Downtown CommissionApril 20, 2022

Agenda_Item_2(a)_Presentation — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 28 pages

CIP ID#5201.008 ESB-MACC Phase 2 Improvements Schematic Design Presentation Miró Rivera-Tatiana Bilbao LLC April 20, 2022 ESB-MACC Waterloo Greenway Status: In-progress (2021-2026) Waterloo Greenway is a 1.5-mile park system that encompasses 35 acres of connected green space, beginning at 15th St. and ending at the edge of Lady Bird Lake (alongside the ESB-MACC). Pontoon Bridge Status: Feasibility A new pontoon bridge is planned to connect the Waterloo Greenway project with South Austin. The floating bridge will provide pedestrian access across Lady Bird Lake. Rainey Street Trailhead Park Status: Schematic Design Rainey Street Trailhead Park is a gateway to the riverside trails; an important entry point from Rainey Street that enhances the ecology of the area and provides new recreational uses, increasing amenities for the neighborhood and Trail users. SITE AND BUILDING ANALYSIS Site, Context and Sustainability 2 THE ESB-MACC Project development 3 MACC DEVELOPMENT 2000: Original Master Plan 2007: Phase 1 = Completed 2010: Phase 1A = Completed 2018: Facilities Expansion Plan 2020: Start of Phase 2 Teodoro González de León Phase 1 1998 - 2009 Phase 2 2017 onwards Phase 3 Future THE ESB-MACC Project development 4 THE ESB-MACC Mission / Goals PHASE 2 - MISSION / GOALS 1. Increase visibility and presence 2. Connect to urban fabric 3. Preserve and enhance parkland 4. Elevate civic gathering space 5. Complete Teodoro’s original vision Urban Design Guidelines Goals 5 Youth Caminos Participants Cultural Arts and Community groups General Public Legacy stakeholders Adjacent neighbors Civic Organizations City Staff ESB-MACC COMMUNITY Schools and Libraries PARD Management ESB MACC Executives and Staff Advisory Committees Boards and Commissions Elected Officials ESB MACC Advisory Board THE ESB-MACC The Community 6 CONTEXT CHALLENGES // SECURING THE ZOCALO Level 2 Level 1 Level 2 Level 1 Level -1 Lady Bird Lake Lady Bird Lake Existing condition of the ESB-MACC Plaza Introduction of a containing wall that limits the Zócalo 7 DESIGN CONCEPT Defining the Space 8 Existing Condition DESIGN CONCEPT Defining the Space 9 Extension of North and South wings DESIGN CONCEPT Defining the Space 10 Adding a lake level will provide area to the development while securing the Zócalo DESIGN CONCEPT Defining the Space 11 This is where we are today - new wings on the North and South and a Lake Level SHADE STRUCTURE, REF ARCH EXISTING GRADE FINISHED GRADE, BEYOND 443.00' FIN. GRADE PLANTED SLOPE SITE SECTION @ LOWER PLAZA 1/16" = 1'-0" SITE SECTION @ PLANTED SLOPE 1/16" = 1'-0" EXISTING GRADE 444.50 429.00 RIPARIAN RESTORATION PLANTED TERRACE WALLS 14'-0" TRAIL PLANTED SLOPE LOWER PLAZA SHADE STRUCTURE, REF ARCH 429.00 443.00 445.00 RIPARIAN RESTORATION 14'-0" TRAIL PLANTING & SEAT WALLS PLANTED SLOPE BEYOND PLAZA SITE SECTION @ ZOCALO & LOWER PLAZA 1/16" = 1'-0" EXISTING GRADE ZOCALO 461.5' 1/8"/ FT SLOPE CORRIDOR REFERENCE DETAILS & IMAGES ARE PROVIDED TO CONVEY GENERAL DESIGN INTENT FOR PRICING PURPOSES. DETAILS MAY NOT REFLECT ACTUAL PROJECT CONDITIONS. Copyright ©2021, Miró Rivera-Tatiana Bilbao LLC Miró Rivera Architects 505 Powell Street Austin, Texas 78703 512.477.7016 Tatiana Bilbao ESTUDIO Paseo de la Reforma 382–4 CDMX, Mexico 06600 +52 (55) 8589 8822 CONSULTANTS Civil Engineer MWM Design Group 305 E Huntland Dr Austin, TX 78752 512.453.0767 Structural Martinez Engineering 501 Congress Ave, Ste 113 Austin, TX 78701 737.238.2741 MEP Aptus Engineering 1919 S 1st St, Bldg B Austin, TX 78704 512.872.5059 Landscape Architect Ten Eyck Landscape Architects 1214 W 6th St, #100 Austin, TX 78703 512.813.9999 OVERLOOK EXISTING GRADE PLANTED SLOPE LANDSCAPE Section SCHEMATIC DESIGN 11/23/2021 REVISION ISSUE DATE NOT FOR REGULATORY APPROVAL, PERMITTING OR CONSTRUCTION MEXICAN AMERICAN CULTURAL CENTER 600 RIVER STREET AUSTIN, TEXAS 78701 SITE SECTIONS SHEET: SCALE: DATE: JOB #: DRAWN BY: L 5 11/23/2021 2003 TELA 12 WELCOME GARDEN PARKING YOUTH PLAY AREA GATEWAYS TRAIL LOADING DOCK HEALING GARDEN ZÓCALO MACC EVENT LAWN CONCEPT PRINCIPLES Approach, Views, Enclosure & Security, Access, Visibility LADY BIRD LAKE 13 Access from Parking Access from Gran Entrada Loading Dock Creating a Lake Level Controlled Access Points Zócalo Connection and extension DESIGN CONCEPT Defining the Space 14 YOUTH PLAY AREA 1 5 0 ' 1 5 0 ' 5 0 ' TRAIL 1 5 0 ' 150' 150' 150' 150' 150' 150' 150' 150' 150' 150' 5 0' 0 ' 5 50' 50' 50' 50' 50' 50' 5 0 ' 5 0 ' 50' 5 0 ' 50' 5 0 ' 150' 1 5 0 ' 150' 150' 1 5 0 ' MACC EVENT LAWN 50' 0 ' 5 50' 5 0 ' 5 0 ' 1 5 0 ' 5 0 ' LANDSCAPE Ground Level HEALING GARDEN 15 TRAIL MACC EVENT LAWN LANDSCAPE Lake Level 16 C P P C P P P P S S L L R P P L S P R L S S PLANTING ZONE DIAGRAM (SHRUBS, FORBS, GRASSES, GROUNDCOVERS) RIPARIAN W/ SLOPE STABILIZATION R RAIN GARDEN / SWALE NATIVE PLANTING AREA L LAWN S P C CACTUS GARDEN TREE DIAGRAM TREES (QUANTITY IS APPROXIMATE) TRANSPLANTED TREE LARGE TREES PALMS SPECIMEN TREE SMALL TREES UNDERSTORY / RIPARIAN UNDERSTORY / RIPARIAN SLOPE / RIPARIAN RAIN GARDEN SUNNY SLOPE UNDERSTORY / RIPARIAN UNDERSTORY / RIPARIAN SLOPE / RIPARIAN RAIN GARDEN CACTUS GARDEN LANDSCAPE Planting Zones Copyright ©2021, Miró Rivera-Tatiana Bilbao LLC Miró Rivera Architects 505 Powell Street Austin, Texas 78703 512.477.7016 Tatiana Bilbao ESTUDIO Paseo de la Reforma 382–4 CDMX, Mexico 06600 +52 (55) 8589 8822 CONSULTANTS Civil Engineer MWM Design Group 305 E Huntland Dr Austin, TX 78752 512.453.0767 Structural Martinez Engineering 501 Congress Ave, Ste 113 Austin, TX 78701 737.238.2741 MEP Aptus Engineering 1919 S 1st St, Bldg B Austin, TX 78704 512.872.5059 Landscape Architect Ten Eyck Landscape Architects 1214 W 6th St, #100 Austin, TX 78703 512.813.9999 SCHEMATIC DESIGN 11/23/2021 REVISION ISSUE DATE NOT FOR REGULATORY APPROVAL, PERMITTING OR CONSTRUCTION MEXICAN AMERICAN CULTURAL CENTER 600 RIVER STREET AUSTIN, TEXAS 78701 PLANTING PLAN & REFERENCE IMAGES SHEET: SCALE: DATE: JOB #: DRAWN BY: L 9 11/23/2021 2003 TELA 17 WALKTHROUGH Aerial View of Gallery Wing and Lake Level Connection 18 FLOOR PLAN Ground Level KEY PLAN Existing (Non-Renovated Space) Youth Education Utility / Mechanical Multi-use Auditorium Auditorium Lobby Dance Class Music Room Community Gallery Permanent Gallery Reception / Visitor Information SHADE STRUCTURE: diam: 80 ft Fits: 450 - 500 seats under the shade structure 19 WALKTHROUGH Youth Classrooms and Zocalo Staircase 20 FLOOR PLAN Second Level 21 KEY PLAN Existing (Non-Renovated Space) Shell Artist’s Studios Library / Media Center Offices Adult Education 1126713241819253630313748424385907378616649549196798467725560 WALKTHROUGH Circulation 22 FLOOR PLAN Lake Level 23 KEY PLAN Black Box Shell Permanent Gallery ●●●●●●●●●●●●●●●●●●●●●●●●●●●●●●●●●●●●SLCWQZCWQZCWQZCWQZCWQZCWQZCWQZCWQZCWQZ WALKTHROUGH Zocalo to Lake Level Staircase 24 WALKTHROUGH Corridor and Gallery Window 25 WALKTHROUGH Lake Elevation 26 SITE LANDSCAPE Overall 28