Electric Utility Commission - Nov. 10, 2025

Electric Utility Commission Regular Meeting of the Electric Utility Commission

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

MEETING OF THE ELECTRIC UTILITY COMMISSION November 10, 2025 ▪ 6:00 PM AUSTIN ENERGY HEADQUARTERS/SHUDDE FATH CONFERENCE ROOM 4815 MUELLER BLVD AUSTIN, TEXAS Some members of the Electric Utility Commission maybe participating by videoconference. The meeting may be viewed online at: http://www.austintexas.gov/page/watch-atxn-live Public comment will be allowed in-person or remotely by telephone. Speakers may only register to speak on an item once either in-person or remotely and will be allowed up to three minutes to provide their comments. Registration no later than noon the day before the meeting is required for remote participation. To register to speak remotely, contact Nici Huff, at Nici.Huff@AustinEnergy.com or via phone at 512-972-8621. Members: Dave Tuttle, Chair Kaiba White, Vice Chair Raul Alvarez Lauren Bellomy CALL TO ORDER Cesar Benavides Jonathon Blackburn Al Braden Chris Gillett AGENDA Chris Kirksey Cyrus Reed Joshua Rhodes PUBLIC COMMUNICATION: GENERAL The first 5 speakers signed up prior to the meeting being called to order will each be allowed a three- minute allotment to address their concerns regarding items not posted on the agenda. APPROVAL OF MINUTES 1. Approve the minutes of the Electric Utility Commission Regular Called Meeting on October 20, 2025. DISCUSSION AND ACTION ITEMS 2. Recommend approval authorizing a contract for for construction services for the Backup Control Center Uninterruptible Power Supply System Replacement for Austin Energy with Fakouri Electrical Engineering, Inc. in the amount of $629,199 plus a $60,000 contingency for a total contract amount not to exceed $689,199. Funding: $689,199 is available in the Capital Budget of Austin Energy. 3. Authorize negotiation and execution of an amendment to the membership agreement with the Electric Power Research Institute to add an additional $120,000 for research programs for a revised total contract amount not to exceed $1,320,000. Funding: $360,000 is available in the Fiscal Year 2025-2026 Operating Budget of Austin Energy. Funding for the remaining contract term is contingent upon available funding in future budgets. 4. Authorize negotiation and execution of all documents and instruments necessary or desirable to acquire approximately 0.0191 acres (832 square feet) of a permanent electric transmission and distribution easement out of Outlot 55, Division “O”, City of Austin, Travis County, Texas, being a portion of Lot 18, Block 2, Elm Grove, a subdivision of record in Book 2, Page 241, Plat Records, Travis County, Texas, from The Board of Directors of Lambie Homes Condominium Association, currently appraised at $95,021 subject to an …

Scraped at: Nov. 29, 2025, 10:36 a.m.

Customer Energy Solutions FY 25 Savings Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

Customer Energy Solutions FY25 YTD MW Savings Report As of September 2025 Energy Efficiency Services EES- Appliance Efficiency Program EES- Home Energy Savings - Rebate EES- AE Weatherization & CAP Weatherization - D.I. * EES- School Based Education * EES- Strategic Partnership Between Utilities & Retailers * EES- Multifamily Rebates EES- Multifamily WX-D.I.+ EES- Commercial Rebate EES- Small Business Energy Efficiency TOTAL Demand Response (DR) - Annual Incremental DR- Power Partner DR- Commercial Demand Response (frmly Load Coop) Demand Response (DR) TOTAL Green Building GB- Residential Ratings GB- Residential Energy Code GB- Multifamily Ratings GB- Multifamily Energy Code GB- Commercial Ratings GB- Commercial Energy Code Green Building TOTAL MW Goal 2.50 0.90 0.70 0.30 1.75 0.65 1.00 6.00 2.00 15.80 MW Goal 6.40 2.00 8.40 MW Goal 0.35 1.48 1.34 4.41 4.60 1.71 13.89 MW To Date 1.70 0.34 0.71 0.13 1.18 2.60 1.53 2.61 0.94 11.74 MW To Date 11.17 7.78 18.95 MW To Date 0.26 1.48 2.05 4.41 2.49 1.71 12.40 Thermal Energy Storage TOTAL 0.00 0.00 Percentage 68% 37% 101% 43% 67% 400% 153% 44% 47% Percentage 175% 389% Percentage 74% 100% 153% 100% 54% 100% Participant Type Participants To Date MWh To Date Customers Customers Customers Products Products Apartments Apartments Customers Customers 2,439 332 889 4,005 159,525 6,324 6,151 115 72 20,327 3,423.95 479.54 1,344.10 556.43 9,175.87 5,323.45 4,129.18 9,148.71 1,699.97 35,281.20 Rebate Budget $ 1,200,000 $ 1,550,000 $ 5,450,000 $ 350,000 $ 1,250,000 $ 900,000 $ 1,800,000 $ 2,250,000 $ 1,100,000 $ 15,850,000 Spent to Date $ 1,018,052 $ 889,246 $ 8,118,489 $ 150,697 $ 1,106,926 $ 2,005,965 $ 2,370,684 $ 1,474,128 $ 595,170 $ 17,729,356 Participant Type Participants To Date MWh To Date Devices Customers 8,214 190 8,404 0 0 0.00 Rebate Budget $ 1,600,000 $ 2,000,000 $ 3,600,000 $ $ $ 1,287,910 1,002,885 2,290,795 Participant Type Participants To Date MWh To Date Rebate Budget Spent to Date Customers Customers Dwellings Dwellings 1,000 sf 1,000 sf 332 1,904 5,802 8,691 4,552 5,996 16,729 0 302 2,049 4,133 5,186 6,590 5,630 23,890 $ - $ 7,420 $ - $ 7,420 0 $ - $ - CES MW Savings Grand TOTAL Residential Totals Commercial Totals MW Goal 38.09 MW To Date 43.09 Percentage Participant Type Participants To Date MWh To Date 45,460 59,171.04 Rebate Budget $ 19,450,000 Spent to Date $ 20,027,572 16.03 14.06 21.09 26.44 132% 188% 190,115 25,231 26783.20 21726.16 $ $ 14,100,000 2,010,849 …

Scraped at: Nov. 29, 2025, 10:36 a.m.

Item 10- Briefing: Fourth Quarter Financial Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 17 pages

Austin Energy Quarterly Financial Report 4th Quarter FY 2025 Stephanie Koudelka Austin Energy Director of Finance November 2025 © Austin Energy Item 10 Agenda Quarterly Financial Report Executive Summary Financial Health Budget to Actuals Financial Statements Competitiveness Metric 2 Executive Summary Operating Results Operating income was above budget by $7m, or 1.5% for the fiscal year. Bond Rating AA- bond rating was affirmed in October 2025, remaining below AA target. Financial Policies Substantial compliance with financial policies. Power Supply Adjustment The PSA was $105M over recovered as of September. 3 Financial Health S&P Bond Rating Target: AA | Actual: AA- Days Cash on Hand Debt Service Coverage Operating Margin Debt to Capitalization Target > 200 Days Target > 2.5x Target > 10% Target < 50% Actual 195 Days Actual 2.5x Actual 21% Actual 57% Includes ~33 Days of Power Supply Adjustment over recovery Includes 10% increase for a one-time adjustment for other post employment benefit costs 4 Rating Agency Update $425 million, Series 2025 Bonds Credit Rating by Agency Stable Outlook S&P Fitch Moody’s AA- AA- Aa3 Credit Rating Drivers • Rate flexibility, including base rate increases and Power Supply Adjustment authority • Improved financial metrics including liquidity and coverage • Diverse generation portfolio 5 Rating Agency Update Future Considerations Downside Scenario (Downgrade) • Weakened financial metrics • Unplanned increases in operating and capital costs • Failure to implement timely rate increases Upside Scenario (Upgrade) • Successful implementation of resource plan • Sustained financial health 6 Austin Energy Quarterly Financial Report Budget to Actuals 7 Austin Energy Fund Summary Millions of $ Actual Budget Base Revenue Power Supply Revenue Other Operating Revenues Total Operating Revenues Power Supply Expense Other Operating Expenses Total Operating Expenses Operating Income (Loss) Transfers In Interest Revenue Debt Service Income (Loss) Before Transfers Administrative Support Transfer General Fund Transfer Economic Development Transfer Other Transfers CIP Transfer Reserve Transfers $ 732 $ 711 576 528 1,815 515 854 1,369 446 5 38 (178) 311 (39) (125) (10) (19) (98) (50) 584 471 1,787 491 843 1,334 453 5 36 (165) 329 (39) (125) (10) (19) (128) (50) Favorable (Unfavorable) $ 21 8 (57) (28) 24 11 35 7 0 (2) 13 18 0 0 0 0 (30) 0 Excess (Deficiency) of Revenues $ (42) $ (30) $ (12) 8 80 60 40 20 0 s n o i l l i M $ Power Supply Adjustment Oct-24 …

Scraped at: Nov. 29, 2025, 10:36 a.m.

Item 11 - Briefing: Fourth Quarter Operations Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 16 pages

Austin Energy FY2025 Q4 Operations Update Lisa Martin Deputy General Manager & Chief Operating Officer November 2025 © Austin Energy Item 11 Agenda Quarterly Operations Update Executive Summary Environmental Performance Reliability Performance Strategic Work 2 Executive Summary Renewable Production 34% aggregate renewable production as a percentage of load in Q4. Carbon-Free Production 55% carbon-free generation as a percentage of load in Q4. Generator Availability Resources at Sand Hill, Decker, Fayette and South Texas all exhibited high availability sufficient to match summer demand. Reliability Performance Performance metrics show similar outage duration and frequency compared to last quarter leading to a stabilized trend. 3 Environmental Performance Austin Energy Operations Update Carbon-Free Generation as a Percentage of Load Monthly Data 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 55% Carbon-Free Average Nuclear Renewable 5 Carbon-Free Generation as a Percentage of Load Rolling 12-Month Average Data 65% 12-month average 6 Net Generation and Load Analysis – Q4 FY2025 Generation vs. Consumption (MWh) Power Generation Cost by Fuel Type 7% 8% 58% 27% Nuclear Coal Natural Gas Renewable 1,478,788 875,532 394,848 918,565 4,454,801 Nuclear Coal Natural Gas Renewable Generation Consumption Historical Q4 System Peak Demand (MW) Power Generation as a Percent of Consumption W M 3,150 3,100 3,050 3,000 2,950 2,900 2,850 2,800 2022 2023 2024 2025 7 Renewable 34% Other 45% Nuclear 21% Reliability Performance Austin Energy Operations Update Generator Performance – Q4 FY2025 Generation Resource Commercial Availability Actual Commercial Availability Summer Target South Texas Project Fayette Power Project Sand Hill Combined Cycle Sand Hill Peakers Decker Peakers 100% 100% 97% 99% 80% 100% 97% 95% 95% 95% 9 Electric Vehicle Charging Network – Q4 FY2025 100.00% 95.00% 90.00% 85.00% 80.00% 100.00% 95.00% 90.00% 85.00% 80.00% Overall Network Uptime 12-month rolling average 98% 98% 98% 99% Q1 FY 25 Q2 FY 25 Q3 FY25 Q4 FY25 DC Fast Chargers Uptime 12-month rolling average 91% 91% Q1 FY 25 Q2 FY25 88% Q3 FY25 89% Q4 FY25 Report Charging Station Outages • ChargePoint app • Austin 3-1-1 • pluginaustin@austinenergy.com Electric Vehicle Charging Stations EV Charging Station Usage Q4 FY2025 Charging Sessions in Q4 Average Monthly: 36,293 741 Megawatt Hours average monthly energy dispensed 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 - 35,910 36,649 36,321 July August September 9 a.m. – 2 p.m. peak usage time 4h 59m average plug-in time 2h 51m average charging time Distribution Reliability – Q4 FY2025 Average …

Scraped at: Nov. 29, 2025, 10:36 a.m.

Item 12 - Briefing: Austin Energy’s Electric System Reliability Plan original pdf

Thumbnail of the first page of the PDF
Page 1 of 16 pages

Austin Energy’s Electric System Resiliency Plan (ESRP) Lisa Martin Deputy General Manager & Chief Operating Officer November 2025 © Austin Energy Item 12 Agenda I. Background • What is an Electric System Resiliency Plan • Goals II. Development • Community Input • Decision Framework III. Plan • Investment Areas • Operational Plan • Investment Forecast IV. Next Steps Why Are We Here? Building a stronger, smarter and more reliable electric system for Austin Overhead Resiliency Study Undergrounding Study | March 2025 Consultant Delivered Overhead Resiliency Study | July 2025 Consultant Delivered Develop Electric System Resiliency Plan Use both studies, further analysis and stakeholder engagement to inform near- and long-term priorities Underground Feasibility Study Electric System Resiliency Plan Existing Reliability Programs 3 Undergrounding & Overhead Study Takeaways $50 billion to underground all the remaining 5,000 miles of distribution lines Undergrounding Risks: Environmental/Cultural Easements Rocky Soil Acquiring Telecom Relocation Critical Root Zones Dense Vegetation Recommended Austin Energy develop a strategic approach to undergrounding Overhead hardening implementation is faster, less expensive and provides similar resiliency benefits Develop an Electric System Resiliency Plan focused on overhead hardening and advanced technologies What is an Electric System Resiliency Plan? ESRP Keeping the power on, even when it’s tough An ESRP helps ensure a power grid can: • Withstand extreme weather like storms, heatwaves, winter storms, and floods • Recover quickly from outages and emergencies • Adapt to future challenges like climate change and growing energy demand Austin Energy’s Electric System Resiliency Plan A bold, integrated and forward-looking strategy to modernize and harden our electric distribution system over the next decade Austin’s ESRP Goals • Reduce outage frequency and duration • • Prioritize investments that deliver the highest customer value Enhance the grid for bi-directional energy flows to better enable distributed energy resources • Adopt a strategic and robust approach to hardening our system so we can achieve greater impact in less time 6 Stakeholder Feedback In-Person and Virtual 7 What We Heard from Our Community Equity & Geographic Considerations Communication & Transparency Wildfire Mitigation & Vegetation Management Community Feedback: Equitable improvements across all Austin neighborhoods Community Feedback: Public-facing progress tracker and clear upgrade timelines Plan Alignment: Data-driven prioritization to target investments equitably Plan Alignment: Transparent reporting, and accessible project timelines Community Feedback: Proactive trimming, maintenance and ecological sensitivity Plan Alignment: Expands vegetation management, using risk-based standards and environmental best practices 8 Decision Framework Data Driven Criteria …

Scraped at: Nov. 29, 2025, 10:36 a.m.

Item 2 - Backup Control Center Uninterruptible Power Supply System Replacement original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Posting Language ..Title Authorize a contract for construction services for the Backup Control Center Uninterruptible Power Supply System Replacement for Austin Energy with Fakouri Electrical Engineering, Inc. in the amount of $629,199 plus a $60,000 contingency for a total contract amount not to exceed $689,199. Funding: $689,199 is available in the Capital Budget of Austin Energy. 25-2210 ..Body Lead Department Austin Financial Services. Managing Department Austin Energy. Amount and Source of Funding Funding is available in the Capital Budget of Austin Energy. Procurement Language: Austin Financial Services issued an Invitation for Bids solicitation IFB 6100 CLMC1097 for these services. The solicitation was issued on July 21, 2025, and closed on August 28, 2025. The recommended contractor submitted the only responsive offer. A complete solicitation package, including a tabulation of the bid received, is available for viewing on the City’s website. This information can currently be found at https://financeonline.austintexas.gov/afo/account_services/solicitation/solicitation_details.cfm?sid=141987 . MBE/WBE: This contract will be awarded in compliance with City Code Chapter 2-9A (Minority-Owned and Women- Owned Business Enterprise Procurement Program). No goals were established for this solicitation. For More Information: Direct questions regarding this Recommendation for Council Action to Austin Financial Services - Central Procurement at FSDCentralProcurementRCAs@austintexas.gov or 512-974-2500. Respondents to the solicitation and their Agents should direct all questions to the Authorized Contact Person identified in the solicitation. Council Committee, Boards and Commission Action: November 10, 2025 - To be reviewed by the Electric Utility Commission. Additional Backup Information: The project involves the replacement of the aging Uninterruptible Power Supply (UPS) system at the Backup Control Center with a new, appropriately sized UPS system. This system will ensure uninterrupted power to the control center during outages, supporting critical infrastructure. The project covers engineering design and analysis for the new UPS system, procurement of equipment, installation and commissioning, detailed cost estimation and project scheduling. Due to the potential for unforeseen site conditions, design and material changes, labor and resource fluctuations, and project timeline uncertainties, a 10% contingency in funding has been included to allow for the expeditious processing of any change orders to cover any unforeseen construction costs associated with the project. There will be no impact to the public as all work will be on City property that is not open to the public. Item 2 If a contract is not approved, system disruptions or security breaches may occur. The contract allows 30 Calendar Days for completion of this …

Scraped at: Nov. 29, 2025, 10:36 a.m.

Item 3 - Electric Power Research Institute original pdf

Thumbnail of the first page of the PDF
Page 1 of 1 page

Posting Language ..Title Authorize negotiation and execution of an amendment to the membership agreement with the Electric Power Research Institute to add an additional $120,000 for research programs for a revised total contract amount not to exceed $1,320,000. Funding: $360,000 is available in the Fiscal Year 2025-2026 Operating Budget of Austin Energy. Funding for the remaining contract term is contingent upon available funding in future budgets. 25-2301 ..De Lead Department Austin Energy Fiscal Note Funding: $360,000 is available in the Fiscal Year 2025-2026 Operating Budget of Austin Energy. Funding for the remaining contract term is contingent upon available funding in future budgets. Prior Council Action: December 14, 2023 - Council authorized negotiation and execution of a membership agreement with the Electric Power Research Institute for research programs. For More Information: Amy Everhart, Director Local Government Issues 512-322-6087; Matthew Russell, Chief Technology Officer 512-322 6382. Council Committee, Boards and Commission Action: November 10, 2025 - To be reviewed by the Electric Utility Commission. Additional Backup Information: This amendment will provide additional funding to support supplemental projects related to scope development of Distributed Energy Resource Management Systems (DERMS), electric vehicle adoption, and field crew safety associated with lifting manhole covers. Through this continued membership agreement with Electric Power Research Institute (EPRI), Austin Energy partners with other utilities to provide funding to EPRI for collaborative research in the following areas of emerging technology: electric transportation and infrastructure, energy storage and distributed generation, distributed energy resource integration, and grid planning and operational technologies. Research results are used to support Austin Energy’s efforts to achieve its Council-mandated strategic goals. Membership in EPRI provides a cost-effective way for utilities to pool resources and participate in research projects that add value to their present and future operations. EPRI was established in 1973 as an independent, non-profit center for public interest energy and environmental research. EPRI brings together member organizations, scientists and engineers, and other leading experts to work collaboratively on solutions to the challenges of electric power. These solutions span nearly every area of power generation, delivery, and use, including health, safety, and the environment. EPRI’s members represent over 90 percent of the electricity generation in the United States, including several large municipal power utilities. Without this additional funding, Austin Energy would need to delay or cancel necessary research projects. Item 3

Scraped at: Nov. 29, 2025, 10:36 a.m.

Item 4 - Eminent Domain Lambie original pdf

Thumbnail of the first page of the PDF
Page 1 of 1 page

25-2353 Posting Language ..Title Approve a resolution authorizing the filing of eminent domain proceedings and payment to acquire approximately 0.0191 acres (832 square feet) of a permanent electric transmission and distribution easement out of Outlot 55, Division “O”, City of Austin, Travis County, Texas, being a portion of Lot 18, Block 2, Elm Grove, a subdivision of record in Book 2, Page 241, Plat Records, Travis County, Texas, from The Board of Directors of Lambie Homes Condominium Association, currently appraised at $95,021 subject to an increase in value based on updated appraisal(s), Special Commissioner’s award, negotiated settlement, or judgment. The property is located at 1106 Lambie Street, Austin, Texas 78702. Funding: $95,021 is available in the Capital Budget of Austin Energy. ..De Lead Department Austin Financial Services. Fiscal Note Funding is available in the Capital Budget of Austin Energy. For More Information: Brandon Williamson, Austin Financial Services, 512-974-5666; Michael Gates, Austin Financial Services, 512- 974-5639; Amy Everhart, Austin Energy, Director, Local Government Issues (512) 322-6087; David Tomczyszyn, Austin Energy, VP Electric Systems Engineering and Technical Services, (512) 322-6821. Council Committee, Boards and Commission Action: November 10, 2025 - To be reviewed by the Electric Utility Commission. Additional Backup Information: This proposed acquisition is required to relocate various structures along the existing Circuit 1015 to accommodate the Texas Department of Transportation’s expansion of Interstate Highway 35 (IH-35) as part of the IH-35 Capital Express Lady Bird Lake program. The IH-35 Capital Express Lady Bird Lake project runs along IH-35 from Holly Street to State Highway 71/Ben White Blvd. The City has attempted to purchase the needed property at 1106 Lambie Street, Austin, Texas 78702. The City and the property owner have been unable to agree on the value of the needed acquisition. The Law Department is requesting authorization to file an action in eminent domain on behalf of the City, and to authorize the City to pay for the property interest in an amount determined by the appraisal, updated appraisal(s), a Special Commissioners’ award, negotiated settlement, or judgment. The State of Texas will reimburse the City for the cost to acquire these property rights, pursuant to both the Standard Utility Agreement executed between the parties regarding the relocation of Circuit 1015 and the Settlement Agreement in Case No. C-1-PB-24-001200 in Travis County Probate Court No. 1, concerning the State’s condemnation of the City’s property at 1007 Lambie Street. Item 4

Scraped at: Nov. 29, 2025, 10:36 a.m.

Item 5 - Eminent Domain 41 Waller original pdf

Thumbnail of the first page of the PDF
Page 1 of 1 page

25-2352 Posting Language ..Title Approve a resolution authorizing the filing of eminent domain proceedings and payment to acquire the property interests needed for the Lady Bird Lake CKT1015 Project in support of the Interstate Highway 35 (IH-35) Capital Express Lady Bird Lake Project for the public use of relocating various utility structures requiring the acquisition of an electric easement consisting of 0.0917 of one acre (3,994 square foot) of a permanent electric transmission and distribution easement, out of Outlot 56, Division “O”, City of Austin, Travis County, Texas, being a portion of Lot 1, Amended Plat of Lots 1-6, Block 1, Resubdivision of Lot 1, Block 1, Magnolia Addition, a subdivision of record in Document No. 200700182, Official Public Records, Travis County, Texas, said Lot 1 conveyed to ESR Development, Incorporated by Warranty Deed with Vendor’s Lien dated June 11, 2007, as recorded in Document No. 2007114168, Official Public Records, Travis County, Texas and by Condominium Declaration for 41 Waller Lofts, A Condominium dated September 7, 2007, as recorded in Document No. 2007167267, Official Public Records, Travis County, Texas; currently appraised at $503,093 subject to an increase in value based on updated appraisals, a Special Commissioner’s award, negotiated settlement, or judgment. The owner of the property is 41 Waller Lofts Condominium Association, Incorporated. The property is located at 41 Waller Street, Austin, Texas, 78702. The general route of the project is along IH-35 from Holly Street to State Highway 71/Ben White Boulevard. Funding: $503,093 is available in the Capital Budget of Austin Energy. ..De Lead Department Austin Financial Services. Fiscal Note Funding is available in the Capital Budget of Austin Energy. For More Information: Brandon Williamson, Austin Financial Services, 512-974-5666; Michael Gates, Austin Financial Services, 512- 974-5639; Amy Everhart, Austin Energy, Director, Local Government Issues (512) 322-6087; David Tomczyszyn, Austin Energy, VP Electric Systems Engineering and Technical Services, (512) 322-6821. Council Committee, Boards and Commission Action: November 10, 2025 - To be reviewed by the Electric Utility Commission. Additional Backup Information: This proposed acquisition is required to relocate various structures along the existing Circuit 1015 to accommodate the Texas Department of Transportation’s expansion of Interstate Highway 35 (IH-35) as part of the IH-35 Capital Express Lady Bird Lake program. The IH-35 Capital Express Lady Bird Lake project runs along IH-35 from Holly Street to State Highway 71/Ben White Blvd. The City has attempted to purchase the needed property at 41 …

Scraped at: Nov. 29, 2025, 10:36 a.m.

Item 6 - Eminent Domain 48 Waller original pdf

Thumbnail of the first page of the PDF
Page 1 of 1 page

25-2354 Posting Language ..Title Approve a resolution authorizing the filing of eminent domain proceedings and payment to acquire the property interests needed for the LBL CKT1015 Project in support of the Interstate Highway 35 (IH-35) Capital Express Lady Bird Lake Project for the public use of relocating various utility structures requiring the acquisition of permanent electric transmission and distribution easement consisting of 0.0040 of one acre (174 square foot) of a permanent electric transmission and distribution easement, out of Outlot 55, Division “O”, City of Austin, Travis County, Texas, being a portion of Lot 12A, Resubdivision of Lots 11 and 12, Block 3, Elm Grove Addition, a subdivision of record in Book 13, Page 61, Plat Records, Travis County, Texas, said Lot 12A being described as a Declaration of Condominium Regime for 48 Waller Street Condominiums dated February 11, 2017, as recorded in Document Number 2017036860, Official Public Records, Travis County, Texas, same being a portion of Unit A in said Condominium Regime, said Unit A conveyed to Jason S. Goss, Justin Atwell Goss, and Courtney Camille Goss, all Individually and as Members of 48 Waller Street Condominium Association, Inc., by Warranty Deed with Vendor’s Lien dated June 20, 2017, as recorded in Document Number 2017100009, Official Public Records, Travis County, Texas; currently appraised at $19,009 subject to an increase in value based on updated appraisal(s), a Special Commissioner’s award, negotiated settlement or judgment. The owners of the needed property are Jason S. Goss, Justin Atewell Goss, Courtney Camille Goss, and 48 Waller Street Condominium Association Incorporated. The property is located at 48 Waller Street, Austin, Texas 78702. The general route of the project is along IH-35 from Holly Street to State Highway 71/Ben White Boulevard. Funding: $19,009 is available in the Capital Budget of Austin Energy. ..De Lead Department Austin Financial Services. Fiscal Note Funding is available in the Capital Budget of Austin Energy. For More Information: Brandon Williamson, Austin Financial Services, 512-974-5666; Michael Gates, Austin Financial Services, 512- 974-5639; Amy Everhart, Austin Energy, Director, Local Government Issues (512) 322-6087; David Tomczyszyn, Austin Energy, VP Electric Systems Engineering and Technical Services, (512) 322-6821. Council Committee, Boards and Commission Action: November 10, 2025 - To be reviewed by the Electric Utility Commission. Additional Backup Information: This proposed acquisition is required to relocate various structures along the existing Circuit 1015 to accommodate the Texas Department of Transportation’s expansion of Interstate Highway …

Scraped at: Nov. 29, 2025, 10:36 a.m.

Item 7 - Security Fencing original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

Posting Language ..Title Authorize three contracts for security fencing-related products and services for Austin Energy with Tony Parent Enterprises, Inc. d/b/a Allied Fence & Security, Viking Fence Co Ltd, and Woolery Custom Fence Co, each for an initial term of one year with up to two one-year extension options in amounts not to exceed $ 38,310,000, divided among the contractors. Funding: $12,000,000 is available in the Capital Budget of Austin Energy. 25-2389 ..Body Lead Department Austin Financial Services. Client Department(s) Austin Energy. Fiscal Note Funding in the amount of $12,000,000 is available in the Capital Budget of Austin Energy. Funding for the remaining contract term is contingent upon available funding in future budgets. Procurement Language: Austin Financial Services issued an Invitation for Bids solicitation IFB 1100 DPL1008REBID for these services. The solicitation was issued on June 16, 2025, and closed on July 29, 2025. Of the seven offers received, the recommended contractors submitted the lowest responsive offers. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s website. This information can currently be found at https://financeonline.austintexas.gov/afo/account_services/solicitation/solicitation_details.cfm?sid=142555 . MBE/WBE: This solicitation was reviewed for subcontracting opportunities in accordance with City Code Chapter 2-9B (Minority-Owned and Women-Owned Business Enterprise Procurement Program). For the goods and services required for this solicitation, there were no subcontracting opportunities therefore, no subcontracting goals were established. For More Information: Direct questions regarding this Recommendation for Council Action to Austin Financial Services - Central Procurement at FSDCentralProcurementRCAs@austintexas.gov or 512-974-2500. Respondents to the solicitation and their Agents should direct all questions to the Authorized Contact Person identified in the solicitation. Council Committee, Boards and Commission Action: November 10, 2025 - To be reviewed by the Electric Utility Commission. Additional Backup Information: These contracts will provide security fencing and related goods and services on an as-needed basis at Austin Energy substation and other locations. Contractors will supply all necessary labor, materials, and equipment to complete routine installations and maintenance as well as rapid response for urgent repairs resulting from damage, vandalism, or compromised gates. Without these contracts, the safety and security of Austin Energy properties, many of which house critical infrastructure, may be compromised. Tony Parent Enterprises and Woolery Custom Fence Co are current Item 7 providers of these services. Viking Fence Co Ltd and Woolery Custom Fence Co are local businesses. 25-2389 25-2389 Contract Details: Contract Term Initial Term Optional Extension …

Scraped at: Nov. 29, 2025, 10:37 a.m.

Item 8 - NetApp Products and Services original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

25-2388 Posting Language ..Title Authorize a contract for NetApp products and services, including provision, delivery, installation, configuration, maintenance, and training for storage area networks, for Austin Energy with CDW, LLC d/b/a Sirius Computer Solutions, LLC, CDW Government for an initial term of one year with up to three 12-month extension options in an amount not to exceed $2,993,400. Funding: $686,000 is available in the Operating Budget of Austin Energy. Funding for the remaining contract term is contingent upon available funding in future budgets. ..Body Lead Department Austin Financial Services. Client Department(s) Austin Energy. Fiscal Note Funding in the amount of $686,000 is available in the Fiscal Year 2025-2026 Operating Budget of Austin Energy. Funding for the remaining contract term is contingent upon available funding in future budgets. Procurement Language: Multiple cooperative purchase programs were reviewed for these services. Austin Energy has determined this contractor best meets the needs of the department to provide these services required for the City. MBE/WBE: This solicitation was reviewed for subcontracting opportunities in accordance with City Code Chapter 2-9B (Minority-Owned and Women-Owned Business Enterprise Procurement Program). For the services required for this solicitation, there were no subcontracting opportunities; therefore, no subcontracting goals were established. For More Information: Direct questions regarding this Recommendation for Council Action to Austin Financial Services - Central Procurement at FSDCentralProcurementRCAs@austintexas.gov or 512-974-2500. Council Committee, Boards and Commission Action: November 10, 2025 - To be reviewed by the Electric Utility Commission. Additional Backup Information: This contract will provide Austin Energy with use of NetApp network storage products and services, including provision, delivery, installation, configuration, maintenance, and training for storage area networks, as well as consolidated maintenance for existing connected storage. The storage area networks replace aging systems and improve the performance of critical components within Austin Energy data centers. This contract will replace an existing contract which expired November 30, 2025. The requested authorization amount was determined using departmental estimates based on historical spend and anticipated future usage. The Texas Department of Information Resources is a cooperative purchasing association recognized under Texas procurement statutes. Cooperative associations, themselves or using a lead government, competitively solicit and award contracts that are eligible for use by other qualified state and local governments. Due to Item 8 their substantial volumes, larger than any one government could achieve independently, cooperative contracts routinely include superior terms, conditions, and pricing. Use of cooperative contracts also results in lower administrative …

Scraped at: Nov. 29, 2025, 10:37 a.m.

Item 9 - 6th Street Chilled Water Transmission Line Extension original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Posting Language ..Title Authorize an additional expenditure for the construction contract for the Sixth Street Chilled Water Transmission Line Extension for Austin Energy with Primoris Energy Services Corporation, to increase the amount by $5,648,400 for a revised total contract amount not to exceed $28,242,001. Funding: $28,242,001 is available in the Capital Budget of Austin Energy. 25-2393 ..Body Lead Department Austin Financial Services. Managing Department Austin Energy. Amount and Source of Funding Funding is available in the Capital Budget of Austin Energy. Procurement Language: Additional Authorization. MBE/WBE: This request is for additional expenditure authority only. MBE/WBE goals will be established if a change order is requested. Prior Council Action: November 21, 2024 - Council approved a contract with Primoris Energy Services Corporation for 6th Street Chilled Water Transmission Extension. For More Information: Direct questions regarding this Recommendation for Council Action to the Austin Financial Services - Central Procurement at FSDCentralProcurementRCAs@austintexas.gov or 512-974-2500. Council Committee, Boards and Commission Action: November 10, 2025 - To be reviewed by the Electric Utility Commission. Additional Backup Information: The downtown chilled water system supports 48 buildings, with plans to integrate two new buildings by mid- year 2026. The system stretches over eight miles and cools more than 18 million square feet in downtown Austin. The additional expenditure is needed due to the discovery of building tie backs on 6th street requiring a switch to a larger wooden box tunnel method. The goal of the project is to add 1,727 feet of new chilled water pipes, both supply and return, inside a 72-inch pipe casing. The work will happen in the public right-of-way, from 400 W 6th Street to 101 1/2 E 6th Street. To do this, seven 30’ x 15’ large holes will be installed for the wood box tunneling. Two 24-inch chilled water pipes will be installed, starting east of Congress Avenue and ending at the corner of San Antonio Street and 6th Street. If the 6th Street Chilled Water Transmission Line Extension project doesn’t move forward as planned, it will impact the continuity of chilled water service for downtown customers. An additional 90 days will be added to the original 360-day schedule due to the expanded scope of work. Item 9 This project is located within zip code 78701 (District 9). 25-2393

Scraped at: Nov. 29, 2025, 10:37 a.m.