Backup — original pdf
Backup
Prereq Construction Activity Pollution Prevention Required V4 LEED v4.1 BD+C: Core and Shell Project Checklist ? N Y 1 Credit Integrative Process 11 0 26 Location and Transportation 20 Credit LEED for Neighborhood Development Location Credit Sensitive Land Protection Credit High Priority Site and Equitable Development Credit Surrounding Density and Diverse Uses 6 Credit Access to Quality Transit Credit Bicycle Facilities Credit Reduced Parking Footprint Credit Electric Vehicles 2 2 Sustainable Sites Credit Site Assessment 2 Credit Protect or Restore Habitat Credit Open Space 2 Credit Rainwater Management Credit Heat Island Reduction Credit Light Pollution Reduction Credit Tenant Design and Construction Guidelines 2 3 Water Efficiency Prereq Outdoor Water Use Reduction Prereq Indoor Water Use Reduction Prereq Building-Level Water Metering 1 1 Credit Outdoor Water Use Reduction Credit Indoor Water Use Reduction 3 Credit Optimize Process Water Use Credit Water Metering 3 21 Energy and Atmosphere Prereq Fundamental Commissioning and Verification Prereq Minimum Energy Performance Prereq Building-Level Energy Metering Prereq Fundamental Refrigerant Management 6 Credit Enhanced Commissioning 14 Credit Optimize Energy Performance Credit Advanced Energy Metering Credit Grid Harmonization 3 Credit Renewable Energy 1 Credit Enhanced Refrigerant Management 11 2 Y 1 1 0 Materials and Resources Prereq Storage and Collection of Recyclables Credit Building Life-Cycle Impact Reduction Credit Environmental Product Declarations Credit Sourcing of Raw Materials Credit Credit Material Ingredients Construction and Demolition Waste Management 6 0 Indoor Environmental Quality Prereq Minimum Indoor Air Quality Performance Prereq Environmental Tobacco Smoke Control Credit Enhanced Indoor Air Quality Strategies Credit Low-Emitting Materials Credit Construction Indoor Air Quality Management Plan Credit Daylight 2 1 3 1 1 6 1 1 1 6 Y 1 1 2 1 1 5 Y Y Y 1 3 1 9 Y Y Y Y 4 1 2 2 6 1 1 1 2 5 Y Y 1 2 1 Regional Priority V4 RP - 1PT RP - 2PT RP - 2PT RP - 4PT RP - 10PT RP - 2PT 1 20 20 2 3 6 6 1 1 1 11 V4 V4 V4 V4 V4 V4 V4 V4 V4 V4 V4 1 2 1 3 2 1 1 11 Required Required Required 3 4 3 1 33 Required Required Required Required 6 18 1 2 5 1 14 Required 6 2 2 2 2 10 Required Required 2 3 1 3 3 1 1 1 1 3 1 1 1 2 1 1 Credit Quality Views 1 0 Innovation Credit Innovation: Cleaning and Disinfecting your space for emerging pathogens Credit Innovation: Green training for contractor Credit Innovation: All-Gender Restrooms Credit Innovation: Green Building Education Credit Exemplary Performance: Reduced Parking Footprint Credit LEED Accredited Professional 2 0 Regional Priority Credit Regional Priority: Reduced Parking Footprint Credit Regional Priority: Renewable Energy Credit Regional Priority: Rainwater Management Credit Regional Priority: Indoor or Outdoor Water Use Reduction 1 1 6 1 1 1 1 1 1 4 1 1 1 1 53 20 52 TOTALS Possible Points: 110 Certified: 40 to 49 points, Silver: 50 to 59 points, Gold: 60 to 79 points, Platinum: 80 to 110 Project Name: Requirement for Credit Analyze energy systems, water systems, site impact on design, social equity, health & wll being Project is on previously developed land. Property is located in a CDFI Investment Area, census tract income is below 80% AMI Meets nearby diverse Uses, and surrounding density Bus Stations too far Meets Network Req. Will need long-term storage Current Parking layout is 70% reduction Providing 2 EV Charging spaces, need additional 4 capable for Energy Code. Site Survey Assesment Would need intensive site restoration Provide outdoor space = 30% of site area Civil Will need 4,500 SF of non roof measures (shade paving, reflective paving, PV over parking) MEP MEP MEP, will need to tap into purple pipe system to reach 40%. MEP MEP Not in Fee MEP MEP Would need to enroll in Demand Response with AE. MEP, PV on roof. Code require 0.75W/SF MEP Need to maintain 50% of structure, enclosure and interior structural elements. Interiors Interiors Interiors MEP Interiors Lighting Designer