Planning CommissionApril 23, 2024

02 Submitted by Commissioner Maxell - EV Charging and Compatibility Amendments.pdf — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 2 pages

Amendment No. Item (HOME Phase 2, Compatibility, EV Charging, OR ETOD Overlay) Commissioner Proposing Amendment 1 EV Maxwell Reference Document Pg #/Section # of document Proposed Amendment Text Change Included in Amendment (YES/NO) References and Notes (if needed) 2 Compatibility Maxwell Draft Ordinance V2 Page 3 of 5 - § 25-2-1062 (B) Draft Ordinance V1 Page 1 of 3 - § 25-2-819 (E) Electric vehicle charging stations maybe located at one level below ground. Reduce the compatibility buffer requirements for residential structures that are 40 feet or less in height even in mixed use zones and higher density multifamily zones. Renumber the sections accordingly. N/A N/A Yes Yes Proposed Text Change, IF necessary (Underline added text/Strikethrough deleted text) (E) Electric vehicle charging stations must be located at one (1) level below ground, ground level or above. (4) The minimum width of a compatibility buffer is 15 feet for a structure that is 40 feet or less and the site is zoned: (a) Multifamily—High Density (MF-5); (b) Multifamily—Highest Density (MF-6); (c) Mixed Use Combining District (MU); (d) Planned Development Area (PDA); (e) Vertical Mixed Use Building (V); or (f) Density Bonus 90 (DB90).