14 - 2608 Gonzalez Park - presentation — original pdf
Backup
H LC D ES IGN RE VIE W PA RQ UE ZARAGOZ A NE IGH BO RHO O D PARK PARQUE ZARAGOZA RESTROOM R E H A B I L I T A T I O N P R O J E C T July 11, 2022 1 HLC DESIGN REVIEW | July 11, 2022Parque Zaragoza Restroom Rehabilitation2 HLC DESIGN REVIEW | July 11, 2022Parque Zaragoza Restroom RehabilitationChronology • 1931 — Zaragosa Park (now Zaragoza Park) established, with baseball field and picnic and celebration areas • 1933 — Swimming pool constructed at the park, used for summer swim season • 1941 — Shelter house, with dressing and toilet facilities for pool users, built by the NYA • 1971 — Planning for renovation of the bathhouse was be- gun • 1975 — Bid awarded for renovation of the bathhouse, in- cluding installation of air conditioning • 1996 — New Parque Zaragoza Recreation Center building dedicated at the park • 2022 — Parque Zaragoza listed on National Register, with bathhouse as a contributing building 3 HLC DESIGN REVIEW | July 11, 2022Parque Zaragoza Restroom Rehabilitation4 HLC DESIGN REVIEW | July 11, 2022Parque Zaragoza Restroom Rehabilitation5 HLC DESIGN REVIEW | July 11, 2022Parque Zaragoza Restroom Rehabilitation6 HLC DESIGN REVIEW | July 11, 2022Parque Zaragoza Restroom Rehabilitation7 HLC DESIGN REVIEW | July 11, 2022Parque Zaragoza Restroom RehabilitationScope Summary • Rehabilitation of building • Programmatic priority for swimming bathhouse use • Provide code compliant restroom and shower facilities • Provide limited air conditioning, at lifeguard/first aid office Retain existing accessible parking Provide accessible route from parking to entrance Enhance connection to the park Limited civil and landscape work Replace electrical systems, improve lighting Window and door repairs, roof replacement, masonry cleaning LEED Silver sustainable building certification 8 HLC DESIGN REVIEW | July 11, 2022Parque Zaragoza Restroom Rehabilitation0 0 0 3 5 0 0 3 2 0 7 8 7 s a x e T , n i t s u A 2 0 1 # , t e e r t S h t 6 t s a E 4 2 1 2 8 1 5 1 . 0 5 4 . 2 1 5 PRELIMINARY Not for regulatory approval, permitting or construction ALFRED GODFREY, ARCHITECT March 28, 2022 DEMOLITION GENERAL NOTES 1. Building has asbestos-containing materials. Contractor to refer to included asbestos abatement specifications prior to conducting any work. Coordinate all demolition with specifications and report. Follow all local, state and federal regulations when removing any asbestos-containing materials. 2. Architect has no knowledge of other asbestos or other hazardous materials on jobsite. Contractor shall immediately isolate the affected area if other asbestos or other hazardous materials are discovered during construction. Notify Owner for further instruction before proceeding with other work. 4. 3. Demolition plans are provided to give a general indication of the scope of the work. Confirm exact extent of the demolition on site. Items to be removed, relocated or salvaged are shown with dashed line and are as listed in the keyed demolition notes. All other items are intended to remain in place. Do not damage items, surfaces, finishes and building elements to remain. 5. Remove only non-load bearing construction and partitions. Contractor to verify, prior to removal, that no structural components, i.e. bearing walls, beams, headers, etc. supporting floor, roof or ceiling joists are designated for removal. Contact the Architect prior to removal of any construction in question or deviating from the design intent. 6. All service locations to be confirmed prior to the commencement of work. Maintain existing utilities to remain in service and protect against damage during demolition operations. 7. Protect all existing finishes shown to remain during demolition to prevent damage. Any damage sustained during demolition shall be repaired or replaced by Contractor to match existing conditions. 8. Protect all finishes uncovered beneath demolished wall coverings, or other removed elements. Do not damamge finishes uncovered in the demolition work. 9. All demolition activities shall be performed so as to produce minimal disturbance to existing facility and occupants. Maintain separation between areas undergoing demolition work and surrounding occupied areas by providing temporary barriers to prevent dust migration. Minimize excessive and prolonged noise levels and dust. 10. Comply with local jurisdiction requirements for demolition work. 11. Where Contractor is designated to make removals, disposition of materials is the sole responsibility of the Contractor. 12. Upon completion of demolition activities, clean the entire area of demolition to a tidy, uniform condition, removing all debris, dust partitions and associated materials used during the demolition. Clean all areas impacted by the demolition, including but not limited to, adjacent occupied areas and areas not within the scope of work. DEMOLITION KEYED NOTES 1. Remove existing concrete flatwork as shown. 2. Remove existing concrete planter borders. 5. 6. 7. I K R A P D O O H R O B H G E N A Z O G A R A Z E U Q R A P I N O T A V O N E R M O O R T S E R t e e r t l S s e a n r e d e P 1 4 7 2 0 7 8 7 S A X E T , I N T S U A DESIGN DEVELOPMENT MARCH 28, 2022 DATE: REVISIONS: DEMOLITION PLAN D1.01 1 BUILDING DEMOLITION PLAN Scale: 1/4" = 1'-0" LEGEND DEMO EXISTING WALL EXISTING WALL TO REMAIN 0 5 10 15 20 25 FT 9 HLC DESIGN REVIEW | July 11, 2022Parque Zaragoza Restroom RehabilitationDate:File name:Time:Thursday, May 5, 20227:08:18 PM/Volumes/LG_STORAGE/01-Active/20-070 Parque Zaragoza/2 Parque Zaragoza SD DD CD/Drawings/LGA Zaragoza Building 220319.vwx0 0 0 3 STOR. 1 SHOWER 1 WATER HEATER SHOWER 2 5 0 0 3 WOMEN MEN JAN. STORAGE 2 1 0 0 3 FE CORRIDOR BOTTLE FILLER OFFICE ACTIVITY ROOM CONDENSING UNIT 1 FLOOR PLAN Scale: 1/4" = 1'-0" 0 5 10 15 20 25 FT 10 HLC DESIGN REVIEW | July 11, 2022Parque Zaragoza Restroom Rehabilitation11 HLC DESIGN REVIEW | July 11, 2022Parque Zaragoza Restroom Rehabilitation12 HLC DESIGN REVIEW | July 11, 2022Parque Zaragoza Restroom RehabilitationSHADE STRUCTURE 3 SHADE STRUCTURE 1 SOLAR CHIMNEY SEE SHEET A4.02 WATER HEATER 1 WEST ELEVATION Scale: 1/4" = 1'-0" SOLAR CHIMNEY SEE SHEET A4.02 SHADE STRUCTURE 3 SHADE STRUCTURE 1 SHADE STRUCTURE 2 09 08 07 06 EXAMPLES OF DECORATIVE SCREEN INFILL 01 10 12 HEAT PUMP OUTDOOR UNIT 2 NORTH ELEVATION Scale: 1/4" = 1'-0" SHADE STRUCTURE 2 05 04 03 CONDENSING UNIT 10 02 09 3 EAST ELEVATION Scale: 1/4" = 1'-0" SOLAR CHIMNEY SEE SHEET A4.02 SHADE STRUCTURE 2 2 0 7 8 7 s a x e T , n i t s u A 2 0 1 # , t e e r t S h t 6 t s a E 4 2 1 2 8 1 5 1 . 0 5 4 . 2 1 5 PRELIMINARY Not for regulatory approval, permitting or construction ALFRED GODFREY, ARCHITECT May 6, 2022 I K R A P D O O H R O B H G E N A Z O G A R A Z E U Q R A P I N O T A V O N E R M O O R T S E R t e e r t l S s e a n r e d e P 1 4 7 2 0 7 8 7 S A X E T , I N T S U A DESIGN DEVELOPMENT MAY 6, 2022 DATE: REVISIONS: EXTERIOR ELEVATIONS A2.01 08 07 06 05 4 SOUTH ELEVATION Scale: 1/4" = 1'-0" 13 HLC DESIGN REVIEW | July 11, 2022Parque Zaragoza Restroom RehabilitationDate:File name:Time:Friday, July 8, 20222:09:03 PM/Volumes/LG_STORAGE/01-Active/20-070 Parque Zaragoza/2 Parque Zaragoza SD DD CD/Drawings/LGA Zaragoza Building 220628.vwx27.59 sq. ft. open 46.5% open TYPE A 26.68 sq. ft. open 45.2% open TYPE B xxxx sq. ft. open xxxx% open xxxx sq. ft. open xxxx% open DECORATIVE PATTERN STUDIES JULY 8, 2022 14 HLC DESIGN REVIEW | July 11, 2022Parque Zaragoza Restroom RehabilitationThank You 15 HLC DESIGN REVIEW | July 11, 2022Parque Zaragoza Restroom Rehabilitation16 HLC DESIGN REVIEW | July 11, 2022Parque Zaragoza Restroom Rehabilitation5 0 0 3 1 0 0 3 05 06 08 FCU-1 0 0 0 3 07 WATER HEATER STOR. 1 19 SHOWER 1 18 SHOWER 2 17 WOMEN 0-01 11 O-02 O-03 FE O-04 MEN O-05 12 O-07 JAN. 13 STORAGE 2 14 O-08 01 10 O-06 O-09 16 CORRIDOR BOTTLE FILLER 15 13 O-10 O-11 OFFICE O-12 11 09 10 02 03 04 05 ACTIVITY ROOM O-13 O-14 O-15 12 CONDENSING UNIT 09 08 07 06 1 FLOOR PLAN Scale: 1/4" = 1'-0" 0 5 10 15 20 25 FT 17 HLC DESIGN REVIEW | July 11, 2022Parque Zaragoza Restroom Rehabilitation18 HLC DESIGN REVIEW | July 11, 2022Parque Zaragoza Restroom RehabilitationSHADE STRUCTURE 3 SHADE STRUCTURE 1 SOLAR CHIMNEY SEE SHEET A4.02 WATER HEATER 1 WEST ELEVATION Scale: 1/4" = 1'-0" SOLAR CHIMNEY SEE SHEET A4.02 SHADE STRUCTURE 3 SHADE STRUCTURE 1 SHADE STRUCTURE 2 09 08 07 06 EXAMPLES OF DECORATIVE SCREEN INFILL 01 10 12 2 NORTH ELEVATION Scale: 1/4" = 1'-0" SHADE STRUCTURE 2 05 04 03 CONDENSING UNIT 10 02 09 3 EAST ELEVATION Scale: 1/4" = 1'-0" SOLAR CHIMNEY SEE SHEET A4.02 SHADE STRUCTURE 2 SHADE STRUCTURE 3 (BEYOND) WATER HEATER 08 07 06 05 4 SOUTH ELEVATION Scale: 1/4" = 1'-0" 2 0 7 8 7 s a x e T , n i t s u A 2 0 1 # , t e e r t S h t 6 t s a E 4 2 1 2 8 1 5 1 . 0 5 4 . 2 1 5 PRELIMINARY Not for regulatory approval, permitting or construction ALFRED GODFREY, ARCHITECT March 28, 2022 I K R A P D O O H R O B H G E N A Z O G A R A Z E U Q R A P I N O T A V O N E R M O O R T S E R t e e r t l S s e a n r e d e P 1 4 7 2 0 7 8 7 S A X E T , I N T S U A DESIGN DEVELOPMENT MARCH 28, 2022 DATE: REVISIONS: EXTERIOR ELEVATIONS A2.01 19 HLC DESIGN REVIEW | July 11, 2022Parque Zaragoza Restroom RehabilitationDate:File name:Time:Thursday, May 5, 20227:08:22 PM/Volumes/LG_STORAGE/01-Active/20-070 Parque Zaragoza/2 Parque Zaragoza SD DD CD/Drawings/LGA Zaragoza Building 220319.vwx