Parks and Recreation BoardJune 22, 2026

03-02: MOU AW IH35 CapEx-Cen Downtown Relocation — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 3 pages

M E M O R A N D U M O F U N D E R S T A N D I N G TO: Shay Ralls Roalson, P. E. M.O.U. # PARD 26-008 Director, Austin Water FROM: Jesús Aguirre, MBA, CPRE Director, Austin Parks and Recreation SUBJECT: IH35 CapEx-Cen Downtown Relocation: MLK to Holly St. FDU: 3920 2207 8162; Project I.D.: 3212.162 DATE: Austin Water is allowed to use parkland located at Sir Swante Palm Neighborhood Park, 200 N IH 35 Svrd SB, for construction of a wastewater line, water lines, and water shaft as indicated on Attachment “B” (Location Map). The application consists of two separate requests. Request One proposes construction of a 66” water transmission main and an associated water shaft. Request two proposes construction of a 16” waterline and 12” wastewater line. Request One For the construction of the water transmission main and water shaft, the parkland requested is for permanent and temporary use. The requested area is: Permanent Water Shaft Use: 833 sq.ft. = $230,817 Permanent Waterline Use: 1,116 sq.ft. = $166,510 Temporary Use: (staging) 2,585 sq.ft. = $126,267 Total Parkland Mitigation Amount Due = $718,734 Austin Water is in an agreement to provide the following mitigation ($718,734) in return for the permanent use and temporary use of the parkland after City Council has approved this request. The project start date is September 2027. The date of final completion is August 2029. The temporary use of parkland is approved for 700 days. Request Two For the construction of the waterline and wastewater line, the parkland requested is for permanent use. The requested area is: Permanent Water and Wastewater Use: 7,903 sq.ft. = $1,179,000 Total Parkland Mitigation Amount Due = $1,179,149 Austin Water is in an agreement to provide the following mitigation ($1,179,000) in return for the permanent use of the parkland after City Council has approved this request. 1 of 3 The project start date is April 2029. The date of final completion is December 2029. The duration of construction on parkland is 274 days. The total mitigation for the use of parkland is $1,897,883. Future recreational use or improvements proposed within the permanent use area will require coordination between Austin Water and the Austin Parks and Recreation. • Austin Water supports the incorporation of compatible parklike improvements within the “Request Two” permanent Declaration of Use area. Austin Parks and Recreation commits to coordinating with Austin Water on any future parklike improvements constructed within the area. • Future operation and maintenance activities associated with the utilities are anticipated to be limited to the area of the Park’s wastewater service connection, where the wastewater facilities will not be encased. This designated area should remain clear of permanent improvements to preserve access for future operation and maintenance activities. Austin Water recognizes the importance of the following measures in supporting continued coordination among City partners to minimize disturbances and support the successful implementation of the Park Development Project during TxDOT construction activities. This MOU and associated Declarations of Use are necessitated by TxDOT’s IH-35 Capital Express Central (CapEx) Project. While Austin Water does not have authority over the execution of TxDOT’s contracts or contractors, Austin Water will coordinate with the applicable parties to support implementation of the following measures. Austin Parks and Recreation will continue to coordinate directly with TxDOT regarding these activities, recognizing that successful implementation is achieved through collaboration among all involved parties. • Maintaining adequate access to parkland during the construction process to allow for the Park Development Project. • • Installing safety fencing and screening along all perimeters of workspace on or adjacent to parkland to ensure safe public access to remaining park areas throughout the construction process. Installing protective fencing along identified Protection Zones which overlap with the Limits of Construction of the proposed work on parkland and ensuring there is no adverse impact to historical assets on parkland including the Shelter House and staircase. • Ensuring compliance with the Palm Park Soil Stripping, Stockpiling, and Treatment Plan. • If the Park Development Project is required to extend its schedule or re-mobilize onsite due to TxDOT’s construction activities, Austin Parks and Recreation may incur additional development costs. Current estimates indicate approximately $480,000 in remobilization costs for a three- to four-month delay. Austin Water will serve as the lead City department in coordinating with TxDOT and its contractors to support inclusion of appropriate compensation to Austin Parks and Recreation within TxDOT-related agreements, should such delays occur. It is the responsibility of the Austin Capital Delivery Services Project Manager and/or the Austin Water Engineer to notify Austin Parks and Recreation of the Notice to Proceed 60 days prior to start of construction on-site. Extension/modification of parkland use must receive prior written approval from Austin Parks and Recreation as soon as identified and at least 90 days in advance. If extension over 60 days is required, this MOU must be updated to address additional impact to parkland due to delay. If the usage of the temporary use area exceeds the duration, additional mitigation fees will be assessed based on the daily use rate. Austin Capital Delivery Services Project Manager and/or the Austin Water Engineer must notify Austin Parks and Recreation upon completion of construction within parkland. Future repair or maintenance work requires notification to Austin Parks and Recreation. 2 of 3 Applicant is responsible for initiating an IET funds transfer from AW FDU 3920 2207 8162 (SPID # 3212.162) to APR FDU 8741-8607-3020-4888 in the amount of ($1,897,883) within 30 Calendar Days after execution of this Memorandum of Understanding. Austin Water Point of Contact: Kevin Koeller Phone Number: 512-972-2055 Austin Capital Delivery Services Point of Contact: Cristina Acuna Phone Number: 512-974-3067 Austin Parks and Recreation Point of Contact: Paul Books Phone Number: 512-978-1315 Parks & Recreation Board: City Council: ____________________________________________________________ Jesús Aguirre, MBA, CPRE Director, Austin Parks and Recreation Date CONCURRENCE ____________________________________________________________ Shay Ralls Roalson, P.E. Director, Austin Water Date Attachments: A (Mitigation Calculation Worksheet) B (Location Map) C (Construction Access, Protective Fencing, and Protection Zones) D (Palm Park Soil Stripping, Stockpiling, and Treatment) 3 of 3