yoga together. Chair Yoga: 3rd Wednesday of each month, February 21 @ 11am (Attendance: 2) George Morales Dove Springs Recreation Center A gentle form of yoga that can be done while seated in a chair. These modifications make yoga accessible to people with various physical capabilities. Chair Yoga: 3rd Friday of each month, February 16 @ 10:30am (Attendance: 5) Yarborough Library Gentle Flow Yoga (8+): 3rd Saturday of every month, February 17 @ 10:30am (Attendance: 5) Windsor Park Library Body, mind and soul will align as we move with intention through gentle movement guided by breath. We will incorporate meditation to regulate the nervous system. Voice/Guitar/Songwriting Lessons - Beginner/Intermediate (15+) Mondays @ 4-5pm (Attendance: 24) Windsor Park Library Join award winning song-writer Javier Jara for voice, guitar and songwriting lessons. Skills addressed: left- and right-hand technique, chords, arpeggios, strumming patterns, vocal technique, and songwriting approaches. Guitar Lessons (15+): Tuesdays Beginner: 2-2:30pm (Attendance: 21) Intermediate: 2:45-3:15pm (Attendance: 17) Tuesdays @ Twin Oaks Library Join accomplished musician Mauricio Callejas for guitar lessons for beginners (finger placement, strumming, sight- reading) and intermediate (chord progressions, ear training, reading sheet music) students. Please bring your own guitar. Drumming Lessons: 2nd Sunday of each month, February 11 @ 1pm (Attendance: 14) George Morales Dove Springs Recreation Center Learn to play drums influenced by West African, Afro-Latin and contemporary styles. Class starts with a movement warm up, then use drums, bells, and shakers to learn basic rhythms and play as a group. Drums provided - feel free to bring your own drum or percussion instrument. Budgeting Workshop: Wednesday, February 21 @ …

Scraped at: March 6, 2024, 2:50 p.m.
March 6, 2024

Item 3. FY25 Budget Recommendation Draft original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

EMMA S. BARRIENTOS MEXICAN AMERICAN CULTURAL CENTER ADVISORY BOARD RECOMMENDATION 20240306-5, 6, 7 Seconded By: Date: March 6, 2024 Subject: FY2025 Budget Recommendations Motioned By: Recommendation The Emma S. Barrientos Mexican American Advisory Board (MACC) recommends the City Council direct the City Manager to take the following actions and to allocate additional funds for the following items for FY 2025. These recommendations include actions that can be taken immediately outside the budget process and recommendations for the FY 2025 budget: Description of Recommendation to Council 1. 2. 3. Allocate the funding requested for the MACC’s Phase 2 FY25 operating expenses. Support funding for the Bronze Community Band Project in the amount of $3,000. Support funding for the Academia Cuauhtli’s FY25 operating expenses in the amount of $140,000. Rationale: Phase 2 Operating Budget In 2018 a comprehensive community engagement was completed as part of the Facility Expansion Plan which included community members and Austin City Council members. The Austin City Council unanimously voted to adopt the 2018 Facility Expansion Plan on May 24, 2018, with the intent to complete all remaining phases without preconditions on funding sources. The 2018 Bond Committee recommended, and Austin City Council approved $27 million to be included under Proposition B for the ESB-MACC Phase 2 project. 74 percent of voters in the 2018 election voted in favor of Proposition B. The Joint Venture team of Miro Rivera Architects (Austin) and Estudio Tatiana Bilbao (Mexico City) was selected to lead the Phase 2 design in part because of their experience designing world-class facilities. The project team has been diligently working on completing the project slated for completion in the Fall of 2025. In order for the facility to be fully operational on day one, the operating budget needs to be increased to support the additional 19,000 square feet as well as the new and renovated program spaces. The Mexican American Cultural Center Advisory Board recommends to the Austin City Council to allocate the necessary amount needed for the Phase 2 operating budget in order to fulfill the commitment by the City of Austin to complete a Phase 2 expansion and renovation that is commensurate with a world- class cultural center that continues to be a reflection of the strength and resiliency of Austin’s Mexican American community. 1 of 3 Bronze Community Band Project The Bronze Community Band provides culturally relevant music education rooted in community-based practice in …

Scraped at: March 6, 2024, 2:50 p.m.
March 6, 2024

Item 3. Presentation from PARD Finance on the financial forecast process and draft elements of the Parks and Recreation FY25 proposal original pdf

Thumbnail of the first page of the PDF
Page 1 of 8 pages

FY25 Budget Kickoff Parks and Recreation Department March 6, 2024 Mexican American Cultural Center Art: Creativity and Culture: A Celebration / Creatividad y Cultura: Una Celebración by Werllayne Nunes 1 Agenda • FY 2025 budget timeline Financial Forecast Directives for FY 2025 • • Mexican American Cultural Center Budget Overview • • Questions Revenue and Performance Measures 2 FY 2024-25 Budget Timeline PARD Budget Kick-off • Department Kick-off Meeting • February 2 Internal Department Base Cost drivers due February 23 • Expenditure Worksheet due to Budget Office March 8 Deliverables • 5-year Financial Forecast presentation to Council April 16 Proposed Budget • Proposed Budget delivered to Council on July 12 10:00 AM • Community Input Session July 24, • Council Budget Work Sessions July 24, 30 and August 1, 6, and 8 January February March April May June July August September October Boards and Commissions Recommendations • Recommendations Due March 31 Budget Adoption • Community Input Session August 1, 3:00 PM • Budget readings and tax rate hearings on August 14-16 3 Current Department Budget Overview FY 2024 Totals at a Glance FY 2024 Approved Budget FY 2024 Positions FY 2024 Sources $126 Million 811 FTEs Tax Supported: 81% Fees/Other: 11% Grants/Other: 8% 4 Financial Forecast Directives for FY 2025 Personnel – Direction from the City Manager • • No new position requests will be considered in FY25 for departments with a vacancy rate of 15% or higher as of March 10, 2024 PARD’s Vacancy Rate is 9% as of March 1 2024 BASE COST DRIVER DEFINITION: General Fund and Support Services departments must develop a forecast with only baseline requirements. In other words, the only increases allowable are those necessary to accommodate items previously authorized by Council. Examples of acceptable forecast items that increase the department’s budget are: the annualized cost of a recreation center that was opened part-way through FY 2024; costs related to annexations or new facilities; and contractually-mandated increases. Published February 23, 2024 “ It’s been a long, long time since the City of Austin has faced a budget crunch. But it looks like fiscal — and legislative — reality might be catching up with us.” “Austin’s economic prosperity along with some pandemic- related factors helped to paper over many of the challenges of budgeting under a tight property tax cap. Now, we’re beginning to understand the fiscal reality of those caps at the same time …

Scraped at: March 6, 2024, 2:50 p.m.
March 6, 2024

Item 4. Phase 2 Construction Project Updates original pdf

Thumbnail of the first page of the PDF
Page 1 of 5 pages

Emma S. Barrientos Mexican American Cultural Center Phase 2 Improvements Project Update March 6, 2024 Heidi Tse, Capital Delivery Project Manager CURRENT PROJECT PHASE: GMP1 (Guaranteed Maximum Price 1): Site Package GMP2 (Guaranteed Maximum Price 2): Building/Landscape Package • Construction (site) – is underway. • Permitting (building) – On 3/4/24, Development Services Department approved the building • Bidding & Negotiation (GMP2) – Negotiations concluded in February. A fully executed contract is application for a permit. expected to early March. CONSTRUCTION PROGRESS: • Trenches were cut at the parking lot to make ready for a new wastewater line for the central utility • Plywood sheathing has been erected as a part of a new wall to enclose the mechanical room at plant. the central utility plant. • Rough-in plumbing or the initial process of installing water lines, drain lines, and pipeline connections in the pump room is awaiting inspector’s approval. • The Austin Energy (AE) Chilled Water District Cooling Network Connection project successfully flushed and tested the new chilled water lines. • Portions of the parking lot where AE trenches were dug for the chilled water lines have been re- paved. • Utility infrastructure (data, water, and wastewater) is being installed with access points, such as manholes and clean-outs throughout the site. • Land regrading or releveling of the ground surface to a specific height between the Zocalo and the Ann & Roy Butler Hike & Bike Trail achieves the elevation change required for the bioswales or a series of narrow rain gardens channeling run-offs to larger storm water collection areas. ANNOUNCEMENTS: • Short term trail re-route for a portion of the south segment of the Ann and Roy Butler Hike and Bike Trail opened on January 16, 2024, and will continue until mid-April. View the map link here. • The Red River Alley was re-opened to vehicular traffic on February 8, 2024. • The Austin Energy (AE) Chilled Water District Cooling Network Connection, a companion project, providing the cooling component of the HVAC system for the MACC campus, concluded all major construction activities at the end of February. • The Confluence, a separate public/private partnership project to stabilize and protect the ecology of Waller Creek, improve water quality, and create a continuous hike and bike trail along the creek is expected to increase activities at the MACC, as the parking lot is the construction access point for the east side …

Scraped at: March 6, 2024, 2:50 p.m.
March 6, 2024

Play audio original link

Play audio

Scraped at: March 15, 2024, 2:50 a.m.
March 6, 2024

Correction - Document was uploaded as backup material for Item 3. However, should have been uploaded as backup material for Item 5. original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

EMMA S. BARRIENTOS MEXICAN AMERICAN CULTURAL CENTER ADVISORY BOARD RECOMMENDATION 20240306-5, 6, 7 Seconded By: Date: March 6, 2024 Subject: FY2025 Budget Recommendations Motioned By: Recommendation The Emma S. Barrientos Mexican American Advisory Board (MACC) recommends the City Council direct the City Manager to take the following actions and to allocate additional funds for the following items for FY 2025. These recommendations include actions that can be taken immediately outside the budget process and recommendations for the FY 2025 budget: Description of Recommendation to Council 1. 2. 3. Allocate the funding requested for the MACC’s Phase 2 FY25 operating expenses. Support funding for the Bronze Community Band Project in the amount of $3,000. Support funding for the Academia Cuauhtli’s FY25 operating expenses in the amount of $140,000. Rationale: Phase 2 Operating Budget In 2018 a comprehensive community engagement was completed as part of the Facility Expansion Plan which included community members and Austin City Council members. The Austin City Council unanimously voted to adopt the 2018 Facility Expansion Plan on May 24, 2018, with the intent to complete all remaining phases without preconditions on funding sources. The 2018 Bond Committee recommended, and Austin City Council approved $27 million to be included under Proposition B for the ESB-MACC Phase 2 project. 74 percent of voters in the 2018 election voted in favor of Proposition B. The Joint Venture team of Miro Rivera Architects (Austin) and Estudio Tatiana Bilbao (Mexico City) was selected to lead the Phase 2 design in part because of their experience designing world-class facilities. The project team has been diligently working on completing the project slated for completion in the Fall of 2025. In order for the facility to be fully operational on day one, the operating budget needs to be increased to support the additional 19,000 square feet as well as the new and renovated program spaces. The Mexican American Cultural Center Advisory Board recommends to the Austin City Council to allocate the necessary amount needed for the Phase 2 operating budget in order to fulfill the commitment by the City of Austin to complete a Phase 2 expansion and renovation that is commensurate with a world- class cultural center that continues to be a reflection of the strength and resiliency of Austin’s Mexican American community. 1 of 3 Bronze Community Band Project The Bronze Community Band provides culturally relevant music education rooted in community-based practice in …

Scraped at: March 29, 2024, 2:50 p.m.
March 6, 2024

Recommendation 20240306-005:FY25 Phase 2 Operating Expenses original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

EMMA S. BARRIENTOS MEXICAN AMERICAN CULTURAL CENTER ADVISORY BOARD RECOMMENDATION 20240306-005 Seconded By: Chair Angelica Navarro Date: March 6, 2024 Subject: FY2025 Budget Recommendations Motioned By: Member Lillian “Lily” Zamarripa-Saenz Recommendation The Emma S. Barrientos Mexican American Advisory Board (MACC) recommends the City Council direct the City Manager to take the following actions and to allocate additional funds for the following items for FY 2025. These recommendations include actions that can be taken immediately outside the budget process and recommendations for the FY 2025 budget: Description of Recommendation to Council 1. Allocate the funding requested by staff for the MACC’s Phase 2 FY25 operating expenses. Support funding for the Bronze Community Band Project in the amount of $3,000. Support funding for the Academia Cuauhtli’s FY25 operating expenses in the amount of $140,000. 2. 3. Rationale: Phase 2 Operating Budget In 2018 a comprehensive community engagement was completed as part of the Facility Expansion Plan which included community members and Austin City Council members. The Austin City Council unanimously voted to adopt the 2018 Facility Expansion Plan on May 24, 2018, with the intent to complete all remaining phases without preconditions on funding sources. The 2018 Bond Committee recommended, and Austin City Council approved $27 million to be included under Proposition B for the ESB-MACC Phase 2 project. 74 percent of voters in the 2018 election voted in favor of Proposition B. The Joint Venture team of Miro Rivera Architects (Austin) and Estudio Tatiana Bilbao (Mexico City) was selected to lead the Phase 2 design in part because of their experience designing world-class facilities. The project team has been diligently working on completing the project slated for completion in the Fall of 2025. In order for the facility to be fully operational on day one, the operating budget needs to be increased to support the additional 19,000 square feet as well as the new and renovated program spaces. The Mexican American Cultural Center Advisory Board recommends to the Austin City Council to allocate the necessary amount needed for the Phase 2 operating budget in order to fulfill the commitment by the City of Austin to complete a Phase 2 expansion and renovation that is commensurate with a world- class cultural center that continues to be a reflection of the strength and resiliency of Austin’s Mexican American community. 1 of 3 Bronze Community Band Project The Bronze Community Band provides culturally relevant …

Scraped at: March 30, 2024, 5:20 a.m.
March 6, 2024

Recommendation 20240306-006: Funding for the Bronze Community Band Program original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

EMMA S. BARRIENTOS MEXICAN AMERICAN CULTURAL CENTER ADVISORY BOARD RECOMMENDATION 20240306-006 Seconded By: Chair Angelica Navarro Date: March 6, 2024 Subject: FY2025 Budget Recommendations Motioned By: Member Lillian “Lily” Zamarripa-Saenz Recommendation The Emma S. Barrientos Mexican American Advisory Board (MACC) recommends the City Council direct the City Manager to take the following actions and to allocate additional funds for the following items for FY 2025. These recommendations include actions that can be taken immediately outside the budget process and recommendations for the FY 2025 budget: Description of Recommendation to Council 1. Allocate the funding requested by staff for the MACC’s Phase 2 FY25 operating expenses. Support funding for the Bronze Community Band Project in the amount of $3,000. Support funding for the Academia Cuauhtli’s FY25 operating expenses in the amount of $140,000. 2. 3. Rationale: Phase 2 Operating Budget In 2018 a comprehensive community engagement was completed as part of the Facility Expansion Plan which included community members and Austin City Council members. The Austin City Council unanimously voted to adopt the 2018 Facility Expansion Plan on May 24, 2018, with the intent to complete all remaining phases without preconditions on funding sources. The 2018 Bond Committee recommended, and Austin City Council approved $27 million to be included under Proposition B for the ESB-MACC Phase 2 project. 74 percent of voters in the 2018 election voted in favor of Proposition B. The Joint Venture team of Miro Rivera Architects (Austin) and Estudio Tatiana Bilbao (Mexico City) was selected to lead the Phase 2 design in part because of their experience designing world-class facilities. The project team has been diligently working on completing the project slated for completion in the Fall of 2025. In order for the facility to be fully operational on day one, the operating budget needs to be increased to support the additional 19,000 square feet as well as the new and renovated program spaces. The Mexican American Cultural Center Advisory Board recommends to the Austin City Council to allocate the necessary amount needed for the Phase 2 operating budget in order to fulfill the commitment by the City of Austin to complete a Phase 2 expansion and renovation that is commensurate with a world- class cultural center that continues to be a reflection of the strength and resiliency of Austin’s Mexican American community. 1 of 3 Bronze Community Band Project The Bronze Community Band provides culturally relevant …

Scraped at: March 30, 2024, 5:20 a.m.
March 6, 2024

Recommendation 20240306-007: Support for Academia Cuauhtli’s fiscal year 24-25 budget original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

EMMA S. BARRIENTOS MEXICAN AMERICAN CULTURAL CENTER ADVISORY BOARD RECOMMENDATION 20240306-007 Seconded By: Chair Angelica Navarro Date: March 6, 2024 Subject: FY2025 Budget Recommendations Motioned By: Member Lillian “Lily” Zamarripa-Saenz Recommendation The Emma S. Barrientos Mexican American Advisory Board (MACC) recommends the City Council direct the City Manager to take the following actions and to allocate additional funds for the following items for FY 2025. These recommendations include actions that can be taken immediately outside the budget process and recommendations for the FY 2025 budget: Description of Recommendation to Council 1. Allocate the funding requested by staff for the MACC’s Phase 2 FY25 operating expenses. Support funding for the Bronze Community Band Project in the amount of $3,000. Support funding for the Academia Cuauhtli’s FY25 operating expenses in the amount of $140,000. 2. 3. Rationale: Phase 2 Operating Budget In 2018 a comprehensive community engagement was completed as part of the Facility Expansion Plan which included community members and Austin City Council members. The Austin City Council unanimously voted to adopt the 2018 Facility Expansion Plan on May 24, 2018, with the intent to complete all remaining phases without preconditions on funding sources. The 2018 Bond Committee recommended, and Austin City Council approved $27 million to be included under Proposition B for the ESB-MACC Phase 2 project. 74 percent of voters in the 2018 election voted in favor of Proposition B. The Joint Venture team of Miro Rivera Architects (Austin) and Estudio Tatiana Bilbao (Mexico City) was selected to lead the Phase 2 design in part because of their experience designing world-class facilities. The project team has been diligently working on completing the project slated for completion in the Fall of 2025. In order for the facility to be fully operational on day one, the operating budget needs to be increased to support the additional 19,000 square feet as well as the new and renovated program spaces. The Mexican American Cultural Center Advisory Board recommends to the Austin City Council to allocate the necessary amount needed for the Phase 2 operating budget in order to fulfill the commitment by the City of Austin to complete a Phase 2 expansion and renovation that is commensurate with a world- class cultural center that continues to be a reflection of the strength and resiliency of Austin’s Mexican American community. 1 of 3 Bronze Community Band Project The Bronze Community Band provides culturally relevant …

Scraped at: March 30, 2024, 5:20 a.m.
March 6, 2024

Approved Minutes original pdf

Thumbnail of the first page of the PDF
Page 1 of 4 pages

EMMA S. BARRIENROS MEXICAN AMERICAN CULTURAL CENTER REGULAR MEETING MINUTES WEDNESDAY, MARCH 6, 2024 The Emma S. Barrientos Mexican American Cultural Center convened in a Regular meeting on Wednesday, March 6, 2024, at City Hall – Board and Commissions Room located at 301 West Second Street in Austin, Texas 78701. (Some members of the ESB-MACC Advisory Board participated via videoconference.) Chair Navarro called the Emma S. Barrientos Mexican American Cultural Center Meeting to order at 6:01pm. Board Members in Attendance: Board Members in Attendance Remotely: Angelica Navarro, Chair John Estrada, Member Hilario “Larry” Amaro, Vice Chair Gerardo Gandy, Member Noemi Castro, Member Cynthia “Cy” Herrera, Member Raul “Roy” Reyna, Member Anthony Martinez, Member (Arrived at 6:07pm) Lily Zamarripa-Saenz, Member Board Members Absent: Eduardo “Eddie” Rodriguez, Member Staff in Attendance: Jodi Jay, PARD Assistant Director Laura Esparza, PARD Division Manager of Museums and Cultural Programs Michelle Rojas, ESB-MACC Culture and Arts Education Manager Marie Ortiz, ESB-MACC Culture and Arts Education Supervisor Tina Davila, ESB-MACC Administrative Specialist PUBLIC COMMUNICATION: GENERAL Leonard Davila introduced himself stating he was a concerned citizen who had grown up in the East Side of Austin and had heard of Parks and Recreations Budget cut. He commented that he would like to see funding considered for programming at Pan Am Hillside and for the Mexican American Experience when the MACC opens back up again. APPROVAL OF MINUTES 1. The minutes from the Regular meeting of February 7, 2024, were approved on Member Zamarripa- Saenz’s motion. Member Estrada seconded the motion. Unanimous vote (9.0). Motion passed. Member Rodriguez was absent. STAFF BRIEFINGS 1 2. Staff Report by Laura Esparza, Division Manager and Olivia Tamzarian, ESB-MACC Culture and Arts Education Marketing & Outreach Representative on staffing updates, February and March programs, marketing and outreach efforts, and updates on signature event planning. Olivia Tamzarian, ESB-MACC Culture and Arts Marketing and Outreach Representative gave a report on the Holistic Wellness programs, Education, Caminos Teen Leadership, and Academia Cuauhtli programming, sharing highlights for the month of February along with upcoming programs & events for the month of March. She also provided an update of current and upcoming marketing and outreach events and announced the MACC’s annual La Mujer event was confirmed for Sunday, April 21, 2024, located at 2403 E 16th St, Austin, TX 78702 in East Austin at the Cathedral. Laura Esparza, PARD Division Manager of Museums and Cultural Programs informed the …

Scraped at: July 6, 2024, 2:20 a.m.
Feb. 28, 2024

Community Interest Announcement original pdf

Thumbnail of the first page of the PDF
Page 1 of 1 page

Emma S. Barrientos Mexican American Cultural Center Advisory Board Community Interest Announcement Phase 2 Construction Project Site Visit February 28, 2024, at 12:00 pm Emma S. Barrientos Mexican American Cultural Center, 600 River St, Austin, TX 78701 A quorum of Commission members may be present. No action will be taken, and no Commission business will occur. Michelle Rojas, Board Liaison 512-974-3771

Scraped at: Feb. 22, 2024, 10:20 p.m.
Feb. 7, 2024

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

REGULAR MEETING of the EMMA S. BARRIENTOS MEXICAN AMERICAN CULTURAL CENTER ADVISORY BOARD Wednesday, February 7, 2024, 6:00 PM City Hall – Boards and Commissions Room 301 W. Second St. Austin, TX 78701 Some members of the Emma S. Barrientos Mexican American Cultural Center Advisory Board may be participating by videoconference. Public comment will be allowed in-person or remotely by telephone. Speakers may only register to speak on an item once either in-person or remotely and will be allowed up to three minutes to provide their comments. To speak in person, registration is required at least 10 min prior to the start of the meeting. Registration no later than noon the day before the meeting is required for remote participation. To register call or email the board liaison at 512-974-3771 or michelle.rojas@austintexas.gov BOARD MEMBERS Angelica Navarro, Chair Hilario “Larry” Amaro, Vice Chair Noemi Castro, Member Anthony Martinez, Member Raul “Roy” Reyna, Member John Estrada, Member Gerardo Gandy, Member Eduardo “Eddie” Rodriguez, Member Cynthia “Cy” Herrera, Member Lillian “Lily” Zamarripa-Saenz, Member AGENDA CALL TO ORDER PUBLIC COMMUNICATION: GENERAL The first 10 speakers signed up prior to the meeting being called to order will each be allowed a (3) three-minute allotment to address their concerns regarding items not posted on the agenda. APPROVAL OF MINUTES 1. Approve the minutes of the Emma S. Barrientos Mexican American Cultural Center Regular Meeting of January 10, 2024. STAFF BRIEFINGS 2. Staff Report by Marie Ortiz, ESB-MACC Culture and Arts Education Supervisor and Michelle Rojas, ESB-MACC Culture and Arts Education Manager on January and February programs, marketing, scope of outreach efforts by ESB-MACC staff, La Mujer and Awards of Excellence planning report, and opportunities for Board participation at ESB-MACC programs for the month of February. DISCUSSION AND ACTION ITEMS 3. Discussion on the Awards of Excellence, the scope of the working group is to provide support in the event planning for the Awards of Excellence and to take action on voting on approving the creation of the working group. DISCUSSION ITEMS 4. Presentation by Robert Ojeda on the Bronze Community Band for support to implement a 5. Presentation by Dr. Angela Valenzuela and Katya Guzman from Academia Cuahutli Basic Music and Performance Program. requesting support for their fiscal year 24-25 budget. 6. Discussion on Phase 2 Construction Project Updates. Navarro, Amaro 7. Update on the Music Creative Hubs Town Hall meeting that took place on January …

Scraped at: Feb. 2, 2024, 11:50 p.m.
Feb. 7, 2024

Item 1. Approval of Minutes original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

EMMA S. BARRIENROS MEXICAN AMERICAN CULTURAL CENTER REGULAR MEETING MINUTES WEDNESDAY, JANUARY 10, 2024 The Emma S. Barrientos Mexican American Cultural Center convened in a Regular meeting on Wednesday, January 10, 2024, at Permitting and Development Center – Event Center, First Floor, Room 1406 located at 6310 Wilhelmina Delco Drive in Austin, Texas 78752. (Some members of the ESB-MACC Advisory Board participated via videoconference.) Vice Chair Amaro called the Emma S. Barrientos Mexican American Cultural Center Meeting to order at 6:13pm. Board Members in Attendance: Board Members in Attendance Remotely: Hilario “Larry” Amaro, Vice Chair Gerardo Gandy, Member (Left at 8:52pm) John Estrada, Member Anthony Martinez, Member Cynthia “Cy” Herrera, Member Eduardo “Eddie” Rodriguez, Member (Left at 6:56pm) Lily Zamarripa-Saenz, Member Board Members Absent: Angelica Navarro, Chair Noemi Castro, Member Raul “Roy” Reyna, Member Staff in Attendance: Laura Esparza, PARD Division Manager of Museums and Cultural Programs Michelle Rojas, ESB-MACC Culture and Arts Education Manager Marie Ortiz, ESB-MACC Culture and Arts Education Supervisor Tina Davila, ESB-MACC Administrative Specialist PUBLIC COMMUNICATION: GENERAL Speaker 1: Robert Ojeda, Bronze Community Band Project, Artistic Director introduced himself informing the Board that his group had been collaborating with the Mexican American Cultural Center since 2016 letting them know they were a community-based program where they reach out to the community and teach the history of music. Ojeda requested to be able to provide a presentation at the February Advisory Board meeting. Speaker 2: Christina Gonzales, Austin Tejano Music Coalition (ATMC), Vice President, asked that the MACC provide a space for ATMC to host their events. APPROVAL OF MINUTES 1. The minutes from the Regular meeting of December 6, 2023, were approved on Member Zamarripa- Saenz’s motion. Member Gandy seconded the motion. Unanimous vote (7.0). Motion passed. Chair Navarro and Members Castro and Reyna were absent. 1 STAFF BRIEFINGS 2. Staff Report on ESB-MACC programs during December and upcoming programs in January. Olivia Tamzarian, ESB-MACC Culture and Arts Education Marketing & Outreach Representative gave a report on the Holistic Wellness programs, Education, Caminos Teen Leadership, and Academia Cuauhtli programming, sharing highlights for the month of December along with upcoming programs & events for the month of January. She also provided an update of current and upcoming marketing and outreach events and shared the dates and locations for the MACC’s 2024 Signature Events. (Please see the Board and Commissions Website for backup material.) DISCUSSION AND ACTION ITEMS …

Scraped at: Feb. 7, 2024, 7:50 p.m.
Feb. 7, 2024

Item 2. Preliminary Survey Findings original pdf

Thumbnail of the first page of the PDF
Page 1 of 1 page

Preliminary Survey Findings 2/5/24 htps://forms.gle/DBVtaW5UfmCxBEVp9 What kind of programs and events do you want to see at the MACC in 2024-2025? Historically based programs. I feel that Mexican Americans, lack and understanding of our history in the US, about the heroes, those that came before us that were instrumental in making the US prosper, Our civil rights leaders that were a big part of positive changes that benefited minorities, prominent leaders in government. And the influence that Mexican Americans have brought to the United States. Music classes for toddlers and kids, family activities, folclórico, arts and crafts night, culture night- find things within our Mexican culture that can be taught about that has an activity to go with it, basic skills nights for young adults, budgeting, cooking, etc. We love tabling at cultural events you host in various parts of the City. I would love to see Viva Mexico and Dia de los Muertos again, but the more events, the better, especially if you could spread them throughout the year a bit more. Cooking, dancing, sports/athletic activities, music lessons (guitar/singing), pottery, boxing or some type of martial arts like jiu-jitsu, sign language classes. Family-friendly events with activities for very active children, book clubs for adults, traditional and healthy cooking classes, outdoor activities. Me gustaría algún programa de clases de música para niños, en los eventos me gustaría ver más opciones de comida tradicional mexicana Local artists presenting their work. Especially latin@ contemporary/modern dance—a genre that is sadly underrepresented. Karaoke Nights! Sport Watch Parties! Rosary Prayer Groups. Bible Studies. Video game meet ups. Love when there is a mix of music, food and kid friendly. Arts n crafts for kids dance classes, yoga classes, language classes, cooking classes Arts and crafts, exercise classes, self defense classes Tejano music artists and folklore dancers. Folkloric Dances, Art exhibits, Music! All that celebrate Mexican culture!

Scraped at: Feb. 7, 2024, 7:50 p.m.
Feb. 7, 2024

Item 2. Signature Events original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

MACC Advisory Board Feb. 7, 2024 Upcoming events! La Mujer 2024‐La Mujer is the ESB’s Mexican American Cultural Center’s annual celebra(cid:415)on of womxn. While we are securing a loca(cid:415)on, we may shi(cid:332) our date of April 20th to a few weeks before or a(cid:332)er. Please stay tuned in the next few weeks for an announcement of our La Mujer event 2024! Awards of Excellence 2024, June 29th, at the Long Center These awards, which were established by the Emma S. Barrientos Mexican American Cultural Center Advisory Board in 2009, recognize those individuals in Aus(cid:415)n that have demonstrated significant leadership and have made meaningful contribu(cid:415)ons in the La(cid:415)no/a cultural arts. Check out last years live video of the ceremony! Awards of Excellence 2023 Video Ways to support upcoming ESB MACC Signature Events! Awards of Excellence 1. Encourage your communi(cid:415)es to nominate someone for an ESB MACC Award of Excellence. 2. Choose one Advisory Board member to be a part of the Awards of Excellence Selec(cid:415)on Commi(cid:425)ee 3. Event greeter 4. Be an Emcee & award presenter 5. Iden(cid:415)fy "In‐kind" dona(cid:415)ons for the event. Examples: o Food o Desserts o Beverages o Flowers o Party favors 6. Set up/Break Down Selec(cid:415)on Commi(cid:425)ee members can be (5‐7 people):  Past Awards of Excellence winners  1 current ESB MACC Advisory board  Past ESB MACC Advisory board members  Ar(cid:415)sts (Music, Visual, Writers, Film, Theater, Dance etc.)  Young person (18‐25)  Community members and leaders Staff can support on further steps, once an Advisory Board member has been appointed to be on the selec(cid:415)on commi(cid:425)ee. La Mujer Late April 20th or 21st, (Date and Loca(cid:415)on s(cid:415)ll being determined)  Be a part of our planning commi(cid:425)ee!  Emcee and announcer  Par(cid:415)cipate in outreach and media announcements  Support an ac(cid:415)vity/workshop at the event  Procure “in‐kind” dona(cid:415)ons o o o  Set up/Break down Food Decora(cid:415)ons Other

Scraped at: Feb. 7, 2024, 7:50 p.m.
Feb. 7, 2024

Item 2. Staff Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 7 pages

MACC Staff Report – 2/7/24 Website - Facebook - Instagram Please share our social media posts, sign up for our newsletter, and check out our upcoming events! Holistic Wellness Programming HWP January: Cooking Demo: Vegan (15+): Wednesday, January 17 @ 6-7:30pm (Attendance: 12) Central Library - Demo Area/Kitchen A vegan diet excludes meat, dairy, and all foods derived from animals. You will learn how to make a quick and healthy meal using products found at your local grocery store. Tastings are included! Pre-registration required. Yoga for All Levels: Saturday, January 20/27 @ 10:30am (Attendance: 14) George Morales Dove Springs Recreation Center Body, mind and soul will align as we move with intention through gentle movement guided by breath, incorporating meditation to regulate the nervous system. Voice/Guitar/Songwriting Lessons Intermediate (15+): January 22/29 Mondays @ 4-5pm (Attendance: 21) Windsor Park Library Join award winning song-writer Javier Jara for voice, guitar and songwriting lessons. Skills addressed: left and right hand technique, chords, arpeggios, strumming patterns, vocal technique, and songwriting approaches. Guitar Lessons (15+): January 23/30 Beginner: 2-2:30pm (Attendance: 10) Intermediate: 2:45-3:15pm (Attendance: 11) Tuesdays @ Twin Oaks Library Join accomplished musician Mauricio Callejas for guitar lessons for beginners (finger placement, strumming, sight- reading) and intermediate (chord progressions, ear training, reading sheet music). Please bring your own guitar. Gentle Flow Yoga (8+): Saturday, January 27 @ 10:30am (Attendance: 3) Windsor Park Library Body, mind and soul will align as we move with intention through gentle movement guided by breath. We will incorporate meditation to regulate the nervous system. Taller Abierto - Painting/Drawing Workshop: Saturday, January 27 @ 2-4pm (Attendance: 16) Windsor Park Library Art classes for all levels led by art instructor Miguel Santana. Includes both art history and exploration of different techniques. All materials provided! HWP Upcoming: Taller Abierto - Painting/Drawing Workshop: 1st Thursday of each month, February 1 @ 10-11:30pm George Morales Dove Springs Recreation Center Art classes for all levels. Includes exploration of different techniques. All materials provided! Pre-registration required. Yoga for All Levels: Saturdays @ 10:30am George Morales Dove Springs Recreation Center Body, mind and soul will align as we move with intention through gentle movement guided by breath. We will incorporate meditation to regulate the nervous system. Family Yoga: 1st Saturday of each month @ 12pm George Morales Dove Springs Recreation Center A space for kids and their adult to practice yoga together. Chair Yoga: 3rd Wednesday of each …

Scraped at: Feb. 7, 2024, 7:50 p.m.
Feb. 7, 2024

Item 4. Bronze Band Community Program original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

BRONZE COMMUNITY BAND BACKGROUND Much of Mexican American music is not notated. Instead, as is typical in community‐based cultures, it is passed down from generation to generation. However, if there is no platform and dedicated spaces for oral based traditions to flourish, there is a danger of lost history, culture, and language. Additionally, consider the following:  Latinx students are overtly underrepresented in high school ensembles. Participation in music education programs often require a financial commitment many Latinx families cannot afford.  Most music education programs center Western European classical music. Programs that center other kinds of music, like Mexican American music, with ensembles just as legitimate as Western symphonies and orchestras, are still few.  There are few music teachers entering the profession who are Latinx. Approximately, over 80% were White (as reported in 2011 by music education researchers). As a result, many Mexican American musicians, though accomplished, didn’t have equitable opportunities to learn to read music. With no basic music reading skills, this may negatively impact their opportunities in the music industry. The Bronze Community Band provides culturally relevant music education rooted in community‐based practice in the regional bajo‐sexto conjunto and orquesta music tradition of Mexican American heritage. It works directly with musicians taking an intergenerational approach (young adults to elders) utilizing a community‐based model to teach basic music literacy and, simultaneously, capture Mexican American music in notated form. The Bronze Community Band passes down the skills that elder Mexican American musicians have learned in their lived experiences within and outside the music entertainment industry. MISSION The Bronze Community Band’s mission is to research, promote and preserve the bi‐musical heritage of the Mexican American community. The Bronze Community Band’s basic music literacy and performance program has four components: 1) Research Development (culturally relevant and inclusive music history), 2) Basic Music Reading (notation lessons) 3) Rehearsals (community‐based) and 4) Presentation. This is a 30‐week program of engaging educational workshops that culminates in a community concert. Participant musicians exhibit their new musicianship skills in reading and performance. SUPPORT FOR BRONZE COMMUNITY BAND Since its founding 8 years ago in 2016, the Bronze Community Band has received both in‐kind services and funding by:  ESB‐Mexican American Cultural Center (2016 – 2022)  Cultural Arts Division of the City of Austin (2018)  Austin Public Library (2019)  Austin History Center Humanities Grant (2019)  Austin Live Music and Elevate Grant (2023) …

Scraped at: Feb. 7, 2024, 7:50 p.m.
Feb. 7, 2024

Item 4. Bronze Community Band Project (BCBP) Overview Presentation original pdf

Thumbnail of the first page of the PDF
Page 1 of 11 pages

Bronze Community Band Project (BCBP) Presentation to the ESB-MACC Advisory Board for support to implement a Basic Music and Performance Program Bronze Community Band Project Mission Statement To research, promote and preserve the bi-musical heritage of the Mexican American community. Vision Statement For Proposed ESB-MACC 2024 Project The BCBP preserves the bi-musical heritage of the Mexican American community by teaching skill sets that build on musicians’ ability in playing by ear to learning how to read music. Bronze Community Band Project Description • The BCBP 2024 program is a vehicle for showcasing traditional and contemporary works of Mexican American music performance art. • The program is to implement a basic music reading and performance 30-week program in collaboration with the ESB- MACC. • The program consists of workshops that incorporate basic music notation lesson plans that lead to a performance of musicians reading music charts as community concert. Principals and Bios • • Robert Rivera Ojeda – Music composer/arranger and performance artist dedicated to the heritage and and preservation of Mexican American music. He has recorded, toured and performed in theater musicals and music entertainment. He holds a Bachelor’s degree in Community Studies and a Master’s degree in Education. He has designed music performance shows that center on the importance of intergenerational and cross-cultural understanding. Jean Jacques Barrera (JJ Barrera) –Music/adjunct professor at the UT Butler School of Music. He teaches bajo sexto, an instrument vital to Texas conjunto music. He has toured internationally including Europe and has recorded with legendary musicians including Austin’s Johnny Degollado. BCBP Program in collaboration with the ESB-MACC The 30-week Bronze Community Band Project program has four components: • • • • Research Development- This time is dedicated to learn songs researched that provide an understanding of the cultural significance of the music presentation. Basic Music Reading- Combining Basic Music Reading and Non-Reading Music Skills. Rehearsals- Incorporate participants into the BCBP presentation. Performance- A two 45-minute set performance art piece that showcases the research of the Bronze Community Band Project with the opportunity to showcase the musician participants of the program and what they have learned. BCBP Program in collaboration with the ESB- MACC ESB-MACC Request • In-kind support from the ESB-MACC for space to implement the BCBP program components program) • Gap funding of $3,000 (BCBP has program funds to implement the Previous Collaboration with ESB-MACC Bronze Community Band Project Presentation at Pan American …

Scraped at: Feb. 7, 2024, 7:50 p.m.
Feb. 7, 2024

Item 5. Academia Cuahutli City Budget Proposal for FY24-25 original pdf

Thumbnail of the first page of the PDF
Page 1 of 6 pages

Brief History The proposal for Academia Cuauhtli came about in a community meeting on September 20, 2013, at the Emma S. Barrientos Mexican American Culture Center. The event was sponsored by the Texas Center for Education Policy with the goal to create space for the community to discuss literacy issues, curriculum, and systematic exclusion of culturally relevant textbooks for and within the Latina/o community. The event brought together community members and leaders, scholars, AISD public school teachers, students, and parents—45 total. After listening to the moving presentations on the clear lack of Latinx children’s books the community members discussed the urgency for preparing a culturally responsive and sustaining curriculum. Additionally, at the meeting, everyone agreed that we need to solve this problem locally in Austin, Texas. As a result, a few months later the Latinx Austin community created and established Academia Cuauhtli and Nuestro Grupo (https://academiacuauhtli.com/about/ ). Vision Statement: A future where children live with a thinking heart and the courage to pursue their aspirations within liberating and sacred learning spaces. Mission Statement Academia Cuauhtli's mission is the following: “honor our communities cultural heritage, foster social justice consciousness and reclaim our collective identities in pursuit of educational freedom.” Since its inception in 2014 Academia Cuauhtli has: enrolled over 500 students; trained and retained 60 teachers, hosted 200 professional development workshops, initiated Cuauhtli's Grow Your Own bilingual leadership development program for AISD teachers of color, and successfully implemented a research partnership between AISD and UT Austin's College of Education researchers (research publications link: https://academiacuauhtli.com/publications/ ) Academia Cuauhtli Organizational Structure 1. Academia Cuauhtli Fall-Spring Saturday classes: Our Saturday classes are completely free and taught in Spanish. Taught by AISD master dual language teachers and in the context of a 12-to-1 student-teacher ratio, we envision this curriculum as not only providing the academic support that the children need in preparation for their STAAR exams and academic performance, generally, but also providing enrichment for students that we anticipate will have enduring impacts for them. More intentionally, Academia Cuauthli offers instruction in Mexican American Studies, Tejano Studies, Bilingual/Dual Language courses, Environmental Studies, Curanderismo, and Danza Mexica. 2. STEM Summer Program: Aztech Kids Code (AKC) in collaboration with Academia Cuauhtli (AC), created a summer coding-danza camp in Austin Texas for ELL students. AKC & AC Summer Camp is a project-based, culturally sustaining STEM program for second to sixth grade Austin Independent School District students attending Academia …

Scraped at: Feb. 7, 2024, 7:50 p.m.
Feb. 7, 2024

Item 5. Academia Cuahutli City Budget Proposal FY24-25_Presentation original pdf

Thumbnail of the first page of the PDF
Page 1 of 14 pages

Supporting Bilingual Education Created by Academia Cuauhtli Bilingual cultural revitalization program for fourth to fifth grade students attending AISD. Our Vision A future where children live with a thinking heart and the courage to pursue their aspirations within liberating and sacred learning spaces. Our Mission Honor our community’s cultural heritage Foster a social justice consciousness Reclaim our collective identities in pursuit of educational freedom. The Challenge Although bilingual students are amongst the highest student populations in Texas public schools, there is not enough culturally relevant curriculum and institutional support for both ELL students and bilingual teachers. Our Initiatives Throughout the years we have established various partnerships and initiatives within the community with key focuses on students, teachers, parents, and community members. Nuestro Grupo La Colaborativa STEM/Aztech Kidz Code Academia Cuauhtli Minimum Operational Costs (150K) Saturday Academy 22,000 Parent Support Program 16,000 Nepohualtzintzin 8,000 Increasing program capacity with additional staff for year- round programs. New STEM program enhancing cognitive learning skills through mayan mathematics. Full implementation of Parent Support Specialist and program - Fall 2024 Aztech Kidz Code 84,000 Saturday School (22K) A bilingual and cultural revitalization program offers instruction in Mexican American Studies and STEM curriculum for third to fifth grade students attending AISD. Staff (12K) Food (5K) Materials (1K) Field Trips (1K) Custodian (3K) Aztech Kidz Code (84K) A culturally sustaining STEM program for 2nd-6th to grade AISD students to learn coding, video game design, digital monetization, and Danza Mexica in both Spanish and English. Staff (64K) Field Trips (2K) Materials (7K) Custodial Staff (6K) Food (5K) Parent Support Specialist (16K) Our parent support program will give us an opportunity to connect with the families of our students, as they attend our Saturday academy. We will bring in community resources and guest speakers, while also learning how they would like to be involved. Parent Support Specialist (13.5K) Guest Speakers (2K) Materials ($500) Nepohualtzintzin (8K) Nepohualtzintzin - Mayan Abacus (8K): The Nepohualtzintzin is a mathematical device used in Mayan indigenous cultures to teach mathematics at an early age in a completely organic way. Program would be designed as a week-long camp with about 25 participants. Certified guest instructor (2.5K) Teachers (4K) Materials ($500) Food (1K) Educational Community Summit (10K) In collaboration with Austin ISD, our summit will bring together educators, families, and community members to display the impact of collaborative partnership to create transformative educational and cultural spaces. Performers + …

Scraped at: Feb. 7, 2024, 7:50 p.m.
Feb. 7, 2024

Item 6. Phase 2 Construction Project Updates original pdf

Thumbnail of the first page of the PDF
Page 1 of 7 pages

Emma S. Barrientos Mexican American Cultural Center Phase 2 Improvements Project Update February 7, 2024 Heidi Tse, Capital Delivery Project Manager CURRENT PROJECT PHASE: GMP1 (Guaranteed Maximum Price 1): Site Package GMP2 (Guaranteed Maximum Price 2): Building/Landscape Package • Construction (site) – is underway. • Permitting (building) – Round 2 revisions to Development Services Department were submitted 1/8/24. Return comments were received on 1/29/24 with comments to be addressed on fire & life safety. A technical consultation is being requested by the MACC project team ensure reviewers’ comments are addressed. • Bidding & Negotiation (GMP2) – initially anticipated contract execution in January but is delayed to February. CONSTRUCTION PROGRESS: • The site was successfully re-energized after a scheduled power shut down on 1/24/24 to demolished electrical circuiting of removed equipment at the Central Utility Plant. • A vital piece of an HVAC (heating, ventilating & air condition) equipment, a heat exchanger, manufactured specifically for the MACC was delivered and inspected. • Primary work has been focused on installing electrical infrastructure or an electrical duct bank, a collection of underground conduits to power the new building additions. Since the city inspector has verified the installation meets code requirements, the trenches have been backfilled or covered up with excavated material. Installation is underway of a carefully planned drainage outfall, as a part of a storm water management system at Lady Bird Lake. This outlet will serve as the primary point of discharge. • • Pallets of brick for the Central Utility Plant has been delivered. • January has been a very wet and icy month. Eleven (11) days were declared as bad weather days. Only eight (8) days were budgeted for January. This and previous months of bad weather has negatively impacted progress. ANNOUNCEMENTS: • Short term trail re-route for a portion of the south segment of the Ann and Roy Butler Hike and Bike Trail started on January 16, 2024, and will continue for approximately 12-weeks. Map link • Art in Public Places will be assembling a review panel as the next step after reviewing the twenty- • Red River Alley is targeted to be fully re-opened as early as mid-February but no later than March seven (27) artist responses. 10th. SCHEDULED MILESTONES: • Construction began – August 28, 2023 • Anticipated completion of all major construction activity – Summer 2025 • Anticipated grand opening – Fall 2025 Please note that …

Scraped at: Feb. 7, 2024, 7:50 p.m.
Feb. 7, 2024

Item 8. Presentation on Demographics and ESB-MACC Cultural Art Activities original pdf

Thumbnail of the first page of the PDF
Page 1 of 21 pages

February 7, 2024 Presentation To Mexican-American Cultural Center Advisory Board Board Advisory Planning for Mexican-American Culture Events and Activities I Intro – Role of Board – To Advise City Council in MACC Cultural Events & Activities Annual City budget process. (See item VI) II “Mexican-American” and “Culture” – Definitions A. Mexican-American – Definition. B. Culture – Definition. Cultural Arts – 1) Visual Arts; 2) Performing Arts; 3) Literary Arts. III Demographics – National, SxSWxNW (Old Mexico into U.S.), Texas, Austin/CenTex area National – 19.5% Hispanic. Most are Mexican-Americans in the southwest U.S. 1. 2. Texas – 40% Hispanic in 2020 – In 2022 Hispanics surpassed Whites: 40.2% to 39.8% 3. Austin Metro area (Round Rock to San Marcos) – 31.9% Hispanics 75.3% of the 31.9% Hispanics are of Mexican descent IV Major National or State Holidays or Historical Events A. National –Holidays - New Year’s Day, MLK, Washington, Memorial Day, Juneteenth, July 4th Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving, Christmas. Other National Observances – Ground Hog Day, Valentine’s Day, Mardi Gras, Ash Wednesday, St. Patrick’s Day, Easter, Cesar Chavez Day, Hispanic Heritage Month (Sept.),Chicano Heritage Month Aug., (Santa Ana & Anaheim, California), Native American Heritage Month/Day, Chanukah/Hanukkah, Kwanza, etc. Texas Holidays – Confederate Memorial Day, Texas Independence day, B. National Mexican-American Historical Events – Treaty of Guadalupe Hidalgo, Cinco de Mayo, Texas Rangers, Zoot Suit Incidents, Mendez v. Westminster – Desegregation Case, Felix Longoria - Burial Case, WWII, GI bill and American GI Forum, Delgado v Bastrop – Texas Desegregation, Cesar Chavez and grape/lettuce boycotts, Chicano Movement, School Walkouts, etc. C. Austin Mexican-American Historical Events – City Plan of 1928, Austin Aqua Festival “Mexican Nights”, Boat Races, Economy Furniture Strike, Austin schools desegregation, East Austin School Closures, first Mexican-American elected officials elected to office in Austin, at-large voting system, etc. V Major Local Mexican-American Cultural Events Same as holidays and observed days above. VI National, Regional, and Austin/Centex Mexican-American Performing Artists A. National Vocalists or Bands – First National music artist – Richie Valenz, 1959. “Donna”, #2, La Bamba, #22; First Mexican-American Group on National Charts and first with a #1 Song: The Champs/Flores Trio, 1958, “Tequila”, #1; First Mexican-American Woman on National Charts – Rosalie “Rosie” Mendez Hamlin, 1960, “Angel Baby”, #5; First Mexican-American Texan Male on National Charts and First #1 from Texas – Freddy Fender, 1960, “Before the Next Teardrop Falls”, #1, “Wasted Days …

Scraped at: Feb. 7, 2024, 7:50 p.m.
Feb. 7, 2024

Play audio original link

Play audio

Scraped at: Feb. 13, 2024, 8:50 p.m.
Feb. 7, 2024

Approved Minutes original pdf

Thumbnail of the first page of the PDF
Page 1 of 5 pages

EMMA S. BARRIENROS MEXICAN AMERICAN CULTURAL CENTER REGULAR MEETING MINUTES WEDNESDAY, FEBRUARY 7, 2024 The Emma S. Barrientos Mexican American Cultural Center convened in a Regular meeting on Wednesday, February 7, 2024, at City Hall – Board and Commissions Room located at 301 West Second Street in Austin, Texas 78701. (Some members of the ESB-MACC Advisory Board participated via videoconference.) Chair Navarro called the Emma S. Barrientos Mexican American Cultural Center Meeting to order at 6:00pm. Board Members in Attendance: Angelica Navarro, Chair Hilario “Larry” Amaro, Vice Chair Noemi Castro, Member Cynthia “Cy” Herrera, Member (Arrived at 6:09/Left at 8:10pm) Raul “Roy” Reyna, Member Lily Zamarripa-Saenz, Member Board Members in Attendance Remotely: John Estrada, Member (Left at 9:40pm) Board Members Absent: Gerardo Gandy, Member Anthony Martinez, Member Eduardo “Eddie” Rodriguez, Member Staff in Attendance: Jodi Jay, PARD Assistant Director Laura Esparza, PARD Division Manager of Museums and Cultural Programs Michelle Rojas, ESB-MACC Culture and Arts Education Manager Marie Ortiz, ESB-MACC Culture and Arts Education Supervisor Tina Davila, ESB-MACC Administrative Specialist PUBLIC COMMUNICATION: GENERAL None. APPROVAL OF MINUTES 1. The minutes from the Regular meeting of January 10, 2024, were approved on Member Zamarripa- Saenz’s motion. Vice Chair Amaro seconded the motion. Unanimous vote (6.0). Motion passed. Members Gandy, Herrera, Martinez, and Rodriguez were absent. STAFF BRIEFINGS 2. Staff Report by Marie Ortiz, ESB-MACC Culture and Arts Education Supervisor and Michelle Rojas, ESB-MACC Culture and Arts Education Manager on January and February programs, 1 marketing, scope of outreach efforts by ESB-MACC staff, La Mujer and Awards of Excellence planning report, and opportunities for Board participation at ESB-MACC programs for the month of February. Marie Ortiz, ESB-MACC Culture and Arts Education Supervisor gave a report on the Holistic Wellness programs, Education, Caminos Teen Leadership, and Academia Cuauhtli programming, sharing highlights for the month of January along with upcoming programs & events for the month of February. She also provided an update of current and upcoming marketing and outreach events and informed the Board they were currently in the process of securing a venue location for their annual La Mujer event. She also mentioned the Awards of Excellence event would take place June 29, 2024, at the Long Center and the MACC’s Event Coordinator, Estrella DeLeon would offer ways for the Advisory Board to assist with the event, such as securing donations, sponsorships, helping with event planning and having a role in the …

Scraped at: March 18, 2024, 5:50 p.m.
Jan. 10, 2024

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

REGULAR MEETING of the EMMA S. BARRIENTOS MEXICAN AMERICAN CULTURAL CENTER ADVISORY BOARD Wednesday, January 10, 2024, 6:00 PM Permitting and Development Center – Event Center, First Floor, Room 1406 6310 Wilhelmina Delco Dr., Austin, TX 78752 Some members of the Emma S. Barrientos Mexican American Cultural Center Advisory Board may be participating by videoconference. Public comment will be allowed in-person or remotely by telephone. Speakers may only register to speak on an item once either in-person or remotely and will be allowed up to three minutes to provide their comments. To speak in person, registration is required at least 10 min prior to the start of the meeting. Registration no later than noon the day before the meeting is required for remote participation. To register call or email the board liaison at 512-974-3771 or michelle.rojas@austintexas.gov BOARD MEMBERS Angelica Navarro, Chair Hilario “Larry” Amaro, Vice Chair Noemi Castro, Member Anthony Martinez, Member Raul “Roy” Reyna, Member John Estrada, Member Gerardo Gandy, Member Eduardo “Eddie” Rodriguez, Member Cynthia “Cy” Herrera, Member Lillian “Lily” Zamarripa-Saenz, Member AGENDA CALL TO ORDER PUBLIC COMMUNICATION: GENERAL The first 10 speakers signed up prior to the meeting being called to order will each be allowed a (3) three-minute allotment to address their concerns regarding items not posted on the agenda. APPROVAL OF MINUTES 1. Approve the minutes of the Emma S. Barrientos Mexican American Cultural Center Regular Meeting of December 6, 2023. 2. Staff Report on ESB-MACC programs during December and upcoming programs in STAFF BRIEFINGS January. DISCUSSION AND ACTION ITEMS 3. Presentation by Heidi Tse on the Phase 2 project, followed by discussion and possible action. Navarro, Amaro 4. Presentation, discussion, and possible action on the Music Creative Hubs. Estrada, Zamarripa-Saenz 5. Presentation, discussion, and possible action on the process for renaming 64 Rainey parkland. Navarro, Estrada 6. Discussion and possible action to create a 64 Rainey Working Group and its scope of work. Zamarripa-Saenz, Navarro 7. Presentation by Vice Chair Larry Amaro on demographics to discuss the possible action of creating multiple working groups for ESB-MACC Cultural Arts Activities. Amaro, Reyna WORKING GROUP UPDATES 8. Update from Phase 2 Project Working Group 9. Update from Budget Working Group 10. Update from Ethnographic Working Group FUTURE AGENDA ITEMS ADJOURNMENT The City of Austin is committed to compliance with the American with Disabilities Act. Reasonable modifications and equal access to communications will be provided upon request. …

Scraped at: Jan. 13, 2024, 10:50 a.m.
Jan. 10, 2024

Item 1. Approval of Minutes original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

EMMA S. BARRIENROS MEXICAN AMERICAN CULTURAL CENTER REGULAR MEETING MINUTES WEDNESDAY, DECEMBER 6, 2023 The Emma S. Barrientos Mexican American Cultural Center convened in a Regular meeting on Wednesday, December 6, 2023, at City Hall – Board and Commissions Room located at 301 West Second Street in Austin, Texas 78701. (Some members of the ESB-MACC Advisory Board participated via videoconference.) Chair Navarro called the Emma S. Barrientos Mexican American Cultural Center Meeting to order at 6:05pm. Board Members in Attendance: Board Members Absent: Angelica Navarro, Chair Gerardo Gandy, Member Hilario “Larry” Amaro, Vice Chair Eduardo “Eddie” Rodriguez, Member Noemi Castro, Member John Estrada, Member Cynthia “Cy” Herrera, Member (Left at 7:15pm) Anthony Martinez, Member Raul “Roy” Reyna, Member Lily Zamarripa-Saenz, Member Staff in Attendance: Laura Esparza, PARD Division Manager of Museums and Cultural Programs Michelle Rojas, ESB-MACC Culture and Arts Education Manager Marie Ortiz, ESB-MACC Culture and Arts Education Supervisor Tina Davila, ESB-MACC Administrative Specialist PUBLIC COMMUNICATION: GENERAL Dr. Angelica Valenzuela, Professor at The University of Texas at Austin announced that she was the organizer of activities for Academia Cuauhtli. She expressed her excitement of support from the community, Laura Esparza, Parks and Recreation Department Museums and Cultural Programs Manager, Katya Guzman, ESB-MACC Academia Cuauhtli Coordinator, ESB-MACC Staff, and the City of Austin. She mentioned she was open to their advice on improvements and how to expand their partnership where they can provide community initiatives and cultural relevant enriching education that nurtures not just the Spanish language but a love of it and everything Latinx. APPROVAL OF MINUTES 1. The minutes from the Regular meeting of November 1, 2023, were approved on Member Zamarripa- Saenz’s motion. Member Martinez seconded the motion. Unanimous vote (8.0). Motion passed. Members Gandy and Rodriguez were absent. STAFF BRIEFINGS 1 2. Staff Report on ESB-MACC programs during November and upcoming programs in December. Olivia Tamzarian, ESB-MACC Culture and Arts Education Marketing & Outreach Representative gave a report on the Holistic Wellness programs, Education, Caminos Teen Leadership, and Academia Cuauhtli programming, sharing highlights for the month of November along with upcoming programs & events for the month of December. She also provided an update of current and upcoming marketing and outreach events. (Please see the Board and Commissions Website for backup material.) Katya Guzman, ESB-MACC Culture and Arts Education Coordinator for Academia Cuauhtli provided a presentation on the vision and mission of the program. Guzman discussed …

Scraped at: Jan. 13, 2024, 10:50 a.m.
Jan. 10, 2024

Item 2. Staff Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 7 pages

MACC Staff Report – 1/10/24 Website - Facebook - Instagram Please share our social media posts, sign up for our newsletter, and check out our upcoming events! Happy New Year from the MACC Staff! Thanks to everyone who attended our events, shared information about the MACC, gave their feedback in meetings, collaborated, and followed us to new locations in 2023. Holistic Wellness Programming Yoga for All Levels: Saturday, December 9 @ 10:30am (Attendance: 7) George Morales Dove Springs Recreation Center Body, mind and soul will align as we move with intention through gentle movement guided by breath. We will incorporate meditation to regulate the nervous system. Gentle Flow Yoga (8+): Saturday, December 2 @ 10:30am (Attendance: 2) Windsor Park Library – 1st class at this location Voice/Guitar/Songwriting Lessons Intermediate (15+): Mondays, Dec 4 & 11 @ 4-5pm (Attendance: 11) Windsor Park Library Join award winning song-writer Javier Jara for voice, guitar and songwriting lessons. Skills addressed: left and right hand technique, chords, arpeggios, strumming patterns, vocal technique, and songwriting approaches. Guitar Lessons (15+): Beginner: 2-2:30pm (Attendance: 8). Intermediate: 2:45-3:15pm (Attendance: 5). Tuesdays, Dec 5 & 12 @ Twin Oaks Library Join accomplished musician Mauricio Callejas for guitar lessons for beginners (finger placement, strumming, sight- reading) & intermediate (chord progressions, ear training, reading sheet music) students. Please bring your own guitar. First Annual Tamalada: Saturday, December 2 @ 1:30-5pm (Attendance: 88) Conley-Guerrero Recreation Center On Saturday, December 2, the ESB MACC hosted a “Tamalada”, a tamale making event at the Austin Central Library. The event included cooking demonstrations, tastings, recipe sharing, and corn husk doll making. There were sessions at 1:30 and 3:00pm, with 51 at the first session and 40 participants in the second session. All attendees enjoyed learning about this Mexican tradition of coming together to make tamales during the holiday season. Taller Abierto: Painting/Drawing Workshop (15+): December 7th @ 10-11:30am (Attendance: 11) George Morales Dove Springs Recreation Center Art classes for all levels led by art instructor Miguel Santana. Includes both art history and exploration of different techniques. All materials provided! Nature Hike: Sunday, December 10 @ 9am (Attendance: 12 ) Sunset Valley Community Garden A beginner friendly hike led by Latino Outdoors. Please dress comfortably and appropriately for the weather and bring a water bottle. Pre-registration required by Thursday, December 7. Drumming Lessons: 2nd Saturday of each month @ 3pm (Attendance: 8), Windsor Park Library 2nd Sunday …

Scraped at: Jan. 13, 2024, 10:50 a.m.
Jan. 10, 2024

Item 3. Phase 2 Project Updates original pdf

Thumbnail of the first page of the PDF
Page 1 of 5 pages

Emma S. Barrientos Mexican American Cultural Center Phase 2 Improvements Project Update January 10, 2024 CURRENT PROJECT PHASE: contract execution in Jan 2024 CONSTRUCTION PROGRESS: • Construction (site) – underway • Permitting (building) – resubmission 1/5/24 of round 2 revisions per Development Services Dept • Bidding & Negotiation (Guaranty Maximum Price for Building Package, aka GMP2) – anticipated • Construction of a fully enclosed building at the central utility plant has steel beams and decking for a new roof. place. • Four trees in the Zocalo were successfully transplanted with a temporary irrigation system in • Short term trail re-route (12 weeks) for a portion of the south segment of the Ann and Roy Butler hike-and-bike trail running parallel to existing trail has been installed with fencing and crushed rock base. This is due to the installation of the piping from the biofiltration ponds (large rain gardens) to the shoreline to control storm water. The pipe runs below the Hike & Bike Trail. A map is provided on the project website. Austin Parks & Rec has posted this map on their social media to help spread the word. • Brick grout mock-up or a small temporary installation of the brick with mortar for the central utility yard building was approved. • Austin Energy (AE) Chilled Water District Cooling Network Connection project will be back-filling or covering up the pipes in the 12’ deep trench with excavated dirt in the parking lot. ANNOUNCEMENTS: • The Art in Public Places Call for Artist(s) for the MACC AIPP Phase 2 Improvement project is now closed as of 12/19/23. SCHEDULED MILESTONES:  Construction began – August 28, 2023  Anticipated completion of all major construction activity – Summer 2025  Anticipated grand opening – Fall 2025 Please note that as in any construction project, schedules are projected as accurately as possible, but all dates are subject to change due to the nature of construction and weather. TOUR: • The City would like to invite members of the Board to an escorted tour of the site with the team to witness the exciting progress at hand. Safety is paramount so personal protective equipment (hard hat, safety vest, closed toe shoes, etc) must be worn. For information on MACC programs and staff relocations during construction, visit the MACC webpage: www.austintexas.gov/department/emma-s-barrientos-mexican-american-cultural-center. For project updates, visit the project website: www.austintexas.gov/MaccPhase2 Project Manager: Heidi Tse 512.974.7172 Heidi.Tse@austintexas.gov Central Utility …

Scraped at: Jan. 13, 2024, 10:50 a.m.