Item #2 Seaholm Multimodal Connectivity Update - Transportation & Public Works — original pdf
Backup

Seaholm Multimodal Connectivity Update February 19, 2025 1 Legend 1. Cesar Chavez Street sidewalk and trail improvements (Sandra Murida Way - San Antonio Street) 2. Trail crossings at West Avenue and Walter Seaholm Drive 3. Third Street and Power Plant Drive (West Avenue – Walter Seaholm Drive) Improved North- South Shoal Creek Trail Alignment at Third Street Improvements to the East-West Crossing of Shoal Creek at Third Street 4. 5. 2/19/2025 2 Power Plan Drive and Third Street Connectivity • Four alternative designs are being considered to improve multimodal connectivity in this area • Broad community engagement has opened to receive feedback. • Learn more at: www.publicinput.com/seaholmmobility 3 Alternative 1: Full Plaza Alternative 1 Concept - Close Power Plant Drive - Improve ramps and install concrete and sod to create a plaza for multimodal movement - Parking on 3rd St. retained 4 Alternative 2: Plaza with Back-In Angle Parking Alternative 2 Concept - Close Power Plant Drive - Improve ramps and install concrete and sod to create a plaza for multimodal movement - Back-In angle parking installed on S. curb of 3rd St. 5 Alternative 3: Trail Connection without Plaza Alternative 3 Concept - Expanded median with urban trail dividing Power Plant Dr. and 3rd St. - Parking retained on 3rd St. 6 Alternative 4: Full Plaza with Delivery Access Alternative 4 Concept - Close Power Plant Drive - Improve ramps and install concrete and sod to create a plaza for multimodal movement - Added delivery zone and ADA parking space 7 Cesar Chavez Street Shared-Use Path Construction began on the improvements in Fall 2024 and is expected to be complete in Spring 2025. 8 Improved Crossing Safety at Cesar Chavez and West/Walter Seaholm • Dynamic signs are being made and should be delivered for installation in the coming weeks. • Foundations are constructed at Walter Seaholm Drive and are currently being constructed at West Avenue 9 Next Steps • Cesar Chavez Blank Out Signs • Installation of signs • Cesar Chavez Trail Connection • Continued construction. Completion late Spring. • 3rd/West Improvements • Community engagement • Design finalization and construction • Cesar Chavez Blank Out Signs • Installation of signs • Cesar Chavez Trail Connection • Continued construction. Completion late Spring. • 3rd/West Improvements • Community engagement • Take the survey until 3/23/25 • Stop by our pop-up event 3/1/25 10am – 12pm at 3rd and West • Design finalization and construction 10 Questions/Discussion 1 1