Historic Landmark CommissionJan. 10, 2024

7.1 - 1311 E Cesar Chavez St - drawings — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 4 pages

GALLERY 100.00' 99.96' G . 2 2 A / 1 STORAGE / INTERNS . 2 2 A / 3 . F E R LARGE STORAGE EXISTING CINDER BLOCKS, TO BE REMOVED; NEW PIER AND BEAM SYSTEM, TO BE INSTALLED; CEDAR POSTS, TO BE PRESERVED; OPEN CELL SPRAY FOAM INSULATION, TO BE ADDED HALLWAY OFFICE / GEN. STORAGE RR EVENT STORAGE 5" 100.42' 2 / A2.2 VIDEO STORAGE 4 / A2.2 M P 3 4 : 1 1 : 3 3 2 0 2 / 2 1 / 2 1 | e t r o K n o t y a l C © WINDOW NOTES 1. ALL EXISTING WINDOW JAMB AND WINDOW SASH, TO BE RESTORED, TYP. 1 WAREHOUSE - PROPOSED 1/4" = 1'-0" PROJECT NORTH PRELIMINARY NOT FOR CONSTRUCTION This drawing was prepared under the supervision of Paul Clayton. It is not to be used for regulatory approval, permitting, or construction purposes. ISSUED DATE PROJECT NUMBER 12.12.23 19012 HISTORIC LANDMARK COMMISSION PACKAGE K R O W R I E H T & N E M O W Z E V A H C R A S E C . E 1 1 3 1 S A X E T , N I T S U A A1.2 WAREHOUSE PLANS 4 WEST ELEVATION 3/16" = 1'-0" 3 SOUTH ELEVATION 3/16" = 1'-0" NEW CUSTOM FABRICATED AND NEW 24 GA KYNAR PARAPET COPING WITH 22 GA GALVANIZED WIND CLEAT, TO BE INSTALLED 2 EAST ELEVATION 3/16" = 1'-0" 1 NORTH ELEVATION 3/16" = 1'-0" M P 4 4 : 1 1 : 3 3 2 0 2 / 2 1 / 2 1 | e t r o K n o t y a l C © PRELIMINARY NOT FOR CONSTRUCTION This drawing was prepared under the supervision of Paul Clayton. It is not to be used for regulatory approval, permitting, or construction purposes. ISSUED DATE PROJECT NUMBER 12.12.23 19012 HISTORIC LANDMARK COMMISSION PACKAGE K R O W R I E H T & N E M O W Z E V A H C R A S E C . E 1 1 3 1 S A X E T , N I T S U A A2.1 EXTERIOR ELEVATION - GALLERY NEW PRE-FINISHED GUTTER, TYP. NEW FASICA BOARD, TO BE INSTALLED, TYP. ALL EXISTING WINDOW JAMB AND WINDOW SASH, TO BE RESTORED, TYP. NEW PRE-FINISHED GUTTER, TYP. NEW FASICA BOARD, TO BE INSTALLED, TYP. ALL EXISTING WINDOW JAMB AND WINDOW SASH, TO BE RESTORED, TYP. EXISTING DOOR, TO BE REPAIRED, TYP. 4 SOUTH ELEVATION - WAREHOUSE 3/16" = 1'-0" 3 WEST ELEVATION - WAREHOUSE 3/16" = 1'-0" 2 NORTH ELEVATION - WAREHOUSE 3/16" = 1'-0" 1 EAST ELEVATION - WAREHOUSE 3/16" = 1'-0" M P 4 4 : 1 1 : 3 3 2 0 2 / 2 1 / 2 1 | e t r o K n o t y a l C © PRELIMINARY NOT FOR CONSTRUCTION This drawing was prepared under the supervision of Paul Clayton. It is not to be used for regulatory approval, permitting, or construction purposes. ISSUED DATE PROJECT NUMBER 12.12.23 19012 HISTORIC LANDMARK COMMISSION PACKAGE NEW PRE-FINISHED GUTTER, TYP. NEW FASICA BOARD, TO BE INSTALLED, TYP. EXISTING DOOR, TO BE REPAIRED, TYP. ALL EXISTING WINDOW JAMB AND WINDOW SASH, TO BE RESTORED, TYP. NEW PRE-FINISHED GUTTER, TYP. NEW FASICA BOARD, TO BE INSTALLED, TYP. ALL EXISTING WINDOW JAMB AND WINDOW SASH, TO BE RESTORED, TYP. EXISTING DOOR, TO BE REPAIRED, TYP. K R O W R I E H T & N E M O W Z E V A H C R A S E C . E 1 1 3 1 S A X E T , N I T S U A A2.2 EXTERIOR ELEVATION - WAREHOUSE E. C E S A R C H A V E Z REMOVE EXISTING FLASHING AT FRONT PARAPET WALL; FULLY ADHERE NEW TPO ROOFING MEMBRANE AT FRONT PARAPET WALL LOCATION TO EXTEND OUT ROOF DECK NEW 24GAKYNAR PARAPET COPING WITH 22 GA GALVANIZED WIND CLEAT, TO BE INSTALLED . T S A T O S A V A N GALLERY CUT OUT AND REMOVE EXISTING ROOF MEMBRANE ABOVE LEAK LOCATION; PROBE ALL EXISTING FIELD WELDS AND REPAIR ON AS NEEDED BASIS W G WAREHOUSE NEW PRE-FINISHED GUTTER, TYP. 1 ROOF PLAN 1/8" = 1'-0" PROJECT NORTH PRELIMINARY NOT FOR CONSTRUCTION This drawing was prepared under the supervision of Paul Clayton. It is not to be used for regulatory approval, permitting, or construction purposes. ISSUED DATE PROJECT NUMBER 12.12.23 19012 HISTORIC LANDMARK COMMISSION PACKAGE K R O W R I E H T & N E M O W Z E V A H C R A S E C . E 1 1 3 1 S A X E T , N I T S U A A3.0 ROOF PLAN M P 5 4 : 1 1 : 3 3 2 0 2 / 2 1 / 2 1 | e t r o K n o t y a l C ©