Design CommissionOct. 25, 2021

Central Fire Station LEED — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 3 pages

0 1 Design Credit Bicycle Facilities 1 Will not apply Use City of Austin Standard 710S. Arc 0 1 Bike rack and interior accommodations 0 15 0 21 Location and Transportation 18 0 Design Credit Surrounding Density and Diverse Uses 8 Complete 0 Design Credit Access to Quality Transit 7 Complete LEED v4 for ID+C: Commercial Interiors Project Checklist C Y ? N Credit Type Credit Points Status CoA Baseline Criteria for Building Projects Deliverables Project Name: Date Updated: 8/6/2021 City of Austin Central Fire and EMS Station Potential Effort (0-3) Additional Fees $ Potential Cost (0-3) Cost Value $ Notes 1 1 0 Design Credit Integrative Process 2 Not Attempted ALL 0 0 0 •Forms: PIp_Project_Information and Integrative Process Worksheet •Energy-Related Systems - A simple box energy modeling is a preliminary building model used to analyze the building’s energy loads. Project teams can use the EPA’s Target Finder tool or a similar tool in order to benchmark energy performance. Target Finder allows projects to set target goals for a building design’s energy demands. •Owner’s project requirements (OPR) a written document that details the ideas, concepts, and criteria determined by the owner to be important to the success of the project. Basis of design (BOD) the information necessary to accomplish the owner’s project requirements, including system descriptions, indoor environmental quality criteria, design assumptions, and references to applicable codes, standards, regulations, and guidelines. In addition, we need to determine if we will be using IP units or SI units for this project. SI refers to the System International Units, which is just the Metric System updated and made more complete. IP relates to inch-pound. I assume we will be using IP, but I just want to confirm. Both Option 1 and Option 2 •Forms: LTc_Sensitive_Land_Protection •Special Circumstances (if applicable) •Applicable Site Plans ed. •Form: LTc_Quality_Transit •Map: Indicating project location, location of transit stops, routs serving each sstop and the walking routes between the location of the project functional entry and the stops •Schedule: Provide all transit types, provide weekday and weekend route schedules showing the frequency of trips and services in opposite directions •Verification: Provide the planned stops or stations will be sited, funded, and under construction by the date of the certification of occupancy and will be completed within two years of that date •EApc_Energy_Performance_IDC •AEDG Tables •v4_Minimum_Energy_Performance_Calculator-v06 •Target Finder-performance results for the project building (a screen capture or other documentation) Use target energy performance results calculator on energy star •Optimize energy performance documentation: provide an efficiency measure that were analyzed during the design process and what analysis method was used and describe now these results were accounted for in the decision making •Energy modeling reports •EAp_Refrigerants •CFC Phase-out Plan •EApc_Energy_Performance_IDC •AEDG Tables •v4_Minimum_Energy_Performance_Calculator-v06 •Target Finder-performance results for the project building (a screen capture or other documentation) Use target energy performance results calculator on energy star •Optimize energy performance documentation: provide an efficiency measure that were analyzed during the design process and what analysis method was used and describe now these results were accounted for in the decision making •Energy modeling reports •Confirmation that tenant-level meters have been installed for all energy sources, except shared AHUs or DX units. •Controls drawings or single-line diagrams indicating all meters •Possible Points: 2 •Attempted Points: 1 •Base Point: Site Selection and Energy Related Systems (1 point) •Option 1: Water-Related Systems (1Point) - Not preferred. •Notes: Design team to test and document energy strategies. Non-potable water use study may not pan out. 0 Points inherently achieved b/c of site. 0 Points inherently achieved b/c of site. Spec low flow fixtures 4pts = 30% reduction. May require non-potable water use to get more than 2-4 points. by Owner, no fees for D-B team requires more expensive high efficiency HVAC may have slight cost impact Verify if in CxA scope cost for meters and installation. Alternate option to purchase PV may have slight cost impact Verify if Carbon offsets are part of Construction Cost possible enclosure for city wheel bins Flintco to include in cost 0 10 year lease commitment Could be slight cost to requiring labels on materials or getting recyclable materials. extra effort to track products, may have to choose more costly material with EPD extra effort to track products, may have to choose more costly material with EPD extra effort to track products, may have to choose more costly material with EPD 0 0 0 0 0 0 0 0 0 0 0 0 0 CoA CoA MEP 1 MEP MEP MEP 2 2 1 1 1 2 2 2 2 ARC CoA 0 0 0 2 2 1 3 1 3 1 0 1 1 0 1 1 1 1 4 4 0 Y Design Credit Indoor Water Use Reduction 4 4 Design Credit Indoor Water Use Reduction Water Efficiency 0 20 13 5 Y Y Y Const. Credit Energy and Atmosphere Fundamental Commissioning and Verification Required Not Attempted 12 Not Attempted 12 38 Required Not Attempted 4a. Include a Commissioning plan for Mechanical, Electrical and Plumbing systems in the design and construction process. •Required form •Provide cutsheets for all fixtures and fitting installed in the project •Upload appliance and process water cutsheets Y Y Y Design Credit Minimum Energy Performance Required Not Attempted Option 1 Tenant-level energy simulation Y 4 Y 0 Y Design Credit 1 Const. Credit Fundamental Refrigerant Management Enhanced Commissioning Required Not Attempted Refer LEED Criteria. Jan 1st 2010 restrictions on use of R22 5 Not Attempted Refer LEED criteria 1 0 1 Design Credit Advanced Energy Metering Not Attempted Option 1: metering 0 Design Credit 0 Design Credit 0 Const. Credit Renewable Energy Production Enhanced Refrigerant Management Green Power and Carbon Offsets 0 Y 3 0 0 0 0 1 1 1 Design Credit Const. Credit 0 Design Credit 3 Const. Credit 0 Const. Credit 0 Const. Credit 0 Const. Credit 4 3 Materials and Resources 13 Storage and Collection of Recyclables Required In Progress Y Y Construction and Demolition Waste Management Planning Required Not Attempted Long-Term Commitment Interiors Life-Cycle Impact Reduction Building Product Disclosure and Optimization - Environmental Product Declarations Building Product Disclosure and Optimization - Sourcing of Raw Materials Building Product Disclosure and Optimization - Material Ingredients Not Attempted Not Attempted Not Attempted Not Attempted Not Attempted 2 3 1 2 1 4 2 2 2 Not Attempted Refer LEED criteria EAc_Refrigerants Not Attempted Refer LEED criteria. All city facilities to be powered by alternaitve energy by 2012. Consult with Austin Energy. 5a. Consult with User, BSD and/or ARRD to incorporate recycling containers and pickup areas in plans and allow for accessibility of large vehicles. 5b. Plan for for recycling areas, pick-up, containers, trash cans and consult with solid waste services. Refer to planning guidelines •MRp_Recyclables •Floor Plans highlighting the recycling storage areas for the project Provide minimum 10 year leasing 12 10 3 Design Credit Optimize Energy Performance 25 Not Attempted Option 1 Tenant-level energy simulation Arch/MEP 0 Costs may include insulation and equipment 8 7 4 Y 4 0 1 2 6 Y 1 1 1 1 1 1 1 0 Const. Credit Construction and Demolition Waste Management 2 Not Attempted Refer city standards - Storm water Pollution Prevention Plan 5c. Divert from Landfill at least 50% with goal of 75% by weight non-hazardous construction demolition waste excluding excavated soil and stone. STD Spec 1505 2 1 extra cost for waste diversion 0 8 5 4 Indoor Environmental Quality 17 Y Y Design Credit Minimum Indoor Air Quality Performance Required Not Attempted a. Comply with current version of ASHRAE 62.1 Sections 4 - 7 Ventilation for acceptable Indoor Air Quality MEP 0 0 0 to be included in HVAC design Y Y Design Credit Environmental Tobacco Smoke Control Required In Progress Arc/CoA 0 smoking prohibited Conform with City Policy but increase distance to 25ft In the City of Austin, smoking is not allowed in public places, including City parks, libraries, buses or within 15 feet of any pedestrian entrance. This ban includes bars and restaurant establishments. Smoking is allowed in private residences. If you are staying in a hotel and wish to smoke, please request a designated smoking room.. • Forms •(Under Team Review) Site plan with non-smoking and smoking areas (25’ from entrances) •(Under Team Review) Signage •No-Smoking Pollicy 1 1 Design Credit Enhanced Indoor Air Quality Strategies 2 Not Attempted Need to select the OPTION MEP verify entryway system options, •EQp_IAQ_Performance •v2009v4v4 1_Minimum_IAQ_Performance_Calculator_v04 •Option 1 ASHRAE Standard 62.1-2012 •CIBSE – documentation demonstrating that natural ventilation is an effective strategy for the project as determined through the flow process in figure 2.8 of the CIBSE Application Manual •ASHRRAE – documentation demonstrating that the minimum outdoor air opening and space configurations meet or exceed the minimum values from the natural procedure outlined in ASHRAE 62.1-2010 section 6.4 •Mechanical ventilation controls documentation •Natural ventilation controls documentation 2 1 0 Const. Credit Low-Emitting Materials 3 0 1 research and calculations required, materials may cost more Low-Emitting Materials—Adhesives and Sealants: All installed sealants and adhesives must meet South Coast Air Quality Management District standards Rule 1168. Low-Emitting Materials—Paints and Coatings: All paints and primers used in the interior of the building must not exceed the VOC limit of Green Seal Environmental Standard GS- 11 and GC-03. All coatings used in the interior of the building must not exceed the VOC limit of SCAQMD Rule 1113. Low-Emitting Materials—Flooring Systems: All installed carpets meet Carpet & Rug Institute's (CRI) Green Label Plus minimum standards. All installed carpet pads meet CRI Green Label minimum standards. All resilient flooring products, including linoleum, laminate flooring, wood flooring, ceramic flooring, wall base, and rubber flooring must be FloorScoreTM certified. 3 Not Attempted Low-Emitting Materials—Flooring Systems: All installed carpets meet Carpet & Rug Institute's (CRI) Green Label Plus minimum standards. All installed carpet pads meet CRI Green Label minimum standards. All resilient flooring products, including linoleum, laminate flooring, wood flooring, ceramic flooring, wall base, and rubber flooring must be FloorScoreTM certified. Low-Emitting Materials—Composite Wood and Agrifiber Products; Require that all installed composite wood and insulation contains no added urea-formaldehyde. Construction IAQ Management Plan—During Construction: Contractor to provide and implement a Construction Indoor Air Quality Management Plan that meets the recommended control measures of the Sheet Metal and Air Conditioning National Contractor's Association IAQ Guidelines. Protect materials from moisture damage and use MERV 8 filters at R.A.Gs for construction phase Std Spec 1510 Construction IAQ Management Plan—Before Occupancy: Refer LEED criteria. Include flush out process in projject requirements and construction schedule. Refer LEED criteria. 8g. Provide adequate daylighting to all regularly occupied spaces and integrate daylighting systems with electric lighting systems and controls. Need to select the OPTION Need to select the OPTION Need to select the OPTION 1 0 0 Const. Credit Construction Indoor Air Quality Management Plan 1 Not Attempted Indoor Air Quality Assessment Thermal Comfort Interior Lighting Daylight Acoustic Performance Innovation 0 Design Credit Innovation 1 0 0 Const. Credit LEED Accredited Professional Regional Priority 0 Const. Credit 0 Design Credit 0 Design Credit 1 Design Credit 2 Design Credit 1 0 0 2 0 3 3 0 0 0 1 0 1 1 2 0 0 3 2 2 1 1 0 0 0 Regional Priority: Specific Credit EA: "Optimize Energy Performance" Not Attempted 0 0 Regional Priority: Specific Credit LT: "Surrounding Density + Diverse Uses"1 Not Attempted 0 0 Regional Priority: Specific Credit LT: "Bicycle Facilities" 1 Will not apply Not Attempted Not Attempted Not Attempted Will not apply Will not apply Not Attempted Not Attempted 2 1 2 3 2 6 5 1 4 1 0 0 0 0 0 0 ? 0 0 0 0 0 1 1 1 2 2 3 2 0 1 0 0 MEP MEP 1 1 2 2 2 0 2 0 1 requires monitoring on site testing fees, HVAC monitoring. 2 pts has to be testing prior to occupancy which maby be hard to do. cost of improved envelope or equip. cost for better lamping and controls may not qualify. Added cost for added windows if needed. may need acoustic testing to prove NRC. Wall STC is mostly included in design. 0 0 0 0 See below for multiple options, cost will vary. 0 No cost added No additional cost beyond credit above. Inherently get due to location. No additional cost beyond credit above. Certified: 40-49 points, Silver: 50-59 points, Gold: 60-79 points, Platinum: 80+ points Certified: 40 to 49 points, Silver: 50 to 59 points, Gold: 60 to 79 points, Platinum: 80+ Possible Points: 110 0 59 30 38 TOTA LS Innovation Up to 5 points: Pilot Credit: "Lead Use Reduction" 1 2 Pilot Credit: "Building Material Human Hazard and Exposure Assessment Material 3 Pilot Credit: "Verified Construction and Demolition Recycling Rates" 4 Pilot Credit: "Performance-based indoor air quality design and assessment 5 Innovation: Green Cleaning Policy 6 Innovation: Education 7 Innovation: Design for Active Occupants Innovation: Integrated Pest Management Link to credit: Lead Recycling Air Cleaning Education Pest In Progress Regional Priority Credits for Commercial Interiors, V4.0, Austin, TX (One point for each category earned by meeting the minimum point threshold for that credit above) 1 Optimize energy performance. Threshold: 18 2 Surrounding density and diverse uses. Theshold: 4 3 Indoor water use reduction. Threshold: 8 4 Reduced parking footprint. Threshold: 2 5 Bicycle facilities. Threshold: 1 6 Renewable energy production. Threshold: 2 2 2 1 2 0 2 1 1 1 1 1 0 1 0 Extra testing and monitoring. Extra testing and monitoring. May require additional research or fee, may not be available More research required to determine. CoA to research. No cost to project. May need Signage designer, graphic design, signs, video, photography CoA to research. No cost to project. 0 0 0 0