Historic Landmark CommissionJan. 11, 2021

1 - Guadalupe Storm Drain Improvement - Presentation — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 13 pages

Little Walnut Creek Flood Risk Reduction Project: Metric to Rutland Presentation to LF&P Committee to Parks and Recreation Board WATERSHED PROTECTION AUSTIN WATER BGE, INC Project Location • Project located along Little Walnut Creek in north Austin. • High Priority Creek Flood Risk Reduction Project. Quail Creek Park WATERSHED PROTECTION AUSTIN WATER BGE, INC. Project Goals • Reduce flood risk to 75 homes and along Mearns Meadow Boulevard. • Reduce floodplain footprint. • Upgrade water and wastewater lines. • Repave Mearns Meadow Boulevard in project area. • Shared use path on Mearns Meadow Boulevard. • Pond expansion required to prevent flooding impacts downstream. • Improvements to Quail Creek Park. ∙ New grass. ∙ ADA path. ∙ Limestone block benches. ∙ Additional 4300+ft2 flat field area. ∙ Preservation and relocation of exercise equipment. WATERSHED PROTECTION AUSTIN WATER BGE, INC. Project Elements Little Walnut Creek Creek Diversion Inlets Quail Valley Tributary Cook Elementary School Neans Tributary Quail Creek Park / Mearns Meadow Detention Pond WATERSHED PROTECTION BGE, INC. Downstream Impacts – Mitigation Required • Downstream Impacts • Diversion takes water downstream faster. • Changes in flow rate and maximum water surface elevations downstream of the project. • Mitigation is required to prevent adverse flooding impacts. • Mitigation Measures • Mearns Meadow Detention Pond expansion. Additional 37 acre-feet of storage during the 100-yr storm. • Low flow outlet modified. • Primary pond outfall culverts and spillways unaffected. WATERSHED PROTECTION AUSTIN WATER BGE, INC. Request  Expand the existing drainage easement located within Quail Creek Park by an additional 69,970 ft2 for the proposed detention pond expansion.  Use additional 20,083 ft2 of parkland for staging/spoils storage.  The total proposed work area is 10.18 acres (including existing easement, additional easement and staging/spoils areas). WATERSHED PROTECTION AUSTIN WATER BGE, INC. Quail Creek Park WATERSHED PROTECTION AUSTIN WATER BGE, INC. Quail Creek Park closures  The Mearns Meadow Detention Pond area will be closed for 3-6 months (weather dependent).  The staging/spoils storage area will be closed for the duration of the project (approximately 3 years).  A section of the park including the playground area to be fenced and will remain open through the duration of the project. WATERSHED PROTECTION AUSTIN WATER BGE, INC. Quail Creek Park Improvements • New granite gravel and concrete trail to reconnect the looped trail • Trails around the pond. • Add ADA compliant trail. • Play Fields • Increase of flat, open mowed area (4300+ft2). • Park Exercise Equipment • Park equipment to be relocated, preserved where possible, and replaced if needed. • Trees possible. • Removed trees will be replaced – with as many planted on site as WATERSHED PROTECTION AUSTIN WATER BGE, INC. Quail Creek Park – Existing WATERSHED PROTECTION AUSTIN WATER BGE, INC. Quail Creek Park – Proposed WATERSHED PROTECTION AUSTIN WATER BGE, INC. Project Timeline – Next Steps • Next Steps • Final Design & Permitting: Now – Spring 2019. • Bid: Spring – Fall 2019. • Construction: ~3 years (Fall 2019 – Fall 2022). ∙ Phasing Plan. ∙ Neighborhood Access. ∙ Temporary Park Closure. WATERSHED PROTECTION AUSTIN WATER BGE, INC. Thank you • Project Sponsors • David Trujillo, P.E. (Watershed Protection)  (512) 974-3496  David.Trujillo@austintexas.gov • Michael Russ, P.E. (Austin Water) • Mueen Chowdhury, P.E. (Austin Water) • Project Manager • Thuan Nguyen, P.E. (Public Works)  (512) 974-3513  Thuan.Nguyen@austintexas.gov • Project Engineer • Francisco Arce, P.E. (BGE, Inc.) http://austintexas.gov/littlewalnuttunnel WATERSHED PROTECTION AUSTIN WATER BGE, INC.