Resource Management Commission Homepage

RSS feed for this page

July 15, 2025

Item 3 - TGS Memo 2025 Statement of Intent to Change Gas Utility Rates original pdf

Thumbnail of the first page of the PDF
Page 1 of 4 pages

Mr. Brocato’s Direct Line: (512) 322-5857 Email: TO: FROM: DATE: RE: M E M O R A N D U M City of Austin Thomas Brocato Samantha Miller July 3, 2025 Texas Gas Service Company’s 2025 Statement of Intent to Change Gas Utility Rates Within the Incorporated Areas of the Central-Gulf, West North, and Rio Grande Valley Service Areas Overview of Application On June 30, 2025 Texas Gas Service Company (“TGS” or “Company”) a Division of ONE Gas, Inc. filed a Statement of Intent to Change Gas Utility Rates within the Incorporated Areas of the Central-Gulf, West North, and Rio Grande Valley Service Areas (Application) pursuant to Subchapter C of Chapter 104 of the Gas Utility Regulatory Act in all municipalities exercising original jurisdiction within the incorporated service areas and at the Railroad Commission of Texas (“Commission”). The proposed effective date for new rates is August 19, 2025. Below is a summary of the key components of the filing: • • • • • • TGS is seeking to increase its revenues by $41.1 million, which is an increase of 7.07% including gas costs, or 9.83% excluding gas costs. TGS currently has four service areas in Texas. In its application TGS is seeking to consolidate all service areas into a single statewide jurisdiction served by TGS. The Company’s proposed rates for all customers are based on the systemwide cost of providing service to customers throughout the entirety of Texas. The estimated change in rates would result in small residential customers’ average monthly bill, including cost of gas, of $48.82 per month, and large residential customers average monthly bill, including cost of gas, of $74.30. For the Central Gulf Service Area, the impact of this change would be an increase of $3.94 per month for small residential customers, and a decrease of $2.99 per month for large residential customers. For West North Service Area, the impact of this change would be an increase of $10.38 per month for small residential customers, and an increase of $14.64 per month for large residential customers. For the Rio Grande Valley Service Area, the impact of this change would be a decrease of $13.71 for small residential customers, and a decrease of $4.59 for large residential customers. Currently, Central Gulf Service Area rates consist of a $21.36 per month customer charge and $0.87646 Ccf volumetric rate for small residential customers. Under TGS’s proposed rate change, …

Scraped at: July 11, 2025, 11:39 p.m.
July 15, 2025

Item 4 - Heat Pump Water Heater Rebates Presentation original pdf

Thumbnail of the first page of the PDF
Page 1 of 4 pages

Heat Pump Water Heater Rebates Resource Management Commission Hammad Chaudhry Energy Efficiency Services Director July 2025 © Austin Energy Item 4 Current Heat Pump Water Heater Offerings New Construction Equipment Rebates Commercial Heat Pump Water Heater • Ala carte incentive structure. • Incentive: $800/unit. Home Energy Savings • Residential whole home energy efficiency upgrades with rebate for HPWH. Incentive: $800/unit. • Appliance Efficiency Program • Stand-alone rebate for HPWH for residential customers. Incentive: $800/unit. • Instant Savings • Stand-alone rebate for HPWH for residential customers. Incentive: $800/unit. • Multifamily Pilot Multifamily Smart Home Rewards Residential New Construction • • FY24-25: Pilot completed with Habitat for Humanity. Provided incentives for 12 WiFi enabled HPWH. • Pilot for cellular or WiFi enabled water heater controllers and smart thermostats. FY26: Planned launch of all-electric incentive packages, including HPWH. • Potential project with 30+ new, low- moderate income, single-family homes in FY26. Multifamily New Construction • • • Tenant receive bill credits and property receive devices free of charge and recurring incentive. Incentive: $50 up front bill credit + $25 recurring annual bill credit. austinenergy.com/smarthome. Water Heater Timers (Legacy) • From 2009 to 2016, Austin Energy offered rebates on Water Heater Timers that scheduled water heating outside of peak demand times. • About 21,500 timers were installed. 2 Heat Pump Water Heater Rebates FY24 & FY25 (To Date) Program Appliance Efficiency Program Home Energy Savings Instant Savings Residential New Construction Multifamily Commercial Total FY24 55 - 42 6 - - 103 FY25 (To Date) 31 - 22 6 - - 59 3 ©Austin Energy. All rights reserved. Austin Energy and the Austin Energy logo and combinations thereof are trademarks of Austin Energy, the electric department of the City of Austin, Texas. Other names are for informational purposes only and may be trademarks of their respective owners.

Scraped at: July 11, 2025, 11:39 p.m.
July 15, 2025

Item 5 - Home Energy Savings Presentation original pdf

Thumbnail of the first page of the PDF
Page 1 of 8 pages

Home Energy Savings Resource Management Commission Hammad Chaudhry Energy Efficiency Services Director June 2025 © Austin Energy Item 5 Home Energy Savings Home Energy Savings provides rebates to help residential customers make whole-home energy improvements. Benefits include energy savings, utility bill savings, better indoor air quality and a more comfortable, more energy efficient home. Improvements may include • Replace or tune-up HVAC system • Replace or repair duct work • Weatherstrip doors • Seal air leaks • Attic insulation • • Install solar screens Install smart thermostats • Air balancing 2 Successes • Consistently high customer satisfaction scores • Popular free in-home energy assessments and online energy quiz • Increased rebates 90%+ Customer Satisfaction Over Past 5 Years 300+ Free In-Home Energy Assessments Performed in Past Year 35% Increase in Average Rebate per Project 3 Challenges • Year over year customer participation decline 456 392 336 FY22 FY23 FY24 • Average total project increase cost is a barrier to customers 30% Increase in Overall Cost to Customers • Sunset of Texas Gas incentives • Program design changes • Economic uncertainty 4 Program Changes Based on Contractor Feedback November 2022 focus group included nine contractors. 1 Pre-Built Scopes Added a free in-home assessment for customers. 2 Free Contractor Training New free training for contractors and staff called Back to Basics. Goal is for contractors to pass final inspections the first time. 4 Training Reimbursement Continued to offer 30% reimbursement on training. 5 Marketing Support Provide more co-branded materials. Created a marketing kit for contractors in 2024. 3 Reduced Requirements Removed Building Performance Institute (BPI) certification requirements and reduced the National Comfort Institute (NCI) certification requirements. 6 Clearer Standards Revised program handbooks to include an inspection checklist for both contractors and utility field staff to follow. 5 Home Energy Savings Program: National Benchmarking Program Requirement Licensing Austin Energy energize CT Mass Save PSEG NJ Applicable w/ TX Dept of Licensing & Regulation More Stringent More Stringent More Stringent Insurance Proof of State Minimum Similar Similar Similar Certifications National Comfort Institute (NCI) Duct System Optimization and Air Balancing More Stringent Including Building Performance Institute and OSHA required for lead installers More Stringent - similar to energize CT for all installers More Stringent and similar to Mass Save Specialized Equipment Either own or have access to equipment More Stringent with requirement to own More Stringent similar to energize CT More Stringent similar to energize …

Scraped at: July 11, 2025, 11:39 p.m.
July 15, 2025

Item 6 - Memo Staff Response to Resolution 20240718-093 (Comprehensive Climate Implementation Program) original pdf

Thumbnail of the first page of the PDF
Page 1 of 15 pages

M E M O R A N D U M TO: Mayor and City Council THROUGH: Genesis D. Gavino, MPA, Chief of Staff FROM: DATE: SUBJECT: Zach Baumer, Director, Office of Climate Ac�on and Resilience May 8, 2025 Staff response to Resolu�on No. 20240718-093 (Comprehensive Climate Implementa�on Program) Background The purpose of this memorandum is to provide a final update on the Comprehensive Climate Implementation Plan. The Austin City Council adopted the Austin Climate Equity Plan in September 2021 to equitably achieve net-zero community-wide greenhouse gas emissions by 2040. With five sections — Sustainable Buildings, Transportation Electrification, Transportation and Land Use, Food and Product Consumption, and Natural Systems — the plan outlines 17 goals and 75 strategies to be completed by 2030. Considerable progress has been made since the plan’s adoption, but work remains, requiring collective action and continued investment. According to a recent analysis conducted by the Office of Climate Action & Resilience (OCAR), 11 of the 17 goals in the plan are either “in need of support” or “off track.” In July 2024, Austin City Council passed Resolution 20240718-093, directing the City Manager to create a comprehensive climate implementation program to refocus City resources toward achieving our community-wide net-zero goal. In the Fall of 2024, staff researched global best practices for improving Austin’s climate plan implementation, including interviews with peer cities and their networks. Staff then worked collaboratively across the City organization to create the Comprehensive Climate Implementation Program, which includes a 2-year Implementation Plan and Programmatic Adjustments. This implementation program aims to equip our City’s leadership with clear and actionable projects and programs to reduce greenhouse gas emissions by 2027. If all actions in this plan were accomplished, our city could reduce up to 2.3 million metric tons of CO2e by 2040. The plan is best viewed as a direct extension of the Climate Equity Plan and follows best practices in municipal efforts to reduce emissions and improve public health outcomes. This memo describes how this work was completed, what programmatic adjustments are being made, and lists the actions in the 2-year implementation plan. The 2-year Implementation Plan The Office of Climate Action and Resilience compiled several hundred potential actions, drawing from the Environmental Investment Plan, departmental plans, and Joint Sustainability Committee recommendations. These actions were prioritized using C40’s “Action Selection and Prioritization” tool to evaluate equity impacts, considering housing, health, green jobs, accessibility, air quality, feasibility, …

Scraped at: July 11, 2025, 11:39 p.m.
July 15, 2025

Item 6 - Recommendation to create revolving fund for solar and energy efficiency investment on City properties original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

BOARD/COMMISSION RECOMMENDATION Resource Management Commission Recommendation No. 20250715-006 Recommendation to Create a Revolving Fund for Solar and Energy Efficiency Investment on City Properties WHEREAS, on August 8, 2019, the Austin City Council adopted a resolution declaring a climate emergency and calling “for an immediate emergency mobilization to restore a safe climate” and directing the city manager to take steps to accelerate local greenhouse gas emissions reductions; and WHEREAS, on September 30, 2021, the Austin City Council adopted the Austin Climate Equity Plan, which established a goal of reaching net-zero greenhouse gas emissions for the Austin Community by 2040; and WHEREAS, on December 12, 2024, the Austin City Council adopted the Austin Energy Resource, Generation and Climate Protection Plan to 2035, which reaffirmed energy efficiency, local solar, demand response and customer-sited batteries as priority strategies for meeting Austin’s energy needs; and WHEREAS, on May 22, 2025 the Austin City Council adopted resolution 20250522-052 directing the City Manager to conduct an analysis of City property, make recommendations for maximizing solar installation, and utilize the energy cost savings or revenue generated to fund projects with a beneficial environmental impact; and WHEREAS, of the 47 recommendations in Austin’s Climate Implementation Plan identifies installing solar on City facilities as the second most cost effective action to reduce greenhouse gas emissions; and WHEREAS, Austin’s Climate Implementation Plan identifies creating a climate revolving fund to invest in energy upgrades to city facilities, capture savings, and reinvest funds for additional investment as a foundational action; and WHEREAS, other jurisdictions in Texas and across the country have successfully established revolving funds, including the City of San Antonio, which has invested $42 million into its Item 6 revolving fund for energy efficiency upgrades and solar installations at city properties, and the resulting savings are available for additional investments; and NOW, THEREFORE, BE IT RESOLVED THAT the Resource Management Commission of the City of Austin recommends that the Austin City Council direct the City Manager to establish a revolving Sustainable City Facilities Fund of at least $15M to seed solar energy installations on city buildings and other city properties and make energy and water efficiency upgrades at city facilities. BE IT FURTHER RESOLVED that the Resource Management Commission recommends that the cost savings from such projects be continuously reinvested to fund additional projects identified in the Climate Implementation Plan that have a beneficial environmental impact. BE IT FURTHER RESOLVED that the …

Scraped at: July 11, 2025, 11:39 p.m.
July 15, 2025

Item 7 - Natural Gas Utilities Presentation original pdf

Thumbnail of the first page of the PDF
Page 1 of 30 pages

Second Natural Gas Utility Policy Briefing Resource Management Commission Paul Robbins July 15, 2025 Item 7 There Are Other Gas Utility Issues Besides High Rates 1. High Fuel Costs 2. Taxes & Fees 3. Low-Income Assistance 4. Greenwashing– Faulty Programs for Conservation & Renewable Natural Gas Three Reasons for High Fuel Prices 1. Rising Support Costs 2. Securitization 3. Gas Exports “Securitization” Winter Storm Uri Surcharge Legalized Piracy • $3.5 Billion Financed Over 16 Years • $1.11/MCF Surcharge • ≈ $38/Year/Residential Austin Customer • ≈ $608 Over 16-Year Payoff Liquefied Natural Gas Taxes & Fees • ≈ 3% for State Fees • 5% for City of Austin Franchise Fee • No Cap on Amount Low-Income Assistance 2024 Austin Energy – $20.1 Million Austin Water – $17.4 Million Austin Watershed Protection – $1.2 Million Total City of Austin – $38.7 Million Texas Gas Service – $200,000 (For Entire Central-Gulf Region) Conservation & Renewable Natural Gas When Clean Energy Is Greenwashing Efficiency of the Direct Use of Natural Gas From Atmos RMC June Presentation y c n e i c i f f E y g r e n E Direct Use of Natural Gas Source Energy Extraction, Processing, Transportation Generation Pipeline Loss Water Heater Efficiency 100 MMBTUs 93 MMBTUs Austin Energy Electric Mix No Losses X 93 MMBTUs 92 MMBTUs 53 MMBTUs Source Energy Extraction, Processing, Transportation Generation Line Loss Water Heater Efficiency 100 MMBTUs 90 MMBTUs 60 MMBTUs 57 MMBTUs 53 MMBTUs Austin Energy Electric Mix With Heat Pump Water Heater Source Energy Extraction, Processing, Transportation Generation Line Loss Heat Pump Water Heater 100 MMBTUs 90 MMBTUs 60 MMBTUs 57 MMBTUs 100 MMBTUs- 204 MMBTUs TGS gives rebates way in excess of the national average. Conservation Total Resource Benefit/Cost Test Total Lifetime Investment vs. Lifetime Monetary Savings = Gas Dryer With Moisture Sensor • Between $200 and $500 to save –– $2.35/Year (Gas-to-Gas change-out). • No other gas utilities give rebates for dryer stubs except One Gas. • Payback of 213 Years at Higher Rebate Level. Tankless Water Heaters • $4,150 to $5,050 for New Tankless Installation vs. $1,600- $1,850 for Tank Unit (2021 dollars). • Requires Regular Scale Cleaning • Claims of Increased Lifetime May Be Exaggerated • No Payback. In fact, it will cost $1,200 to $2,200 more over life. • Expensive • Scale Cleaning • Freeze Damage Efficient Furnaces Built for Northern Climates • Estimates of Increased …

Scraped at: July 11, 2025, 11:39 p.m.
July 15, 2025

Multifamily & Commercial Project Pipeline Monthly Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

Energy Efficiency Services - Commercial and Multifamily Enrollment Pipeline Program Code Enrollment Number WFS Location Name Installation Address Council Dist. Measures 7/1/2025 Est. kWh Savings Est. $ Incentive Commercial 1340142 5-QA Review HEB 754 2400 S CONGRESS AVE Multifamily 1329500 3-Installation CAMDEN-GAINES RANCH 4424 GAINES RANCH LOOP Multifamily 1323774 3-Installation SOUTH LAMAR VILLAGE 3505 S LAMAR BLVD Multifamily 1302240 3-Installation THE MICHAEL AT PRESIDIO 13535 LYNDHURST ST LEASE Multifamily Income Qualified 1334002 3-Installation High Point Village 2400 WICKERSHAM LN A UNIT 2 Multifamily Income Qualified 1328829 3-Installation BRIDGE AT BALCONES 12215 HUNTERS CHASE DR S12 Multifamily Income Qualified 1327092 4-Post Inspection AGAVE AT SOUTH CONGRESS 625 E STASSNEY LN A 3 8 5 6 3 6 3 HVAC, Lighting New Construction 2,650,925.9 $134,684 Building Information, Property Information, QC - Qualification, Solar Screen/Solar Film 168,642.1 $70,256 Attic Insulation, Property Information, Smart PPT Eligible Thermostat, Plenum Redesign and Remediation - Qualification, Supplemental Measure, HVAC Tune-Up 343,826.2 $115,950 Building Information, Property Information, QC - Qualification, HVAC Tune-Up, Unit Information 154,933.0 $146,287 Attic Insulation, Building Information, Limited Time Bonus Offer, Property Information, Smart PPT Eligible Thermostat, QC - Qualification, Supplemental Measure, HVAC Tune-Up, Unit Information Building Information, ECAD Incentive, Limited Time Bonus Offer, Lighting, Property Information, Smart PPT Eligible Thermostat, QC - Qualification, HVAC Tune-Up, Unit Information Attic Insulation, Building Information, ECAD Incentive, Limited Time Bonus Offer, Lighting, Property Information, Smart PPT Eligible Thermostat, QC - Qualification, QC - Verification, Supplemental Measure, HVAC Tune-Up 166,350.4 $126,824 319,824.0 $178,520 210,361.6 $138,501 Rebate Fact Sheet - Energy Efficiency Services June 2025 Rebate Program Enrollment Customer or Property Property Address Year Built * Property Information Commercial Rebates 1337032 HEB 754 2400 S CONGRESS AVE AUSTIN, TX 78704 Total Number of Rentable Units N/A Building Total Square Feet 143385 Measure ** Rebates and Estimated Annual Savings Est. Kilowatt (kW) Reduction Est. Kilowatt- hours (kWh) Reduction Est. $/kW Rebate per Tenant Unit HVAC Lighting New Construction 23.8 525.3 32,160 2,618,765 $547 $132 Total Rebate $12,997 $69,298 Total *** 549.1 * Year built may not include major renovations ** Fact sheets include final inspection information, and some values may have changed since original proposal. *** Assumes 100% Occupancy 2,650,926 $82,295 $679 Date (Year) Measure Rebate Amount Energy Efficiency Rebates in Past 10-Years N/A Rebate Fact Sheet - Energy Efficiency Services June 2025 Rebate Program Enrollment Property Information Multifamily Income Qualified 1329351 Customer or Property HILLSIDE ON CANNON Property Address Year …

Scraped at: July 11, 2025, 11:40 p.m.
July 15, 2025

Play video original link

Play video

Scraped at: July 17, 2025, 11:39 a.m.
July 15, 2025

Item 7- Second Natural Gas Utilities Presentation original pdf

Thumbnail of the first page of the PDF
Page 1 of 30 pages

Second Natural Gas Utility Policy Briefing Resource Management Commission Paul Robbins July 15, 2025 Item 7 There Are Other Gas Utility Issues Besides High Rates 1. High Fuel Costs 2. Taxes & Fees 3. Low-Income Assistance 4. Greenwashing– Faulty Programs for Conservation & Renewable Natural Gas Three Reasons for High Fuel Prices 1. Rising Support Costs 2. Securitization 3. Gas Exports “Securitization” Winter Storm Uri Surcharge Legalized Piracy • $3.5 Billion Financed Over 16 Years • $1.11/MCF Surcharge • ≈ $38/Year/Residential Austin Customer • ≈ $608 Over 16-Year Payoff U.S. Liquefied Natural Gas Competes on World Market Taxes & Fees • ≈ 3% for State Fees • 5% for City of Austin Franchise Fee • No Cap on Amount Low-Income Assistance 2024 Austin Energy – $20.1 Million Austin Water – $17.4 Million Austin Watershed Protection – $1.2 Million Total City of Austin – $38.7 Million (1.5% of Gross) Texas Gas Service – $200,000 (For Entire Central-Gulf Region) Gas Companies are Greenwashing Clean Energy Efficiency of the Direct Use of Natural Gas From Atmos RMC June Presentation y c n e i c i f f E y g r e n E Direct Use of Natural Gas Source Energy Extraction, Processing, Transportation Generation Pipeline Loss Water Heater Efficiency 100 MMBTUs 93 MMBTUs Austin Energy Electric Mix No Losses X 93 MMBTUs 92 MMBTUs 53 MMBTUs Source Energy Extraction, Processing, Transportation Generation Line Loss Water Heater Efficiency 100 MMBTUs 90 MMBTUs 60 MMBTUs 57 MMBTUs 53 MMBTUs Austin Energy Electric Mix With Heat Pump Water Heater Source Energy Extraction, Processing, Transportation Generation Line Loss Heat Pump Water Heater 100 MMBTUs 90 MMBTUs 60 MMBTUs 57 MMBTUs 100 MMBTUs- 204 MMBTUs TGS gives rebates way in excess of the national average. Conservation Total Resource Benefit/Cost Test Total Lifetime Investment vs. Lifetime Monetary Savings = Gas Dryer With Moisture Sensor • Between $200 and $500 to save –– $2.35/Year (Gas-to-Gas change-out). • No other gas utilities give rebates for dryer stubs except One Gas. • Payback of 213 Years at Higher Rebate Level. Tankless Water Heaters • $4,150 to $5,050 for New Tankless Installation vs. $1,600- $1,850 for Tank Unit (2021 dollars). • Requires Regular Scale Cleaning • Claims of Increased Lifetime May Be Exaggerated • No Payback. In fact, it will cost $1,200 to $2,200 more over life. • Expensive • Scale Cleaning • Freeze Damage Efficient Furnaces Built for Northern Climates …

Scraped at: July 19, 2025, 8:41 a.m.
July 15, 2025

Recommendation No. 20250715-006: Recommendation to Create a Revolving Fund for Solar and Energy Efficiency Investment on City Properties original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

BOARD/COMMISSION RECOMMENDATION Resource Management Commission Recommendation No. 20250715-006 Recommendation to Create a Revolving Fund for Solar and Energy Efficiency Investment on City Properties WHEREAS, on August 8, 2019, the Austin City Council adopted a resolution declaring a climate emergency and calling “for an immediate emergency mobilization to restore a safe climate” and directing the city manager to take steps to accelerate local greenhouse gas emissions reductions; and WHEREAS, on September 30, 2021, the Austin City Council adopted the Austin Climate Equity Plan, which established a goal of reaching net-zero greenhouse gas emissions for the Austin Community by 2040; and WHEREAS, on December 12, 2024, the Austin City Council adopted the Austin Energy Resource, Generation and Climate Protection Plan to 2035, which reaffirmed energy efficiency, local solar, demand response and customer-sited batteries as priority strategies for meeting Austin’s energy needs; and WHEREAS, on May 22, 2025 the Austin City Council adopted resolution 20250522-052 directing the City Manager to conduct an analysis of City property, make recommendations for maximizing solar installation, and utilize the energy cost savings or revenue generated to fund projects with a beneficial environmental impact; and WHEREAS, of the 47 recommendations in Austin’s Climate Implementation Plan identifies installing solar on City facilities as the second most cost effective action to reduce greenhouse gas emissions; and WHEREAS, Austin’s Climate Implementation Plan identifies creating a climate revolving fund to invest in energy upgrades to city facilities, capture savings, and reinvest funds for additional investment as a foundational action; and WHEREAS, other jurisdictions in Texas and across the country have successfully established revolving funds, including the City of San Antonio, which has invested $42 million into its revolving fund for energy efficiency upgrades and solar installations at city properties, and the resulting savings are available for additional investments; and NOW, THEREFORE, BE IT RESOLVED THAT the Resource Management Commission of the City of Austin recommends that the Austin City Council direct the City Manager to establish a revolving Sustainable City Facilities Fund of at least $15M to seed solar energy and battery installations on city buildings and other city properties and make energy and water efficiency upgrades at city facilities that meet minimum cost effectiveness thresholds to be calibrated during implementation. BE IT FURTHER RESOLVED that the Resource Management Commission recommends that the cost savings from such projects be continuously reinvested to fund additional projects identified in the Climate Implementation Plan that …

Scraped at: July 22, 2025, 3:17 a.m.
July 15, 2025

Approved Minutes original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

RESOURCE MANAGEMENT COMMISSION MEETING MINUTES Tuesday, July 15, 2025 RESOURCE MANAGEMENT COMMISSION REGULAR CALLED MEETING MINUTES Tuesday, July 15, 2025 The Resource Management Commission convened in a Regular Called meeting on Tuesday, July 15, 2025, at Austin Energy Headquarters 4815 Mueller Blvd, Austin, TX 78723. Chair Charlotte Davis called the Resource Management Commission meeting to order at 6:00 p.m. Board Members/Commissioners in Attendance: Commissioner Charlotte Davis, Chair; Commissioner Paul Robbins, Vice Chair; Commissioner Trey Farmer; Commissioner Martin Luecke; Commissioner Raphael Schwartz; Commissioner Alison Silverstein. Board Members/Commissioners in Attendance Remotely: Commissioner GeNell Gary; Commissioner Danielle Zigon Commissioners Absent: Commissioner Dino Sasaridis; Commissioner Joseph Gerland PUBLIC COMMUNICATION: General- N/A APPROVAL OF MINUTES 1. Approve the minutes of the Resource Management Commission Regular Called Meeting on June 17, 2025. The motion approving the minutes of the Resource Management Commission regular called meeting of June 17, 2025, was approved on Commissioner Silverstein’s motion, Commissioner Luecke’s second on a 7-0 vote, with Commissioner Gary off the dais, Commissioners Gerland and Sasaridis absent, and one vacancy. DISCUSSION AND ACTION ITEMS 2. Recommend approval of the Annual Internal Review of the Resource Management Commission for July 2024 through June 2025. The motion to recommend approval of the Annual Internal Review of the Resource Management Commission for July 2024 through June 2025 was approved on Commissioner Silverstein’s motion, Commissioner Luecke’s second on a 7-0 vote, with Commissioner Gary off the dais, Commissioners Gerland and Sasaridis absent, and one vacancy. RESOURCE MANAGEMENT COMMISSION MEETING MINUTES Tuesday, July 15, 2025 STAFF BRIEFINGS 3. Staff briefing regarding the 2025 Texas Gas Service rate case by Marija Norton, City Controller, Financial Services Department and Thomas Brocato, outside counsel, Lloyd Gosselink Rochelle & Townsend, P.C. The staff briefing was presented by Marija Norton, City Controller, Financial Services Department and Thomas Brocato, outside counsel, Lloyd Gosselink Rochelle & Townsend, P.C. 4. Staff briefing on Heat Pump Water Heater Rebates by Hammad Chaudhry, Director, Energy Efficiency Services, Austin Energy. The staff briefing was presented by Hammad Chaudhry, Director, Energy Efficiency Services. 5. Staff briefing on Home Energy Savings by Hammad Chaudhry, Director, Energy Efficiency Services, Austin Energy. The staff briefing was presented by Hammad Chaudhry, Director, Energy Efficiency Services. DISCUSSION AND ACTION ITEMS 6. Discuss and action to recommend creating a revolving fund for solar and energy efficiency investment on City properties. (Sponsors: Davis and Luecke) The commission discussed creating a revolving fund for solar …

Scraped at: Aug. 21, 2025, 4:18 a.m.
June 17, 2025

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

REGULAR MEETING OF THE RESOURCE MANAGEMENT COMMISSION June 17, 2025 6:00 p.m. Austin Energy Headquarters; 1st Floor; Shudde Fath Conference Room 4815 Mueller Blvd, Austin, Texas 78723 Some members of the Resource Management Commission maybe participating by videoconference. Public comment will be allowed in-person or remotely by telephone. Speakers may only register to speak on an item once either in-person or remotely and will be allowed up to three minutes to provide their comments. Registration no later than noon the day before the meeting is required for remote participation. To register contact Nici Huff, at Nici.Huff@austinenergy.com or 512-972-8621. Members: Charlotte Davis, Chair Paul Robbins, Vice Chair Trey Farmer GeNell Gary AGENDA Joseph Gerland Martin Luecke Dino Sasaridis Raphael Schwartz CALL MEETING TO ORDER Alison Silverstein Danielle Zigon Vacant PUBLIC COMMUNICATION: GENERAL The first 5 speakers signed up prior to the meeting being called to order will each be allowed a three-minute allotment to address their concerns regarding items not posted on the agenda. APPROVAL OF MINUTES 1. Approve the minutes of the Resource Management Commission Meeting on May 20, 2025. DISCUSSION AND ACTION ITEMS 2. Recommend approval of the Austin Water Capital Improvement Projects located in the Drinking Water Protection Zone for approval to include in the 5-year Capital spending plan as required by Financial Policy #8. STAFF BRIEFINGS 3. Staff Briefing regarding the 2025 Atmos Energy rate case and discussion on policies for future rate case and franchise agreement negotiations by Marija Norton, City Controller, Financial Services Department and Freddy Herrera, outside counsel, Herrera Law & Associates, PLLC. 4. Staff Briefing regarding Austin Water’s quarterly report on Water Management Strategy Implementation by Kevin Kluge, Environmental Conservation Division Manager of Austin Water. DISCUSSION ITEMS 5. Presentation by Atmos Energy regarding Atmos Energy Mid-Tex Division Update by Chris Felan, VP of Rates and Regulatory Affairs and Kelly Biegler, VP of Public Affairs - Mid-Tex Division, Atmos Energy. 6. Presentation on ideas that can increase effectiveness of Austin's water conservation programs and strategies. (Sponsors: Robbins, Davis) FUTURE AGENDA ITEMS ADJOURNMENT The City of Austin is committed to compliance with the American with Disabilities Act. Reasonable modifications and equal access to communications will be provided upon request. Meeting locations are planned with wheelchair access. If requiring Sign Language Interpreters or alternative formats, please give notice at least 2 days (48 hours) before the meeting date. Please call Nici Huff at Austin Energy, at …

Scraped at: June 13, 2025, 4:51 p.m.
June 17, 2025

Customer Energy Solutions FY 25 Savings Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

Energy Efficiency Services EES- Appliance Efficiency Program EES- Home Energy Savings - Rebate EES- AE Weatherization & CAP Weatherization - D.I. * EES- School Based Education * EES- Strategic Partnership Between Utilities & Retailers * EES- Multifamily Rebates EES- Multifamily WX-D.I.+ EES- Commercial Rebate EES- Small Business Energy Efficiency TOTAL Demand Response (DR) - Annual Incremental DR- Power Partner DR- Commercial Demand Response (frmly Load Coop) Demand Response (DR) TOTAL Green Building GB- Residential Ratings GB- Residential Energy Code GB- Multifamily Ratings GB- Multifamily Energy Code GB- Commercial Ratings GB- Commercial Energy Code Green Building TOTAL MW Goal 2.50 0.90 0.70 0.30 1.75 0.65 1.00 6.00 2.00 15.80 MW Goal 6.40 2.00 8.40 MW Goal 0.35 1.48 1.34 4.41 4.60 1.71 13.89 MW To Date 0.84 0.17 0.59 0.09 0.80 1.61 0.77 0.90 0.38 6.15 MW To Date 3.33 3.33 MW To Date 0.20 0.92 1.56 3.30 1.83 1.07 8.87 Thermal Energy Storage TOTAL 0.00 0.00 Non-Public - AE# Customer Energy Solutions FY25 YTD MW Savings Report As of April 2025 Percentage 34% 19% 85% 29% 46% 247% 77% 15% 19% Percentage 52% 0% Percentage 56% 62% 116% 75% 40% 63% Participant Type Participants To Date MWh To Date Rebate Budget Customers Customers Customers Products Products Apartments Apartments Customers Customers 1,217 165 735 2,043 127,072 4,142 3,451 65 30 11,848 1,701.98 236.95 1,116.32 458.57 6,494.81 3,047.05 2,352.20 1,890.81 802.15 18,100.84 $ 1,200,000 $ 1,550,000 $ 5,450,000 $ 350,000 $ 1,250,000 $ 900,000 $ 1,800,000 $ 2,250,000 $ 1,100,000 $ 15,850,000 Spent to Date $ 541,863 $ 375,318 $ 6,672,807 $ 100,863 $ 670,723 $ 1,285,851 $ 1,096,222 $ 824,219 $ 238,338 $ 11,806,204 Participant Type Participants To Date MWh To Date Rebate Budget Devices Customers 2,344 2,344 0 0.00 $ 1,600,000 $ 2,000,000 $ 3,600,000 $ 254,230 $ 254,230 Participant Type Participants To Date MWh To Date Rebate Budget Spent to Date Customers Customers Dwellings Dwellings 1,000 sf 1,000 sf 253 1,180 3,495 6,353 2,713 3,974 11,281 0 229 1,279 3,614 3,705 5,107 3,466 17,398 $ - $ - $ - $ - 0 $ - $ - CES MW Savings Grand TOTAL Residential Totals Commercial Totals MW Goal 38.09 MW To Date 18.35 Percentage Participant Type Participants To Date MWh To Date Rebate Budget 25,473 35,499.15 $ 19,450,000 Spent to Date $ 12,060,434 16.03 14.06 9.32 15.75 58% 112% 142,602 16,534 16915.52 15985.67 $ $ 14,100,000 2,002,693 $ $ …

Scraped at: June 13, 2025, 4:51 p.m.
June 17, 2025

Item 2- Drinking Water Protection Zone Memo original pdf

Thumbnail of the first page of the PDF
Page 1 of 7 pages

Memorandum To: Boards and Commissions From: Shay Ralls Roalson, Director, Austin Water Date: June 6, 2025 Subject: Board and Commission and Citizen Review of new Growth-related Capital Improvement Projects in Drinking Water Protection Zone In accordance with Austin Water’s (AW) Financial Policy No. 8, which is adopted by City Council annually as part of the annual budget adoption process, AW is providing a report of new growth-related capital improvement projects (CIP) located in the Drinking Water Protection Zone (DWPZ). The financial policy, which requires certain Board and Commission review of applicable projects, reads as follows: Capital improvement projects for new water and wastewater treatment plants, capital expansions, and growth-related projects that are located in the Drinking Water Protection Zone (DWPZ) will be identified and submitted, as part of the annual budget process, to the following Boards and Commissions: Water and Wastewater Commission, Resource Management Commission, and the Environmental Board. These Boards and Commissions will review growth-related DWPZ capital projects spending plans, obtain Board and Commission and citizen input, review consistency with Imagine Austin Comprehensive Plan, review effect on growth within the DWPZ, and make recommendations on project approval for inclusion in Austin Water's five-year capital spending plan. This summer, AW representatives will be distributing a brief report to the Commissions on the CIP projects located in the DWPZ related to the financial policy. Attachments: CIP Subprojects Summary CIP Subprojects Supplemental Information and Map The City of Austin is committed to compliance with the Americans with Disabilities Act. Reasonable modifications and equal access to communications will be provided upon request. Item 2 Austin Water Infrastructure Management Financial Policy No. 8 Drinking Water Protection Zone Projects Summary FY26-30 CIP Plan Development Each year, as part of the City of Austin Budget approval process, Austin Water submits a plan for the capital improvements program (CIP) spending for the upcoming five-year period. Austin Water’s FY26-30 CIP Plan includes projects located across the Austin metropolitan area, including the Drinking Water Protection Zone (DWPZ). In compliance with Austin Water’s Financial Policy No. 8, the capital improvement projects for new water and wastewater treatment plants, capital expansions, and growth related projects that are located in the DWPZ are presented below for consideration by City of Austin Boards and Commissions. These projects represent improvements required to meet Austin Water standards for operability and customer service. While additional capacity may be added in accordance with current design standards, the …

Scraped at: June 13, 2025, 4:51 p.m.
June 17, 2025

Item 3- 2025 Atmos Energy Rate Case Update & Gas Utility Policy Discussion original pdf

Thumbnail of the first page of the PDF
Page 1 of 15 pages

2025 Atmos Energy Rate Case Update & Gas Utility Policy Discussion Marija Norton| City Controller Alfred R. Herrera| Herrera Law & Associates, PLLC Item 3 2025 Atmos Energy Rate Case Timeline Nov 18, 2024: Rate case filed with Railroad Commission of Texas (RRC). Discovery begins. Dec 16, 2024: Rate case filed with Atmos Texas Municipalities (ATM). Dec 18, 2024: Errata to update filing, if necessary. Dec 23, 2024: Proposed effective date for RRC rate case. Jan 20, 2025: Proposed effective date for ATM rate case. Jan 21, 2025: Settlement conference. Jan 30, 2025: Proposed effective date for City of Austin only. City of Austin adopts denial resolution. Feb 3, 2025: Discovery ends on Atmos Mid-Tex direct case. Feb 13, 2025: Intervenor testimony due. Feb 19, 2025: Settlement conference. Feb 20, 2025: Staff testimony due. Feb 25, 2025: Discovery ends on intervenor & staff testimony. Feb 28, 2025: Rebuttal testimony due. Mar 7, 2025: Discovery ends on rebuttal testimony. Mar 10, 2025: Trial briefs & prehearing conference. Mar 11-12, 2025: Hearing on the merits. Mar 19, 2025: Initial briefs. Mar 26, 2025: Reply briefs. Apr 25, 2025: Proposal for Decision (PFD) issued. Apr 30, 2025: Settlement reached. May 1, 2025: Exceptions to PFD. May 7, 2025: Replies to exceptions. May 13, 2025: Commission conference. May 22, 2025: Initial statutory deadline – extended to June 18, 2025 Jun 17, 2025: Expected date for RRC consideration of settlement. 2 2025 Atmos Energy Rate Case Settlement Overview 3 2025 Atmos Energy Rate Case Settlement Overview Customer Class Current Atmos As-File Proposed Rates ATM Proposed Rates Settlement Rates ATM Cities: Residential Customer Charge Consumption Charge Commercial Customer Charge Consumption Charge Industrial & Transportation Customer Charge Consumption Charge - Tier 1 Consumption Charge - Tier 2 Consumption Charge - Tier 3 $ $ 47.91 0.14846 $ $ 47.91 0.37584 $ $ 20.00 0.98029 $ $ 25.00 0.78025 $ $ 136.68 0.09165 $ $ 136.68 0.09165 $ $ 145.00 0.16276 $ $ 140.00 0.26133 $ $ $ $ 2,492.04 0.3312 0.2425 0.0520 $ $ $ $ 2,492.04 0.3312 0.2425 0.0520 $ $ $ $ 2,462.00 0.7954 0.5824 0.1249 $ $ $ $ 2,100.00 1.0479 0.7672 0.1645 4 2025 Atmos Energy Rate Case Settlement Overview Cost of Capital Return on Equity Cost of Long Term Debt Capital Structure - Equity Capital Capital Structure - Debt Capital Rate of Return Current - Last Authorized 9.80% 5.20% 60.18% 39.82% 7.97% …

Scraped at: June 13, 2025, 4:51 p.m.
June 17, 2025

Item 4- Austin Water's Water Management Strategy Implementation Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 28 pages

Water Management Strategy Implementation REPORT First Quarter 2025, January – March Resource Management Commission June 17, 2025 Item 4 Contents 2  First Quarter Summary  Notes Regarding Data  Water Conservation Updates  Water Loss Reduction Updates  Reclaimed Water and Onsite Reuse Updates  Conservation Outreach Updates  Water Use and GPCD  Water Supply Project Updates First Quarter Summary The sustainability of Austin’s water supply is critical to the City’s future. This is the first quarterly report on implementation of water management strategies in the 2024 Water Conservation and Water Forward Plans. Austin Water has committed to this regular reporting to provide the latest information for stakeholders to understand our progress. In the first quarter of Calendar Year 2025, Austin Water initiated many bedrock tasks of water management strategies, including this new process of reporting. Notes Regarding Data Quarterly reporting of strategy implementation is a groundbreaking effort undertaken by Austin Water. Several important metrics require both explanation and development. Some metrics will be available in future quarterly reports.  Quarterly Data – All quarterly data should be considered preliminary and draft, subject to adjustment and revision at the end of the year and included in the annual report.  Historical Data – Where possible, 2024 quarterly metrics are included for reference with the 2025 first quarter metrics. Not all metrics have historical data.  Yield of Strategies – Estimated volumetric yields from strategies are included in the Water Conservation Plan (2029 and 2034) and the Water Forward Plan (2030). Austin Water is working to identify the volumetric yields of strategies as they are being implemented and report them in future reporting. 4 Water Conservation Updates  New single family residential irrigation inspections started in October 2024  3 Commercial/Institutional water audits conducted with pre-approved Bucks for Business applications  Commercial water audit training: 2 staff members were certified and local utilities are working to bring the training to Central Texas  WaterWise Landscape and Rainscape applications increased by 900% and 350% respectively between Q1 2024 and Q1 2025 5 Water Conservation Metrics Residential Rebate Programs Approved Rebates 45 40 35 30 25 20 15 10 5 0 6 Drought Survival Tools Irrigation Upgrades Other Residential Programs Rainwater Harvesting Rebates WaterWise Landscape WaterWise Rainscape Q1 2024 Q2 2024 Q3 2024 Q4 2024 Q1 2025 Water Conservation Metrics Commercial Rebate Programs Approved Rebates Approved Rebates 2.5 2 1.5 1 …

Scraped at: June 13, 2025, 4:51 p.m.
June 17, 2025

Multifamily & Commercial Project Pipeline Monthly Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

Energy Effeciency Services - Commercial and Multifamily Enrollment Pipeline 6/1/2025 Program Latest Workflow Enrollment(s) # Location Name Installation Address Council District Est. kW Savings Est. kWh Savings Est. $ Incentive Measures Planned Multifamily 3-Installation 1329500 CAMDEN-GAINES RANCH Commercial 3-Installation Multifamily 3-Installation 1337032 1323774 HEB 754 SOUTH LAMAR VILLAGE 3505 S LAMAR BLVD LEASE 4424 GAINES RANCH LOOP 2400 S CONGRESS AVE Multifamily 3-Installation 1302240 THE MICHAEL AT PRESIDIO 13535 LYNDHURST ST LEASE Multifamily Income Qualified Multifamily Income Qualified Multifamily Income Qualified 3-Installation 1327092 AGAVE AT SOUTH CONGRESS 625 E STASSNEY LN A 4-Post Inspection 1329351 HILLSIDE ON CANNON 3-Installation 1328829 BRIDGE AT BALCONES 2302 E WILLIAM CANNON DR 1 12215 HUNTERS CHASE DR S12 8 3 5 6 3 2 6 122.0 168,642 $ 70,256 549.1 2,650,926 $ 82,295 152.5 343,826 $ 115,950 Building Information,Property Qualification, Solar Screen/Solar Film HVAC,Lighting New Construction Attic Insulation, ECAD Incentive, Lighting, Smart PPT Eligible Thermostat, HVAC Tune-Up 41.7 162,206 $ 119,520 Building Information,Property Information,QC - Qualification,HVAC Tune-Up,Unit Information 54.3 208,321 $ 138,852 Attic Insulation, ECAD Incentive, Lighting, Smart PPT Eligible Thermostat, HVAC Tune-Up 157.0 242,240 $ 158,534 Attic Insulation, ECAD Incentive, Lighting, Smart PPT Eligible Thermostat, HVAC Tune-Up 68.1 319,824 $ 178,520 Attic Insulation, ECAD Incentive, Lighting, Smart PPT Eligible Thermostat, HVAC Tune-Up Rebate Fact Sheet - Energy Efficiency Services May 2025 Rebate Program Enrollment Property Information Multifamily 1297546 Customer or Property THE BOULEVARD AT TOWN LAKE Property Address Year Built * Total Number of Rentable Units Building Total Square Feet 2600 LAKE AUSTIN BLVD 05 AUSTIN, TX 78703 1995 256 N/A Rebates and Estimated Annual Savings Measure ** Attic Insulation HVAC Tune-Up Plenum Redesign and Remediation Smart PPT Eligible Thermostat Water Saving Devices Est. Kilowatt (kW) Reduction Est. Kilowatt- hours (kWh) Reduction Est. $/kW 57.3 30.5 223.2 22.0 10.7 27,321 118,566 450,042 125,752 114,929 $1,317 $1,813 $378 $1,779 $413 Rebate per Tenant Unit $295 $216 $330 $153 $17 Total Rebate $75,429 $55,253 $84,420 $39,060 $4,439 Total *** 343.6 * Year built may not include major renovations ** Fact sheets include final inspection information, and some values may have changed since original proposal. *** Assumes 100% Occupancy $258,601 836,611 $1,010 $5,701 Date (Year) Measure Rebate Amount Energy Efficiency Rebates in Past 10-Years N/A Rebate Fact Sheet - Energy Efficiency Services May 2025 Rebate Program Enrollment Property Information Multifamily Income Qualified 1328775 Customer or Property WILDWOOD APARTMENTS Property Address Year Built * Total Number of …

Scraped at: June 13, 2025, 4:51 p.m.
June 17, 2025

Item 6- Water Conservation Presentation original pdf

Thumbnail of the first page of the PDF
Page 1 of 21 pages

Austin Water Conservation Potential Resource Management Commission Paul Robbins • July 17, 2025 Item 6 With Maximum Drought, Global Warming, Sedimentation, and increasing population, the Highland Lakes could be dry by 2040 Average temperatures have spike since 2009. Heat and drought influenced water conservation policy. On June 15, 2025, the Lakes Were Only 53% Full. Watering restrictions, building codes, efficiency mandates, education programs, and higher water costs have contributed to dramatic reductions in per capita water use. Some assume it can go no lower. New Programs and Strategies COMMERCIAL IRRIGATION RATES Other Texas Cities 12 to 122% Higher Than Normal Commercial Rates Austin 2% Discount Originally recommended in 2007 COMMERCIAL LANDSCAPE REBATES In Austin, Residential landscape rebates are very expensive and rarely used. Commercial landscapes use 9 X as much water as Residential, and retrofits may be more cost effective – particularly coupled with high irrigation rates. COMMERCIAL INSPECTION FINES Landscapes since 2014 Car Washes since 2014 Cooling Towers since 2018 20% Non-Compliance – 68 Million Gallons/Year AGGRESSIVE REBATE PROGRAM FOR COMMERCIAL CLOTHES WASHERS AND DISHWASHERS About 10,000 Commercial Clothes Washers and Dishwashers in Austin. Clothes Washers: as much as 69% savings Dishwashers: as much as 75% savings But almost no rebates between 2021 and 2024. BUCKS FOR BUSINESS COMMERCIAL REBATE PROGRAM Replacing toilets in volume Poor participation in recent years until new staff person and third-party vendor. 24 million gallons saved in 2024, 6 X the previous 3 years combined Recycling car wash water MANDATORY TOILET CHANGEOUT 140,000 old units left in 2012. Retrofits should be required. Originally recommended in 2007 MANDATORY SOIL DEPTH IN NEW SUBDIVISIONS Placing 6 inches of soil on disturbed ground enhances moisture retention (like a sponge) Originally recommended in 2007 OLD PIPE REPLACEMENT In 2023, 12.5% of Austin’s water leaked. Most was from old cast iron and polybutylene pipe. It has been getting worse since 2007. Replacing cast iron and PB would require $1.6 billion in overnight costs. Not cost effective unless viewed on a 100-year timeline. • Savings from water processing cost. • Savings avoiding new treatment plant capital and O&M costs. • Savings from new water purchases. Ductile Iron Stainless Steel RECLAIMED WATER Despite the number of reclaimed water customers growing by almost 4 times since 2011, the actual volume sold has remained the same. Only 6% reclaimed. But at full potential, it could supply 715,000 Austinites. Building a new reclaimed water …

Scraped at: June 16, 2025, 10:15 a.m.
June 17, 2025

Item 5- Atmos Energy Mid-Tex Division Presentation original pdf

Thumbnail of the first page of the PDF
Page 1 of 27 pages

Atmos Energy, Mid-Tex Division For Austin Resource Management Commission June 17, 2025 Item 5 Atmos Energy (Mid-Tex) Service Territory – Austin, TX I W E V R E V O I W E V R E V O Cities in the Atmos Texas Municipalities (ATM) Coalition Austin Fredericksburg Lampasas Balch Springs Gatesville Bandera Blooming Grove Burnet Cameron Cedar Park Clifton Commerce Goldthwaite Granbury Greenville Groesbeck Hamilton Heath Henrietta Leander Longview Marble Falls Mart Mexia Olney Pflugerville Point Copperas Cove Hickory Creek Princeton Corsicana Electra Hico Hillsboro Ranger Rice Riesel Rockdale Rogers Round Rock San Angelo Sanger Somerville Star Harbor Trinidad Whitney I W E V R E V O Austin, TX Service Territory Atmos Energy Mid-Tex Division BY THE NUMBERS 11,019 Customers 120 Miles of Pipeline 125 Employees $226,895 Charitable Giving I W E V R E V O Mid-Tex Division BY THE NUMBERS 1.8 Million Customers 32,827 Miles of Pipeline 1,978 Employees 550 $1.4 Billion FY24 Capital Investment $8.8 Million Communities Served Charitable Giving Y T E F A S Safety Drives Everything We Do Our vision is to be the safest provider of natural gas services, and we are doing our part to modernize the nation’s aging natural gas delivery network. Over the last 10 years, we have invested more than $10 billion to modernize our pipeline infrastructure and have committed to spending approximately $24 billion over the next five years. Y T E F A S Training for Safe Operations Atmos Energy field employees receive extensive in-person, virtual, and hands-on training and participate in our Pipeline Safety Management System that provides continuous feedback. 9,000 Hours spent on safety training across the enterprise in FY23. 2 Million+ Hours of training at the Charles K. Vaughan Center since its opening in 2010. Y T E F A S M E T S Y S Reducing Third-Party Pipeline Damage Safe digging starts with calling 811 to have underground utility- owned lines located and marked. It’s free. It keeps you safe. It’s the law. Call 811 Before You Dig • Natural gas safety is a partnership, so we want everyone to understand the importance of calling 811 before building a deck, planting a tree, installing a fence, or digging for any other project. • The most common cause of outside natural gas leaks is excavation that damages natural gas pipelines. APWA Uniform Color for Marking Underground Utility Lines Red: Electric Yellow: …

Scraped at: June 17, 2025, 8:03 a.m.
June 17, 2025

Item 6- Water Conservation Presentation, V2 original pdf

Thumbnail of the first page of the PDF
Page 1 of 23 pages

Austin Water Conservation Potential Resource Management Commission Paul Robbins • July 17, 2025 Item 6, V2 Stress on Highland Lakes Water Supply Lake Levels Adjusted for 1950s Drought Lake Levels Adjusted for 1950s and 1700s Drought Lake Levels Adjusted for Drought and worst global warming scenario Sedimentation Met Demand 2023 2030 2040 2050 2060 2070 2080 Water Supply Left/Unmet Demand t e e F - e r c A 1,400,000 1,200,000 1,000,000 800,000 600,000 400,000 200,000 0 -200,000 -400,000 -600,000 With Maximum Drought, Global Warming, Sedimentation, and increasing population, the Highland Lakes could be dry by 2040 Average temperatures have spike since 2009. Heat and drought influenced water conservation policy. On June 15, 2025, the Lakes Were Only 53% Full. Watering restrictions, building codes, efficiency mandates, rebates, education programs, and higher water costs have contributed to dramatic reductions in per capita water use. Some assume it can go no lower. New Programs and Strategies COMMERCIAL IRRIGATION RATES Other Texas Cities 12 to 122% Higher Than Normal Commercial Rates Austin 2% Discount Originally recommended in 2007 COMMERCIAL LANDSCAPE REBATES In Austin, Residential landscape rebates are very expensive and rarely used. Commercial landscapes use 9 X as much water as Residential, so retrofits may be more cost effective – particularly coupled with high irrigation rates. COMMERCIAL INSPECTION FINES Landscapes since 2014 Car Washes since 2014 Cooling Towers since 2018 20% Non-Compliance – 68 Million Gallons/Year AGGRESSIVE REBATE PROGRAM FOR COMMERCIAL CLOTHES WASHERS AND DISHWASHERS About 10,000 Commercial Clothes Washers and Dishwashers in Austin. Clothes Washers: as much as 69% savings. Dishwashers: as much as 75% savings. But almost no rebates between 2021 and 2024. BUCKS FOR BUSINESS COMMERCIAL REBATE PROGRAM Replacing toilets in volume Poor participation in recent years until new staff person and third-party vendor. 24 million gallons saved in 2024, 6 X the previous 3 years combined. Recycling car wash water MANDATORY TOILET CHANGEOUT 140,000 old units left in 2012. Retrofits should be required. Originally recommended in 2007 MANDATORY SOIL DEPTH IN NEW SUBDIVISIONS Placing 6 inches of soil on disturbed ground enhances moisture retention (like a sponge). Originally recommended in 2007 OLD PIPE REPLACEMENT In 2023, 12.5% of Austin’s water leaked. Most was from old cast iron and polybutylene pipe. It has been getting worse since 2007. Replacing cast iron and polybutylene would require $1.6 billion in overnight costs. But only $11 million/year is typically spent to replace ≈6 …

Scraped at: June 18, 2025, 5:53 a.m.
June 17, 2025

Item 6- Water Conservation Presentation, V3 original pdf

Thumbnail of the first page of the PDF
Page 1 of 23 pages

Austin Water Conservation Potential Resource Management Commission Paul Robbins • July 17, 2025 Item 6, V3 Stress on Highland Lakes Water Supply Lake Levels Adjusted for 1950s Drought Lake Levels Adjusted for 1950s and 1700s Drought Lake Levels Adjusted for Drought and worst global warming scenario Sedimentation Met Demand 2023 2030 2040 2050 2060 2070 2080 Water Supply Left/Unmet Demand t e e F - e r c A 1,400,000 1,200,000 1,000,000 800,000 600,000 400,000 200,000 0 -200,000 -400,000 -600,000 With Maximum Drought, Global Warming, Sedimentation, and increasing population, the Highland Lakes could be dry by 2040 Average temperatures have spike since 2009. Heat and drought influenced water conservation policy. On June 15, 2025, the Lakes Were Only 53% Full. Watering restrictions, building codes, efficiency mandates, rebates, education programs, and higher water costs have contributed to dramatic reductions in per capita water use. Some assume it can go no lower. New Programs and Strategies COMMERCIAL IRRIGATION RATES Other Texas Cities 12 to 122% Higher Than Normal Commercial Rates Austin 2% Discount Originally recommended in 2007 COMMERCIAL LANDSCAPE REBATES In Austin, Residential landscape rebates are very expensive and rarely used. Commercial landscapes use 9 X as much water as Residential, so retrofits may be more cost effective – particularly coupled with high irrigation rates. COMMERCIAL INSPECTION FINES Landscapes since 2014 Car Washes since 2014 Cooling Towers since 2018 20% Non-Compliance – 68 Million Gallons/Year AGGRESSIVE REBATE PROGRAM FOR COMMERCIAL CLOTHES WASHERS AND DISHWASHERS About 10,000 Commercial Clothes Washers and Dishwashers in Austin. Clothes Washers: as much as 69% savings. Dishwashers: as much as 75% savings. But almost no rebates between 2021 and 2024. BUCKS FOR BUSINESS COMMERCIAL REBATE PROGRAM Replacing toilets in volume Poor participation in recent years until new staff person and third-party vendor. 24 million gallons saved in 2024, 6 X the previous 3 years combined. Recycling car wash water MANDATORY TOILET CHANGEOUT 140,000 old units left in 2012. Retrofits should be required. Originally recommended in 2007 MANDATORY SOIL DEPTH IN NEW SUBDIVISIONS Placing 6 inches of soil on disturbed ground enhances moisture retention (like a sponge). Originally recommended in 2007 OLD PIPE REPLACEMENT In 2023, 12.5% of Austin’s water leaked. Most was from old cast iron and polybutylene pipe. It has been getting worse since 2007. Replacing cast iron and polybutylene would require $1.6 billion in overnight costs. But only $11 million/year is typically spent to replace ≈6 …

Scraped at: June 18, 2025, 5:53 a.m.
June 17, 2025

Play video original link

Play video

Scraped at: June 20, 2025, 11:26 p.m.
June 17, 2025

Item 6- Corrected and Final Water Conservation Presentation original pdf

Thumbnail of the first page of the PDF
Page 1 of 23 pages

Austin Water Conservation Potential Resource Management Commission Paul Robbins • July 17, 2025 Stress on Highland Lakes Water Supply Lake Levels Adjusted for 1950s Drought Lake Levels Adjusted for 1950s and 1700s Drought Lake Levels Adjusted for Drought and worst global warming scenario Sedimentation Met Demand 2023 2030 2040 2050 2060 2070 2080 Water Supply Left/Unmet Demand t e e F - e r c A 1,400,000 1,200,000 1,000,000 800,000 600,000 400,000 200,000 0 -200,000 -400,000 -600,000 With Maximum Drought, Global Warming, Sedimentation, and increasing population, the Highland Lakes could be dry by 2040 Average temperatures have spike since 2009. Heat and drought influenced water conservation policy. On June 15, 2025, the Lakes Were Only 53% Full. Watering restrictions, building codes, efficiency mandates, rebates, education programs, and higher water costs have contributed to dramatic reductions in per capita water use. Some assume it can go no lower. New Programs and Strategies COMMERCIAL IRRIGATION RATES Other Texas Cities 12 to 122% Higher Than Normal Commercial Rates Austin 2% Discount Originally recommended in 2007 COMMERCIAL LANDSCAPE REBATES In Austin, Residential landscape rebates are very expensive and rarely used. Commercial landscapes use 9 X as much water as Residential, so retrofits may be more cost effective – particularly coupled with high irrigation rates. COMMERCIAL INSPECTION FINES Landscapes since 2014 Car Washes since 2014 Cooling Towers since 2018 20% Non-Compliance – 68 Million Gallons/Year AGGRESSIVE REBATE PROGRAM FOR COMMERCIAL CLOTHES WASHERS AND DISHWASHERS About 10,000 Commercial Clothes Washers and Dishwashers in Austin. Clothes Washers: as much as 69% savings. Dishwashers: as much as 75% savings. But almost no rebates between 2021 and 2024. BUCKS FOR BUSINESS COMMERCIAL REBATE PROGRAM Replacing toilets in volume Poor participation in recent years until new staff person and third-party vendor. 24 million gallons saved in 2024, 6 X the previous 3 years combined. Recycling car wash water MANDATORY TOILET CHANGEOUT 140,000 old units left in 2012. Retrofits should be required. Originally recommended in 2007 MANDATORY SOIL DEPTH IN NEW SUBDIVISIONS Placing 6 inches of soil on disturbed ground enhances moisture retention (like a sponge). Originally recommended in 2007 OLD PIPE REPLACEMENT In 2023, 12.5% of Austin’s water leaked. Most was from old cast iron and polybutylene pipe. It has been getting worse since 2007. Replacing cast iron and polybutylene would require $1.6 billion in overnight costs. But only $11 million/year is typically spent to replace ≈6 miles of pipe. …

Scraped at: June 27, 2025, 8:47 a.m.
June 17, 2025

Approved Minutes original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

RESOURCE MANAGEMENT COMMISSION MEETING MINUTES Tuesday, June 17, 2025 RESOURCE MANAGEMENT COMMISSION REGULAR CALLED MEETING MINUTES Tuesday, June 17, 2025 The Resource Management Commission convened in a Regular Called meeting on Tuesday, May 20, 2025, at Austin Energy Headquarters 4815 Mueller Blvd, Austin, TX 78723. Chair Charlotte Davis called the Resource Management Commission meeting to order at 6:01 p.m. Board Members/Commissioners in Attendance: Commissioner Charlotte Davis, Chair; Commissioner Paul Robbins, Vice Chair; Commissioner GeNell Gary; Commissioner Martin Luecke; Commissioner Raphael Schwartz; Commissioner Alison Silverstein. Board Members/Commissioners in Attendance Remotely: Commissioner Joseph Gerland PUBLIC COMMUNICATION: General- N/A APPROVAL OF MINUTES 1. Approve the minutes of the Resource Management Commission Regular Called Meeting on May 20, 2025. The motion approving the minutes of the Resource Management Commission regular called meeting of May 20, 2025, was approved on Commissioner Silverstein’s motion, Commissioner Gary’s second on a 7-0 vote, with Commissioners Farmer, Sasaridis, Zigon absent and one vacancy. DISCUSSION AND ACTION ITEMS 2. Recommend approval of the Austin Water Capital Improvement Projects located in the Drinking Water Protection Zone for approval to include in the 5-year Capital spending plan as required by Financial Policy #8. The motion to recommend approval authorizing the Austin Water Capital Improvement Projects located in the Drinking Water Protection Zone included in the 5-year Capital spending plan as required by Financial Policy #8 was approved on Commissioner Silverstein’s motion, Vice Chair Robbins second on an 7-0 vote, Commissioners Farmer, Sasaridis, Zigon absent and one vacancy. STAFF BRIEFINGS 3. Staff Briefing regarding the 2025 Atmos Energy rate case and discussion on policies for future rate case and franchise agreement negotiations by Marija Norton, City Controller, RESOURCE MANAGEMENT COMMISSION MEETING MINUTES Tuesday, June 17, 2025 Financial Services Department and Freddy Herrera, outside counsel, Herrera Law & Associates, PLLC. The staff briefing was presented by Marija Norton, City Controller, Financial Services Department and Freddy Herrera, outside counsel, Herrera Law & Associates, PLLC. 4. Staff Briefing regarding Austin Water’s quarterly report on Water Management Strategy Implementation by Kevin Kluge, Environmental Conservation Division Manager of Austin Water. The staff briefing was presented by Kevin Kluge, Environmental Conservation Division Manager of Austin Water. DISCUSSION ITEMS 5. Presentation by Atmos Energy regarding Atmos Energy Mid-Tex Division Update by Chris Felan, VP of Rates and Regulatory Affairs and Kelly Biegler, VP of Public Affairs - Mid-Tex Division, Atmos Energy. The presentation was presented by Chris Felan, VP of …

Scraped at: July 22, 2025, 3:17 a.m.
May 20, 2025

Multifamily & Commercial Project Pipeline Monthly Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 4 pages

Energy Effeciency Services - Commercial and Multifamily Enrollment Pipeline 5/1/2025 Program Enroll # Workflow Location Name Installation Address Commercial 1337032 2-Pre-Inspection HEB 754 2400 S CONGRESS AVE Multifamily-IQ 1294951 2-Pre-Inspection BURNET FLATS APTS 5453 BURNET RD B Multifamily-IQ 1319881 2-Pre-Inspection WALNUT CREEK APARTMENTS 6409 SPRINGDALE RD Multifamily-IQ 1325312 2-Pre-Inspection THE PARK AT WALNUT CREEK Multifamily-IQ 1327092 3-Installation AGAVE AT SOUTH CONGRESS 12113 METRIC BLVD 1 625 E STASSNEY LN A Multifamily-IQ 1327099 2-Pre-Inspection BRIDGE AT SOUTHPARK LANDING 420 W SLAUGHTER LN 11 Multifamily-IQ 1328775 4-Post Inspection WILDWOOD APARTMENTS Multifamily-IQ 1328829 3-Installation BRIDGE AT BALCONES Multifamily-IQ 1329351 3-Installation HILLSIDE ON CANNON Multifamily-IQ 1330404 2-Pre-Inspection SAGE HILL APARTMENTS 7610 CAMERON RD MAINT 12215 HUNTERS CHASE DR S12 2302 E WILLIAM CANNON DR 1 7227 E US 290 HWY SVRD EB Multifamily-IQ 1331169 2-Pre-Inspection ACCLAIM AT SOUTH CONGRESS 701 WOODWARD ST 13 Multifamily-IQ 1332255 2-Pre-Inspection BELARA AUSTIN 1500 CROSSING PL 1 Multifamily-IQ 1333031 2-Pre-Inspection TIMBERS APARTMENTS 1034 CLAYTON LN 1 Multifamily-IQ 1333055 2-Pre-Inspection ELM RIDGE 1190 AIRPORT BLVD Council District 3 7 1 7 4 2 4 6 2 4 3 3 4 1 Zip 78704 78756 78723 Measures Est. KW Est. KWh Est. Incentive Lighting New Construction,General 525.3 2,618,765 $ 69,298 Limited Time Bonus Offer,Smart PPT Eligible Thermostat,HVAC Tune-Up 36.8 171,986 $ 80,550 ECAD Incentive,Limited Time Bonus Offer,Lighting,Smart PPT Eligible Thermostat,HVAC Tune-Up 27.6 93,596 $ 70,218 78758 Limited Time Bonus Offer,Lighting,Smart PPT Eligible Thermostat,Plenum Redesign and Remediation,HVAC Tune-Up 54.0 33,013 $ 93,232 78745 Attic Insulation,Building Information,ECAD Incentive,Limited Time Bonus Offer,Lighting,Property Information,Smart PPT Eligible Thermostat,QC - Qualification,HVAC Tune-Up,Unit Information 54.3 208,321 $ 138,852 78748 ECAD Incentive,Limited Time Bonus Offer,Lighting,Smart PPT Eligible Thermostat,HVAC Tune-Up 32.0 124,454 $ 114,430 78752 78729 78744 Attic Insulation,Building Information,ECAD Incentive,Limited Time Bonus Offer,Property Information,Smart PPT Eligible Thermostat,QC - Qualification,QC - Verification,HVAC Tune- Up,Unit Information Building Information,ECAD Incentive,Limited Time Bonus Offer,Lighting,Property Information,Smart PPT Eligible Thermostat,QC - Qualification,HVAC Tune-Up,Unit Information Attic Insulation,Building Information,Limited Time Bonus Offer,Property Information,Smart PPT Eligible Thermostat,Plenum Redesign and Remediation,QC - Qualification,HVAC Tune-Up 134.5 82,237 $ 220,215 68.1 319,824 $ 178,520 291.6 560,653 $ 142,841 78723 Duct Sealing and Remediation,Limited Time Bonus Offer,Smart PPT Eligible Thermostat,HVAC Tune-Up,Water Saving Devices 42.5 164,490 $ 113,396 78704 78741 78723 78702 Attic Insulation,Limited Time Bonus Offer,Lighting,Plenum Redesign and Remediation,Supplemental Measure,Water Saving Devices 157.8 399,438 $ 172,950 Duct Sealing and Remediation,Limited Time Bonus Offer,Smart PPT Eligible Thermostat,HVAC Tune-Up Attic Insulation,ECAD Incentive,Limited Time Bonus Offer,Lighting,HVAC Tune-Up,Water Saving Devices Limited Time Bonus Offer,Smart PPT Eligible …

Scraped at: May 13, 2025, 3:41 p.m.
May 20, 2025

Customer Energy Solutions FY 25 Savings Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

Energy Efficiency Services EES- Appliance Efficiency Program EES- Home Energy Savings - Rebate EES- AE Weatherization & CAP Weatherization - D.I. * EES- School Based Education * EES- Strategic Partnership Between Utilities & Retailers * EES- Multifamily Rebates EES- Multifamily WX-D.I.+ EES- Commercial Rebate EES- Small Business Energy Efficiency TOTAL Demand Response (DR) - Annual Incremental DR- Power Partner DR- Commercial Demand Response (frmly Load Coop) Demand Response (DR) TOTAL Green Building GB- Residential Ratings GB- Residential Energy Code GB- Multifamily Ratings GB- Multifamily Energy Code GB- Commercial Ratings GB- Commercial Energy Code Green Building TOTAL MW Goal 2.50 0.90 0.70 0.30 1.75 0.65 1.00 6.00 2.00 15.80 MW Goal 6.40 2.00 8.40 MW Goal 0.35 1.48 1.34 4.41 4.60 1.71 13.89 MW To Date 0.69 0.13 0.54 0.11 0.67 1.49 0.36 0.60 0.33 4.92 MW To Date 3.33 3.33 MW To Date 0.17 0.71 1.25 3.17 1.61 0.93 7.85 Thermal Energy Storage TOTAL 0.00 0.00 Non-Public - AE# Customer Energy Solutions FY25 YTD MW Savings Report As of March 2025 Percentage 28% 15% 77% 37% 38% 229% 36% 10% 17% Percentage 52% 0% Percentage 49% 48% 93% 72% 35% 55% Participant Type Participants To Date MWh To Date Rebate Budget Customers Customers Customers Products Products Apartments Apartments Customers Customers 1,007 133 665 2,608 114,150 3,031 2,612 47 26 10,129 1,419.98 184.87 1,009.22 585.39 5,549.31 2,888.57 1,423.82 1,232.11 699.79 14,993.06 $ 1,200,000 $ 1,550,000 $ 5,450,000 $ 350,000 $ 1,250,000 $ 900,000 $ 1,800,000 $ 2,250,000 $ 1,100,000 $ 15,850,000 Spent to Date $ 458,844 $ 279,449 $ 5,974,961 $ 128,757 $ 506,899 $ 1,053,697 $ 655,279 $ 393,256 $ 218,772 $ 9,669,914 Participant Type Participants To Date MWh To Date Rebate Budget Devices Customers 2,344 2,344 0 0.00 $ 1,600,000 $ 2,000,000 $ 3,600,000 $ 254,230 $ 254,230 Participant Type Participants To Date MWh To Date Rebate Budget Spent to Date Customers Customers Dwellings Dwellings 1,000 sf 1,000 sf 221 899 2,653 5,981 2,518 3,290 9,754 0 202 978 3,241 3,387 4,612 3,025 15,444 $ - $ - $ - $ - 0 $ - $ - CES MW Savings Grand TOTAL Residential Totals Commercial Totals MW Goal 38.09 MW To Date 16.10 Percentage Participant Type Participants To Date MWh To Date Rebate Budget 22,227 30,437.48 $ 19,450,000 Spent to Date $ 9,924,144 16.03 14.06 8.20 14.97 51% 106% 127,670 14,442 14240.99 14337.59 $ $ 14,100,000 2,001,932 $ $ …

Scraped at: May 14, 2025, 1:31 p.m.
May 20, 2025

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

REGULAR MEETING OF THE RESOURCE MANAGEMENT COMMISSION May 20, 2025 6:00 p.m. Austin Energy Headquarters; 1st Floor; Shudde Fath Conference Room 4815 Mueller Blvd, Austin, Texas 78723 Some members of the Resource Management Commission maybe participating by videoconference. Public comment will be allowed in-person or remotely by telephone. Speakers may only register to speak on an item once either in-person or remotely and will be allowed up to three minutes to provide their comments. Registration no later than noon the day before the meeting is required for remote participation. To register contact Natasha Goodwin, at Natasha.Goodwin@austinenergy.com or 512-322-6505. Members: Charlotte Davis, Chair Paul Robbins, Vice Chair Trey Farmer GeNell Gary AGENDA Joseph Gerland Martin Luecke Dino Sasaridis Raphael Schwartz CALL MEETING TO ORDER Alison Silverstein Danielle Zigon Vacant PUBLIC COMMUNICATION: GENERAL The first 5 speakers signed up prior to the meeting being called to order will each be allowed a three-minute allotment to address their concerns regarding items not posted on the agenda. APPROVAL OF MINUTES 1. Approve the minutes of the Resource Management Commission Meeting on April 15, 2025. DISCUSSION AND ACTION ITEMS 2. Recommend approval authorizing an amendment to a contract for continuation of the Better Building Energy Efficiency Lending Program for Austin Energy with Velocity Credit Union, to increase the amount by $5,000,000 and to extend the term by five years for a revised total contract amount not to exceed $14,400,000. Funding: $600,000 is available in the Operating Budget of Austin Energy. 3. Recommend approval authorizing a contract for Strategic Partnership of Utilities and Retailers program administration for Austin Energy with CLEAResult Consulting, Inc., for an initial term of two years with up to three one-year extension options in an amount not to exceed $11,000,000. Funding: $1,250,000 is available in Operating Budget of Austin Energy. 4. Recommend approval of a resolution authorizing amendments to Austin Water’s Fiscal Year 2024-2025 GoPurple pilot incentive program for alternative onsite water reuse systems and reclaimed water connections for new commercial, mixed use and multi- The City of Austin is committed to compliance with the American with Disabilities Act. Reasonable modifications and equal access to communications will be provided upon request. Meeting locations are planned with wheelchair access. If requiring Sign Language Interpreters or alternative formats, please give notice at least 2 days (48 hours) before the meeting date. Please call Natasha Goodwin at Austin Energy, at (512) 322-6505 or email Natasha.Goodwin@austinenergy.com …

Scraped at: May 17, 2025, 7:21 a.m.
May 20, 2025

Item 2- RCA: Energy Efficiency Lending Program original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Posting Language ..Title Authorize an amendment to a contract for continuation of the Better Building Energy Efficiency Lending Program for Austin Energy with Velocity Credit Union, to increase the amount by $5,000,000 and to extend the term by five years for a revised total contract amount not to exceed $14,400,000. Funding: $600,000 is available in the Operating Budget of Austin Energy. ..Body Lead Department Financial Services Department. Client Department(s) Austin Energy. Fiscal Note Funding in the amount of $600,000 is available in the Fiscal Year 2024-2025 Operating Budget of Austin Energy. Funding for the remaining contract term is contingent upon available funding in future budgets. Purchasing Language: Contract Amendment. MBE/WBE: This contract will be awarded in compliance with Chapter 2-9C of the City Code (Minority-Owned and Women-Owned Business Enterprise Procurement Program). No subcontracting opportunities were identified; therefore, no goals were established for this contract. Prior Council Action: April 7, 2011 - Council approved a contract for the energy efficiency lending program with Velocity Credit Union. For More Information: Direct questions regarding this Recommendation for Council Action to the Financial Services Department – Central Procurement at FSDCentralProcurementRCAs@austintexas.gov or 512-974-2500. Council Committee, Boards and Commission Action: May 12, 2025 - To be reviewed by the Electric Utility Commission May 20, 2025 - To be reviewed by the Resource Management Commission. Additional Backup Information: This contract amendment will support Austin Energy’s (AE) Better Building Energy Efficient Lending Program. Currently, through this program, AE offers loans with low interest rates and a flexible credit score threshold for customers to invest in energy efficiency upgrades. The program is especially beneficial for low- to-moderate income customers and small businesses, making energy efficiency improvements more affordable. Additionally, the program supports several AE initiatives, including the Home Energy Savings Program, the Weatherization Assistance Program, and Small Business Program. By reducing upfront cost barriers, it helps building owners to complete comprehensive energy efficiency upgrades through AE’s other programs. Qualifying low-to-moderate income customers can take advantage of zero percent financing for a new air conditioning system when participating in the Weatherization Assistance Program. The program was created through the United States Department of Energy’s Better Building Program, and supports AE’s goal of achieving and increasing energy efficiency savings and renewable energy use. City funds through the Customer Benefits Charge included on customers’ utility bill are used to reduce loan interest rates to promote participation and accessibility of the programs. The …

Scraped at: May 17, 2025, 7:21 a.m.
May 20, 2025

Item 3- RCA: Strategic Partnership of Utilities and Retailers Program original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Posting Language ..Title Authorize a contract for Strategic Partnership of Utilities and Retailers program administration for Austin Energy with CLEAResult Consulting, Inc., for an initial term of two years with up to three one-year extension options in an amount not to exceed $11,000,000. Funding: $1,250,000 is available in Operating Budget of Austin Energy. ..Body Lead Department Financial Services Department. Client Department(s) Austin Energy. Fiscal Note Funding in the amount of $1,250,000 is available in the Fiscal Year 2024-2025 Operating Budget of Austin Energy. Funding for the remaining contract term is contingent upon available funding in future budgets. Purchasing Language: Austin Energy is designating this purchase as a Critical Business Need in accordance with Senate Bill 7, as adopted by the City as Resolution No. 040610-02. MBE/WBE: Critical Business Need contracts are exempt from the City Code Chapter 2-9B (Minority-Owned and Women-Owned Business Enterprise Procurement Program); therefore, no subcontracting goals were established. For More Information: Direct questions regarding this Recommendation for Council Action to the Financial Services Department – Central Procurement at FSDCentralProcurementRCAs@austintexas.gov or 512-974-2500. Council Committee, Boards and Commission Action: May 12, 2025 - To be reviewed by the Electric Utility Commission May 20, 2025 - To be reviewed by the Resource Management Commission. Additional Backup Information: The contract is to support the Strategic Partnership of Utilities and Retailers (SPUR) program for Austin Energy. The SPUR program includes a product called Instant Savings which provides price discounts to customers at point of purchase for high efficiency products, such as ENERGY STAR® clothes dryers and smart thermostats. The program also includes the recently launched Retail Coupon, which provides digital coupons that can be used for equipment such as heat pump water heaters. Instant Savings and the addition of the Retail Coupon allow participation in Austin Energy’s demand response programs, which is critical to meeting the goals set in the Resource, Generation, and Climate Protection Plan to 2035. CLEAResult Consulting Inc. provides Austin Energy with a turnkey, cost-effective solution for managing the SPUR program across various retailers and manufacturers. The contractor also works with Austin Energy in the development of future program expansion, which will offer additional products and more opportunities for customers to participate in demand response programs. The customer validation feature for the Retail Coupon requires an interface to Austin Energy’s Energy Efficiency Collaborative Platform. Austin Energy declared a Critical Business Need to keep the current provider during migration of …

Scraped at: May 17, 2025, 7:21 a.m.
May 20, 2025

Item 4- RCA: GoPurple Incentive Program original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Posting Language ..Title Approve a resolution authorizing amendments to Austin Water’s Fiscal Year 2024-2025 GoPurple pilot incentive program for alternative onsite water reuse systems and reclaimed water connections for new commercial, mixed use and multi-family developments in the total aggregate amount of $4,000,000, not to exceed $1,500,000 per project for affordable housing projects exempt from the GoPurple reuse requirements and not to exceed $500,000 per project for all other projects. Funding in the amount of $4,000,000 is available in the Fiscal Year 2024-2025 Operating Budget of Austin Water. ..De Lead Department Austin Water. Fiscal Note Funding in the amount of $4,000,000 is available in the Fiscal Year 2024-2025 Operating Budget of Austin Water. Prior Council Action: November 29, 2018 – City Council approved the Water Forward Plan on a 10-0 vote. December 11, 2019 – City Council voted to approve the Land Development Code Revision directing Austin Water to establish a regulatory program and an incentive program for Onsite Water Reuse Systems on first reading, on a 7-4 vote. February 13, 2020 – City Council voted to approve the Land Development Code Revision directing Austin Water to establish a regulatory program and an incentive program for Onsite Water Reuse Systems on second reading, on a 7-4 vote. December 10, 2020 - City Council approved an ordinance establishing City Code Chapter 15-13 relating to treatment, monitoring and reporting regulations for Onsite Water Reuse Systems, on a 10-0 vote. April 22, 2021 – City Council voted to initially approve the Pilot Incentive Program for Onsite Water Reuse Systems for Fiscal Year 2021 for the installation of alternative Onsite Water Reuse Systems up to a total aggregate amount of $1,000,000 and not to exceed $500,000 for each project on a 10-1 vote. September 30, 2021 - City Council voted to reauthorize the Pilot Incentive Program for Onsite Water Reuse Systems for Fiscal Year 2022 for the installation of alternative Onsite Water Reuse Systems up to a total aggregate amount of $1,000,000 and not to exceed $500,000 for each project on a 10-1 vote. September 29, 2022 - City Council voted to reauthorize the Pilot Incentive Program for Onsite Water Reuse Systems for Fiscal Year 2023 for the installation of alternative Onsite Water Reuse Systems up to a total aggregate amount of $1,000,000 and not to exceed $500,000 for each project on a 10-1 vote. March 7, 2024 - City Council voted to reauthorize …

Scraped at: May 17, 2025, 7:21 a.m.
May 20, 2025

Item 5- Recommendation Audit of the Austin Energy District Energy and Cooling System original pdf

Thumbnail of the first page of the PDF
Page 1 of 1 page

Resource Management Commission Resolution on Austin Energy District Energy and Cooling System WHEREAS, the City of Austin established its first District Energy and Cooling system plant in 2001; and WHEREAS, this system has now expanded to seven plants around Austin, and currently shifts about 28 MW during peak demand while providing air conditioning and refrigeration at a savings to at least 73 commercial customers; and WHEREAS, this system would not have been built without Austin Energy's support; and WHEREAS, the peak load reduction from the District Energy and Cooling System lowers Austin Energy’s wholesale electricity purchase costs for all Austin Energy customers; and WHEREAS, expansion of the District Energy and Cooling system is an important strategy to save more energy and reduce carbon emissions as the new Austin Energy generation plan is implemented; and WHEREAS, a transparent understanding of the District Energy and Cooling system’s financial health is necessary to evaluate continued public investment and long-term planning; WHEREAS, Austin Energy has not released detailed information and data relevant to the financial viability of the district chilling system and the timeline by which a sale or other alternatives for the system might proceed; NOW THEREFORE BE IT RESOLVED that the Resource Management Commission recommends that the City Council: 1) Commission an audit of Austin Energy's District Energy and Cooling system to identify the drivers of its financial underperformance, assess the cost- benefit of future expansion or divestment, and to suggest potential actions Austin Energy may take to ensure its long-term financial viability; 2) Direct Austin Energy to publicly share a strategic roadmap detailing the timeline, rationale, and evaluation criteria for any planned expansion or divestment of the District Energy and Cooling system and deliver a public status report no later than September 30, 2025.

Scraped at: May 17, 2025, 7:21 a.m.
May 20, 2025

Item 6- Staff Briefing GoPurple Pilot Program original pdf

Thumbnail of the first page of the PDF
Page 1 of 7 pages

GoPurple Program A m e n d m e n t f o r A f f o r d a b l e H o u s i n g P r o j e c t s Katherine Jashinski, P.E., Supervising Engineer Resource Management Commission May 20, 2025 GoPurple Program: Expanding Water Reuse Austin City Council Adoption on March 7th 2024  Code Changes for Onsite Water Reuse and Reclaimed Water Connections  Affordability Strategies for Reuse Projects  New community Benefit Charge increase ($0.15 per thousand gallons) to fund Reclaimed Water System expansion and Onsite Reuse programs Go Purple | AustinTexas.gov 2 Exemptions to Code Requirements for Deeply Affordable Housing Projects A development is not required to connect to a reclaimed water line or use reclaimed water when the director of the Housing Department certifies the development is participating in a city, state, or federal program that requires: 1) A minimum of fifty percent on-site income-restricted dwelling units for 60% or lower median family income for rental units; or 2) A minimum of fifty percent on-site income-restricted dwelling units for 80% or lower median family income for ownership units. 3 Direction from Council on Incentives for Deeply Affordable Housing Projects ORDINANCE NO. 20240307-037 “The City Manager is further directed to explore the feasibility of a program to fully subsidize the cost of reclaimed connections, dual use plumbing, and on- site water reuse systems for affordable housing projects that are exempt from the requirements with the goal of implementing a program by April 1st, 2025. The funding should come from sources other than affordable housing programs.” 4 Proposing Increase in Program Cap to $1.5M for Deeply Affordable Housing Projects Incentive Eligible Costs Proposed Changes to Per Project Funding Onsite Water Reuse System Incentive (Existing Incentive) Covers the design and installation costs of a collection and treatment system and dual plumbing Increase the per project cap from $500,000 to $1,500,000 for exempt affordable housing projects Reclaimed Main Extension Cost Share (Existing Incentive) Covers the design and installation cost of public reclaimed water mains Maintain the current per project cap of $500,000 Dual Plumbing Rebate (Proposed Incentive) Covers the design and installation cost of dual plumbing in buildings for reclaimed water service Only exempt affordable housing projects would be eligible for up to $1,000,000 per project 5 Oversight and Management of Program Administration • Current City budget includes a reservation …

Scraped at: May 17, 2025, 7:21 a.m.
May 20, 2025

Item 7- Staff Briefing 2024 Texas Gas Service Rate Case original pdf

Thumbnail of the first page of the PDF
Page 1 of 16 pages

2024 Texas Gas Service (TGS) Rate Case Update & Gas Utility Policy Discussion Marija Norton| City Controller 2024 TGS Rate Case Timeline June 3: TGS filed application with the City of Austin (COA) and Railroad Commission (RRC) for New Rates to be effective July 8. TGS subsequently agreed to extend COA effective date of new rates to August 1. Settlement meeting. Settlement meeting. July 18: City Council suspended effective date of New Rates by 90 days. July 25: Aug. 6: Aug. 8: Discovery ends. Aug. 20: City testimony filed. Aug. 22: Settlement meeting. Aug. 27: Staff testimony filed. Aug. 29: COA Public Hearing on New Rates. Sept. 10: Rebuttal testimony filed. Sept. 19: Hearing. Sept. 26: Austin City Council denies TGS’ proposed rate increase. Oct. 30: COA deadline for final action on New Rates. Nov. 19: Commission decision. Dec. 5: Deadline for RRC action. 2 2024 TGS Rate Case Settlement Overview 3 2024 TGS Rate Case Settlement Overview 4 2024 TGS Rate Case Settlement Overview 5 Gas Utility Customer Class Counts Customer Class Residential Commercial Industrial Public Authority Texas Gas Service Atmos Energy CenterPoint Energy SiEnergy 219,806 9,971 7 341 10,710 307 2 2,274 106 1,057 1 TOTAL 230,125 11,019 2,380 1,058 6 Gas Utility Service Area - TGS 7 Gas Utility Service Area – Atmos Energy 8 Gas Utility Service Area – CenterPoint Energy 9 Gas Utility Service Area - SiEnergy 10 Important Dates – Rate Cases Atmos Energy – Settlement at Railroad Commission in March 2025 Texas Gas Service – Settlement at Railroad Commission in November 2024 CenterPoint Energy – Settlement at Railroad Commission in June 2024 SiEnergy – Settlement approved by City Council in August 2023 Typically, we see full rate cases filed every 4-5 years. If a company has filed a GRIP (Gas Reliability Infrastructure Program), they must file a full rate case within 5 1/2 years. 11 Important Dates – Franchise Agreements Texas Gas Service CenterPoint Energy Expires May 14, 2028 Expires Dec. 24, 2037 Expires Oct. 15, 2026 Expires Feb. 22, 2035 Atmos Energy SiEnergy 12 Important Dates – GRIP Filings Texas Gas Service – • Filed 2/11/2025, with original effective date of 4/12/2025 • Council approved ordinance on 3/17/2025 extending the effective date by 45 days to 5/27/2025 • Increase of $3.36 per month for Residential, $12.88 per month for Commercial, $461.83 per month for Industrial, and $25.96 per month for Public Authority …

Scraped at: May 17, 2025, 7:21 a.m.
May 20, 2025

Item 9- Austin Energy’s Residential Rooftop Solar Program original pdf

Thumbnail of the first page of the PDF
Page 1 of 4 pages

An update – Australian Solar & Remote Inspections Resolution on Changes to Residential Rooftop Solar Rebate Program D. SASARIDIS 20 MAY 2025 Regarding - Feb 3, 2025 – Commissioners Sasaridis, Silverstein, Robbins introduce “Resolution on Changes to Residential Rooftop Solar Rebate Program” – discussed proposed changes to policy, inspection, for both solar and batteries. Today – Providing some requested updates about solar inspections and Australian Solar Update – Australia Research I emailed 12 large Australian solar providers – got no responses. I called 9 Australian solar providers, and obtained the following information: Solarbright.com.au: • • When asked why he thought Australia’s solar adoption was so far ahead of the USA, he noted: Spoke with Nicholas • • • Incentives (did not say how much) High energy prices driving up demand Inspections are not mandatory – regulatory has relaxed over the years – large driver • I asked about costs, if $1 USD per watt was realistic, Nicholas said: • • That’s high, $0.50 USD per watt is common He sells 5 kW systems for ($3,500 AUD) $2,250 USD Solar Power Direct: • • When asked why he thought Australia’s solar adoption was so far ahead of the USA, he noted: Spoke with Adrian • • Electricity rates high, return on investment Incentives, 6.6 kW system would net $2k direct to the installer, some discount passed along to • • I asked about costs: • • • He thought $1 / W AUD ($0.64 / W USD) is realistic He would sell a 6.6 kW system for $3,520 USD He pays about $115 USD for a 450 W panel ($0.25 / W) Regarding Inspections: • Rely on the regulatory landscape for the components, with random inspections Update – Remote Inspections in Texas Utilities – two largest in TX Municipalities in TX Oncor CenterPoint Fort Worth – Ongoing now 15 other Texas cities implementing in the future A remote inspection standard exists! Considering for the future Remote Inspections happening now

Scraped at: May 17, 2025, 7:21 a.m.
May 20, 2025

Item 5- Memo District Energy and Cooling System original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

M E M O R A N D U M TO: Mayor and City Council THROUGH: Jon Fortune, Deputy City Manager FROM: Stuart Reilly, Interim General Manager, Austin Energy DATE: May 15, 2025 SUBJECT: District Energy and Cooling System Review ____________ The purpose of this memorandum is to provide an update on Austin Energy’s District Energy and Cooling (DEC) system and inform you of an upcoming review of potential options for the system to grow and effectively meet new development needs in the future. The driver for this DEC system review is finding innovative ways to achieve the best environmental outcomes for our community and serve new customers. BACKGROUND The DEC system was established in FY 2001 to shift electric load off-peak and to provide an energy efficient alternative to traditional air conditioning systems in suitable areas. Instead of each building having a separate cooling system, DEC chills water at night and pumps this water through a network of underground pipes to cool large buildings. The DEC system is a valuable resource to the Austin community because it uses energy at night to chill water that is used for cooling during the heat of the day, which shifts energy usage to lower demand times and reduces the peak demand needs of Austin Energy. Fostering growth of the DEC system therefore reduces the need for additional summer peak generation needed to support customers. The DEC system operates in four districts, downtown, the Domain, ACC Highland, and Mueller, serving 73 customers under contract. It provides environmental benefits by being an alternative to individual air conditioning systems and is an attractive option for developers seeking to make the most of their buildable square footage, while receiving an efficient and reliable way to meet their cooling needs. With the rapid pace of growth in Austin, the DEC system is in need of expansion in order to meet customer needs or risk continued new development that is not capable of coming online to receive district cooling service. As such, Austin Energy has proposed looking at ways the system can grow and flourish, providing more environmental benefits, and more energy efficiency benefits, and continuing to reduce our summer peak demand needs – enhancing sustainability and affordability for all customers. PAGE: DATE: SUBJECT: 2 of 2 May 15, 2025 District Energy & Cooling System Review UPCOMING ASSESSMENT Following City Council feedback from last year, Austin Energy recognized …

Scraped at: May 20, 2025, 10:35 p.m.
May 20, 2025

Item 7- Revised Staff Briefing 2024 Texas Gas Service Rate Case original pdf

Thumbnail of the first page of the PDF
Page 1 of 16 pages

2024 Texas Gas Service (TGS) Rate Case Update & Gas Utility Policy Discussion Marija Norton| City Controller 2024 TGS Rate Case Timeline June 3: TGS filed application with the City of Austin (COA) and Railroad Commission (RRC) for New Rates to be effective July 8. TGS subsequently agreed to extend COA effective date of new rates to August 1. Settlement meeting. Settlement meeting. July 18: City Council suspended effective date of New Rates by 90 days. July 25: Aug. 6: Aug. 8: Discovery ends. Aug. 20: City testimony filed. Aug. 22: Settlement meeting. Aug. 27: Staff testimony filed. Aug. 29: COA Public Hearing on New Rates. Sept. 10: Rebuttal testimony filed. Sept. 19: Hearing. Sept. 26: Austin City Council denies TGS’ proposed rate increase. Oct. 30: COA deadline for final action on New Rates. Nov. 19: Commission decision. Dec. 5: Deadline for RRC action. 2 2024 TGS Rate Case Settlement Overview 3 2024 TGS Rate Case Settlement Overview 4 2024 TGS Rate Case Settlement Overview 5 Gas Utility Customer Class Counts Customer Class Residential Commercial Industrial Public Authority Texas Gas Service Atmos Energy CenterPoint Energy SiEnergy 219,806 9,971 7 341 10,710 307 2 2,274 106 TOTAL 230,125 11,019 2,380 303 1 1 305 6 Gas Utility Service Area - TGS 7 Gas Utility Service Area – Atmos Energy 8 Gas Utility Service Area – CenterPoint Energy 9 Gas Utility Service Area - SiEnergy 10 Important Dates – Rate Cases Atmos Energy – Settlement at Railroad Commission in March 2025 Texas Gas Service – Settlement at Railroad Commission in November 2024 CenterPoint Energy – Settlement at Railroad Commission in June 2024 SiEnergy – Settlement approved by City Council in August 2023 Typically, we see full rate cases filed every 4-5 years. If a company has filed a GRIP (Gas Reliability Infrastructure Program), they must file a full rate case within 5 1/2 years. 11 Important Dates – Franchise Agreements Texas Gas Service CenterPoint Energy Expires May 14, 2028 Expires Dec. 24, 2037 Expires Oct. 15, 2026 Expires Feb. 22, 2035 Atmos Energy SiEnergy 12 Important Dates – Gas Reliability Infrastructure Program (GRIP) Filings Texas Gas Service – • Filed 2/11/2025, with original effective date of 4/12/2025 • Council approved ordinance on 3/17/2025 extending the effective date by 45 days to 5/27/2025 • Increase of $3.36 per month for Residential, $12.88 per month for Commercial, $461.83 per month for Industrial, and $25.96 …

Scraped at: May 20, 2025, 10:35 p.m.
May 20, 2025

Item 8- Texas Gas Service Overview original pdf

Thumbnail of the first page of the PDF
Page 1 of 26 pages

Austin Resource Management Commission Anthony Brown, Manager of Rates and Regulatory Bryan Weeks, Director of Engineering May 20, 2025 Natural Gas Serves Every Area of the Economy Source: Energy Information Administration, Monthly Energy Review, 2024 2 Third-largest Natural Gas Utility in Texas Committed to Texans • Serves 706,000 Texans • Available in 111 communities • Employs over 1,000 Texans • Economic impact of nearly $137M in 2024 • Charitable giving: $524,335 in 2024 We've delivered reliable, affordable natural gas to our customers since 1906 3 Cities in the Central-Gulf Service Area • Austin • Dripping Springs • Lakeway • Port Arthur • Bastrop Rural • Galveston • Lockhart • Port Neches • Bayou Vista • Georgetown • Luling • Rollingwood • Beaumont • Gonzales • Marble Falls • Shiner • Bee Cave • Groves • Mustang Ridge • Sunset Valley • Buda • Hutto • Nederland • Westlake Hills • Cedar Park • Jamaica Beach • Nixon • Yoakum • Cuero • Kyle • Pflugerville 4 Mission, Strategy and Core Values Mission – Why we exist We deliver natural gas for a better tomorrow Strategy – How we get there • Safe Operations • Capital Investments • Delivering Foundational Energy • Serving Customers • Engaged & High-performing Workforce Core Values – Our compass Safety: We are committed to operating safely and in an environmentally responsible manner. Ethics: We are accountable to the highest ethical standards and are committed to compliance. Inclusion & Diversity: We embrace an inclusive and diverse culture that encourages collaboration. Service: We provide exceptional service to our customers and support each other. Value: We create value for all stakeholders; our customers, employees, investor and communities. 5 Committed to Safety & Reliable Service • Work When Safe philosophy • Following guidelines set forth by state and federal agencies • Investing in damage prevention technology ▪ Line locating ▪ Leak detection • Reliable service ▪ No significant outages during Winter Storms Uri (2021), Elliott (2022), Mara (2023), Geri (2024) and Kingston (2025) despite frigid temperatures 6 Austin System Maps 7 Consumer Price Index (CPI) Inflation Rate 10.0 Austin, TX CPI Inflation Rate U.S. General Inflation Rate 8.0 6.0 4.0 2.0 0.0 2018 2019 2020 2021 2022 2023 2024 Source: U.S. Bureau of Labor Statistics 8 Labor Inflation Rate 10.0 U.S. Labor Inflation Rate Austin, TX Labor Inflation Rate 8.0 6.0 4.0 2.0 0.0 2018 2019 2020 2021 2022 2023 …

Scraped at: May 20, 2025, 10:35 p.m.
May 20, 2025

Play video original link

Play video

Scraped at: May 21, 2025, 8:24 p.m.
May 20, 2025

Item 8- Gas Utility Presentation- Robbins original pdf

Thumbnail of the first page of the PDF
Page 1 of 6 pages

Gas Utility Briefing Resource Management Commission Paul Robbins March 25, 2025 Texas Gas Service: $342 Million, 63% Plant Cost Increase in Only 4 Years But 5% Increase in Customers in Only 4 Years Unlike Austin Energy and Austin Water, City Council Was Not Allowed in Decisions on Whether to Allocate This Money $185 Million in New Infrastructure in 4 Years $4 Million in Developer Construction Fees Only 2% Collected From Capital Recovery Fees ( aka Contribution to Aid in Construction) Central Texas Region Galveston Region Central Texas Region and Galveston Region Combined for Rates Over Austin’s Objections

Scraped at: May 21, 2025, 8:24 p.m.
May 20, 2025

Approved Minutes original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

RESOURCE MANAGEMENT COMMISSION MEETING MINUTES Tuesday, May 20, 2025 RESOURCE MANAGEMENT COMMISSION REGULAR CALLED MEETING MINUTES Tuesday, May 20, 2025 The Resource Management Commission convened in a Regular Called meeting on Tuesday, May 20, 2025, at Austin Energy Headquarters 4815 Mueller Blvd, Austin, TX 78723. Chair Charlotte Davis called the Resource Management Commission meeting to order at 6:01 p.m. Board Members/Commissioners in Attendance: Commissioner Charlotte Davis, Chair; Commissioner Paul Robbins, Vice Chair; Commissioner Trey Farmer; Commissioner GeNell Gary; Commissioner Dino Sasaridis; Commissioner Raphael Schwartz; Commissioner Alison Silverstein. Board Members/Commissioners in Attendance Remotely: Commissioner Joseph Gerland; Commissioner Danielle Zigon. PUBLIC COMMUNICATION: General- N/A APPROVAL OF MINUTES 1. Approve the minutes of the Resource Management Commission Regular Called Meeting on April 15, 2025. The motion approving the minutes of the Resource Management Commission regular called meeting of April 15, 2025 was approved on Commissioner Silverstein’s motion, Vice Chair Robbins’s second on a 9-0 vote, with Commissioner Luecke absent and one vacancy. DISCUSSION AND ACTION ITEMS 2. Recommend approval authorizing an amendment to a contract for continuation of the Better Building Energy Efficiency Lending Program for Austin Energy with Velocity Credit Union, to increase the amount by $5,000,000 and to extend the term by five years for a revised total contract amount not to exceed $14,400,000. Funding: $600,000 is available in the Operating Budget of Austin Energy. The motion to recommend approval authorizing an amendment to a contract for continuation of the Better Building Energy Efficiency Lending Program for Austin Energy with Velocity Credit Union, was approved on Commissioner Silverstein’s motion, Vice Chair Robbins second on an 8-0-1 vote, with Commissioner Zigon abstaining, Commissioner Luecke absent, and one vacancy. 3. Recommend approval authorizing a contract for Strategic Partnership of Utilities and Retailers program administration for Austin Energy with CLEAResult Consulting, Inc., RESOURCE MANAGEMENT COMMISSION MEETING MINUTES Tuesday, May 20, 2025 for an initial term of two years with up to three one-year extension options in an amount not to exceed $11,000,000. Funding: $1,250,000 is available in Operating Budget of Austin Energy. The motion to recommend approval authorizing a contract for Strategic Partnership of Utilities and Retailers program administration for Austin Energy with CLEAResult Consulting, Inc., was approved on Vice Chair Robbins motion, Commissioner Silverstein’s second on a 7-0-2 vote, with Commissioners Gary and Zigon abstaining, Commissioner Luecke absent, and one vacancy. STAFF BRIEFINGS 6. Staff Briefing regarding Austin Water’s proposed Go Purple Affordable …

Scraped at: June 19, 2025, 3:44 a.m.