17.1 - 1508 Westover Rd - Drawings — original pdf
Backup
1508 WESTOVER RD M= N= O= P= Q= R= S= MAS MATL MAX MECH MED CAB MTL MFR MIN MIR MISC MO MTD MTL MW N NAP ND NIC NV OC OD OE OFF OPG OPP OVHD PC PL PLAS PLAM PLMG PLYWD PN PNLG PNT POLY PP PROP PTD PT PT PVC QT QTR QTZ R RD RE: REF REINF REQD REV RFD RM RO RSR RUB S SAN SB SC SCL SCH SD SEC SF SHLVS SECT SHT SHTG SIM SP SPEC S/S SS SSK STC STD STF STL STRUCT SUSP SWR TB TBD TD TELE THOLD TLT TKBD TPH TR TSTAT TYP UL UNO VB VCT VERT VEST VWC T= U= V= W= W W/ MASONRY MATERIAL MAXIMUM MECHANICAL MEDICINE CABINET METAL MANUFACTURER MINIMUM OR MINUTE MIRROR MISCELLANEOUS MASONRY OPENING MOUNTED METAL MIRCOWAVE OVEN NORTH NAPKIN NAPKIN DISPENSOR NOT IN CONTRACT NAPKIN VENDOR ON CENTER OUTSIDE DIAMETER OVERHEAD ELECTRIC OFFICE OPENING OPPOSITE OVERHEAD PIECE PLATE PLASTIC PLASTIC LAMINATE PLUMBING PLYWOOD PANEL PANELING PAINT POLYETHYLENE POWER POLE PROPANE PAINTED POINT PRESSURE TREATED POLYVINYL CHLORIDE QUARRY TILE QUARTER QUARTZ RADIUS, RISER ROAD, ROADWAY REFER REFRIGERATOR REINFORCEMENT REQUIRED REVERSE ROOF DRAIN ROOM ROUGH OPENING RISER RUBBER SOUTH SANITARY SPLASH BLOCK SOLID CORE SCALE SCHEDULE SOAP DISPENSER SECOND SQUARE FOOT SHELVES SECTION SHEET SHEATHING SIMILAR SPACE SPECIFICATION STAINLESS STEEL SANITARY SEWER SERVICE SINK SOUND TRANSMISSION COEFFICIENT STANDARD STUD-TO-FINISH (DIM) STEEL STRUCTURAL SUSPENDED SEWER TOWEL BAR TO BE DETERMINED TOWEL DISPENSER TELEPHONE THRESHOLD TOILET TACKBOARD TOILET PAPER HOLDER TOWEL RECEPTACLE THERMOSTAT TYPICAL UNDERWRITERS LABORATORIES INC. UNLESS NOTED OTHERWISE VINYL BASE VINYL COMPOSITION TILE VERTICAL VESTIBULE VINYL WALL COVERING WEST WITH #= A= B= C= D= E= F= G= H= 1R/1S 2R/2S ABV A/C ACC ACOUST ACT ADDL AFF AHU ALUM APPROX ARCH ASPH BD B.L. BLDG BLK BLKG BLW BM BR BRG BTM CAB CANT CJ CL CLG CLOS CLR CMU CO COL COND CONDT CONC CONT CONTR COV CPT CT CTR DF DIA DIM DISP DN DR DS DTL DWG DW E EA EJ ELEC ELEV ENAM ENVIR EQ EQUIP ESU EW EWC EXH EXIST EXP EXT F2F FAR FD FDN FE FEC FF FIN FIXT FLEX FLR FLUOR FR FTF FTG FURR GA GAL GALV GC GEN GL GWB GYP H HB HC HD HDW HM HORIZ HOL HR HT HTR HVAC I= J= K= L= ID INT INSUL J KS LF LIN ONE ROD, ONE SHELF TWO RODS, TWO SHELVES ABOVE AIR CONDITIONER ACCESSIBLE ACOUSTICAL ACOUSTICAL TILE ADDITIONAL ABOVE FINISH FLOOR AIR HANDLING UNIT ALUMINUM APPROXIMATE ARCHITECT. ARCHITECTURAL ASPHALT BOARD BUILDING LINE BUILDING BLOCK BLOCKING BELOW BEAM BRICK BEARING BOTTOM CABINET CANTILEVER CONTROL JOINT CENTER LINE CEILING CLOSET CLEAR CONCRETE MASONRY UNIT CASED OPENING COLUMN CONDENSOR CONDUIT CONCRETE CONTINUOUS CONTRACT, CONTRACTOR COVER, COVERING CARPET CERAMIC TILE COUNTER TOP DRINKING FOUNTAIN DIAMETER DIMENSION DISPENSOR DOWN DOOR, DRIVE DOWNSPOUT DETAIL DRAWING DISHWASHER EAST EACH EXPANSION JOINT ELECTRICAL ELEVATION ENAMEL ENVIRONMENT EQUAL EQUIPMENT ELECTRIC STUB-UP EACH WAY ELEC WATER COOLER EXHAUST FAN EXISTING EXPANSION EXTERIOR FLOOR-TO-FLOOR FLOOR-TO-AREA RATIO FLOOR DRAIN FOUNDATION FIRE EXTINGUISHER FIRE EXTINGUISHER CABINET FINISH FLOOR FINISH FIXTURE FLEXIBLE FLOOR FLUORESCENT FIRE RETARDANT FINISH-TO-FINISH (DIM) FOOTING FURRING GAUGE GALLON GALVANIZED GENERAL CONTRACTOR GENERAL GLASS, GLAZING GYPSUM WALL BOARD GYPSUM HIGH HOSE BIBB HOLLOW CORE HEAD HARDWARE HOLLOW METAL HORIZONTAL HOLLOW HOUR HEIGHT HEATER HEATING, VENTILATION, AIR CONDITIONING INSIDE DIAMETER INTERIOR INSULATE, INSULATION (RESERVED) KNEE SPACE LINEAR FEET LINEN INDEX TO 34X22 ARCHITECTURAL SHEETS: INDEX TO 34X22 ARCHITECTURAL SHEETS: A001 - COVER SHEET A101 - SITE AND ROOF PLAN A102 - FLOOR PLANS A103 - POWER/LIGHTING PLANS (RESERVED) A201 - EXTERIOR ELEVATIONS A301 - SECTIONS A501 - DETAILS (RESERVED) A601 - SCHEDULES S1-1 - STRUCTURAL GENERAL NOTES & SPECIFICATIONS S2-1 - FOUNDATION PLAN S2-2 - FOUNDATION SECTIONS & DETAILS S3-1 - 1ST FLOOR CEILING FRAMING PLAN S3-2 - 2ND FLOOR CEILING FRAMING PLAN S3-3 - ROOF FRAMING PLAN S4-1 - 1ST FLOOR BRACED WALL PLAN S4-2 - 2ND FLOOR BRACED WALL PLAN S5-1 - FRAMING SECTIONS & DETAILS BID DOC. DATE CONTRACT DOC. DATE CONTRACT DOC. DATE EDITION DATES EDITION DATES 09 AUG 24 18 AUG 24 21 AUG 24 11 SEP 24 13 SEP 24 WORK PHASES PRE SD DD CD BID BID CA PROJECT NUMBER PROJECT NUMBER CODE NAME CODE NAME 1508 WESTOVER RD INCLUSIVE SHEET INCLUSIVE SHEET NOS.THIS SECTION NOS.THIS SECTION SEQUENCE SEQUENCE NUMBER NUMBER TO TO OF OF 7 c c 2023 ACCESSORY DWELLINGS UNLIMITED LLC ALL RIGHTS RESERVED. ADU 10' REAR YARD 26'-8" 5'-2" " 2 - ' 0 1 " 8 - ' 0 1 " 4 - ' 1 2 EXISTING POOL 12:12 12:12 10:12 9:12 9:12 NEW 2-STORY ADU D R A Y E D S I ' 5 K C A B T E S 10'-0" 13'-4" 3'-4" 3" 3'-0" " 0 " 12 2 - ' 0 1 " 0 - ' 4 6 6 1 " 8 - ' 4 1 " 2 - ' 3 4 8 ' - 4 " D R A Y E D S I ' 5 K C A B T E S VISITIBILITY PATH 11'-4" " 0 - ' 5 3'-0" 2'-6" 2'-6" EXISTING RESIDENCE- NO WORK EXISTING PORCH AND PAVERS 15' FRONT SETBACK W W W W W W EXIST APRON REMAINS BID DOC. DATE CONTRACT DOC. DATE CONTRACT DOC. DATE EDITION DATES EDITION DATES 09 AUG 24 18 AUG 24 21 AUG 24 11 SEP 24 13 SEP 24 WORK PHASES PRE SD DD CD BID BID CA PROJECT NUMBER PROJECT NUMBER CODE NAME CODE NAME 1508 WESTOVER RD INCLUSIVE SHEET INCLUSIVE SHEET NOS.THIS SECTION NOS.THIS SECTION SEQUENCE SEQUENCE NUMBER NUMBER TO TO OF OF 7 (1/8" = 1'-0") 0' 4' 8' 16' (1" =30') (1/8" = 1'-0") 0' 15' 30' 60' 0' 4' 8' 16' WESTOVER ROAD 2023 ACCESSORY DWELLINGS UNLIMITED LLC ALL RIGHTS RESERVED. c c ADU 2 A301 2 A301 BEDROOM 203 E E 203 202 W/D KITCHEN 9'-4" 202 201 26'-8" 205 LIN " 4 - ' 5 S 1 / R 1 204 " 8 - ' 4 REF " 0 - ' 3 " 0 - ' 3 " 0 - ' 3 BATH 204 PRODUCTS MODELNUMBER MATERIAL TRADENAME D 1 A301 C C C 3'-0" 5'-8" LIVING 201 B B B " 0 - ' 5 " 0 - ' 9 " 0 1 - ' 1 " 0 - ' 4 1 " 8 - ' 8 2 " 8 - ' 4 1 " 0 1 - ' 2 1 " 4 - ' 7 D " 4 - ' 1 2 " 8 - ' 4 " 2 - ' 9 " 8 - ' 4 " 0 1 - ' 2 " 0 - ' 2 1 5 " 0 - ' 2 3 " 4 - ' 1 2 " 4 - ' 5 " 0 1 - ' 1 " 8 - ' 6 " 4 - ' 5 " 2 - ' 2 26'-8" STORAGE 104 7'-2" 9'-6" 2R/2S 104 POWDER 103 102 PRODUCTS MODELNUMBER MATERIAL TRADENAME " 8 - ' 6 105 S 1 / R 1 CLOSET 103 S 1 / R 1 VISITIBILITY PATH 106 A A 1 A301 102 BEDROOM 101 " 6 - ' 8 " 0 1 - ' 8 " 0 - ' 2 " 8 - ' 2 " 0 - ' 0 1 " 4 - ' 7 1 " 8 - ' 4 1 " 0 - ' 2 3 . A E X A M . " 5 7 7 @ S R E S R 3 1 P U I LOW WALL P Y T " 0 1 UP 3 RISERS @ 7.75" MAX EA. NEW 2X4 WALL NEW 2X6 WALL A 101 4'-11" 5'-1" 320'-0" 6'-8" 480'-0" 13'-4" 3'-4" 26'-8" 10'-0" 13'-4" 3'-4" 6'-8" 11" TYP 6'-8" 26'-8" (1/4" = 1'-0") 0' 2' 4' 8' (1/4" = 1'-0") 0' 2' 4' 8' BID DOC. DATE CONTRACT DOC. DATE CONTRACT DOC. DATE EDITION DATES EDITION DATES 09 AUG 24 18 AUG 24 21 AUG 24 11 SEP 24 13 SEP 24 WORK PHASES PRE SD DD CD BID BID CA PROJECT NUMBER PROJECT NUMBER CODE NAME CODE NAME 1508 WESTOVER RD INCLUSIVE SHEET INCLUSIVE SHEET NOS.THIS SECTION NOS.THIS SECTION SEQUENCE SEQUENCE NUMBER NUMBER TO TO OF OF 7 c c 2023 ACCESSORY DWELLINGS UNLIMITED LLC ALL RIGHTS RESERVED. ADU 2 A301 2 A301 BATH 204 PRODUCTS MODELNUMBER MATERIAL TRADENAME 1 A301 BEDROOM 203 CO SD KITCHEN 202 CO SD LIVING 201 SYMBOL LEGEND 110V DUPLEX OUTLET WP GFCI OUTLET 220V OUTLET FLOOR OUTLET LIGHTING SWITCH 3-WAY LIGHTING SWITCH 4-WAY LIGHTING SWITCH DIMMER LIGHTING SWITCH GARBAGE DISPOSAL SWITCH PHONE/CABLE/INTERNET SD SMOKE DETECTOR T P W S 3 S 4 S D S I P S D S TOP HALF OF OUTLET SWITCHED CEILING-MOUNTED LIGHT A/C RETURN-AIR VENT 110V DUPLEX GFCI OUTLET WALL-MOUNTED LIGHT GAS CONNECTION RECESSED LIGHT A/C SUPPLY REGISTER UNDER-CABINET FIXTURE HOSE BIB TRACK LIGHTS DB DOORBELL CEILING FAN WITH LIGHT KIT CEILING FAN W/O LIGHT KIT EXHAUST FAN FAN/LIGHT FAN/HEATER FAN/HEATER/LIGHT CO CARBON MONOXIDE DETECTOR T THERMOSTAT STORAGE 104 POWDER 102 PRODUCTS MODELNUMBER MATERIAL TRADENAME CLOSET 103 1 A301 BEDROOM 101 CO SD (1/4" = 1'-0") 0' 2' 4' 8' (1/4" = 1'-0") 0' 2' 4' 8' BID DOC. DATE CONTRACT DOC. DATE CONTRACT DOC. DATE EDITION DATES EDITION DATES 09 AUG 24 18 AUG 24 21 AUG 24 11 SEP 24 13 SEP 24 WORK PHASES PRE SD DD CD BID BID CA PROJECT NUMBER PROJECT NUMBER CODE NAME CODE NAME 1508 WESTOVER RD INCLUSIVE SHEET INCLUSIVE SHEET NOS.THIS SECTION NOS.THIS SECTION SEQUENCE SEQUENCE NUMBER NUMBER TO TO OF OF 7 c c 2023 ACCESSORY DWELLINGS UNLIMITED LLC ALL RIGHTS RESERVED. ADU D C C C A A 103 102 NOTE: ELEVATION HEIGHTS SHOWN ARE APPROXIMATE PL - 119'0"' HDR - 118'0"' FF - 110'0"' PL - 109'0" HDR - 108'0" FF - 100'0"' HDR - 118'0"' PL - 113'4"' FF - 110'0"' PL - 109'0" HDR - 108'0" FF - 100'0"' E E D B B B 201 A METAL ROOFING TO MATCH EXISTING RES NEW WOOD SHUTTERS TO MATCH EXISTING RES STUCCO TO MATCH EXISTING RES DIVIDED LITE WINDOWS ON STREET-FACING WINDOWS (THAT ARE VISIBLE) 104 101 PL - 113'4"' FF - 110'0"' PL - 109'0" FF - 100'0"' PL - 119'0"' HDR - 118'0"' FF - 110'0"' PL - 109'0" HDR - 108'0" FF - 100'0"' BID DOC. DATE CONTRACT DOC. DATE CONTRACT DOC. DATE EDITION DATES EDITION DATES 09 AUG 24 18 AUG 24 21 AUG 24 11 SEP 24 13 SEP 24 WORK PHASES PRE SD DD CD BID BID CA PROJECT NUMBER PROJECT NUMBER CODE NAME CODE NAME 1508 WESTOVER RD INCLUSIVE SHEET INCLUSIVE SHEET NOS.THIS SECTION NOS.THIS SECTION SEQUENCE SEQUENCE NUMBER NUMBER TO TO OF OF 7 (1/4" = 1'-0") 0' 2' 4' 8' c c 2023 ACCESSORY DWELLINGS UNLIMITED LLC ALL RIGHTS RESERVED. ADU 104 103 105 106 BID DOC. DATE CONTRACT DOC. DATE CONTRACT DOC. DATE EDITION DATES EDITION DATES 09 AUG 24 18 AUG 24 21 AUG 24 11 SEP 24 13 SEP 24 WORK PHASES PRE SD DD CD BID BID CA PROJECT NUMBER PROJECT NUMBER CODE NAME CODE NAME 1508 WESTOVER RD INCLUSIVE SHEET INCLUSIVE SHEET NOS.THIS SECTION NOS.THIS SECTION SEQUENCE SEQUENCE NUMBER NUMBER TO TO OF OF 7 c c 2023 ACCESSORY DWELLINGS UNLIMITED LLC ALL RIGHTS RESERVED. ADU BID DOC. DATE CONTRACT DOC. DATE CONTRACT DOC. DATE EDITION DATES EDITION DATES 09 AUG 24 18 AUG 24 21 AUG 24 11 SEP 24 13 SEP 24 WORK PHASES PRE SD DD CD BID BID CA PROJECT NUMBER PROJECT NUMBER CODE NAME CODE NAME 1508 WESTOVER RD INCLUSIVE SHEET INCLUSIVE SHEET NOS.THIS SECTION NOS.THIS SECTION SEQUENCE SEQUENCE NUMBER NUMBER TO TO OF OF 7 c c 2023 ACCESSORY DWELLINGS UNLIMITED LLC ALL RIGHTS RESERVED. ADU