Airport Advisory CommissionMarch 8, 2022

AEDP Update Presentation — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 11 pages

Airport Expansion Development Program Capital Program Update Airport Advisory Commission March 08, 2022 AUS Project Update Bipartisan Infrastructure Law Environmental Assessment Update RFQ Updates 1 Bipartisan Infrastructure Law (BIL) Clarifying Information: Airport terminal Program Project Eligibility provisions from Directly from Legislative Language Airport terminal development as defined under 49 U.S.C. §47102(28) • Airport passenger terminal buildings including terminal gates • Access roads servicing exclusively airport traffic that leads directly to or from an airport passenger terminal building • Walkways that lead directly to or from an airport passenger terminal building *Connection to lightrail • Vehicles for moving passengers between terminal facilities and between terminal facilities and aircraft Source: FAA Website AAC Capital Program Update 2 Airport Terminal Program— Project Priorities As Stated in the BIL Airport Infrastructure Grant Program federal shares (FAA Contributions) are the same as for AIP • Generally 75% for large and medium hubs • Generally 90% for other NPIAS airports Terminal Improvement Program federal shares (FAA Contributions) are modified from AIP • 75% for large and medium hubs • 95% for small hubs, non-hubs, and non-primary airports Terminal Improvement Program also includes apportionment by airport size • No more than 55% of TIP can go to large hubs • No more than 15% can go to medium hubs (150M of overall 1B program, ~5M per medium hub airport) • No more than 20% can go to small hubs • Not less than 10% must go to nonhub and non-primary airports AAC Capital Program Update Source: FAA Website 3 Airport Terminal Program— Project Priorities As Stated in the BIL Consideration to be given to projects that: Increase capacity and passenger access Replace aging infrastructure Achieve compliance with the Americans with Disabilities Act/ expand accessibility for persons with disabilities Improve airport access for historically disadvantaged populations Improve energy efficiency, including upgrading environmental systems, upgrading plant facilities, and achieving Leadership in Energy and Environmental Design (LEED) accreditation standards Improve airfield safety through terminal relocation Encourage actual and potential competition Previously funding FAA Programs/Projects 1. 2. 3. 4. 5. 6. 7. 8. Source: FAA Website AAC Capital Program Update 4 AUS – FAA BIL Strategies Airport Terminals Grant Program: • Shovel ready projects • Baggage Handling System • Terminal Optimization • Future Projects • Concourse B • Tunnel Airport Infrastructure Grant Program: • Shovel ready project • Demo for Airfield Infrastructure • Future Projects • Airfield Infrastructure • Central Utility Plant 10+ Gate Midfield Concourse Airfield and Utility Infrastructure Tunnel Expandable for Future Growth Optimize Barbara Jordan Terminal AAC Capital Program Update 5 Environmental Assessment Update 6 Environmental Assessment Update February 22, 2022 – EA Posted: AUS Environmental Assessment | SpeakUp Austin! March 23 2022 Meeting • Draft Environmental Assessment Virtual Public • Save the date for a virtual public meeting to learn more about the Draft Environmental Assessment and to learn how to submit comments to be included in the final draft that will be presented to the Federal Aviation Administration. March 26 2022 (In-Person) • Draft Environmental Assessment Open House • Save the date for an in-person open house to learn more about the Draft Environmental Assessment and learn how to submit comments to be included in the final draft that will be presented to the Federal Aviation Administration. AAC Capital Program Update 7 RFQ Updates 8 Request for Qualifications Updates AEDP Program Element Est. Council Date Est. Advertise Date Professional Design Services – AEDP Airfield Infrastructure 1/31/2022 Thursday, May 19, 2022 Program Management Support Consultant *3/7/2022 Thursday, July 28, 2022 South Buildings Demo Contractor Summer 22 Thursday, July 28, 2022 AEDP Airfield Infrastructure Construction – CMR Construction Contract Concourse B - Design Consultant South Campus Stormwater Design IDIQ Asbestoses /Lead/PFAS Remediation Summer 22 Thursday, September 1, 2022 Fall 22 4Q22 4Q22 4Q22 Thursday, November 3, 2022 Thursday, November 3, 2022 Thursday, December 1, 2022 Concourse B – Construction Contractor Thursday, December 1, 2022 AAC Capital Program Update 9 AEDP Contracting & Business Opportunities AustinTexas.gov/AEDP-Business Thank You! Questions, Comments & Discussion Follow progress of the program at AustinTexas.gov/AEDP 10