Electric Utility Commission - May 11, 2020

Electric Utility Commission Regular Meeting of the Electric Utility Commission - This meeting to be held by videoconference.

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

Special Meeting of the Electric Utility Commission May 11, 2020 The Electric Utility Commission is to be held May 11, 2020 with Social Distancing Modifications Public comment will be allowed via telephone; no in-person input will be allowed. All speakers must register in advance of Saturday, May 9 by Noon. All public comment will occur at the beginning of the meeting. To speak remotely at the Electric Utility Commission meeting, residents must: •Call or email the board liaison at 512-497-0966 OR jeff.vice@austinenergy.com no later than noon, Saturday, May 9. The information required is the speaker name, item number(s) they wish to speak on, whether they are for/against/neutral, and a telephone number or email address. •Once a request to speak has been called in or emailed to the board liaison, residents will receive either an email or phone call providing the telephone number to call on the day of the scheduled meeting. •Speakers must call in at least 15 minutes prior to meeting start in order to speak, late callers will not be accepted and will not be able to speak. •Speakers will be placed in a queue until their time to speak; each speaker will have up to three minutes to speak. •Handouts or other information may be emailed to jeff.vice@austinenergy.com by noon, Saturday before the scheduled meeting. This information will be provided to Board and Commission members in advance of the meeting. •If this meeting is broadcast live, residents may watch the meeting here: http://www.austintexas.gov/page/watch-atxn-live Electric Utility Commission May 11, 2020  10:00 AM – 11:30AM VIA VIDEOCONFERENCING http://www.austintexas.gov/page/watch-atxn-live Austin, Texas AGENDA Members: Cary Ferchill, Chair (Adler) Marty Hopkins, Vice Chair (Casar) Jim Boyle (Pool) Vacancy (Ellis) Vacancy (Garza) Karen Hadden (Kitchen) Cyrus Reed (Tovo) Rachel Stone (Harper-Madison) Dave Tuttle (Alter) Matt Weldon (Flannigan) Stefan Wray (Renteria) For more information, please visit: www.austintexas.gov/euc Reading and Action on Consent Agenda: Items 2-7 may be acted upon by one motion. No separate discussion or action on any of the items is necessary unless desired by a Commissioner. CALL MEETING TO ORDER 1. APPROVAL OF MINUTES – Approve minutes of the March 9, 2020 regular and special called joint commission meetings. NEW BUSINESS – CONSENT ( ) = Target Council Meeting Date; [ ] = RCA Type 2. (5/21) [Purchasing] Authorize award of a multi-term contract with TransAmerican Power Products, to provide distribution steel poles, for up to five years for a …

Scraped at: May 8, 2020, 12:20 a.m.

Item 12: Council Action Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Item 12 4. 5. 6. 7. 8. 9. EUC Report re Council Action May 11, 2020 Item below approved by EUC January 13; Council approved on date indicated in parenthesis. 13. (3/26) [Austin Energy] Authorize negotiation and execution of all documents and instruments necessary or desirable to sell approximately 0.021 acres or 912 square feet of land out of the Thomas Anderson Survey No. 17, Travis County, Texas, to the State of Texas for the Texas Department of Transportation project known as the Oak Hill Parkway, located at 6005 McCarty Lane and conveyed by warranty deed to the City of Austin Electric Utility Department, recorded in Volume 11591, Page 1325, for the amount of $6,384. (District 8) Items below approved by EUC February 10; Council approved on date indicated in parenthesis. 3. (3/26) [Austin Energy] Authorize negotiation and execution of all documents and instruments necessary or desirable to acquire a permanent electric transmission and distribution easement consisting of approximately 0.227 acres (9,880 square feet) of land for the purpose of upgrading the capacity of Circuits 1004 and 961 and the overall electric system, and being a part of Lot 2, Reed Central Austin, a subdivision in Travis County, Texas, according to the Plat recorded in Volume 94, Page 133 of the Plat Records of Travis County, Texas, with said Lot 1 being described to Kumusha Investments, L.L.C., a Texas limited liability company in that certain Special Warranty Deed recorded in Document Number 2009021276 of the Official Public Records of Travis County, Texas, and located at 915 W. Howard Lane, in an amount not to exceed $245,000, including standard and customary closing costs. (District 7) (3/12) [Capital Contracting] Authorize negotiation and execution of professional services agreements with the following four staff recommended firms (or other qualified responders) for Request for Qualifications Solicitation No. CLMP288: HDR Engineering, Inc.; Jacobs Engineering Group, Inc.; Stanley Consultants, Inc.; and Stantec Consulting Services, Inc.; for engineering and technical services for the 2020 Engineering Services for Austin Energy Plants rotation list, in amount not to exceed $10,000,000. (Districts 1 and 4) (3/12) [Purchasing] Authorize award of a multi-term contract with Equipment Depot LTD., to provide forklift leasing services, for up to five years for a total contract amount not to exceed $865,000. (3/12) [Purchasing] Authorize negotiation and execution of a contract with Advanced Power Technologies LLC, to provide online transformer monitors, in an amount not to exceed …

Scraped at: May 8, 2020, 12:20 a.m.

Item 8: 2QTR20 Financial Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 29 pages

Austin Energy Quarterly Financial Report 2nd Quarter FY 2020 (January – March 2020) Mark Dombroski Chief Financial Officer May 11, 2020 © 2018 Austin Energy Disclaimer This information is unaudited and should be read in conjunction with the audited Comprehensive Annual Financial Reports for the City of Austin, when published on: http://austintexas.gov/service/current-comprehensive-annual-financial-report 2 QUARTERLY Financial Report Agenda Executive Summary Financial Policy Compliance Financial Performance Measures Actual to Budget Analysis Financial Statements Market and Industry Analyses 3 Austin Energy Quarterly Financial Report Executive Summary 4 Executive Summary Substantially compliant with all financial policies. Capital Reserve balance below minimums but total cash above minimum of $414m. $ 629 Million Revenues Operating revenues trended close to budget through March. Balance sheet is liquid and adequately capitalized. Cash balances are stable through the second quarter. Meeting financial metrics supporting AA credit rating. Received credit upgrade from Fitch Ratings in May 2019. $515 Million Expenses Operating expenses exceed forecast by 2.7% primarily due to higher costs in power production and electric service delivery. City Council approved a $35 million bill reduction effort in April. This includes a reduction in regulatory charges, increase in CAP discounts, increase in Plus 1 funding and reductions in tiers 4 & 5. This information is unaudited and should be read in conjunction with the audited Comprehensive Financial Reports for the City of Austin, when published on www.austintexas.gov/financeonline/finance/main.cfm 5 Austin Energy Quarterly Financial Report Financial Policy Compliance 6 Financial Policy Compliance Financial policies are memorialized and adopted by ordinance each year during the budgeting process Compliance Debt Reserves Operating Non-Compliance Debt Policies Reserves Policies Operating Policies Full Compliance Partial Compliance Full Compliance Capital Reserve balance below minimums but total cash above minimum of $414m This information is unaudited and should be read in conjunction with the audited Comprehensive Financial Reports for the City of Austin, when published on www.austintexas.gov/financeonline/finance/main.cfm 7 Austin Energy Quarterly Financial Report Financial Performance Measures 8 Financial Performance Measures Standard & Poor’s Global Ratings AA Achieved November 2018 Excessive Liquidity Coverage Efficiency Leverage Deficient Days Cash on Hand Debt Service Coverage Ratio Operating Margins Debt to Capitalization Minimum > 150 Days Minimum > 2.0 Minimum > 10% Minimum < 50% Actual 225 Days Actual 2.7 Actual 5% Actual 51% Excludes General Fund Transfer This information is unaudited and should be read in conjunction with the audited Comprehensive Financial Reports for the City of Austin, when published on www.austintexas.gov/financeonline/finance/main.cfm …

Scraped at: May 8, 2020, 12:20 a.m.

Item 9: 2QTR20 Operations Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 16 pages

Austin Energy Operational Update Q2 FY20 To the Electric Utility Commission Charles Dickerson Chief Operating Officer, Austin Energy May 11, 2020 © 2018 Austin Energy 1 Austin Energy Operational Update Discussion Topics Safety Carbon Footprint Performance Power Production On-Site Energy Resources Future State 2 Austin Energy Operational Update Safety 3 Safety Data Q1 FY20 Q2 FY20 (10/19 – 12/19) (1/20 – 3/20) Total Near Misses Total Injuries Total Recordable Cases Total Vehicle Accidents 13 15 6 8 14 8 6 11 4 Austin Energy Operational Update Performance 5 Commercial Availability & Start Success Commercial Availability Generation Resource Commercial % Availability Target Seasonal (Jan-Mar) Commercial Availability Actuals (%) Q1 FY20 Q2 FY20 AVG AVG * 95 95 97 100 30 39 73 88 46 82 77 90 Decker Steam Units Sand Hill Combined Cycle Fayette Units South Texas Project Start Success Commercial Availability values reflect maintenance or refueling outages typical for this period Start Success Target(%) Start Success Actuals (%) Q2 FY20 Q1 FY20 AVG AVG Simple Cycle Start Success 99 100 100 6 Net Generation and Load Analysis FY 2020 Q2 Power Generation Cost by Fuel Type Consumption vs. Generation (GWh) 16% 7% 14% 64% 6,188 8,000 6,000 4,000 2,000 0 841 1,602 1,074 2,605 Renewables Coal Nuclear Natural Gas *Costs include fuel for generation, fuel transportation, renewable Power purchases agreements Consumption Generation Renewables Coal Nuclear Natural Gas Historical FY Q2 System Peak Demand (MW) Renewable Power as Percent of Consumption 2,411 2,129 2,197 2,045 2,500 2,400 2,300 2,200 2,100 2,000 1,900 1,800 1,848 2016 2017 2018 2019 2020 58% Non-renewables Renewables 42% This information is unaudited and should be read in conjunction with the audited Comprehensive Financial Reports for the City of Austin, when published on 7 System Reliability Metrics CAIDI = Customer Average Interruption Duration Index Average time to restore service. SAIDI = System Average Interruption Duration Index Total duration of interruptions for the average customer, during a period of time. SAIFI = System Average Interruption Frequency Index How often the average customer experiences a sustain interruption, over a period of time. SAIDI 58.02 57.22 52.95 60.41 55.75 45.50 F O N O I T A R U D L A T O T S N O I T P U R R E T N I 65 60 55 50 45 40 Q2 FY19 Q2 FY20 Austin Energy Top Decile Goal Top Quartile Q2 FY19 Q2 FY20 …

Scraped at: May 8, 2020, 12:20 a.m.

Items 2-7: Draft RCAs original pdf

Thumbnail of the first page of the PDF
Page 1 of 12 pages

Item 20-1943 Item 2 Posting Language ..Title Authorize award of a multi-term contract with TransAmerican Power Products, to provide distribution steel poles, for up to five years for a total contract amount not to exceed $6,000,000. (Note: This solicitation was reviewed for subcontracting opportunities in accordance with City Code Chapter 2-9D, Minority Owned and Women Owned Business Enterprise Procurement Program. For the goods required for this solicitation, there were no subcontracting opportunities; therefore, no subcontracting goals were established). ..Body Lead Department Purchasing Office. Client Department(s) Austin Energy. Fiscal Note Funding in the amount of $400,000 is available in the Fiscal Year 2019-2020 Operating Budget of Austin Energy. Funding for the remaining contract term is contingent upon available funding in future budgets. Purchasing Language: The Purchasing Office issued an Invitation for Bids (IFB) 1100 MMH1001 for these goods. The solicitation issued on December 16, 2019 and it closed on February 20, 2020. Of the eight offers received, the recommended contractor submitted the lowest responsive offer. A complete solicitation package, including a tabulation of the bids received, is available for viewing on the City’s Financial Services website, Austin Finance Online. Link: Solicitation Documents. Prior Council Action: For More Information: Inquiries should be directed to the City Manager’s Agenda Office, at 512-974-2991 or AgendaOffice@austintexas.gov NOTE: Respondents to this solicitation, and their representatives, shall continue to direct inquiries to the solicitation’s Authorized Contact Person: Terry V. Nicholson, at 512-322-6586 or terry.nicholson@austintexas.gov. Council Committee, Boards and Commission Action: Additional Backup Information: The contract is for the purchase of steel poles to be used for Austin Energy’s power distribution construction and maintenance projects. The contract will ensure a continued timely supply of poles for installation of new power lines and upgrades of existing infrastructure. The purchase of this equipment will be made on an as- needed basis in order to maintain the reliability of the electrical system and to support construction and development activities in Austin Energy’s service area. This contract will replace the existing contract which expires in June 2020. The recommended contractor is the current provider for these goods. Contract Detail: Contract Term Initial Term Optional Extension 1 Optional Extension 2 Optional Extension 3 TOTAL Length of Term 2 yrs. 1 yr. 1 yr. 1 yr. 5 yrs. Contract Authorization $2,400,000 $1,200,000 $1,200,000 $1,200,000 $6,000,000 Note: Contract Authorization amounts are based on the City’s estimated annual usage. ..Strategic Outcome(s) Strategic Outcome(s): Government That Works …

Scraped at: May 8, 2020, 12:20 a.m.

Approved Minutes original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Electric Utility Commission May 11, 2020 Minutes The Electric Utility Commission (EUC) convened a regularly scheduled meeting via videoconference/WebEx. Meeting called to order by Chair Ferchill at 10:12a.m. Present were Commissioners Boyle, Hadden, Hopkins, Reed, Stone, Tuttle and Weldon. Commissioner Wray was absent and there are two vacancies. 1. APPROVAL OF MINUTES – Approve minutes of the March 9, 2020 regular and special called joint commission meetings. Motion (Hopkins) to approve minutes; seconded (Reed); passed on a vote of 8-0, with Commissioner Wray absent and two vacancies. NEW BUSINESS – CONSENT ( ) = Target Council Meeting Date; [ ] = RCA Type Motion (Hopkins) to recommend Items 2, 3 and 5-7; seconded (Weldon); passed on a vote of 8-0, with Commissioner Wray absent and two vacancies. Following discussion, Motion (Reed) to recommend Item 4; seconded (Weldon); passed on a vote of 8-0, with Commissioner Wray absent and two vacancies. 2. (5/21) [Purchasing] Authorize award of a multi-term contract with TransAmerican Power Products, to provide distribution steel poles, for up to five years for a total contract amount not to exceed $6,000,000. 3. (6/4) [Purchasing] Authorize negotiation and execution of a multi-term contract with Technology International Inc., to provide neutral grounding resistors for up to five years for a total contract amount not to exceed $790,000. 4. (6/4) [Purchasing] Authorize negotiation and execution of a multi-term contract with CLEAResult Consulting Inc D/B/A CLEAResult, to provide support services for energy efficiency retail instant savings program, for up to five years for a total contract amount not to exceed $5,250,000. 5. (6/4) [Purchasing: Various depts; AE’s portion approximately $1.7M] Authorize negotiation and execution of a cooperative contract with Home Depot USA Inc., to provide maintenance, repair, operating supplies, industrial supplies, and related products and services, for a term of 79 months for a total contract amount not to exceed $13,107,300. 6. (6/4) [Purchasing: Various depts; AE’s portion approximately $550K] Authorize negotiation and execution of a multi-term cooperative contract with Cornish Medical Electronics Corporation of Texas D/B/A Cornish Medical, to provide automated external defibrillators, bleed kits, accessories, and related services, for up to three years for a total contract amount not to exceed $5,410,000. 7. (7/30) [Purchasing: Various depts; AE’s portion approximately $3M] Authorize negotiation and execution of a multi-term contract with EMR Elevator Inc. D/B/A EMR Elevator Excellence, to provide elevator and escalator preventive maintenance, repair, and modernization services, for up to …

Scraped at: July 10, 2020, 10:50 a.m.