03. Hilton Dual Brand Hotel — original pdf
Backup
UDG PRESENTATION | 04.24.2023 HILTON DUAL BRAND HOTEL TEMPO & EMBASSY SUITES AUSTIN, TEXASURBAN DESIGN PACKAGE 01: PROJECT OVERVIEW 02: SITE CONTEXT 03: SITE PLAN & LANDSCAPE DESIGN 04: ARCHITECTURAL FLOOR PLANS 05: RENDERINGS 06: BUILDING MATERIALS & ELEVATIONS DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023FOR USTIN L5 HOTEL 209 W 5TH STREET SITE AREA HILTON AUSTIN pr oject ov erview LOT AREA: EXISTING ZONING: BASE FAR: BASE FAR AREA: 11,813 SF CBD 8.0 94,504 SF ITY TS N ENTURES.COM T E E R T S A C A V A L W 5TH STREET PROJECT LOCATION W 4TH STREET T E E R T S O D A R O L O C VICINITY MAP COA GRID: J22 MAPSCO: 585W DENSITY BONUS FEBRUARY 2023 PROJECT ACTUAL FAR: TOTAL ACTUAL FAR AREA: PROJECT REQUESTED FAR: TOTAL REQUESTED FAR AREA: BONUS FAR AREA: 25.35:1 299,447 SF 26.0:1 307,138 SF 212,634 SF DATE AUSTIN WATER UTILITY AUSTIN INDUSTRIAL WASTE DEPARTMENT CITY OF AUSTIN FIRE DEPARTMENT NO ON-SITE PARKING AEGB 2 STAR CERTIFICATION DEVELOPMENT SERVICES DEPARTMENT BUILDING DATA I CERTIFY THAT THESE ENGINEERING DOCUMENTS ARE COMPLETE, ACCURATE AND ADEQUATE FOR THE INTENDED PURPOSES, INCLUDING CONSTRUCTION, BUT ARE NOT AUTHORIZED FOR CONSTRUCTION PRIOR TO FORMAL CITY APPROVAL. BUILDING HEIGHT: HIGHEST OCCUPIED HEIGHT: AMENITY GSF: BOH/MECH GSF: GUESTROOM GSF: TOTAL TENANT GSF: TOTAL # OF ROOMS: DATE DATE DATE 370’-10” 342’-8” 29,488 SF 30,172 SF 229,787 SF 10,000 SF 480 KEYS SHEET INDEX SHEET NO. DESCRIPTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 COVER SHEET FINAL PLAT GENERAL NOTES KIMLEY-HORN GENERAL NOTES AWU GENERAL NOTES EXISTING CONDITIONS AND DEMO PLAN EROSION CONTROL PLAN SITE PLAN SITE DATA TABLES PAVEMENT & PAVEMENT RESTORATION PLAN GRADING PLAN EXISTING DRAINAGE AREA MAP PROPOSED DRAINAGE AREA MAP OVERALL STORM AND UTILITY PLAN STORM PLAN AND PROFILES OVERALL UTILITY PLAN UTILITY PLAN AND PROFILES OFFSITE WASTEWATER PLAN AND PROFILE PAVING DETAILS UTILITY DETAILS STORM DRAIN DETAILS EROSION CONTROL DETAILS LANDSCAPE (SHEET 1 OF 6) LANDSCAPE (SHEET 2 OF 6) LANDSCAPE (SHEET 3 OF 6) LANDSCAPE (SHEET 4 OF 6) LANDSCAPE (SHEET 5 OF 6) LANDSCAPE (SHEET 6 OF 6) BUILDING ELEVATIONS (SHEET 1 OF 2) BUILDING ELEVATIONS (SHEET 2 OF 2) THIS NOTE IS BEING PLACED ON THE PLAN SET IN PLACE OF A TEMPORARY TRAFFIC CONTROL STRATEGY WITH THE FULL UNDERSTANDING THAT, AT A MINIMUM OF 6 WEEKS PRIOR TO THE START OF CONSTRUCTION, A TEMPORARY TRAFFIC CONTROL PLAN MUST BE REVIEWED AND APPROVED BY THE RIGHT OF WAY MANAGEMENT DIVISION. THE OWNER/REPRESENTATIVE FURTHER RECOGNIZES THAT A REVIEW FEE, AS PRESCRIBED BY THE MOST CURRENT VERSION OF THE CITY'S FEE ORDINANCE, SHALL BE PAID EACH TIME A PLAN OR PLAN REVISION IS SUBMITTED TO RIGHT OF WAY MANAGEMENT DIVISION FOR REVIEW. THE FOLLOWING MUST BE TAKEN INTO CONSIDERATION WHEN DEVELOPING FUTURE TRAFFIC CONTROL STRATEGIES: PEDESTRIAN AND BICYCLE TRAFFIC ACCESS MUST BE MAINTAINED AT ALL TIMES, UNLESS OTHER WISE AUTHORIZED BY RIGHT OF WAY MANAGEMENT. NO LONG-TERM LANE CLOSURES WILL BE AUTHORIZED, UNLESS RIGHT OF WAY MANAGEMENT DETERMINES THAT ADEQUATE ACCOMMODATIONS HAVE BEEN MADE TO MINIMIZE TRAFFIC IMPACT. PROJECT SHOULD BE PHASED SO THAT UTILITY INSTALLATION MINIMALLY IMPACTS EXISTING OR TEMPORARY PEDESTRIAN FACILITIES. SITE PLAN APPROVAL SHEET ____OF____ 1 FILE NUMBER__________________APPLICATION DATE_______________ SP-2022-0518C XXXX APPROVED BY COMMISSION ON_______________UNDER SECTION_______ OF 112 CHAPTER__________OF THE CITY OF AUSTIN CODE. XX-X EXPIRATION DATE (25-5-81,LDC)__________CASE MANAGER__________________ XXXX PROJECT EXPIRATION DATE (ORD.#970905-A)__________DWPZ______DDZ______ __________________________________________________________________________ Director, Development Services Department RELEASED FOR GENERAL COMPLIANCE:_____________ZONING_____________ XXXX Rev. 1____________________________Correction 1_____________________________ Rev. 2____________________________Correction 2_____________________________ Rev. 3____________________________Correction 3_____________________________ Final plat must be recorded by the Project Expiration Date, if applicable. Subsequent Site Plans which do not comply with the Code current at the time of filing, and all required Building Permits and/or a notice of construction (if a building permit is not required), must also be approved prior to the Project Expiration Date. WARNING: CONTRACTOR IS TO VERIFY PRESENCE AND EXACT LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION. 02/02/2023 T C E J O R P A H K 0 0 8 2 0 4 9 6 0 E T A D 3 2 0 2 Y R A U R B E F N W O H S S A : E L A C S P J C K T P P J C : Y B D E N G S E D I : Y B D E K C E H C : Y B N W A R D T E E H S R E V O C L E T O H 5 L N T S U A I I N T S U A F O Y T C I S A X E T , Y T N U O C S V A R T I SHEET NUMBER 1 OF 30 SP-2022-0518C DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023AU STI N TRANSIT MAP ROUTE LEGEND SITE METROBUS LOCAL METRORAPID METRORAIL RED LINE METROBUS LOCAL METROEXPRESS UT SHUTTLE SOURCE: CAPMETRO.ORG DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023HILTON AUSTIN VICIN ITY M AP SITE A B C D INDEED BUILDING COLORADO RIVER PARKING GARAGE AUSTIN CONVENTION CENTER HANOVER REPUBLIC SQUARE LAVACA PLAZA REPUBLIC SQUARE E F G H HIGH FREQUENCY ROUTE HIGH FREQUENCY STOPS METROBIKE STATIONS H D C B A F E G W 5TH STREET LAVACA STREET DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023AU STI N View corr idors N IV E R SIT Y O F T E X A S N IV E R SIT Y O F T E X A S S TI N S TI N U U A A U U C C A A P IT O L P IT O L U U P P M M A A C C S S CIVIC D IS T R IC T CIVIC D IS T R IC T N T O N T O W W N N D D O O W W 5 T H S T R E E T 1/4 MILE RADIUS LAVACA STREET DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023AU STI N View corr idors LADY BIRD LAKE LADY BIRD LAKE UNIVERSITY OF TEXAS UNIVERSITY OF TEXAS AUSTIN AUSTIN CAPITOL CAMPUS CAPITOL CAMPUS CIVIC DISTRICT CIVIC DISTRICT L A V A C A S T R E E T DOWNTOWN DOWNTOWN 1/4 MILE RADIUS 5TH STREET DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023SITE BENCHES 3 BIKE RACKS LIGHT POLES PORTE-COCHERE TREE GRATE 4 FIRE HYDRANT TRASH BINS LANDSCAPE AREA 5 6 7 8 1 3 5 2 2 2 EXISTING GREAT STREETS FRONTAGE 1 2 4 5 6 W 5TH STREET RETAIL SITE PLAN great str eets GREAT STREETS COMPLIANCE NARRATIVE The site plan provides all of the required site furnishings along Lavaca St. which includes two benches, four bike racks, and one waste bin. Two City of Austin streetlights and three Red Oak trees spaced 22 feet apart have been located along Lavaca St. as well. Along the W. 5th Street frontage, the site plan provides all required furnishings including two benches, four bike racks, and one trash bin. The 5th Street frontage also includes two City of Austin streetlights, three Drake elm trees spaced 22’ apart, as well as a fire hydrant on the northwest corner of the property. Both the Lavaca St. and the W. 5th St. frontage include sidewalk widths that have been approved by the urban design department. In addition to the Great Street requirements being met, the site plan includes specialty stone paving throughout, low voltage pedestrian lighting to enhance visibility and safety, soil cells to provide ample soil volume for the proposed street trees, planter beds with native plants along Lavaca St, and an automatic irrigation system to provide all watering needs for proposed trees, shrubs and perennials. 6 1 5 8 3 8 8 5 8 T E E R T S A C A V A L 7 8 LOBBY ALLEY N DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023SITE DESIGN 5TH STR EET 3 3 3 4 7 7 5 7 7 7 7 6 6 1 6 2 W 5TH STREET 5 6 RETAIL 7 7 1 2 Charcoal Black Stone Paver Granite 3 Mesabi Black Stone Paver Granite Drake Elm COA Bench Plainwell Bench Stainless Steel 4 5 Date: Rev: TYPE: S2 - Bold Lighting billet outdoor cs wallwash wallgraz-06-12-22S2 COA BIKE RACK U Shaped Stainless Steel 6 In-Grade Wall Grazer Date: Rev: TYPE: S9 - S9, S9A Targetti_Keplero-Gimbal_SpecS9 7 KEPLERO GIMBAL Performance Precision Optic Professional Inground LED Fixture Tree Uplights KEPLERO GIMBAL Performance Precision Optic Professional Inground LED Fixture S9 - S9, S9A Targetti_Keplero-Gimbal_SpecS9 Rev: TYPE: Concept: 4 LED projector incorporating maximum precision and control for specific aimed illumination of objects. Date: Housing: 8” tall x 11” diameter die-cast aluminum housing. Materials: Anodized and powder coated black die-cast aluminum heat sink. PVC installation sleeve and stainless steel (AISI316L) trim ring with extra clear glass (Anti-slip available). ABody completed with marine grade cataphoresis painting treatment suitable for use in marine grade environments. Stainless steel trim will need to be maintained and cleaned regularly to avoid mineral deposits. Trim: Stainless steel (AISI316L) trim available in ultra flat round decorative ring, with beveled edge in brushed natural, bronze or black finishes. Features tamper-proof Torx screws. Optic: 4 LED gimbal optical system with two different beam spreads: Narrow Spot 9º, Flood 28º and Elliptical 44°. Range of motion: 40º tilt on the vertical axis and rotates 355º on the horizontal plane with integrated locking system. Mounting: Flush and semi-flush installation sleeves with stainless steel extension sleeve or optional raised installation tube for landscape. Fixture includes screw down holes and stainless steel screws for attachment to installation sleeve. Includes optional stainless steel L brackets for mounting support. Installation sleeve required for flush or semi-flush mounting (sold separately). Driver: Integrated 4/1 driver (Non-dimmable / 0-10V / Reverse Phase / Forward Phase). Installation: Fixture flush mount installation includes 9” tall x 11” diameter sleeve, extension sleeve for wire slack and accessibility. Fixture is provided with 6ft IP68 connector cable, direct burial brass ingrade jbox (required, sold separately). Wattage: 15W Color Temperature: 3000K / 4000K CRI: Ra84 Lumen Maintenance (L70): 50,000hrs Calculation for LED fixtures are based on measurements that comply with IES LM-80. Voltage: Universal Voltage 120-277V AC 50/60Hz IK Rating: IK10 IP Rating: IP67*, IP68 Tested** Load Rating: Resistant to static loads up to 4,496lbs in flush mounted cement and pavement installations. Certifications: cULus Wet Listed E477426 Tested in accordance with LM-79-08 Energy efficient for California installations. Warranty: 5 year limited warranty * Up to 1 METER DEPTH of water for up to a maximum of 30 MINUTES ** Not suitable for submersible installations ANot to be in direct contact with salt for extended periods of time or used with corrosive agents. IP68 IP67 A KEPLERO® Gimbal with Clear Lens A IP68 IP67 Marine Drive Over Tested Cool Touch 40° 355° Delivered Lumens: 3000K 4000K Narrow Spot 9º = 718Lm 790Lm Flood 28º = 636Lm 699Lm Elliptical EL 43º x 30º = 582Lm 641Lm TYPE OPTICS WATTAGE COLOR TEMP + TRIM & INSTALLATION 41 — 4/1 Dimming GMB — Gimbal NS — Narrow Spot 9º L1 — 15W 30 — 3000K Required (See Pg 2) KEPLERO® Gimbal with Clear Lens Marine Drive Over Tested Cool Touch 40° FL — Flood 28º 40 — 4000K EL — Elliptical 43º x 30º 355° Delivered Lumens: 8.00” 3000K 4000K Narrow Spot 9º = 718Lm 790Lm Flood 28º = 636Lm 699Lm Elliptical EL 43º x 30º = 582Lm 641Lm Ø8.27” Concept: 4 LED projector incorporating maximum precision and control for specific aimed illumination of objects. Housing: 8” tall x 11” diameter die-cast aluminum housing. Materials: Anodized and powder coated black die-cast aluminum heat sink. PVC installation sleeve and stainless steel (AISI316L) trim ring with extra clear glass (Anti-slip available). ABody completed with marine grade cataphoresis painting treatment suitable for use in marine grade environments. Stainless steel trim will need to be maintained and cleaned regularly to avoid mineral deposits. Trim: Stainless steel (AISI316L) trim available in ultra flat round decorative ring, with beveled edge in brushed natural, bronze or black finishes. Features tamper-proof Torx screws. Optic: 4 LED gimbal optical system with two different beam spreads: Narrow Spot 9º, Flood 28º and Elliptical 44°. Range of motion: 40º tilt on the vertical axis and rotates 355º on the horizontal plane with integrated locking system. Mounting: Flush and semi-flush installation sleeves with stainless steel extension sleeve or optional raised installation tube for landscape. Fixture includes screw down holes and stainless steel screws for attachment to installation sleeve. Includes optional stainless steel L brackets for mounting support. Installation sleeve required for flush or semi-flush mounting (sold separately). Driver: Integrated 4/1 driver (Non-dimmable / 0-10V / Reverse Phase / Forward Phase). Installation: Fixture flush mount installation includes 9” tall x 11” diameter sleeve, extension sleeve for wire slack and accessibility. Fixture is provided with 6ft IP68 connector cable, direct burial brass ingrade jbox (required, sold separately). Wattage: 15W Color Temperature: 3000K / 4000K CRI: Ra84 Lumen Maintenance (L70): 50,000hrs Calculation for LED fixtures are based on measurements that comply with IES LM-80. Voltage: Universal Voltage 120-277V AC 50/60Hz IK Rating: IK10 IP Rating: IP67*, IP68 Tested** Load Rating: Resistant to static loads up to 4,496lbs in flush mounted cement and pavement installations. Certifications: cULus Wet Listed E477426 Tested in accordance with LM-79-08 Energy efficient for California installations. Warranty: 5 year limited warranty * Up to 1 METER DEPTH of water for up to a maximum of 30 MINUTES ** Not suitable for submersible installations ANot to be in direct contact with salt for extended periods of time or used with corrosive agents. Views PRODUCT CODE KPL — KEPLERO DRIVER (Non-Dimming / 0-10V / Reverse Phase / Forward Phase) Ø11.00” (Non-Dimming / 0-10V / Reverse Phase / Forward Phase) FL — Flood 28º 40 — 4000K EL — Elliptical 43º x 30º Views Ø11.00” PRODUCT CODE DRIVER TYPE OPTICS WATTAGE Targetti USA - A Targetti Group Company - COLOR TEMP TRIM & INSTALLATION 750-A W. 17th St. Costa Mesa, CA 92627 + KPL — KEPLERO 41 — 4/1 Dimming GMB — Gimbal NS — Narrow Spot 9º L1 — 15W 30 — 3000K Required (See Pg 2) - Phone (714) 513-1991 - Email: targettiusa@targetti.com - targettiusa.com - 3.24.21 - Page 1 of 6 DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023SITE DESIGN LAVAC A STR EET LAVACA STREET 3 6 3 9 9 9 9 3 9 9 3 6 9 9 CONCRETE RAMP 5 6 4 8 8 6 2 8 7 2 1 PORTE-COCHERE 7 7 7 8 1 2 3 Charcoal Black Stone Paver Granite Mesabi Black Stone Paver Granite Spanish Red Oak 7 7 4 5 1 8 8 8 W 5 T H S T R E E T Date: Rev: TYPE: S2 - Bold Lighting billet outdoor cs wallwash wallgraz-06-12-22S2 9 9 LOBBY RETAIL 6 COA Bike Rack U Shaped Stainless Steel Hameln Grass Date: Rev: TYPE: Soft Leaf Yucca S10 - BEGA S10, S10A 99862_BEGA_Spec 8 In-Grade Wall Grazer COA Bench Plainwell Bench Stainless Steel Mexican Feather Grass Lit Bollard 9 KEPLERO GIMBAL Performance Precision Optic Professional Inground LED Fixture Tree Uplights Type: BEGA Product: Project: Voltage: Color: Options: Modified: BEGA LED system bollard - luminaire head with shielded light - 360° Enclosure: Housing constructed of die-cast aluminum. Die-castings are marine grade, copper free (≤ 0.3% copper content) A360.0 aluminum alloy. Glass diffuser, inside white. Fully gasketed for weather tight operation using molded silicone gasket. Installation: BEGA LED system bollards are designed for easy attachment to system bollard tubes using an interlocking stainless steel mechanism and stainless steel set screw threaded into stainless steel insert. An accompanying bollard tube must be selected for proper installation, see below chart for compatible tube options. Electrical: 16.5W LED luminaire, 19.8 total system watts, -30°C start temperature. Integral 120V through 277V electronic LED driver, 0-10V dimming. LED module(s) are available from factory for easy replacement. Standard LED color temperature is 3000K with a >80 CRI. Available in 4000K (>80 CRI); add suffix K4 to order. Note: LEDs supplied with luminaire. Due to the dynamic nature of LED technology, LED luminaire data on this sheet is subject to change at the discretion of BEGA-US. For the most current technical data, please refer to www.bega-us.com. Finish: All BEGA standard finishes are polyester powder coat with minimum 3 mil thickness. Available in four standard BEGA colors: Black (BLK); White (WHT); Bronze (BRZ); Silver (SLV). To specify, add appropriate suffix to catalog number. Custom colors supplied on special order. CSA certified to U.S. and Canadian standards, suitable for wet locations. Protection class IP65 7 Weight: 8.4 lbs Luminaire Lumens: 1286 A A B A B B Bollard heads · shielded · 360° Lamp 99 862 16.5 W LED A 71⁄2 B 5 1⁄2 Bollard tubes 99 626 GFCI outlet 99 622 — 99 644 99 658 99 635 99 615 — Integrated components 1 LED floodlight 19.3 W Door A ✔ 7 1⁄2 ✔ 7 1⁄2 ✔ 7 1⁄2 ✔ 7 1⁄2 Passive infrared motion sensor Emergency lighting battery 10 W ✔ 7 1⁄2 71⁄2 B 32 32 32 32 Anch. unit 79 818 79 818 79 818 79 818 32 79 818 14 1⁄2 79 817 BEGA 1000 BEGA Way, Carpinteria, CA 93013 (805) 684-0533 FAX (805) 566-9474 www. bega-us . com ©copyright BEGA 2018 Updated 04/27/2018 Date: Rev: TYPE: S9 - S9, S9A Targetti_Keplero-Gimbal_SpecS9 KEPLERO GIMBAL Performance Precision Optic Professional Inground LED Fixture S9 - S9, S9A Targetti_Keplero-Gimbal_SpecS9 Rev: TYPE: Concept: 4 LED projector incorporating maximum precision and control for specific aimed illumination of objects. Date: Housing: 8” tall x 11” diameter die-cast aluminum housing. Materials: Anodized and powder coated black die-cast aluminum heat sink. PVC installation sleeve and stainless steel (AISI316L) trim ring with extra clear glass (Anti-slip available). ABody completed with marine grade cataphoresis painting treatment suitable for use in marine grade environments. Stainless steel trim will need to be maintained and cleaned regularly to avoid mineral deposits. Trim: Stainless steel (AISI316L) trim available in ultra flat round decorative ring, with beveled edge in brushed natural, bronze or black finishes. Features tamper-proof Torx screws. Optic: 4 LED gimbal optical system with two different beam spreads: Narrow Spot 9º, Flood 28º and Elliptical 44°. Range of motion: 40º tilt on the vertical axis and rotates 355º on the horizontal plane with integrated locking system. Mounting: Flush and semi-flush installation sleeves with stainless steel extension sleeve or optional raised installation tube for landscape. Fixture includes screw down holes and stainless steel screws for attachment to installation sleeve. Includes optional stainless steel L brackets for mounting support. Installation sleeve required for flush or semi-flush mounting (sold separately). Driver: Integrated 4/1 driver (Non-dimmable / 0-10V / Reverse Phase / Forward Phase). Installation: Fixture flush mount installation includes 9” tall x 11” diameter sleeve, extension sleeve for wire slack and accessibility. Fixture is provided with 6ft IP68 connector cable, direct burial brass ingrade jbox (required, sold separately). Wattage: 15W Color Temperature: 3000K / 4000K CRI: Ra84 Lumen Maintenance (L70): 50,000hrs Calculation for LED fixtures are based on measurements that comply with IES LM-80. Voltage: Universal Voltage 120-277V AC 50/60Hz IK Rating: IK10 IP Rating: IP67*, IP68 Tested** Load Rating: Resistant to static loads up to 4,496lbs in flush mounted cement and pavement installations. Certifications: cULus Wet Listed E477426 Tested in accordance with LM-79-08 Energy efficient for California installations. Warranty: 5 year limited warranty * Up to 1 METER DEPTH of water for up to a maximum of 30 MINUTES ** Not suitable for submersible installations ANot to be in direct contact with salt for extended periods of time or used with corrosive agents. IP68 IP67 A KEPLERO® Gimbal with Clear Lens A IP68 IP67 Marine Drive Over Tested Cool Touch 40° 355° Delivered Lumens: 3000K 4000K Narrow Spot 9º = 718Lm 790Lm Flood 28º = 636Lm 699Lm Elliptical EL 43º x 30º = 582Lm 641Lm TYPE OPTICS WATTAGE COLOR TEMP + TRIM & INSTALLATION 41 — 4/1 Dimming GMB — Gimbal NS — Narrow Spot 9º L1 — 15W 30 — 3000K Required (See Pg 2) KEPLERO® Gimbal with Clear Lens Marine Drive Over Tested Cool Touch 40° FL — Flood 28º 40 — 4000K EL — Elliptical 43º x 30º 355° Delivered Lumens: 8.00” 3000K 4000K Narrow Spot 9º = 718Lm 790Lm Flood 28º = 636Lm 699Lm Elliptical EL 43º x 30º = 582Lm 641Lm Ø8.27” Concept: 4 LED projector incorporating maximum precision and control for specific aimed illumination of objects. Housing: 8” tall x 11” diameter die-cast aluminum housing. Materials: Anodized and powder coated black die-cast aluminum heat sink. PVC installation sleeve and stainless steel (AISI316L) trim ring with extra clear glass (Anti-slip available). ABody completed with marine grade cataphoresis painting treatment suitable for use in marine grade environments. Stainless steel trim will need to be maintained and cleaned regularly to avoid mineral deposits. Trim: Stainless steel (AISI316L) trim available in ultra flat round decorative ring, with beveled edge in brushed natural, bronze or black finishes. Features tamper-proof Torx screws. Optic: 4 LED gimbal optical system with two different beam spreads: Narrow Spot 9º, Flood 28º and Elliptical 44°. Range of motion: 40º tilt on the vertical axis and rotates 355º on the horizontal plane with integrated locking system. Mounting: Flush and semi-flush installation sleeves with stainless steel extension sleeve or optional raised installation tube for landscape. Fixture includes screw down holes and stainless steel screws for attachment to installation sleeve. Includes optional stainless steel L brackets for mounting support. Installation sleeve required for flush or semi-flush mounting (sold separately). Driver: Integrated 4/1 driver (Non-dimmable / 0-10V / Reverse Phase / Forward Phase). Installation: Fixture flush mount installation includes 9” tall x 11” diameter sleeve, extension sleeve for wire slack and accessibility. Fixture is provided with 6ft IP68 connector cable, direct burial brass ingrade jbox (required, sold separately). Wattage: 15W Color Temperature: 3000K / 4000K CRI: Ra84 Lumen Maintenance (L70): 50,000hrs Calculation for LED fixtures are based on measurements that comply with IES LM-80. Voltage: Universal Voltage 120-277V AC 50/60Hz IK Rating: IK10 IP Rating: IP67*, IP68 Tested** Load Rating: Resistant to static loads up to 4,496lbs in flush mounted cement and pavement installations. Certifications: cULus Wet Listed E477426 Tested in accordance with LM-79-08 Energy efficient for California installations. Warranty: 5 year limited warranty * Up to 1 METER DEPTH of water for up to a maximum of 30 MINUTES ** Not suitable for submersible installations ANot to be in direct contact with salt for extended periods of time or used with corrosive agents. Views PRODUCT CODE KPL — KEPLERO DRIVER (Non-Dimming / 0-10V / Reverse Phase / Forward Phase) Ø11.00” PRODUCT CODE DRIVER TYPE OPTICS WATTAGE Targetti USA - A Targetti Group Company - COLOR TEMP TRIM & INSTALLATION 750-A W. 17th St. Costa Mesa, CA 92627 + KPL — KEPLERO 41 — 4/1 Dimming GMB — Gimbal NS — Narrow Spot 9º L1 — 15W 30 — 3000K Required (See Pg 2) (Non-Dimming / 0-10V / Reverse Phase / Forward FL — Flood 28º 40 — 4000K - Phone (714) 513-1991 - Email: targettiusa@targetti.com - targettiusa.com - 3.24.21 - Page 1 of 6 DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023SITE DESIGN pavin g material INSTALL PHOTO 1 2 1 2 CHARCOAL - LIGHTER PAVER MESABI - DARKER PAVER TW DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023overall floor plan lev els 00 & 01 AGM 97 SF SALES DIR. 121 SF T_K ADA JR CONN 395 SF T_K JR CONN 242 SF T_K TYP 303 SF T_K TYP 303 SF T_QQ CONN 313 SF TENANT ENTRY TENANT ENTRY TENANT SPACE A 3127 SF WATER METER VAULT WATER METER VAULT FDC BIKE RACK, TYP BIKE RACK, TYP FDC VEST. 37 SF T_K TYP 303 SF R E T A W G N M O C N I I F S 9 3 1 T_K TYP 303 SF VEST. 50 SF R E T A W G N M O C N I I F S 9 3 1 BIKE RACK, TYP BIKE RACK, TYP F&B 99 SF HYDRATION STATION ADA K @ LEVELS 5, 9, 13, 17, 21 SKY LOBBY 193 SF T_K ADA TYP 353 SF BENCH, TYP BENCH, TYP FDC SKY LOBBY 217 SF CARTS 72 SF TENANT ELEV. EL 7x TENANT ELEV. HK 58 SF TENANT STAIR TENANT STAIR ELEC 51 SF 1' - 6 7/8" FROM PL 1' - 6 7/8" FROM PL L P M O R F " 6 - ' 3 2 ELEV PIT ELEV PIT EL 7x ELEV PIT ELEV PIT W.C. 53 SF W.C. 62 SF W.C. 53 SF W.C. 62 SF SOILED LINEN 342 SF SOILED LINEN 342 SF EMBASSY BREAKFAST 1686 SF LAUNDRY EQUIPMENT LAUNDRY EQUIPMENT 419 SF 419 SF CLEAN LINEN 686 SF CLEAN LINEN EMBASSY BUFFET 686 SF 548 SF PRIVATE DINING 630 SF MPOE 76 SF MPOE 76 SF ELEC 180 SF ELEC 62 SF ELEC 180 SF GM 143 SF HR 93 SF F VEST. D M 116 SF N F D O M T L N I H O T L I H F S 7 0 2 F S 7 0 2 EL 6 ELEV PIT ELEV PIT EL 5 EL 4 STORAGE 271 SF STORAGE 271 SF ELEV LOBBY FSAE/SERVICE 215 SF W RR 127 SF VEST. VEST. VEST. 49 SF ELEC 650 SF ELEC 647 SF SALES 90 SF CATERING 96 SF STOR 30 SF NURSE 70 SF W LOCKER 201 SF WOMENS 183 SF MENS 255 SF 19' - 9 7/8" M LOCKER 133 SF FROM PL STAFF BREAKROOM 739 SF SERVICE EL 1 SERVICE EL 2 SERVICE EL 1 SERVICE EL 2 ELEV PIT ELEV PIT EL 3 25' - 9 7/8" FROM PL ROOFTOP BAR ENTRY ROOFTOP BAR ENTRY I G N D L I U B G N T S X E I I I G N D L I U B G N T S X E I I PLANTERS TYP FIRE & DOM PUMP 494 SF FIRE & DOM PUMP 492 SF KITCHEN 1242 SF M RR EMER ELEC 157 SF 290 SF EMER ELEC 289 SF " 4 6 / 9 6 - ' 1 L P M O R F " 7 - ' 1 L P M O R F LEVEL 04 - EMBASSY SUITES BREAKFAST & STAFF 39-22127-00 1.00 LEVEL 00: BASEMENT © DLR Group 39-22127-00 02-03-2023 © DLR Group 04-11-2023 1.00 LEVELS 00 & 01 AUSTIN DUAL BRAND HOTEL EMBASSY SUITES & TEMPO BY HILTON HOTELS LEVELS 00 & 01 AUSTIN DUAL BRAND HOTEL EMBASSY SUITES & TEMPO BY HILTON HOTELS 1.02 39-22127-00 02-03-2023 LEVELS 04 & 05 AUSTIN DUAL BRAND HOTEL EMBASSY SUITES & TEMPO BY HILTON HOTELS © DLR Group JUMP LOBBY 295 SF JUMP LOBBY 295 SF T_QQ TYP 337 SF CARTS 34 SF EL 6 EL 6 EL 5 EL 5 EL 4 EL 6 EL 4 EL 5 AOR 37 SF EL 4 ELEV LOBBY 262 SF ELEV LOBBY 262 SF ELEVATOR LOBBY T_QQ TYP 341 SF MAIN HOTEL ENTRY MAIN HOTEL ENTRY SERVICE EL 1 SERVICE EL 2 SERVICE EL 1 SERVICE EL 2 EL 3 EL 3 SERVICE EL 1 SERVICE EL 2 EL 3 T_K A 278 SF T_K B CONN 290 SF HK 39 SF I G N D L I U B G N FIRE COMMAND T S X 223 SF E I I I G N D L I U B G N T S X E I I ROOF UP VALET 61 SF VALET 53 SF FSAE 158 SF FSAE 158 SF RECEIVING 383 SF FSAE 170 SF FIRE COMMAND 198 SF UP RECEIVING 337 SF COVERED PORTE COCHERE T_QQ TYP 348 SF LED SCREEN DISPLAY ES_K TYP 342 SF PLANTER FOOD WASTE CAN FOOD WASTE WASH BIB CAN WASH BIB REC. COMP. ES_K ADA STUDIO CONN 335 SF REC. COMP. TRASH COMP. TRASH COMP. H T R E B G N D A O L I 0 3 x 0 1 DUMPSTER STORAGE 0 3 x 0 1 H T R E B G N D A O L I S R E T E M S A G DUMPSTER STORAGE BIKE RACKS COVERED PORTE COCHERE ES_K TYP 341 SF AEC TRANSFORMER ROOM 688 SF AEC TRANSFORMER ROOM 709 SF ELECT. DISCON. GREASE TRAP ACCESS ELECT. DISCON. GREASE TRAP ACCESS FDC ADA K @ LEVELS 5, 9, 13, 17, 21 & 25 ES_K ADA CORNER CONN 499 SF ES_K A CONN 367 SF ES_K B 336 SF ONE LOADING BERTH REQ'S ZONING VARIANCE ES_QQ END CONN 551 SF GAS METERS ES_K B 338 SF OVERHEAD COILING DOOR ONE LOADING BERTH REQ'S ZONING VARIANCE 0 LEVEL 05 - TYPICAL ADA KING GUESTROOM FLOOR LEVEL 01: JUMP LOBBY 10 20 40 OVERHEAD COILING DOOR SCALE: 1/16" = 1'=0" 0 10 20 40 SCALE: 1/16" = 1'=0" 20 10 0 SCALE: 1/16" = 1'=0" 40 N DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023overall floor plan lev els 02 & 03 PRIVATE DINING 630 SF TENANT SPACE A 6401 SF TENANT SPACE A 6401 SF GM 143 SF HR 93 SF EL 7x EL 7x TENANT ELEV. TENANT ELEV. EL 7x TRANSFER STAIR EGRESS ABOVE TENANT STAIR TRANSFER STAIR EGRESS ABOVE VEST. 116 SF TENANT STAIR EMBASSY BREAKFAST 1686 SF EL 6 EL 5 EL 6 EL 6 EL 5 EL 4 EL 5 EL 4 EL 4 AGM 97 SF SALES DIR. 121 SF VEST. 151 SF CATERING VEST. 96 SF 151 SF SALES 90 SF F&B 99 SF STOR 30 SF NURSE 70 SF W LOCKER 201 SF T_K ADA JR CONN 395 SF T_K JR CONN 242 SF T_K TYP 303 SF T_K TYP 303 SF T_K TYP 303 SF T_K TYP 303 SF TOP GOLF SUITE 1 64 SF TOP GOLF SUITE 1 64 SF T_QQ CONN 313 SF ES - KITCHEN & BAR 915 SF ES - KITCHEN & BAR 915 SF TERRACE 515 SF TERRACE 515 SF EL 7x EL 7x ES LOBBY 386 SF EL 7x ES LOBBY 386 SF HK 58 SF VEST. LUGGAGE VEST. 96 SF LUGGAGE 96 SF HYDRATION STATION ADA K @ LEVELS LUGGAGE 5, 9, 13, 17, 21 110 SF LUGGAGE 110 SF T_K ADA TYP 353 SF IDF 62 SF IDF 62 SF ELEC 51 SF TOP GOLF SUITE 2 132 SF TOP GOLF SUITE 2 132 SF WATER FEATURE WATER FEATURE EL 6 EL 5 EL 6 EL 5 EL 4 EL 6 EL 4 EL 5 EL 4 DUAL BRAND RECEPTION 697 SF DUAL BRAND RECEPTION 697 SF T_QQ TYP 337 SF ELEVATOR LOBBY ELEVATOR LOBBY ELEVATOR LOBBY M RR 186 SF SERVICE EL 1 SERVICE EL 2 SERVICE EL 1 SERVICE EL 2 EL 3 EL 3 BUILDING ENGINEERING EL 3 176 SF BUILDING ENGINEERING 176 SF WOMENS 183 SF MARKET MARKET T_QQ TYP 341 SF SERVICE EL 1 SERVICE EL 2 SERVICE EL 1 EL 3 SERVICE EL 2 EL 3 SERVICE EL 1 SERVICE EL 2 EL 3 T_K B CONN 290 SF T_K A 278 SF M RR 186 SF HK 39 SF FAMILY RR 62 SF FAMILY RR 62 SF ROOF ELEC 62 SF TENANT 257 SF TENANT 257 SF ELEV LOBBY FSAE 213 SF FSAE FSAE/SERVICE 213 SF 215 SF 4 0 L E V E L U H A N E H C T K I MENS 255 SF 3 0 L E V E L U H 4 A 0 N L E E H V C E T L K U H A N E H C T K I I 3 0 L E V E L U H A N E H C T K I M LOCKER 133 SF HYDRATION STATION HYDRATION STATION TEMPO LOOK UP MOMENT TEMPO LOOK UP MOMENT T_QQ TYP 348 SF CAFE 72 SF CAFE 72 SF TEMPO LOBBY 1491 SF TEMPO LOBBY 1491 SF ES_K TYP 342 SF FSAE 156 SF FSAE 156 SF FSAE 170 SF W RR 192 SF W RR 192 SF ES_K ADA STUDIO CONN 335 SF VEST. 40 SF VEST. 40 SF EMBASSY BUFFET 548 SF KITCHEN 1242 SF W RR 127 SF M RR 157 SF VEST. 49 SF MECH EQUIPMENT 1684 SF MECH EQUIPMENT 1684 SF STAFF BREAKROOM 739 SF KITCHEN EXHAUST KITCHEN EXHAUST LVL 00, 01, 02, 03 AHU LVL 00, 01, 02, 03 AHU LEVEL 02 - TENANT/MEP LEVEL 02 - TENANT/MEP LEVEL 04 - EMBASSY SUITES BREAKFAST & STAFF LEVEL 02: TENANT 1.01 1.01 © DLR Group © DLR Group © DLR Group 39-22127-00 04-11-2023 1.02 39-22127-00 04-11-2023 39-22127-00 02-03-2023 LEVELS 02 & 03 LEVELS 02 & 03 AUSTIN DUAL BRAND HOTEL LEVELS 04 & 05 AUSTIN DUAL BRAND HOTEL EMBASSY SUITES & TEMPO BY HILTON HOTELS EMBASSY SUITES & TEMPO BY HILTON HOTELS AUSTIN DUAL BRAND HOTEL EMBASSY SUITES & TEMPO BY HILTON HOTELS ES_K TYP 341 SF BKB KITCHEN 1172 SF BKB KITCHEN 1172 SF TEMPO FLEX MTG 466 SF ES_K ADA CORNER CONN 499 SF TEMPO FLEX MTG 466 SF ADA K @ LEVELS 5, 9, 13, 17, 21 & 25 TEMPO INFORMAL MTG 297 SF TEMPO INFORMAL MTG 297 SF ES_QQ END CONN 551 SF ES_K A CONN 367 SF ES_K B 336 SF ES_K B 338 SF LEVEL 03 - DUAL BRAND LOBBY/RECEPTION LEVEL 03 - DUAL BRAND LOBBY/RECEPTION LEVEL 05 - TYPICAL ADA KING GUESTROOM FLOOR LEVEL 03: RECEPTION & LOBBIES 0 10 0 20 10 40 20 20 40 40 SCALE: 1/16" = 1'=0" 0 SCALE: 1/16" = 1'=0" 10 SCALE: 1/16" = 1'=0" N DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023overall floor plan lev els 04 - 24 EL 7x EL 7x VEST. 116 SF VEST. 116 SF ELEC 61 SF ELEC 62 SF EMBASSY BREAKFAST 2641 SF EMBASSY BREAKFAST 1686 SF EL 6 EL 5 EL 6 EL 4 EL 5 EL 4 PRIVATE DINING 630 SF AGM 94 SF GM 143 SF HR 93 SF GM 142 SF HR 93 SF ELEV LOBBY ELEV LOBBY EL 3 EL 3 FSAE/SERVICE 215 SF FSAE/SERVICE 215 SF AGM 97 SF SALES DIR. 113 SF SALES DIR. 121 SF SALES 89 SF SALES 90 SF CATERING 97 SF CATERING 96 SF NURSE 74 SF ? ? F&B 99 SF F&B 92 SF STOR 30 SF NURSE 70 SF W LOCKER 263 SF W LOCKER 201 SF WOMENS 139 SF WOMENS 183 SF MENS 264 SF MENS 255 SF M LOCKER 137 SF M LOCKER 133 SF VEST. 49 SF VEST. 49 SF W RR 127 SF W RR 127 SF M RR 157 SF M RR 147 SF STAFF BREAKROOM 707 SF STAFF BREAKROOM 739 SF EMBASSY BUFFET 332 SF EMBASSY BUFFET 548 SF KITCHEN 1231 SF KITCHEN 1242 SF T_K JR CONN 397 SF T_K JR CONN 240 SF T_K ADA JR CONN 388 SF T_K ADA JR CONN T_K JR CONN 395 SF 240 SF T_K TYP 301 SF T_K JR CONN 242 SF T_K TYP 303 SF T_K TYP 303 SF T_K TYP 301 SF T_K TYP 303 SF T_K TYP 303 SF T_K TYP 301 SF T_K TYP 303 SF T_K TYP 303 SF T_K TYP 301 SF T_K TYP 303 SF T_QQ CONN 313 SF T_QQ CONN 311 SF T_K TYP 303 SF T_QQ CONN 313 SF HYDRATION STATION HYDRATION STATION HYDRATION STATION EL 7x EL 7x HK 60 SF HK EL 7x 56 SF HK 58 SF ADA K @ LEVELS 5, 9, 13, 17, 21 ADA K @ LEVELS 5, 9, 13, 17, 21 T_QQ TYP T_K ADA TYP 350 SF 353 SF T_K ADA TYP 353 SF ELEC 51 SF ELEC 52 SF ELEC 51 SF HYDRATION STATION ADA QQ @ LEVELS 7, 11,15, 19, 23 & 27 EL 6 EL 6 EL 5 EL 4 EL 5 EL 6 EL 4 EL 5 T_K A 278 SF EL 4 T_K A 279 SF T_K B CONN 290 SF T_K B CONN 291 SF T_K B CONN 290 SF T_K A 278 SF ELEVATOR LOBBY ELEVATOR LOBBY ELEVATOR LOBBY HK 40 SF PL EQUIP 39 SF HK 39 SF SERVICE EL 1 SERVICE EL 2 SERVICE EL 1 SERVICE EL 2 SERVICE EL 1 EL 3 SERVICE EL 2 EL 3 EL 3 ROOF ROOF FSAE 170 SF FSAE 170 SF FSAE 170 SF ES_K STUDIO CONN 337 SF ES_K ADA STUDIO CONN 336 SF ES_K ADA STUDIO CONN 335 SF T_QQ TYP 337 SF T_QQ TYP 338 SF T_QQ TYP 341 SF T_QQ TYP 340 SF T_QQ TYP 337 SF T_QQ TYP 341 SF T_QQ TYP 348 SF T_QQ TYP 349 SF T_QQ TYP 348 SF ES_K TYP 342 SF ES_K TYP 353 SF ES_K TYP 342 SF ES_K TYP 341 SF ES_K TYP 341 SF ES_K TYP 341 SF ES_K ADA CORNER CONN 493 SF ES_QQ CORNER CONN ES_K ADA CORNER CONN 490 SF 499 SF ADA K @ LEVELS 5, 9, 13, 17, 21 & 25 ADA K @ LEVELS 5, 9, 13, 17, 21 & 25 ES_K A CONN 367 SF ES_K A CONN 367 SF ES_K B 336 SF ES_K B 336 SF ES_K A CONN 367 SF ES_K B 336 SF ES_K B 338 SF ES_K B 338 SF ES_K B 338 SF ES_QQ END CONN ES_QQ END CONN 551 SF 550 SF ES_QQ END CONN 551 SF LEVEL 04 - EMBASSY SUITES BREAKFAST & STAFF LEVEL 04 - EMBASSY SUITES BREAKFAST & STAFF LEVEL 04: EMBASSY SUITES BREAKFAST 1.02 39-22127-00 04-11-2023 1.02 39-22127-00 02-03-2023 LEVELS 04 & 05 LEVELS 04 & 05 AUSTIN DUAL BRAND HOTEL AUSTIN DUAL BRAND HOTEL EMBASSY SUITES & TEMPO BY HILTON HOTELS EMBASSY SUITES & TEMPO BY HILTON HOTELS © DLR Group © DLR Group LEVEL 05 - TYPICAL ADA KING GUESTROOM FLOOR LEVEL 05 - TYPICAL ADA KING GUESTROOM FLOOR LEVEL 06 - TYPICAL GUESTROOM FLOOR LEVELS 05-24: TYPICAL GUESTROOM LEVELS 1.03 39-22127-00 02-03-2023 LEVEL 06 & 07 AUSTIN DUAL BRAND HOTEL EMBASSY SUITES & TEMPO BY HILTON HOTELS SCALE: 1/16" = 1'=0" SCALE: 1/16" = 1'=0" 0 10 0 20 10 40 20 40 N © DLR Group T_K J 3 E T T_QQ 337 T_QQ 341 T_QQ 348 ES_K 342 S ES_K 341 ES_QQ C LEVE DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023PREMIUM SUITE TOP 3 FLOORS PREMIUM SUITE TOP 3 FLOORS T_PREMIUM WELLNESS T_PREMIUM WELLNESS SUITE SUITE 678 SF 678 SF T_K WELLNESS 303 SF T_K WELLNESS 303 SF T_K WELLNESS 303 SF T_K WELLNESS 303 SF T_K WELLNESS 303 SF T_K WELLNESS 303 SF T_K WELLNESS 303 SF AGM T_K WELLNESS 97 SF 303 SF T_QQ CONN 326 SF T_QQ CONN SALES DIR. 326 SF 121 SF PRIVATE DINING 630 SF T_K ADA JR CONN 395 SF T_K JR CONN 242 SF T_K TYP 303 SF T_K TYP 303 SF BALLROOM 2283 SF BALLROOM 2283 SF T_K TYP 303 SF T_K TYP 303 SF T_QQ CONN 313 SF overall floor plan lev els 25 - 28 HYDRATION STATION HYDRATION STATION EL 7x EL 7x HK 60 SF HK 60 SF EL 7x ADA WELLNESS ROOM ON LEVEL 25 ADA WELLNESS ROOM ON LEVEL 25 T_QQ ADA TYP 352 SF T_QQ ADA TYP 352 SF ELEC 51 SF ELEC 51 SF ELEC 62 SF WELLNESS ROOMS WELLNESS ROOMS 5% OF 296 ROOMS = 15 REQUIRED 5% OF 296 ROOMS = 15 REQUIRED GM 143 SF HR 93 SF VEST. 116 SF SALES 90 SF CATERING 96 SF F&B 99 SF STOR 30 SF T_K B CONN NURSE 306 SF 70 SF T_K B CONN 306 SF W LOCKER 201 SF WOMENS 183 SF M LOCKER 133 SF STAFF BREAKROOM 739 SF T_QQ TYP 337 SF T_QQ TYP 337 SF T_QQ TYP 341 SF T_QQ TYP 341 SF EMBASSY BREAKFAST 1686 SF EL 6 EL 6 EL 5 EL 5 EL 4 EL 4 EL 6 EL 5 EL 4 T_K A 278 SF T_K A 278 SF ELEVATOR LOBBY ELEVATOR LOBBY ELEV LOBBY SERVICE EL 1 SERVICE EL 1 SERVICE EL 2 EL 3 SERVICE EL 2 EL 3 HK 40 SF HK 40 SF EL 3 FSAE 170 SF FSAE 170 SF FSAE/SERVICE 215 SF ES_K STUDIO CONN 337 SF ES_K STUDIO CONN 337 SF MENS 255 SF T_QQ TYP 348 SF T_QQ TYP 348 SF ES_K TYP 342 SF ES_K TYP 342 SF EMBASSY BUFFET 548 SF ES_K TYP 341 SF ES_K TYP 341 SF ES_QQ CORNER CONN ES_QQ CORNER CONN 492 SF 492 SF KITCHEN 1242 SF VEST. 49 SF W RR 127 SF M RR 157 SF ES_K A CONN 366 SF ES_K A CONN 366 SF ES_K B 335 SF ES_K B 335 SF ES_K B 337 SF ES_K B 337 SF ES_QQ ADA END CONN ES_QQ ADA END CONN 577 SF 577 SF ADA K @ LEVELS 5, 9, 13, 17, 21 & 25 LEVEL 27 - TYPICAL WELLNESS/PREMIUM SUITE GUESTROOM FLOOR LEVEL 04 - EMBASSY SUITES BREAKFAST & STAFF LEVEL 27 - TYPICAL WELLNESS/PREMIUM SUITE GUESTROOM FLOOR LEVELS 25-27: PREMIUM/WELLNESS SUITE LEVEL LEVELS 04 & 05 LEVELS 27 & 28 AUSTIN DUAL BRAND HOTEL AUSTIN DUAL BRAND HOTEL EMBASSY SUITES & TEMPO BY HILTON HOTELS EMBASSY SUITES & TEMPO BY HILTON HOTELS LEVELS 27 & 28 AUSTIN DUAL BRAND HOTEL EMBASSY SUITES & TEMPO BY HILTON HOTELS 1.02 1.04 1.04 39-22127-00 39-22127-00 39-22127-00 02-03-2023 02-03-2023 02-03-2023 © DLR Group © DLR Group © DLR Group EL 7x EL 7x EL 7x HK 58 SF HYDRATION STATION ADA K @ LEVELS 5, 9, 13, 17, 21 VEST. 248 SF VEST. 248 SF T_K ADA TYP 353 SF PREFUNCTION LOBBY PREFUNCTION LOBBY 777 SF 777 SF TERRACE 320 SF TERRACE 320 SF T_QQ TYP 337 SF T_QQ TYP 341 SF T_QQ TYP 348 SF ES_K TYP 342 SF C E L E C E L E ELEC 51 SF VEST. VEST. MTG STO 434 SF MTG STO 434 SF EL 6 EL 6 EL 5 EL 5 EL 4 EL 4 EL 6 EL 5 ELEV LOBBY ELEV LOBBY ELEVATOR LOBBY I E C EL 4 V R E S I E C V R E S T_K A 278 SF T_K B CONN 290 SF EXIT ONLY EXIT ONLY HK 39 SF ROOF SERVICE EL 1 SERVICE EL 1 SERVICE EL 2 SERVICE EL 2 EL 3 EL 3 SERVICE EL 1 SERVICE EL 2 EL 3 FSAE 396 SF FSAE 396 SF FSAE 170 SF VEST. 60 SF VEST. 60 SF RR 50 SF RR 50 SF ES_K ADA STUDIO CONN 335 SF AV/IDF 241 SF AV/IDF 241 SF MEETING ROOM 694 SF ES_K TYP 341 SF MEETING ROOM 694 SF ES_K ADA CORNER CONN 499 SF E G A R O T S G T M F S 9 4 1 E G A R O T S G T M F S M RR 9 4 1 170 SF PANTRY 896 SF PANTRY 896 SF M RR 170 SF W RR 170 SF W RR 170 SF ES_QQ END CONN 551 SF ES_K A CONN 367 SF ES_K B 336 SF ES_K B 338 SF LEVEL 05 - TYPICAL ADA KING GUESTROOM FLOOR LEVEL 28 - BALLROOM & MEETING ROOM LEVEL 28 - BALLROOM & MEETING ROOM LEVEL 28: BALLROOM & MEETING SPACE 0 10 10 10 0 20 0 SCALE: 1/16" = 1'=0" SCALE: 1/16" = 1'=0" SCALE: 1/16" = 1'=0" 20 20 40 40 40 N DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023overall floor plan lev els 29 & 30 EL 7x EL 7x EL 7x OPEN TO BELOW OPEN TO PRIVATE DINING BELOW 630 SF AGM 97 SF SALES DIR. 121 SF SALES 90 SF CATERING 96 SF GM 143 SF HR 93 SF VEST. 116 SF C E L E C E L E ELEC 62 SF VEST. VEST. ELEC 210 SF ELEC 210 SF STOR 30 SF F&B 99 SF EMBASSY BREAKFAST 1686 SF EL 6 EL 6 EL 5 EL 5 EL 4 EL 4 EL 6 EL 5 EL 4 ELEV LOBBY 249 SF ELEV LOBBY 249 SF ELEV LOBBY NURSE 70 SF GUEST LAUNDRY GUEST LAUNDRY 145 SF 145 SF W LOCKER 201 SF FITNESS 2236 SF FITNESS 2236 SF EL 3 EL 3 EL 3 FSAE 179 SF FSAE 179 SF FSAE/SERVICE 215 SF VEST. 132 SF VEST. 132 SF VEST. 49 SF W RR 127 SF MEETING ROOM MEETING ROOM 1170 SF 1170 SF M RR 157 SF EMBASSY BUFFET 548 SF KITCHEN 1242 SF WOMENS 183 SF MENS 255 SF M LOCKER 133 SF STAFF BREAKROOM 739 SF STORAGE 161 SF STORAGE 161 SF LINE OF CANOPY ABOVE LINE OF CANOPY ABOVE T_K ADA JR CONN 395 SF T_K JR CONN 242 SF T_K TYP 303 SF T_K TYP 303 SF T_K TYP 303 SF T_K TYP 303 SF T_QQ CONN 313 SF DECK 1624 SF DECK 1624 SF EL 7x EL 7x EL 7x HK 58 SF HYDRATION STATION ADA K @ LEVELS 5, 9, 13, 17, 21 VEST. 150 SF VEST. 150 SF T_K ADA TYP 353 SF C E L E C E L E ELEC 51 SF VEST. 76 SF VEST. 76 SF EL 4 F S 3 5 1 S S E C C A T S E U G S S E C C A T S E U G F S 3 5 1 EL 6 EL 6 EL 5 EL 5 EL 4 EL 4 EL 6 EL 5 ELEVATOR LOBBY ELEVATOR LOBBY ELEVATOR LOBBY SERVICE EL 1 SERVICE EL 1 SERVICE EL 2 SERVICE EL 2 EL 3 EL 3 SERVICE EL 1 SERVICE EL 2 EL 3 ROOF ROOF T_K B CONN 290 SF T_K A 278 SF HK 39 SF I E C V R E S I E C V R E S ROOF ES_K ADA STUDIO CONN 335 SF KITCHEN 1067 SF KITCHEN 1067 SF VEST. 64 SF VEST. 64 SF FAMILY 62 SF FAMILY 62 SF M RR 249 SF M RR 249 SF W RR 314 SF W RR 314 SF T_QQ TYP 337 SF T_QQ TYP 341 SF ES_K TYP 342 SF ES_K TYP 341 SF BAR 63 SF BAR 63 SF FSAE 162 SF FSAE 162 SF FSAE 170 SF ROOFTOP BAR & LOUNGE 2656 SF T_QQ TYP ROOFTOP BAR & LOUNGE 348 SF 2656 SF ES_K ADA CORNER CONN 499 SF ADA K @ LEVELS 5, 9, 13, 17, 21 & 25 ES_K A CONN 367 SF ES_K B 336 SF ES_K B 338 SF ES_QQ END CONN 551 SF LEVEL 28 - FITNESS LEVEL 28 - FITNESS LEVEL 04 - EMBASSY SUITES BREAKFAST & STAFF LEVEL 29: FITNESS & MEETING LEVEL 29 & 30 LEVELS 04 & 05 LEVEL 29 & 30 1.05 AUSTIN DUAL BRAND HOTEL AUSTIN DUAL BRAND HOTEL AUSTIN DUAL BRAND HOTEL EMBASSY SUITES & TEMPO BY HILTON HOTELS EMBASSY SUITES & TEMPO BY HILTON HOTELS EMBASSY SUITES & TEMPO BY HILTON HOTELS 1.05 1.02 39-22127-00 39-22127-00 39-22127-00 02-03-2023 04-11-2023 04-11-2023 © DLR Group © DLR Group © DLR Group LEVEL 05 - TYPICAL ADA KING GUESTROOM FLOOR LEVEL 30 - ROOFTOP BAR LEVEL 30 - ROOFTOP BAR LEVEL 30: ROOFTOP BAR 0 0 0 10 10 10 20 20 20 40 40 40 SCALE: 1/16" = 1'=0" SCALE: 1/16" = 1'=0" SCALE: 1/16" = 1'=0" N DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023409 Lavaca St 301 Lavaca St 198 W 4th St local PALETTE 208 Colorado St 413 Lavaca St Image capture: Feb 2023 © 2023 Google Image capture: Feb 2023 © 2023 Google Image capture: Feb 2023 © 2023 Google Image capture: Feb 2023 © 2023 Google 522 Lavaca St 318 Congress Ave. 512 Congress Ave. Image capture: Feb 2023 © 2023 Google Image capture: Feb 2022 © 2023 Google Image capture: Apr 2022 © 2023 Google Image capture: Feb 2023 © 2023 Google DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023Austin, Texas Google Street ViewFeb 2023See more datesAustin, Texas Google Street ViewApr 2022See more datesAustin, Texas Google Street ViewFeb 2023See more datesAustin, Texas Google Street ViewFeb 2022See more datesAustin, Texas Google Street ViewFeb 2023See more datesAustin, Texas Google Street ViewFeb 2023See more datesAustin, Texas Google Street ViewFeb 2023See more datesAustin, Texas Google Street ViewFeb 2023See more dates409 Lavaca St 301 Lavaca St 301 Lavaca St RUSTIC TEXTURES GRAYS AND WHITES local LANGUAGES URBAN SCALE TOWER MASSING ACCENTUATE VERTICAL EXPRESSION URBAN SCALE TOWER MASSING BROKEN DOWN WITH SHAPING AND REVEALS 413 Lavaca St GRAYS AND WHITES URBAN SCALE TOWER STOPS AT PODIUM LANGUAGE Image capture: Feb 2023 © 2023 Google Image capture: Feb 2023 © 2023 Google URBAN SCALE TOWER STOPS AT PODIUM LANGUAGE PEDESTRIAN SCALE PODIUM Image capture: Feb 2023 © 2023 Google PEDESTRIAN SCALE PODIUM PORTAL LANGUAGE PORTAL LANGUAGE URBAN SCALE TOWER STOPS AT PODIUM LANGUAGE PORTAL LANGUAGE Image capture: Feb 2023 © 2023 Google PORTAL LANGUAGE PORTAL LANGUAGE DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023Image capture: Feb 2023© 2023 GoogleAustin, Texas Google Street ViewFeb 2023See more dates413 Lavaca StImage capture: Feb 2023© 2023 GoogleAustin, Texas Google Street ViewFeb 2023See more dates301 Lavaca StImage capture: Apr 2022© 2023 GoogleAustin, Texas Google Street ViewApr 2022See more dates318 Congress Ave.Image capture: Feb 2023© 2023 GoogleAustin, Texas Google Street ViewFeb 2023See more dates512 Congress Ave.Image capture: Feb 2022© 2023 GoogleAustin, Texas Google Street ViewFeb 2022See more dates522 Lavaca StImage capture: Feb 2023© 2023 GoogleAustin, Texas Google Street ViewFeb 2023See more dates208 Colorado StImage capture: Feb 2023© 2023 GoogleAustin, Texas Google Street ViewFeb 2023See more dates198 W 4th StImage capture: Feb 2023© 2023 GoogleAustin, Texas Google Street ViewFeb 2023See more dates409 Lavaca StAustin, Texas Google Street ViewFeb 2023See more datesAustin, Texas Google Street ViewFeb 2023See more datesAustin, Texas Google Street ViewFeb 2023See more datesAustin, Texas Google Street ViewFeb 2023See more datesexterior REFERENCES DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023project PALETTE DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023Hote l elevations 370’ - 10” 370’ - 10” 368’ - 2” 342’ - 8” 326’ - 8” E D A C F E F D B F A F D B A A G NORTH EAST WEST SOUTH A WINDOW SYSTEM B METAL PANEL C CMU D WINDSCREEN E CANOPY F PLANTINGS G ART DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023thank you DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023AP PENDIX: l2 8 su n studie s HANOVER PLACE 511’-2” NO DIRECT SUN ON GLAZING NO SUN ON WEST FACADE SUMMER SOLSTICE | JUNE 20TH | 11:35 PM DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023AP PENDIX: l2 8 su n studie s S U N A N G L E HANOVER PLACE 511’-2” NO DIRECT SUN ON GLAZING SUMMER SOLSTICE | JUNE 20TH | 12:35 PM DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023AP PENDIX: l2 8 su n studie s S U N A N G L E HANOVER PLACE 511’-2” NO DIRECT SUN ON GLAZING SUMMER SOLSTICE | JUNE 20TH | 1:35 PM DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023AP PENDIX: l2 8 su n studie s S U N A N G L E HANOVER PLACE 511’-2” NO DIRECT SUN ON GLAZING SUMMER SOLSTICE | JUNE 20TH | 2:35 PM DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023AP PENDIX: l2 8 su n studie s HANOVER PLACE 511’-2” NO DIRECT SUN ON GLAZING NO SUN ON WEST FACADE SUMMER SOLSTICE | JUNE 20TH | 3:35 PM DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023AP PENDIX: l2 8 su n studie s HANOVER PLACE 511’-2” NO DIRECT SUN ON GLAZING NO SUN ON WEST FACADE WINTER SOLSTICE | DECEMBER 21ST | 12:35 PM DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023AP PENDIX: l2 8 su n studie s S U N A N G L E HANOVER PLACE 511’-2” NO DIRECT SUN ON GLAZING WINTER SOLSTICE | DECEMBER 21ST | 1:35 PM DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023AP PENDIX: l2 8 su n studie s S U N A N G L E HANOVER PLACE 511’-2” NO DIRECT SUN ON GLAZING WINTER SOLSTICE | DECEMBER 21ST | 2:35 PM DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023AP PENDIX: l2 8 su n studie s SUN ANGLE HANOVER PLACE 511’-2” WINTER SOLSTICE | DECEMBER 21ST | 3:35 PM DLR GROUP — AUSTIN DUAL BRAND — UDG — 04.24.2023 Date: To: From: Subject: April 6, 2023 City of Austin Design Commission Planning & Urban Design Working Group Density Bonus Working Group review of Hilton Dual Brand Hotel substantial compliance with the Urban Design Guidelines April 5, 2023; 12:00 pm; Virtual Microsoft Teams Meeting Mr. David Merritt Meeting date: Applicant: The proposed project, Hilton Dual Brand Hotel, is located on Lavaca between 4th and 5th Streets, on the east side of the street. The address is 415 Lavaca. The project includes two hotels (259,959 sf / 480 hotel) and retail (10,000 sf) plus 29,488 sf of amenities. The project has no parking spaces. The applicant is seeking a Density Bonus to raise the FAR from 8:1 to 26:1 resulting in a total project gross area of 299,477 gsf. The site is 11,813 sf) with a current allowable building size of 94,504 gsf based on the current allowable 8:1 FAR. The total proposed building height is 371 ft (30 floors). The maximum height achievable under the Density Bonus program is unlimited. Per the Density Bonus Program ordinance, the applicant is required to meet the three gatekeeper requirements: • Substantially comply with the City’s Urban Design Guidelines • Provide streetscape improvements along all public street frontages consistent with the Great Streets Program Standards • Applicant must commit to a minimum of 2-star green building rating (3-star proposed). WORKING GROUP REVIEW OF PROJECT FOR COMPLIANCE WITH THE URBAN DESIGN GUIDELINES AREA WIDE GUIDELINES 1. Create dense development – 26:1 far is being requested. Project complies with this Section. 2. Create mixed-use development – Hotel and are a ground floor restaurant are proposed. Project complies with this Section. 3. Limit development which closes downtown streets – This project is not permanently closing down any streets. Project complies with this Section. 4. Buffer neighborhood edges- 5. N/A Incorporate civic art in both public and private development – Digital art was mentioned in the presentation, but Commissioners were unclear on the nature of the work. Samples of digital art could help Commissioners understand if this could be considered civic art. Additional civic art could be considered for the porte cochere, exterior walls, exterior entry, or ROW. Project does not comply with the section at this time. 6. Protect important public views – Since this project is already surrounded by high-rises, there are no important public views to protect. Not applicable. 7. Avoid historical misrepresentations – Project complies with this Section. 8. Respect adjacent historic buildings- N / A 9. Acknowledge that rooftops are not seen from other buildings and the street – Project complies with this Section. 10. Avoid the development of theme environments- Project complies with this Section. 11. Recycle existing building stock – Project does not comply with this section. 1 Project complies with 6 Area Wide Guidelines, and 4 items are not applicable. 1 item is not in compliance. GUIDELINES FOR THE PUBLIC STREETSCAPE 1. Protect the pedestrian where the building meets the street- Some type of change in paving pattern or color, or added signage could warn pedestrians that they should be cautious of approaching vehicles where the driveway meets the sidewalk. A traffic arm to slow traffic coming into and out of the garage. Project does not comply with this Section. 2. Minimize curb cuts- The project does comply with this section. 3. Create a potential for two-way streets- Not Applicable. 4. Reinforce pedestrian activity- The building does not offer parking, but could offer bike valet services for hotel guests, bike racks for hotel staff, a coffee window at the street, or otherwise consider services to support pedestrian activity. Project partially complies with this section. 5. Enhance key transit stops- This project is not immediately adjacent to any key transit stops so enhancement does not apply. Not applicable. 6. Enhance the streetscape- Project complies with this Section. 7. Avoid conflicts between pedestrians and utility equipment- 8. There are no conflicts between pedestrians and utility equipment. Project complies with this section. Install street trees- Street trees are being installed in compliance with The Great Streets Program. Project complies with this Section. 9. Provide pedestrian-scaled lighting- Lighting is shown on the The Great Streets Program but no mention was made as to the the type. The lighting could be more clearly illustrated for full compliance credit. Project partially complies with this Section. 10. Provide protection from cars/promote curbside parking- Pedestrians could be more protected at sidewalk with clear indication of sidewalk vs driveway. Project does not yet comply with this section. 11. Screen mechanical and utility equipment- Equipment is either screened and/or within building envelope. Project complies with this Section. 12. Provide generous street-level windows- Street-level windows are limited due to the flood plain. Not Applicable. 13. Install pedestrian-friendly materials at street level- Project Complies with this section. Project receives 6 points for full compliance. 3 items are in partial compliance. 2 items were not applicable. 2 items were not in compliance. PLAZAS AND OPEN SPACE GUIDELINES 1. Treat the Four Squares with special consideration- Not applicable. 2. Contribute to an open space network- Multiple lobby spaces, amenities and a restaurant space create connection with the public. Project complies with this section. 3. Emphasize connections to parks and greenways- 4. Not applicable. Incorporate open space into residential development (pool, deck, dog area)- Not applicable. 5. Develop green roofs- Project has plantings – but not a green roof. Project does not comply with this section. 6. Provide plazas in high use areas- Not applicable. 7. Determine plaza function, size and activity- Not applicable. 8. Respond to microclimate in plaza design- Not applicable. 9. Consider views, circulation, boundaries and subspaces in plaza design- Not applicable. 10. Provide an appropriate amount of plaza seating- Not applicable. 2 11. Provide visual and spatial complexity in plaza design- Not applicable. 12. Use plants to enliven urban spaces. The plantings on the amenity spaces could be more considered. Project is partially compliant. 13. Provide interactive civic art and fountains in plaza- Not applicable. 14. Provide food service for plaza participants- Not applicable. 15. Increase safety in plazas through wayfinding, lighting and visibility- Not applicable. 16. Consider plaza operations and maintenance- Not applicable. Project complies with 1 of the 16 applicable Plaza and Open Space Guidelines. 1 item receives partial compliance. items were not in compliance. 13 items were not applicable. 1 item was not in compliance. GUIDELINES FOR BUILDINGS 1. Build to the street- This project is built to the street. Project complies with this Section. 2. Provide multi-tenant, pedestrian-oriented development at the street level- Project complies with this section. 3. Accentuate primary entrances- The entrance to the sky lobby is flush with the wall. Project partially complies with this section. 4. Encourage the inclusion of local character- The proposed building shows very little local character. Local art or graphics or at least some use of local materials or indigenous features would tie the project to our local character. Utilizing existing buildings stock (AW.11) like a sign from Antone’s or local public art (AW.5) could visually locate the building in Austin and create a sense of place Project could reference the Mexican American Cultural District. Project does not comply with this section. 5. Control on-site parking- Not applicable. 6. Create quality construction- Project complies with this Section. 7. Create buildings with human scale- The illustrations convey a sensitivity to human scale. Close-up vignettes of activated areas could convey compliance to Commissioners. Project partially complies with this Section. Project complies with 3 items and partically complies with 2 items. 1 item is not applicable and 1 item is not in compliance. OVERALL RESULTS Areawide Public Streetscape Plazas and Open Space Buildings TOTAL 6 out of 11 comply 6 out of 13 comply 1 out of 16 comply 3 out of 7 comply 16 out of 47 comply 0 partially complies 3 partially comply 1 partially comply 2 partially comply 6 partially comply 4 not applicable 2 not applicable 13 not applicable 1 not applicable 20 not applicable The Density Bonus Working Group has determined that Hilton Dual Brand may not be in substantial compliance with the Urban Design Guidelines. It should be noted that the findings of this Working Group Memo are not reflective of the Design Commission and should not be construed as a final determination. Not all categories have equal weight from a points determination perspective. Substantial Compliance is a judgement call based upon the overall contribution to the experience of the public. Bringing partial points to full compliance and any out of compliance items to full compliance increases the likelihood of support from the full Design Commission. WORKING GROUP COMMENTS • Consider a change in paver material to alert pedestrians when the sidewalk becomes a driveway. Consider adding a traffic arm or other deterrent to slow vehicles pulling out of the porte cochere. Please reinforce PS.1 – Protect Pedestrians where the Building Meets the Street. • We appreciate pulling building services under the building away from the sidewalk. Thank you! Great job on achieving PS.7 – Avoid Conflicts between Pedestrians and Utility Equipment. 3 • Consider adding pedestrian or bike services for staff and guests. This could include but is not limited to bottle fillers, walking maps (15-minute area,) bike valet for guests, bike tours for guests, bike racks for staff, tire pump for staff. This would increase compliance with PS.4 – Reinforce Pedestrian Activity. • Consider the thermal qualities of dark and black pavers – does this increase the heat island effect? What is the experience for pedestrians? PS.4 – Reinforce Pedestrian Activity. • Consider incorporation of the Mexcian American Heritage Corridor – Resolution 20110825-067 – to increase compliance with B.4- Encourage the Inclusion of Local Character. The Working Group appreciates this opportunity to preliminarily review and comment on this project and we look forward to a continued collaborative process while moving this project forward. With thanks, Jen Weaver City of Austin Design Commission Chair Planning & Urban Design Working Group 4 DOWNTOWN DENSITY BONUS PROGRAM (DDBP) SUBMITTAL INSTRUCTIONS A property owner (Owner) or their representative (Applicant) acting on behalf of the Owner can initiate an administrative request to the Director of Planning (Director) seeking additional Floor-to-Area (FAR) entitlements as outlined in the Downtown Density Bonus Program per the Land Development Code (LDC) 25-2-586. In order for the Director to conduct an administrative review, the requirements listed below must be submitted. Once an application is deemed complete, the Director will inform the Applicant of review commencement. The following submittals are required in a complete PDF package of no more than 10 MB in size with sheets no larger than 11x17 inches: 1. Completed DDBP Submittal; 2. Vicinity plan locating the project in its context, and showing a minimum 9 block area around the project; 3. Location and nature of nearby transit facilities; 4. Drawings (submitted drawings should demonstrate compliance with Great Streets Standards): o Site plan; o Floor plans; o Exterior elevations (all sides); o Three-dimensional views; 5. As part of the gatekeeper requirements, o Urban Design Guidelines checklist; o Great Streets Compliance – Contact Jill Amezcua, Program Manager at: (jill.amezcua@austintexas.gov) o 2 Star Austin Energy Green Building rating - submit copy of the projects signed Austin Energy Green Building Letter of Intent and Austin Energy Green Building checklist: (greenbuilding@austinenergy.com) 6. Other items that may be submitted but not required: Narrative / graphics / photos to further describe the project. 7. Coordination memo acknowledgment from the City of Austin’s Housing and Planning Department for detailing of affordable housing community benefits. Please contact Brendan Kennedy, (Brendan.Kennedy@austintexas.gov), for more information. 8. Please submit all materials in PDF format (no larger than 10 MB) to: Jorge E. Rousselin, Development Services Division Manager Urban Design – Housing and Planning Department jorge.rousselin@austintexas.gov (512) 974-2975 DOWNTOWN DENSITY BONUS PROGRAM (DDBP) SUBMITTAL APPLICATION 1. Project Name: 2. Property Owner Name: Address: Phone: E-mail: Name: Address: Phone: E-mail: 3. Applicant/Authorized Agent 4. Anticipated Project Address: Page 1 of 9 5. Site Information a. Lot area (also include on site plan): b. Existing zoning (include any zoning suffixes such as “H,” “CO,” etc. If the property has a conditional overlay (CO), provide explanation of conditions (attach additional pages as necessary): c. Existing entitlements: I. Current floor to area (FAR) limitation: II. Current height limitation (in feet) : III. Affected by Capitol View Corridors (CVCs) Yes/No? Yes No If yes, please provide specify height allowed under CVC: 6. Existing Deed Restrictions Detail existing deed restrictions on the property (if any): Page 2 of 9 7. Building Information a. Total square footage - Only include the square footage that counts towards FAR; see LDC 25-1-21(40), (44), and (45): b. Gross floor area devoted to the different land use categories included in the project (e.g., retail/restaurant, office, apartment, condominium, hotel): c. Number or units (if residential development): d. Number of rooms (if hotel or similar use): e. Number of floors: f. Height: g. FAR requested: Page 3 of 9 8. Gatekeeper Requirement (1 of 3): Urban Design Guidelines for Austin Provide detailed explanation of how the project substantially complies with the Urban Design Guidelines for Austin (referencing specific guidelines) in order to meet the first Gatekeeper requirement of the DDBP as described in LDC § 25-2-586 (C)(1)(a). Attach Urban Design Guidelines checklist and additional page(s) as necessary. Page 4 of 9 9. Gatekeeper Requirement (2 of 3): Great Streets Provide an explanation of how this project meets Great Streets standards, the second Gatekeeper requirement of the DDBP as described in LDC § 25-2-586 (C)(1)(b). Attach additional page(s) as necessary: Page 5 of 9 10. Gatekeeper Requirement (3 of 3): 2 Star Austin Energy Green Building Provide an explanation of how this project achieves a minimum two Star Austin Energy Green Building, in order to meet the third Gatekeeper requirement of the DDBP as described in LDC § 25-2-586 (C)(1)(c). Attach Austin Energy Green Building checklist and additional page(s) as necessary: Page 6 of 9 11. Density Bonus Calculation Provide a calculation method of how the additional FAR is sought including site area and amount per square foot according to the Community Benefits calculations described in LDC § 25-2-586 (E)(1)-(12). 12. Community Benefits: Onsite, Fee in lieu, or Combination Detail which community benefits from LDC § 25-2-586 (E) will be used and how they will be applied (on site, fee in lieu of, or combination of the two). Attach additional page(s) as necessary: Page 7 of 9 13. Acknowledgements a. Applicant understands that a standard restrictive covenant template will be drafted by the City of Austin to address Gatekeeper requirements in accordance with 25-2-586(C)(1): b. Applicant understands that will be required to submit a copy of the project’s signed Austin Energy Green Building Letter of Intent: c. Applicant has received and reviewed a copy of the Downtown Density Bonus d. Applicant has received and reviewed a copy of the Urban Design Guidelines for e. Applicant has scheduled presentation to the Design Commission Working Group and follow-up Design Commission Meeting by coordinating dates with program staff? Contact Sophia Benner at: sophia.benner@austintexas.gov. f. To confirm in-lieu fees or provision of on-site affordable housing as a public benefit, Applicant must detail program requirements and obtain a letter of affordability from the Housing Development Assistance team, Housing & Planning Department. Yes Yes Ordinance: Yes Austin: Yes Yes Yes No No No No No No Page 8 of 9 Signed: Owru r or\Applicant Authorized Agent Date Submitted Page 9 of9 DOWNTOWN DENSITY BONUS PROGRAM (DDBP) APPLICATION SUBMITTAL CHECKLIST Submitted: Completed DDBP Application; Vicinity plan/aerial locating the project in its context, and showing a minimum 9 block area around the project; Location of nearby transit facilities; Drawings: ▪ ▪ ▪ ▪ Site plan; Floor plans; Exterior elevations (all sides); Three-dimensional views; Copy of the projects signed Austin Energy Green Building Letter of Intent; Other items that may be submitted but not required: Narrative / graphics / photos to further describe the project. Letter of affordability and acknowledgment from HPD for affordable housing community benefit. Page 10 of 9