C.11.2 - 1415 W 10th St - applicant email — original pdf
Backup
Ed Richardson Contreras, Kalan Allen, Amber 1415 W 10th St | OWANA and Neighborhood Meeting Dates Summary Monday, June 21, 2021 12:49:02 PM From: To: Cc: Subject: Date: H Folks, Below is a summary of our outreach to both OWANA’s Zoning Committee and through that process to the adjacent neighbors to the project. We will also meet with them (OWANA) Thursday the 24th to give them an update. For context, our client’s father became sick after the second round of meetings (and eventually passed away early 2021) so the project was somewhat delayed as a result – hence the gap between the fall meetings and permitting in 2021. We will send the updated presentation on Thursday for distribution to HLC members. -9.24.2020: OWANA Zoning Committee Meeting: Ed Richardson | CRA presents existing site conditions and proposed design to OWANA Zoning Committee. - 10.13.2020: Meeting with Adjacent Neighbors: Ed Richardson | CRA meets all directly adjacent neighbors at 1415 W 10th to review proposed design. Topics included: - Reviewed Existing and Proposed Drainage on site with east neighbor. - Reviewed Height and Location of proposed structures. Reviewed what each neighbor with views into the lot could expect to see from their homes. - Discussed Fence Heights and Location. We will revisit the Fence and Fence Heights when project is closer to construction. We are open to a lower fence along 10thstreet. - Reviewed Second Floor Window Alignments: between the proposed structure and the existing home to the east. Clark Richardson field surveyed the window locations and mapped them on the survey and reviewed with property owner. There are no direct window alignments. - 10.22.2020: OWANA Zoning Committee Meeting II: Ed Richardson | CRA presented our responses to the comments / concerns from the previous meeting Shoring: The noise and disruption from potential shoring for the construction of the basement was a primary concern for neighbors. CRA recommends no driven piles be used for shoring and instead drilled piers be used in any temporary shoring required. The structural work for the shoring will be part of the means and methods for construction of the basement by the contractor and therefore while it will be engineered. The precise drawings will not be included in the architectural drawings. Street Façade: We’re proposing a specimen tree be added in front of the street façade complimenting the window located towards the west side of the façade (see 9). Site Drainage: We’ve sketched in the proposed French drain system for the lot and plan to use the front yard to filter run off from the southside of the lot. Not mentioned in the previous meeting, the second-floor roofed areas on the project are Green Roofs (about 32% of the total roof area) which will help mitigate water run off on the site and to neighborhood stormwater systems (see 8). We will add down leaders at the east façade (see 10). Alley Access: We continue to recommend that the alley not be used for construction access due to its minimal clearance (10’) and distance 06.24.2021: OWANA Zoning Committee Meeting III: Ed Richardson | CRA will join OWANA again with an update on the status of the project in advance of the HLC Meeting. Thanks, Ed Richardson CRA