04.2 - 900 Chicon St - Scope of Work — original pdf
Backup

HUSTON-TILLOTSON UNIVERSITY AUSTIN, TEXAS Project Applicant Applicant Site Address: 900 Chicon Street, Austin, TX, 78702 email address: Name: Huston-Til cgallion@htu.edu lotson University Old Administration The Historic symbolizing a vital generations, aesthetic piece of this project proposes our shared heritage. targeted authenticity. and historical restoration, Building holds significant cultural and architectural value, To ensure its continued measures for future preservation that address structural restorative integrity, This project of the basement moisture supports the removal floor will undergo and replacement membrane of the basement wall membrane. the structure from continued The outer walls intrusion, ensuring long-term stability replacement to protect and preservation. Phase 1 Remove and Replace Excavate the soil around the basement foundation Slope soil away from the foundation existing membrane Outer Membrane (6 feet) around perimeter-providing enough working to ensure proper drainage space. during and after the work. Remove to expose the outer walls. The excavation down to the Phase 2 Clean and Inspect Walls Clean the walls thoroughly, or manual scrub cleaning with synthetic brush cleaner-water rinse after Inspect the walls for cracks, holes, membrane. debris, or old coating. to ensure a smooth surface. will be repaired All defects or damage. applying removing any dirt, before the Power wash-100 PSI or below Dawn will be used as a Phase 3. Repair Cracks Prime Fill cracks Seal all joints enters or holes in the basement where the foundation through seams or imperfections. and Seal Joints walls using flexible Foundation Sealant meets the wall with a flexible This ensures sealant. that no water Phase 4. Apply Bonding Primer and then Sealant (allow to dry) Apply primer to help liquid adhere to walls. membrane Apply Sealant Phase 5. Install the Waterproof Membrane- liquid and sheet Phase 6. Install Drainage Layer and Protection Phase 7. Backfill After the membrane and drainage system are installed, with Proper Soil backfill area the excavated Additional Needed Gutters Phase 8. Install Supplies and Equipment: Excavation Cleaning Foundation Sealant Power Washer-100 PSI or below equipment debris supplies (Dawn, synthetic brushes, towels) /concrete sealant-flexible sheet-waterproof Membrane Soil Rotten wood replacement Earth compactor Drainage-backflow prevention Damaged gutter replacement 350 ft Double wall culvert Dumpster *All work and materials will meet the Secretar y of Interiors standards.