Historic Landmark CommissionJune 14, 2022

7 - 2608 Gonzales St - Presentation — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 18 pages

HLC DE SI GN RE VIE W PA RQ UE ZARAGOZ A NE IGH BO RHO O D PARK PARQUE ZARAGOZA RESTROOM R E H A B I L I T A T I O N P R O J E C T June 14, 2022 1 HLC DESIGN REVIEW | June 14, 2022Parque Zaragoza Restroom Rehabilitation 2 HLC DESIGN REVIEW | June 14, 2022Parque Zaragoza Restroom Rehabilitation Chronology • 1931 — Zaragosa Park (now Zaragoza Park) established, with baseball field and picnic and celebration areas • 1933 — Swimming pool constructed at the park, used for summer swim season • 1941 — Shelter house, with dressing and toilet facilities for pool users, built by the NYA • 1971 — Planning for renovation of the bathhouse was be- gun • 1975 — Bid awarded for renovation of the bathhouse, in- cluding installation of air conditioning • 1996 — New Parque Zaragoza Recreation Center building dedicated at the park • 2022 — Parque Zaragoza listed on National Register, with bathhouse as a contributing building 3 HLC DESIGN REVIEW | June 14, 2022Parque Zaragoza Restroom Rehabilitation 4 HLC DESIGN REVIEW | June 14, 2022Parque Zaragoza Restroom Rehabilitation 5 HLC DESIGN REVIEW | June 14, 2022Parque Zaragoza Restroom Rehabilitation 6 HLC DESIGN REVIEW | June 14, 2022Parque Zaragoza Restroom Rehabilitation 7 HLC DESIGN REVIEW | June 14, 2022Parque Zaragoza Restroom Rehabilitation Scope Summary • Rehabilitation of building • Programmatic priority for swimming bathhouse use • Provide code compliant restroom and shower facilities • Provide limited air conditioning, at lifeguard/first aid office Retain existing accessible parking Provide accessible route from parking to entrance Enhance connection to the park Limited civil and landscape work Replace electrical systems, improve lighting Window and door repairs, roof replacement, masonry cleaning LEED Silver sustainable building certification 8 HLC DESIGN REVIEW | June 14, 2022Parque Zaragoza Restroom Rehabilitation 0 0 0 3 5 0 0 3 2 0 7 8 7 s a x e T , n i t s u A 2 0 1 # , t e e r t S h t 6 t s a E 4 2 1 2 8 1 5 1 . 0 5 4 . 2 1 5 PRELIMINARY Not for regulatory approval, permitting or construction ALFRED GODFREY, ARCHITECT March 28, 2022 DEMOLITION GENERAL NOTES 1. Building has asbestos-containing materials. Contractor to refer to included asbestos abatement specifications prior to conducting any work. Coordinate all demolition with specifications and report. Follow all local, state and federal regulations when removing any asbestos-containing materials. 2. Architect has no knowledge of other asbestos or other hazardous materials on jobsite. Contractor shall immediately isolate the affected area if other asbestos or other hazardous materials are discovered during construction. Notify Owner for further instruction before proceeding with other work. 4. 3. Demolition plans are provided to give a general indication of the scope of the work. Confirm exact extent of the demolition on site. Items to be removed, relocated or salvaged are shown with dashed line and are as listed in the keyed demolition notes. All other items are intended to remain in place. Do not damage items, surfaces, finishes and building elements to remain. 5. Remove only non-load bearing construction and partitions. Contractor to verify, prior to removal, that no structural components, i.e. bearing walls, beams, headers, etc. supporting floor, roof or ceiling joists are designated for removal. Contact the Architect prior to removal of any construction in question or deviating from the design intent. 6. All service locations to be confirmed prior to the commencement of work. Maintain existing utilities to remain in service and protect against damage during demolition operations. 7. Protect all existing finishes shown to remain during demolition to prevent damage. Any damage sustained during demolition shall be repaired or replaced by Contractor to match existing conditions. 8. Protect all finishes uncovered beneath demolished wall coverings, or other removed elements. Do not damamge finishes uncovered in the demolition work. 9. All demolition activities shall be performed so as to produce minimal disturbance to existing facility and occupants. Maintain separation between areas undergoing demolition work and surrounding occupied areas by providing temporary barriers to prevent dust migration. Minimize excessive and prolonged noise levels and dust. 10. Comply with local jurisdiction requirements for demolition work. 11. Where Contractor is designated to make removals, disposition of materials is the sole responsibility of the Contractor. 12. Upon completion of demolition activities, clean the entire area of demolition to a tidy, uniform condition, removing all debris, dust partitions and associated materials used during the demolition. Clean all areas impacted by the demolition, including but not limited to, adjacent occupied areas and areas not within the scope of work. DEMOLITION KEYED NOTES 1. Remove existing concrete flatwork as shown. 2. Remove existing concrete planter borders. 5. 6. 7. I K R A P D O O H R O B H G E N A Z O G A R A Z E U Q R A P I N O T A V O N E R M O O R T S E R t e e r t l S s e a n r e d e P 1 4 7 2 0 7 8 7 S A X E T , I N T S U A DESIGN DEVELOPMENT MARCH 28, 2022 DATE: REVISIONS: DEMOLITION PLAN D1.01 1 BUILDING DEMOLITION PLAN Scale: 1/4" = 1'-0" LEGEND DEMO EXISTING WALL EXISTING WALL TO REMAIN 0 5 10 15 20 25 FT 9 HLC DESIGN REVIEW | June 14, 2022Parque Zaragoza Restroom RehabilitationDate:File name:Time:Thursday, May 5, 20227:08:18 PM/Volumes/LG_STORAGE/01-Active/20-070 Parque Zaragoza/2 Parque Zaragoza SD DD CD/Drawings/LGA Zaragoza Building 220319.vwx #27 #16 Parque Zaragoza Neighborhood Park 2608 Gonzales St. Austin, Texas 78702 This property is listed in or eligible for listing in the National Register of Historic Places. ITEM NO. GIS ID BARRIER VIOLATION RECOMMENDED ACTION QUANTITY PRIORITY LEVEL Inspection Date: 12/17/2015 *Item Number includes photo CODE HEADING 2012 Texas Accessibility Standards Other Features: 175 Door 307.2 Protruding Objects Reconstruct the doorway. 16* 19 27* Door Gate: 1066 Door 404.2.7 Door & Gate Hardware Protruding Object: 236 Mounted Object 307.2 Protruding Objects There are 4 cased openings that are protruding objects. The door does not have compliant hardware. The frame within the doorway is a protruding object. Replace with compliant hardware. Relocate out of circulation path, install where the lowest edge is at 27" maximum, or add cane detection. BUDGETED COST 4 1 1 $ 10,000 $ 300 $ 300 1 1 1 10 HLC DESIGN REVIEW | June 14, 2022Parque Zaragoza Restroom Rehabilitation " 8 - ' 6 3'-0" Door Studies 1 NOVEMBER 4, 2021 PARQUE ZARAGOZA 11 HLC DESIGN REVIEW | June 14, 2022Parque Zaragoza Restroom Rehabilitation 12 HLC DESIGN REVIEW | June 14, 2022Parque Zaragoza Restroom Rehabilitation 5 0 0 3 1 0 0 3 05 06 08 FCU-1 0 0 0 3 07 WATER HEATER STOR. 1 19 SHOWER 1 18 SHOWER 2 17 WOMEN 0-01 11 O-02 O-03 FE O-04 MEN O-05 12 O-07 JAN. 13 STORAGE 2 14 O-08 01 10 O-06 O-09 16 CORRIDOR BOTTLE FILLER 15 13 O-10 O-11 OFFICE O-12 11 09 10 02 03 04 05 ACTIVITY ROOM O-13 O-14 O-15 12 CONDENSING UNIT 09 08 07 06 1 FLOOR PLAN Scale: 1/4" = 1'-0" 0 5 10 15 20 25 FT 13 HLC DESIGN REVIEW | June 14, 2022Parque Zaragoza Restroom Rehabilitation 14 HLC DESIGN REVIEW | June 14, 2022Parque Zaragoza Restroom Rehabilitation SHADE STRUCTURE 3 SHADE STRUCTURE 1 SOLAR CHIMNEY SEE SHEET A4.02 WATER HEATER 1 WEST ELEVATION Scale: 1/4" = 1'-0" SOLAR CHIMNEY SEE SHEET A4.02 SHADE STRUCTURE 3 SHADE STRUCTURE 1 SHADE STRUCTURE 2 09 08 07 06 EXAMPLES OF DECORATIVE SCREEN INFILL 01 10 12 2 NORTH ELEVATION Scale: 1/4" = 1'-0" SHADE STRUCTURE 2 05 04 03 CONDENSING UNIT 10 02 09 3 EAST ELEVATION Scale: 1/4" = 1'-0" SOLAR CHIMNEY SEE SHEET A4.02 SHADE STRUCTURE 2 SHADE STRUCTURE 3 (BEYOND) WATER HEATER 08 07 06 05 4 SOUTH ELEVATION Scale: 1/4" = 1'-0" 2 0 7 8 7 s a x e T , n i t s u A 2 0 1 # , t e e r t S h t 6 t s a E 4 2 1 2 8 1 5 1 . 0 5 4 . 2 1 5 PRELIMINARY Not for regulatory approval, permitting or construction ALFRED GODFREY, ARCHITECT March 28, 2022 I K R A P D O O H R O B H G E N A Z O G A R A Z E U Q R A P I N O T A V O N E R M O O R T S E R t e e r t l S s e a n r e d e P 1 4 7 2 0 7 8 7 S A X E T , I N T S U A DESIGN DEVELOPMENT MARCH 28, 2022 DATE: REVISIONS: EXTERIOR ELEVATIONS A2.01 15 HLC DESIGN REVIEW | June 14, 2022Parque Zaragoza Restroom RehabilitationDate:File name:Time:Thursday, May 5, 20227:08:22 PM/Volumes/LG_STORAGE/01-Active/20-070 Parque Zaragoza/2 Parque Zaragoza SD DD CD/Drawings/LGA Zaragoza Building 220319.vwx LEGEND LIMIT OF WORK PROPERTY LINE EXISTING TREE TO REMAIN SINGLE GRIND HARDWOOD MULCH AT 50% CRZ SOD PROPOSED 2" CALIPER SHADE TREE TREE PROTECTION NOTES : 1. 2. 3. 4. 5. 6. 7. 8. 9. IT IS CRUCIAL THAT TREE PROTECTION FENCES MUST BE ERECTED PRIOR TO THE BEGINNING OF ANY SITE DEMOLITION. THE TREE PROTECTION FENCE SHALL BE A MIN. 5'-0' HIGH CHAIN LINK FENCE MOUNTED ON VERTICAL PIPES DRIVEN 2'-0" MIN. INTO THE GROUND, AT APPROXIMATELY 6'-8' O.C. REFER TO PLAN FOR LOCATIONS PROTECTION FENCE SHALL BE PLACED AROUND CRITICAL ROOT ZONE OF ALL TREES TO REMAIN. UPON APPROVAL BY OWNER OR LANDSCAPE ARCHITECT. OTHER FENCING MATERIAL MAY BE USED IN LIEU OF CHAIN LINK FENCE. SUCH AS: A. T-POSTS AT 8'-0" O.C. W/ 4' HT. BRIGHT ORANGE, LIGHT WEIGHT, REUSABLE MESH SAFETY FENCING MADE OF HIGH DENSITY POLYETHYLENE WITH 1 1/2" X 3" SIZE MESH OR SIMILAR MATERIAL. B. WOOD BARRICADES WHICH INCLUDED INSTALLING 2 X 4 AS POST AT 4' ABOVE GROUND AT EVERY 6' O.C. WITH (3) -2 X 4 RAILS MINIMUM. UNDER NO CIRCUMSTANCES, SHOULD A CONTRACTOR DRIVE OR PARK MACHINERY ON TREE ROOTS OR UNDER THE DRIPLINE. AVOID DISTURBING ROOTS IN CRITICAL ROOT ZONE. IF ROOT CUTTING IS NECESSARY OR ANY ROOTS ARE DAMAGED, THEY SHALL BE CUT CLEANLY WITH THE APPROPRIATE PRUNING SHEARS OR PRUNING SAWS A FEW INCHES ON THE SIDE CLOSER TO THE TRUNK. ANY EXPOSED OR PRUNED TREE ROOTS MUST BE COVERED IMMEDIATELY WITH DIRT AND MULCH TO PREVENT ROOTS FROM DRYING OUT. NO STORAGE OR CONCRETE DUMPING IS PERMITTED ON TREE ROOTS AND/OR UNDER DRIPLINE. NO BUILDING MATERIALS ARE TO BE STACKED OR STOCKPILED WITHIN THE DRIPLINE OR WITHIN 6 FEET OF ANY TREE TO BE PRESERVED, WHICHEVER DISTANCE IS GREATER. TOPSOIL SHALL NOT BE STOCKPILED WITHIN THE DRIP LINE OR WITHIN 6 FEET OF ANY TREE TO BE PRESERVED, WHICHEVER DISTANCE IS GREATER. 10. TREE BOARDING SHALL BE USED IF WORK IS REQUIRED WITHIN FENCING. 11. ANY UNDERSTORY CLEARING WITHIN SIX FEET OF EXISTING TREE TRUNKS SHOULD BE DONE BY HAND. 12. CONTRACTOR TO NOTIFY LANDSCAPE ARCHITECT IF ROOT PRUNING IS DEEMED NECESSARY. CONTRACTOR SHALL NOT CUT ROOT LARGER THAN 2” PRIOR CONSULTING LANDSCAPE ARCHITECT. 13. CONTRACTOR IS REQUIRED TO HIRE A CERTIFIED ARBORIST TO MONITOR AND ASSIST WITH FIELD LAYOUT (EXACT LOCATIONS OF FENCING, ROOT PRUNING, AND ZERO CURB CUTBACK) OF THE TREE PRESERVATION PROGRAM DURING DEMOLITION AND CONSTRUCTION TO ENSURE TREE PROTECTION PROCEDURES AND TECHNIQUES ARE PRACTICED AS SPECIFIED TO ADDRESS CONCERNS AND CONDITIONS WHICH OCCUR IN THE FIELD. AT A MINIMUM, THE INDIVIDUAL RESPONSIBLE FOR MONITORING AND FIELD LAYOUT OF THE TREE PROTECTION SHALL HAVE A MINIMUM OF 5 YEARS OF EXPERIENCE AS A CONSULTANT, AND SHALL NOT BE AFFILIATED WITH A TREE CARE CONTRACTOR IN THE HARRIS COUNTY AREA. QUALIFICATIONS OF THE SELECTED CERTIFIED ARBORIST SHALL BE SUBMITTED FOR REVIEW AND APPROVAL BY THE LANDSCAPE ARCHITECT. 2 0 7 8 7 s a x e T , n i t s u A , 0 1 3 e t S , t e e r t S h t 2 1 E 4 2 2 1 . i m o c n o s n b o r a r u k a s a w w w . . 0 3 8 5 7 3 3 3 1 7 . : P 4 0 0 3 3 0 0 3 2 0 0 3 6 0 0 3 5 0 0 3 0 0 0 3 1 0 0 3 SOD MULCH 50% CRZ 7 0 0 3 2-INCH CALIPER SHADE TREE, TYP. RESTORE TO EXISTING - HYDROSEED SOD 8 0 0 3 16 HLC DESIGN REVIEW | June 14, 2022Parque Zaragoza Restroom Rehabilitation Thank You 17 HLC DESIGN REVIEW | June 14, 2022Parque Zaragoza Restroom Rehabilitation 1 WEST ELEVATION Scale: 1/4" = 1'-0" 04 03 02 01 04 01 14 03 2 NORTH ELEVATION Scale: 1/4" = 1'-0" 3 EAST ELEVATION Scale: 1/4" = 1'-0" 13 12 11 10 02 09 2 0 7 8 7 s a x e T , n i t s u A 2 0 1 # , t e e r t S h t 6 t s a E 4 2 1 2 8 1 5 1 . 0 5 4 . 2 1 5 PRELIMINARY Not for regulatory approval, permitting or construction ALFRED GODFREY, ARCHITECT Sept 1 2021 I K R A P D O O H R O B H G E N A Z O G A R A Z E U Q R A P I N O T A V O N E R M O O R T S E R l t e e r t S s e a n r e d e P 1 4 7 2 0 7 8 7 S A X E T , I N T S U A PRELIMINARY DESIGN SEPT 1, 2021 DATE: REVISIONS: EXTERIOR ELEVATIONS A2.01 08 07 06 05 4 SOUTH ELEVATION Scale: 1/4" = 1'-0" 18 HLC DESIGN REVIEW | June 14, 2022Parque Zaragoza Restroom Rehabilitation