02. AUS West Garage Presentation — original pdf
Backup

WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025AGENDA: • SCHEDULE OVERVIEW • PROGRAM REVIEW • DESIGN OVERVIEW • ENTRANCE ROADWAY ALTERATIONS & TRAFFIC MODELING • EARLY OPENING PLAN • SUSTAINABILITY OVERVIEW AGENDA WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025 Spaces open by mid 2026 GOAL: SOLUTION: Break ground March 2025 RECAP OF EVENTS: July 23, 2o24 First OAC: August 19, 2o24 90% civil submission to DSD: 30% Submittal: September 27, 2o24 Civil submission for completeness: September 27, 2o24 Completeness approved: October 8, 2o24 Civil formal review start: October 14, 2o24 November 22, 2o24 60% Submittal: Subcontractor Outreach Meetings: November 19 and December 4, 2024 and Feb 19, 2025 January 14, 2025 GMP submitted to City: January 31, 2025 90% Submittal: February 28, 2025 Ground Breaking Ceremony: Early March 2025 Site clearing activity: March 24, 2025 Site Development Permit Target: March 24, 2025 Issue for Building Permit: GOAL & PLAN RECAP: PAST EVENTS WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025LOT B GOOGLE EARTH IMAGE WITH SITE LOCATION WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025Program Item Current Program Parking Level / Count 7 Levels / 7,037 spaces Ramping Stacked speed ramp assembly Structural System Cast-in-place concrete Fire Sprinkler System Fire sprinkler system and standpipe EV Chargers 16 EV Chargers on Ground Level Parksmart Certfication Parksmart Certification; coring matrix being is at rear of presentation Connection to Blue Garage Covered Pedestrian Bridge connecting Southeast corner of Level 3 West Garage to Northeast corner of Level 3 Blue Garage. Roadway access to Garage A new dedicated roadway that enters Garage and accesses speed ramp in southwest corner. PROGRAM OVERVIEW WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 202536" SD 24" S D 24" S D IT & ELEC DUCTBANKS 24" S D 24" S D 24" S D 48" SD 5 0 4 24" S D 48" SD 24" S D 24" S D 24" S D UTILITY CORRIDOR COMM & ELEC ) P Y T ( I E T L - L E ) P Y T ( E IT L - L E ) P Y T ( I E T L - L E 5 0 6 5 0 4 ) P Y T ( I E T L - L E ) P Y T ( E IT L - L E UTILITY CORRIDOR COMM & ELEC 5 0 2 ) P Y T ( I E T L - L E GARAGE FOOTPRINT EL-LITE (TYP) EL-LITE (TYP) E L - L I T E ( T Y P ) ) P Y T ( I E T L - L E P ) Y E ( T L -LIT E E L - L I T E ( T Y P ) 5 0 2 4 4 " S D 8" RW 2 4 " S D 60" SD 12" W P ) Y E ( T L - L I T E 2 4 " S D 2 4 " S D 24" SD 36" SD 48" SD 5 0 6 2 4 " S D 2 4 " S D 5 0 4 2 4 " S D ’ 2 0 4 = M A R D E E P S ’ 2 4 + S Y A B G N K R A P I ’ 0 6 X S I 60" SD I R O D R R O C Y T I L I T U 24" SD 24" SD 12" W 24" S D W " 2 1 I R O D R R O C Y T L T U I I ) P Y T ( E T I L - L E 5 0 8 1 8 " S D W WEST GARAGE Austin-Bergstrom International Airport SITE UTILITIES PLAN 1" = 50'-0" UTILITY OVERVIEW & GARAGE FOOTPRINT LEGEND: EL-LITE - ELEC LIGHT CONDUIT RW - RECLAIMED WATER SD - STORM DRAIN W - WATER N G-27 WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025BLUE GARAGE PRECEDENT WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025BLUE GARAGE PRECEDENT WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025O R D E R VEHICULAR MOVEMENT W I N A R T S E D E P I N O T C E N N O C I Y T T N E D I ADMIN BLDG LOT D NEW WEST GARAGE BLUE GARAGE IDENTITY BLUE GARAGE & ‘YELLOW’ GARAGE DIAGRAM WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025AVIATION IMAGERY WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025EXTERIOR SKIN EVOLUTION FROM AUG 13, 2024 WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025PGAL, Inc. 3601 S Congress Ave d100 Austin, TX 78704 T 512 236 1005 www.pgal.com GIST E R E D AR ST O P H ERR U E R I R H C S T A T 2 09 4 E FO C H I T E C T E B U S H SA X E 6 T THE SEAL APPEARING ON THIS DOCUMENT WAS AUTHORIZED BY CRIS R I CERTIFY THAT THESE DRAWINGS ARE COMPLETE, ACCURATE AND ADEQUATE FOR THEIR INTENDED PURPOSES, INCLUDING CONSTRUCTION, BUT ARE NOT AUTHORIZED FOR CONSTRUCTION UNTIL CITY APPROVAL. E G A R A G T S E W S U A I D R A V E L U O B L A T N E D S E R P 2 / 1 - 1 2 9 2 I 9 1 7 8 7 X T N T S U A I REV A B C D DESCRIPTION 30% SUBMITTAL 60% SUBMITTAL 90% SUBMITTAL ISSUE FOR PERMIT DATE 09/27/2024 11/22/2024 01/30/2025 03/24/2025 NAME DATE CHECKED BY CRIS R 03/24/2025 DESIGNED BY CRIS R 03/24/2025 13308.002 EXTERIOR PERSPECTIVES A-9-00 D t v r . 3 2 - 3 - A - 2 0 0 . 8 0 3 3 1 / B t o L - e g a r a G t s e W - 2 0 0 . 8 0 3 3 1 L / / : s c o D k s e d o t u A M A 9 1 : 7 3 : 0 1 5 2 0 2 / 2 1 3 / 2 SOUTHWEST VIEW N.T.S. 1 NORTHWEST VIEW N.T.S. GARAGE AXOS WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025NORTHWEST PERSPECTIVE WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025NORTHWEST PERSPECTIVE WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025EAST CORE EXTERIOR PERSPECTIVE WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025EAST CORE EXTERIOR PERSPECTIVE WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025 OVERALL ROADWAY DIAGRAM WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025ROADWAY DRAWING: NEW PAVEMENT WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025ROADWAY DRAWING: NEW PAVEMENT WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025ROADWAY DRAWING: NEW PAVEMENT WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025OBJECTIVE ONE: Provide clear, comfortable, and intuitive connections between parking and terminal LOT F OBJECTIVE TWO: Enhance pedestrian experience and provide sense of place and local character LOT E OBJECTIVE THREE: LOT D Support AUS 2040 Master Plan sustainability goals TYPICAL DOWNTOWN AUSTIN CITY BLOCK LOT G WEST GARAGE BLUE GARAGE LOT C CONRAC APPROXIMATE 5-MINUTE WALK LANDSCAPE OBJECTIVES AUS West Garage Design Commission 24 March 2025 LANDSCAPE AS WAYFINDING FUTURE ARRIVALS & DEPARTURES HALL LANDSCAPE AS WAYFINDING AUS West Garage Design Commission 24 March 2025 WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025OBJECTIVE ONE: Provide clear, comfortable, and intuitive connections between parking and terminal OBJECTIVE TWO: LOT F Enhance pedestrian experience and provide sense of place and local character LOT E OBJECTIVE THREE: LOT D Support AUS 2040 Master Plan sustainability goals BIKEWAY CONNECTION TO SH-71 SHARED USE PATH & DOWNTOWN AUSTIN LOT G WEST GARAGE BLUE GARAGE LOT C CONRAC LANDSCAPE OBJECTIVES AUS West Garage Design Commission 24 March 2025 BICYCLE EXPERIENCE FUTURE ARRIVALS & DEPARTURES HALL BICYCLE EXPERIENCE AUS West Garage Design Commission 24 March 2025 WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025OBJECTIVE ONE: OBJECTIVE TWO: Provide clear, comfortable, and intuitive connections between parking and terminal CONCEPTUAL PATH OF PROJECT CONNECT AUSTIN LIGHT RAIL PHASE 1 PRIORITY EXTENSION Enhance pedestrian experience and provide sense of place and local character LOT F OBJECTIVE THREE: LOT E Support AUS 2040 Master Plan sustainability goals LOT G LOT D WEST GARAGE BLUE GARAGE LOT C CONRAC LANDSCAPE OBJECTIVES AUS West Garage Design Commission 24 March 2025 TRANSIT EXPERIENCE FUTURE ARRIVALS & DEPARTURES HALL TRANSIT EXPERIENCE AUS West Garage Design Commission 24 March 2025 WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025OBJECTIVE ONE: OBJECTIVE TWO: OBJECTIVE THREE: Provide clear, comfortable, and intuitive connections between parking and terminal Enhance pedestrian experience and provide sense of place and local character Support AUS 2040 Master Plan sustainability goals LANDSCAPE OBJECTIVES WOODED PATHWAY 1999 AUS West Garage Design Commission 24 March 2025 EXISTING CONDITIONS EXISTING CONDITIONS AUS West Garage Design Commission 24 March 2025 LANDSCAPE SPINE 2020 WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025OBJECTIVE ONE: OBJECTIVE TWO: OBJECTIVE THREE: Provide clear, comfortable, and intuitive connections between parking and terminal Enhance pedestrian experience and provide sense of place and local character Support AUS 2040 Master Plan sustainability goals LANDSCAPE OBJECTIVES AUS West Garage Design Commission 24 March 2025 EXISTING CONDITIONS - LANDSCAPE “SPINE” EXISTING CONDITIONS - LANDSCAPE “SPINE” AUS West Garage Design Commission 24 March 2025 WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025OBJECTIVE ONE: OBJECTIVE TWO: OBJECTIVE THREE: Provide clear, comfortable, and intuitive connections between parking and terminal Enhance pedestrian experience and provide sense of place and local character Support AUS 2040 Master Plan sustainability goals WEST GARAGE LANDSCAPE OBJECTIVES AUS West Garage Design Commission 24 March 2025 PROPOSED - LANDSCAPE “SPINE” EXTENSION PROPOSED = LANDSCAPE “SPINE” EXTENSION AUS West Garage Design Commission 24 March 2025 WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025Provide clear, comfortable, and intuitive connections between parking and terminal NO TREES WITHIN UTILITY EASEMENT OBJECTIVE ONE: OBJECTIVE TWO: OBJECTIVE THREE: NATIVE & ADAPTED RE-PLANTING Enhance pedestrian experience and provide sense of place and local character NATIVE & ADAPTED PLANTING Support AUS 2040 Master Plan sustainability goals STRIPED CROSSING STRIPED CROSSING STRIPED CROSSING LIGHTING LANDSCAPE OBJECTIVES AUS West Garage Design Commission 24 March 2025 LANDSCAPE IMPROVEMENTS RECLAIMED WATER CURB EXTENSION RAISED CROSSING WIDENED PATHWAY & SEATWALLS CONNECT TO EXISTING PATH LANDSCAPE IMPROVEMENTS AUS West Garage Design Commission 24 March 2025 WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025SUSTAINABILITY: PARKSMART CERTIFICATION: the certification program for garages CONCRETE MIX: LOWER EMBODIED CARBON as demonstrated by Environmental Product Declarations 16 EV CHARGERS SOLAR READY: SOLAR VEHICLE CANOPIES CAN BE ADDED ON ROOF LEVEL BLUE GARAGE DRONE PHOTO SHOWING SOLAR ARRAY ON ROOF LEVEL TURN KEY SOLAR CANOPY INSTALLED ON ROOF LEVEL AXO SHOWING ENTIRE ROOF LEVEL AS HIGHLIGHTED IN YELLOW 2 SOUTHWEST VIEW N.T.S. ELECTRICAL ROOMS FLOOR PLAN MAP SUSTAINABILITY 43'-9" 40'-0" 40'-0" 40'-0" 40'-0" 40'-0" 40'-0" 40'-0" 3 4 5 6 7 8 9 10 11 2'-10" 40'-0" 12 13 14 15 16 17 18 40'-0" 40'-0" 40'-0" 40'-0" 40'-0" 40'-0" 40'-0" 19 20 2'-10" 40'-0" 21 22 23 24 25 26 40'-0" 40'-0" 40'-0" 40'-0" 40'-0" 28 29 43'-9" " 0 - ' 5 2 1'-4" CONCRETE BARRIER WALL TO CREATE DEDICATED GARAGE EXIT DRIVE AISLE www.pgal.com 3 AE-3-50 2 AE-3-50 1 AE-3-50 GARAGE EXIT ROADWAY & FIRE LANE; RE: CIVIL DRAWINGS UTILITY & IT CORRIDOR AND LANDSCAPE ZONE, RE: LANDSCAPE DRAWINGS STAIR 10 G160 STAIR 9 G161 STAIR 8 G150 EMERGENCY/ BACKUP GARAGE EXIT STAIR 7 G151 STAIR 6 G140 GRADING OF GROUND LEVEL SLAB WILL BE DESIGNED TO GENERALLY FOLLOW EXISTING GRADE SEE CIVIL 'DRAINAGE PLAN' FOR EXISTING LOT B GRADES ZONE 5 ZONE 4 509'-0" 506' - 6" FIRE RISER RM G136 STORAGE G137 FIRE RISER RM G138 STORAGE G139 FIRE RISER RM G122 ELEC. G123 FIRE RISER RM G124 ELEC. G125 4 AE-3-54 FIRE RISER RM G115 STORAGE G116 FIRE RISER RM G117 STORAGE G118 ZONE 1 BREAK IN THE BARRIER WALL TO ALLOW FIRE LANE TO CONTINUE WILL BE WITH GATE ARMS ADJUSTMENTS TO LOT D STRIPING WILL BE REQUIRED TO CREATE HEAD-IN PARKING ALONG BARRIER WALL AND REFORM LOT D CIRCULATION DRIVE AISLE PGAL, Inc. 3601 S Congress Ave d100 Austin, TX 78704 T 512 236 1005 2 1 1'-4" 21 GROUND LEVEL EXIT WITH EXIT GATE ARM 0 0 - 2 - E A / 4 1 A-1-02 4 AE-3-50 1 AE-3-51 X 2 AE-3-51 MAIN ELEC. G135 LIFE SAFETY G134 1 O T N W O D P M A R E FIRE PUMP RM G133 INTERIM REVIEW THIS DOCUMENT IS RELEASED FOR INTERIM REVIEW UNDER THE AUTHORITY OF CHRISTOPHER RUEBUSH TEXAS REG. NO. 20946 NOT FOR REGULATORY APPROVAL, BIDDING, PERMIT, OR CONSTRUCTION PURPOSES. AE-3-51 D C 3 " 4 - ' 1 M L K J H G F B A " 4 - ' 1 " 8 - ' 9 5 " 7 - ' 9 5 " 8 - ' 9 5 " 0 1 - ' 2 " 8 - ' 9 5 " 7 - ' 9 5 " 8 - ' 9 5 " 5 - ' 1 1 " 0 1 - ' 9 2 " 4 - ' 1 " 8 - ' 9 5 " 7 - ' 9 5 " 2 - ' 2 2 1 " 7 - ' 9 5 " 8 - ' 9 5 ZONE 6 ZONE 3 STORAGE G132 STAIR 5 G131 STAIR 4 G130 STAIR 3 G121 STAIR 2 G120 GROUND LEVEL ENTRY RAMP UP TO 2 7 3 1 4 AE-3-52 BLUE GARAGE EXIT LANE 2 / AE-2-00 2 AE-3-52 TNC ROADWAY CONRAC ENTRY RAMP 25 27 28 29 30 26 1 2 AE-3-53 AE-3-53 LOT D 1 / AE-2-00 ZONE 2 4 3 / AE-2-00 15 NOTES: GENERAL NOTES 1. SEE 'PK' DRAWINGS FOR DETAIL AND DIMENSIONS OF PARKING PLANS 2. SLAB SLOPE LINES SHOWN DESCRIBE THE DESIGN INTENT; SEE A-1-30 FOR SLAB ELEVATION DEVIATIONS FROM BASE ELEVATION LEVEL 3. PROTECT ALL VERTICAL PIPES (STORM, PLUMBING, FIRE) FROM VEHICLES WITH STEEL PLATE; SEE DETAIL X/A-X-XX PGAL, Inc. 3601 S Congress Ave d100 Austin, TX 78704 T 512 236 1005 KEYNOTE LEGEND www.pgal.com Key Keynote Text 4 7 15 21 CAST-IN-PLACE CONCRETE SLAB ON GRADE CAST-IN-PLACE BARRIER WALL WITH INTEGRAL COLOR EXISTING BLUE GARAGE TIRE INFLATION STATION 0 0 - 2 - E A / 5 " 4 - ' 1 M L " 8 - ' 9 5 " 7 - ' 9 5 " 8 - ' 9 5 " 0 1 - ' 2 " 8 - ' 9 5 " 7 - ' 9 5 K J H G F D C B A E.1 E " 8 - ' 9 5 D.5 " 4 - ' 1 " 5 - ' 1 1 " 0 1 - ' 9 2 W 3 AE-3-54 2 AE-3-54 3 AE-3-53 RW PUMP RM G110 ELEC G111 LIFE SAFETY G119 ELEC G112 STAIR 1 G114 1 OVERALL FLOOR PLAN - LEVEL 1 1/32" = 1'-0" 0 16' 32' 64' HORIZONTAL SCALE IN FEET INTERIM REVIEW THIS DOCUMENT IS RELEASED FOR INTERIM REVIEW UNDER THE AUTHORITY OF CHRISTOPHER RUEBUSH TEXAS REG. NO. 20946 NOT FOR REGULATORY APPROVAL, BIDDING, PERMIT, OR CONSTRUCTION PURPOSES. 6 3 5 2 4 1 N A L P Y E K E G A R A G T S E W S U A I D R A V E L U O B L A T N E D S E R P 2 / 1 - 1 2 9 2 I 9 1 7 8 7 X T N T S U A I REV A B C DESCRIPTION 30% SUBMITTAL 60% SUBMITTAL 90% SUBMITTAL DATE 09/27/2024 11/22/2024 01/30/2025 NAME DATE CHECKED BY -- 01/30/2025 DESIGNED BY Team 01/30/2025 13308.002 OVERALL GROUND LEVEL FLOOR PLAN A-1-10 C t v r . 3 2 - 3 - A - 2 0 0 . 8 0 3 3 1 / B t o L - e g a r a G t s e W - 2 0 0 . 8 0 3 3 1 L / / : s c o D k s e d o t u A M P 9 1 : 6 5 : 2 1 5 2 0 2 / 1 3 / 1 E G A R A G T S E W S U A D R A V E L U O B L A I T N E D I S E R P 2 / 1 - 1 2 9 2 9 1 7 8 7 X T N I T S U A REV A B DESCRIPTION 30% SUBMITTAL 60% SUBMITTAL DATE 09/27/2024 11/22/2024 t v r . 3 2 - 3 - A - 2 0 0 . 8 0 3 3 1 / B t o L - e g a r a G t s e W - 2 0 0 . 8 0 3 3 1 L / / : s c o D k s e d o t u A M P 7 0 : 3 1 : 4 4 2 0 2 / 5 2 / 1 1 NAME DATE CHECKED BY -- 11/22/2024 DESIGNED BY Team 11/22/2024 13308.002 EXTERIOR PERSPECTIVES A-9.00 B NORTHWEST VIEW 1 N.T.S. WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025Parksmart Certification Measure C10 - Stormwater Management Options C11 - Rainwater Harvesting C12 - Greywater Reuse Rainwater Harvesting Greywater Reuse C13 - Indoor Water Efficiency Efficient Fixtures Implement an Erosion and Sedimentation Control Plan 2 Meet or exceed Municipal and Local Watershed Water Quality Control Targets Retain minimum of 50% of total average rainfall Max Points Available Points Points Attempted Awarded Project Name: AUS West Garage Parksmart Scorecard Parksmart Certification Measure Options A13 - Reused, Repurposed or Recycled Materials Max Points Available Points Attempted Points Awarded Add Points Attempted for Each Option in White Columns Below Max Points Available Points Attempted Points Awarded A14 - Third Party Sustainability Certification Platinum LEED 2009 or v4 At least 80% reused, repurposed or recycled At least 50% but less than 80% reused, repurposed or recycled At least 20% but less than 50% reused, repurposed or recycled Gold LEED 2009 or v4 Silver LEED 2009 or v4 Certified LEED 2009 or v4 Certified any level LEED v2.2 Four Green Globes Three Green Globes Two Green Globes One Green Globes Energy Conservation or Environmental Sustainability Program LEED Professional Credential (AP or AP with specialty) Green Globes Assessor (GGA) LEED Green Associate Green Globes Professional (GGP) Certified Administrator of Public Parking (CAPP) Certified Parking Professional (CPP) Facilities Management Administrator (FMA) or Real Property Administrator (RPA) Certified Facility Manager (CFM) Parksmart Advisor (formerly Green Garage Assessor) Alternative Program LCA performed and savings implemented on project totaling over $2 million LCA performed and savings implemented on project totaling over $1 million LCA performed and savings implemented on project totaling over $500,000 LCA performed and savings implemented on project totaling over $100,000 6 4 2 12 10 8 6 4 12 10 8 6 2 4 4 3 3 2 2 1 1 1 4 8 6 4 2 4 8 A15 - Credentialed Management A16 - Life Cycle Assessment (Must be at least 20) Subtotal 90 39 0 Options Parksmart Certification Measure C14 - Water Efficient Landscaping C15 - Roofing Systems PROGRAMS B1 - Placemaking B2 - Access to Mass Transit B3 - Wayfinding Systems - External Placemaking Access to Mass Transit Dynamic Signage Wayfinding System Reservation System B4 - Wayfinding Systems - Internal B5 - Traffic Flow Plan Parking Guidance via Single Space Detection Parking Guidance via Electronic Level Occupancy Detection Parking Guidance via Automatic Variable Signage Parking Guidance via Manual Count and Static Signage At least four traffic flow strategies Average idle time of 5 seconds or less At least three traffic flow strategies At least two traffic flow strategies Carshare Hub Alternative Fuel Vehicles In Carshare Hub Rideshare: Reserved Spaces Rideshare: Incentives Preferred parking for low-emitting and fuel efficient vehicles Discounted rates for low-emitting and fuel efficient vehicles B6 - Carshare Program B7 - Rideshare Program C16 - Renewable Energy Generation B8 - Low-emitting and Fuel Efficient Vehicles B9 - Alternative Fuel Vehicles AFV: Reserved Parking Spaces B10 - Alternative Fuel Fleet Vehicles B11 - Bicycle Parking B12 - Bicycle Sharing/Rental B13 - Marketing/Educational Program (Must be at least 20) Subtotal AFV: Rate Discount At least 50% of fleet vehicles are powered by alternative fuels At least 25% but less than 50% of fleet vehicles are powered by alternative fuels Meets Tier One and Tier Two criteria Meets Tier One criteria Contains bicycle sharing or bicycle rental hub Promotes bicycle sharing or bicycle rental hub Marketing/Educational Program 6 4 1 2 1 4 3 2 1 4 4 3 2 5 1 4 2 2 2 3 3 4 2 6 4 6 4 4 64 Project Registration #: Parksmart Certification Measure MANAGEMENT A1 - Parking Pricing A2 - Shared Parking Options Parking Pricing Shared Parking Program Oversubscription of Parking Permits Shared Parking Analysis A3 - TMA/TMO Transportation Management Association / Organization A4 - Recycling Program Active Recycling Program Percentage of Recycling: At least 25% but less than 50% Percentage of Recycling: 50% or more Organized Sustainable Purchasing Program A5 - Sustainable Purchasing Program A6 - Proactive Operational Maintenance A7 - Cleaning Procedures - Occupied Spaces A8 - Cleaning Procedures - Parking Decks A9 - Building Systems Commissioning Purchasing of Product Groups Proactive Operational Maintenance Cleaning Products & Hand Cleaners Spot Cleaning / Oil Degreasing Power Washing: Water is Disposed Power Washing: Water is Recycled Sweeping: Electric or Propane Sweeping: Power Scrubber USGBC LEED 2009 or v4 Enhanced Commissioning credit USGBC LEED 2009 Fundamental Commissioning of Building Energy Systems prerequisite or v4 Fundamental Commissioning and Verification prerequisite ASHRAE Guideline 0-2005 and ASHRAE Guideline 1.1- 2007 California Commissioning Guide for New or Existing Buildings ASHRAE Level II Audit Comparable Established Certified Commissioning Authority (CxA) Standards A10 -Construction Waste Management 85% or more recycled or reused A11 - Regional Materials A12 - Regional Labor At least 50% but less than 85% recycled or reused At least 20% but less than 50% recycled or reused At least 75% sourced regionally At least 50% but less than 75% sourced regionally At least 60% regional At least 35% but less than 60% regional Rideshare for laborers 6 2 2 6 4 2 1 2 2 1 6 2 1 2 3 1 1 8 6 6 6 4 4 6 4 2 6 3 3 1 1 6 2 1 6 2 6 4 Max Points Available Points Attempted Points Awarded Parksmart Certification Measure Options Max Points Available Points Attempted Points Awarded Max Points Available Points Attempted Points Awarded Parksmart Certification Measure Options Water Efficient Landscaping TECHNOLOGY AND STRUCTURE DESIGN C1 - Idle Reduction Payment Systems Idle Reduction Payment Systems C2 - Fire Suppression Systems Halon Free Fire Suppression Systems 3 4 1 4 2 1 C3 - No/Low VOC Coatings, Paints, Sealants C4 - Tire Inflation Stations C5 - EV Charging Stations Green Roof Blue Roof Carport or Canopy High SRI Roofing Solar Panels 2 5 No/Low VOC Coatings, Paints, Sealants Tire Inflation Stations Two or more DC Fast Chargers One DC Fast Charger Two or more AC Level II EV Chargers, equaling at least 1% of all parking spaces Two or more AC Level II EV Chargers, equaling at least 0.5% but less than 1% of all parking spaces At least one AC Level II EV Charger, equaling less than 0.5% of all parking spaces Level I equipped spaces equaling at least 0.5% of all parking spaces No additional payment is required to charge vehicles 4 2 2 2 5 4 5 4 2 1 1 2 1 2 1 3 4 2 2 2 5 1 At least 75% of energy is on-site renewable energy C6 - HVAC Systems - Occupied Spaces C7 - Ventilation Systems - Parking Decks Energy Efficient System CO Sensors Programmable Thermostats Environmentally Safer Coolants Demand Controlled Ventilation 4 6 6 4 6 26 2 1 1 6 C8 - Lighting Controls At least 50% of lighting fixtures controlled by simple timer Variable Air Flow System Schedule or Occupancy Controls Calibration and Maintenance Design for Natural Ventilation At least 75% of lighting fixtures controlled by occupancy sensors At least 50% of lighting fixtures controlled by occupancy sensors At least 50% of lighting fixtures controlled by advanced programmable system At least 50% and less than 75% of energy is on-site renewable energy At least 25% and less than 50% of energy is on-site renewable energy At least 5% and less than 25% of energy is on-site renewable energy At least 75% of energy is offset by RECs At least 50% and less than 75% of energy is offset by RECs At least 25% and less than 50% of energy is offset by RECs At least 25% of lighting fixtures on lighting controls At least 60% of (exterior) lighting fixtures controlled by photocells or occupancy sensors At least 60% of (exterior) lighting fixtures controlled by programmable timer C9 - Energy Efficient Lighting System Lighting Power Density (LPD) Average Rated Lamp Life 0 7 6 1 3 1 1 2 2 2 C13 - Indoor Water Efficiency Efficient Fixtures C10 - Stormwater Management C11 - Rainwater Harvesting C12 - Greywater Reuse C14 - Water Efficient Landscaping C15 - Roofing Systems C16 - Renewable Energy Generation 2 Implement an Erosion and Sedimentation Control Plan Meet or exceed Municipal and Local Watershed Water Quality Control Targets Retain minimum of 50% of total average rainfall Rainwater Harvesting Greywater Reuse Water Efficient Landscaping Green Roof Blue Roof Carport or Canopy High SRI Roofing Solar Panels At least 75% of energy is on-site renewable energy At least 50% and less than 75% of energy is on-site renewable energy At least 25% and less than 50% of energy is on-site renewable energy At least 5% and less than 25% of energy is on-site renewable energy At least 75% of energy is offset by RECs At least 50% and less than 75% of energy is offset by RECs At least 25% and less than 50% of energy is offset by RECs At least 5% and less than 25% of energy is offset by RECs C17 - Design for Durability C18 - Energy Resiliency - Storage Design for Durability Grid Interactive Energy Storage Grid and On-site Renewable Interactive Energy Storage 12 10 8 Innovative Approach (Must be at least 20) Subtotal INNOVATION D1 - Innovative Approach TOTALS 6 Management Subtotal Programs Subtotal Technology and Structure Design Subtotal Innovation Total 4 2 2 2 4 2 2 2 6 4 3 2 2 8 6 4 3 2 1 6 2 4 12 10 88 6 90 64 88 6 248 2 2 4 6 50 3 39 26 50 3 118 0 0 0 0 0 0 5 of 5 241122 - AUS West Garage 1 of 5 241122 - AUS West Garage 2 of 5 241122 - AUS West Garage At least 5% and less than 25% of energy is offset by RECs 241122 - AUS West Garage 4 of 5 3 of 5 241122 - AUS West Garage Parksmart Award Levels / New Construction: Parksmart Bronze: 110 - 134 points Parksmart Silver: 135 - 159 point Parksmart Gold: 160+ points 88 Max Points 6 Available 50 Points Attempted 3 2 39 26 Points Awarded PARKSMART MATRIX FROM 90% SUBMITTAL 241122 - AUS West Garage 5 of 5 C17 - Design for Durability C18 - Energy Resiliency - Storage Design for Durability Grid Interactive Energy Storage Grid and On-site Renewable Interactive Energy Storage (Must be at least 20) Subtotal Parksmart INNOVATION Certification Measure D1 - Innovative Approach C10 - Stormwater TOTALS Management Management Subtotal Programs Subtotal Technology and Structure Design Subtotal Innovation Total C11 - Rainwater Harvesting C12 - Greywater Reuse C14 - Water Efficient Landscaping C15 - Roofing Systems C16 - Renewable Energy Generation C13 - Indoor Water Efficiency Efficient Fixtures Options Innovative Approach Implement an Erosion and Sedimentation Control Plan Meet or exceed Municipal and Local Watershed Water Quality Control Targets Retain minimum of 50% of total average rainfall Rainwater Harvesting Greywater Reuse Water Efficient Landscaping Green Roof Blue Roof Carport or Canopy High SRI Roofing Solar Panels At least 75% of energy is on-site renewable energy At least 50% and less than 75% of energy is on-site renewable energy At least 25% and less than 50% of energy is on-site At least 5% and less than 25% of energy is on-site renewable energy renewable energy At least 75% of energy is offset by RECs At least 50% and less than 75% of energy is offset by At least 25% and less than 50% of energy is offset by RECs RECs At least 5% and less than 25% of energy is offset by RECs C17 - Design for Durability Design for Durability C18 - Energy Resiliency - Storage Grid Interactive Energy Storage Grid and On-site Renewable Interactive Energy Storage D1 - Innovative Approach Innovative Approach (Must be at least 20) Subtotal INNOVATION TOTALS Management Subtotal Programs Subtotal Technology and Structure Design Subtotal Innovation Total 2 2 2 4 2 2 2 6 4 3 2 2 3 2 1 6 2 4 2 2 6 4 3 2 2 8 6 4 3 2 1 6 2 4 2 90 64 2 88 2 4 6 2 248 12 10 88 6 90 64 88 6 4 6 50 3 118 2 4 6 50 3 39 26 50 3 0 0 0 0 0 0 0 0 0 0 0 0 248 118 241122 - AUS West Garage 5 of 5 WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025WEST GARAGEAUSTIN-BERGSTROM INTERNATIONAL AIRPORTDESIGN COMMISSION | MARCH 24, 2025