02.0 - 1010 E Cesar Chavez St Briefing - Presentation — original pdf
Backup
URTH CAFFÈ HLC BRIEFING June 03, 2026 PRojECT ConSidERATionS FoR REviEw: 1. SPE UPdATE REqUiREd FoR ConSTRUCTion To RESTART. Documentation of existing conditions as they stand on the site with partial structure had to be shown on updated SPE. Building permit could not be approved without SPE approval within city of Austin permitting system. • Design team submitted SPE and building permit for the main restaurant concurrently to cut down on exposure time of the remaining structure to stand in the elements. 2. BUilding PERmiT RE-SUBmiSSion FoR mAin RESTAURAnT And BAkERy BUilding REqUiREd FoR ConSTRUCTion To RESTART. Documentation of existing conditions had to be updated within the building permit illustrating historic facade that remains, and demolition of back wall within the restaurant permit. Bakery building drawings had to indicate all demolished areas and what the wall construction would comprise of for the reconstruction. • Design team met with HLC to present briefing on demolition • Design team coordinated with HLC via email correspondence to confirm process for updating and reviewing drawings. • Design team met with Architectural Review Committee to review proposed design including preservation of historic facade and reconstruction of back portion of building. CiTy oF AUSTin CommUniCATion SEPTEMBER 11, 2024 — ARC REVIEW COMMITTEE MEETING NOVEMBER 11, 2024 — ARC REVIEW COMMITTEE MEETING DECEMBER 4, 2024 — HISTORIC LANDMARK COMMISSION MEETING AND APPROVAL APRIL 28, 2025 — INITIAL PERMIT SUBMISSION JUNE 2, 2025 — RESUBMISSION 1 JULY 24, 2025 — RESUBMISSION 2 NOVEMBER 20, 2025 — RESUBMISSION 3 DECEMBER 13, 2025 — PERMIT APPROVAL MARCH 2, 2026 — SELECTIVE DEMOLITION START DATE MARCH 10, 2026 — STOP WORK ORDER ISSUED mARCH 25, 2026 -- 1010 E CESAR CHAvEZ BUilding PERmiT SUBmiTTEd To CoA APRIL 1, 2026 -- HLC BRIEFING (Briefing related to on site conditions) APRil 7, 2026 -- SPE UPdATE SUBmiTTEd To CoA FoR APPRovAl • Design team met with permitting building reviewer and building official to discuss APRIL 8, 2026 -- ARCHITECTURAL REVIEW COMMITTEE MTG resubmission drawing requirements and code requirements • Design team prepared and updated drawings for permitting resubmission 3. HiSToRiC FACAdE mAinTAinS THE oRiginAl SUPPoRTS And BRACing PRovidEd By THE gC FoR PRoTECTion FRom THE ElEmEnTS. no CURREnT woRk iS AFFECTing HiSToRiC FACAdE To dATE. APRIL 20, 2026 -- 1010 E CESAR CHAVEZ MCR COMMENTS RECEIVED (18 DAY TOTAL REVIEW @ COA) mAy 5, 2026 -- SPE APPRovEd By CoA (21 DAY TOTAL REVIEW @ COA) mAy 7, 2026 -- 1010 E CESAR CHAvEZ BUilding PERmiT RESUBmiSSion (REviEw iS ongoing) mAy 8, 2026 -- 104 mEdinA ST. BUilding PERmiT SUBmiTTEd To CoA mAy 21, 2026 -- 104 mEdinA ST BUilding PERmiT APPRovEd MAY 27, 2026 -- SITE MOBILIZATION RESUMED (suRVEY COnTROL pOInTs & InITIAL fOunDATIOn LAY- OuT ARE COmpLETE) JUNE 1, 2026 -- EqUIPMENT SCHEDULED FOR DELIVERY JUNE 2, 2026 -- FOUNDATION ExCAVATION SCHEDULED TO BEGIN 2 URTH CAFFÈ HLC Briefing-June 3, 2026