Historic Landmark CommissionJune 5, 2024

21.5 - 3001 S Congress Ave - StJosephHall_HLCMeeting_060324 — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 14 pages

St. Joseph Hall, St. Edward’s University Austin, Texas NORTH Project: Location: Phase: Date: St. Joseph Hall 3001 S. Congress Ave. Demolition Permit June 5, 2024 St. Joseph Hall, St. Edward’s University Austin, Texas Historic Designations on Campus • Carriage House: NR • Holy Cross Hall: CoA and NR • Main Building: CoA, RTHL, NR National Register Boundary (one listing, multiple buildings) NORTH Project: Location: Phase: Date: St. Joseph Hall 3001 S. Congress Ave. Demolition Permit June 5, 2024 • Constructed: 1962 • Architect: Julian & White Architects • Description: Two story, two wing structure. Brick masonry & breeze block walls. 65 private rooms, lounge, library, and chapel. Bomb shelter located under building. Project: Location: Phase: Date: St. Joseph Hall 3001 S. Congress Ave. Demolition Permit June 5, 2024 Existing Conditions: • Vacant since 2019 • Some Hazardous Material Removed • Hazardous materials remaining: exterior columns, roofing underlayment • Adaptive Re-Use Costs: $8-40 Million Project: Location: Phase: Date: St. Joseph Hall 3001 S. Congress Ave. Demolition Permit June 5, 2024 Existing Conditions: • Structure in-compatible w/ proposed program. • Typical Breeze Block damage • Chapel partially deconstructed (altar at St. Ignatius) Project: Location: Phase: Date: St. Joseph Hall 3001 S. Congress Ave. Demolition Permit June 5, 2024 Existing Conditions: • Restrooms in disrepair Project: Location: Phase: Date: St. Joseph Hall 3001 S. Congress Ave. Demolition Permit June 5, 2024 Original Items to be Salvaged: ORCO Stained Glass Windows Cross Statue of Saint Joseph Project: Location: Phase: Date: St. Joseph Hall 3001 S. Congress Ave. Demolition Permit June 5, 2024 Original Items to be Salvaged: Alter from St. Joseph’s Hall given to St. Ignatius Martyr Catholic Church Project: Location: Phase: Date: St. Joseph Hall 3001 S. Congress Ave. Demolition Permit June 5, 2024 Historic Drawing Documentation: Austin History Center Package Project: Location: Phase: Date: St. Joseph Hall 3001 S. Congress Ave. Demolition Permit June 5, 2024 St. Edward’s University – Buildings by Julian & White Science Building (Fleck Hall), Built in 1958 2007 renovation by Anderson-Wise Architects Doyle Hall, Built in 1960 2009 addition by Specht Harpman Architects Project: Location: Phase: Date: St. Joseph Hall 3001 S. Congress Ave. Demolition Permit June 5, 2024 St. Edward’s University – Buildings by Julian & White Doyle Hall, Built in 1960 2009 addition by Specht Harpman Architects Project: Location: Phase: Date: St. Joseph Hall 3001 S. Congress Ave. Demolition Permit June 5, 2024 St. Edward’s University – Buildings by Julian & White Premont Hall, Built in 1964 2006 renovation by McKinney York Architects Project: Location: Phase: Date: St. Joseph Hall 3001 S. Congress Ave. Demolition Permit June 5, 2024 Brothers of Holy Cross Garden Project: Location: Phase: Date: St. Joseph Hall 3001 S. Congress Ave. Demolition Permit June 5, 2024 Brothers of Holy Cross Garden “Although St. Joe Hall is no longer a home to the brothers we bring a very important piece of that home here in this garden in front of St. Joe Hall.” - Br. Thomas Dziekan, C.S.C., Provincial of the Moreau Province “The garden is intended to be a ‘visual reminder’ of the endurance of the Holy Cross mission at the University, which has been strengthened by the life and witness of the brothers.” - Congregation of Holy Cross Project: Location: Phase: Date: St. Joseph Hall 3001 S. Congress Ave. Demolition Permit June 5, 2024