Backup — original pdf
Backup
Temporary & Permanent Use of Parkland at Edward Rendon Sr. Metro Park at Festival Beach and Peace Point at Lady Bird Lake Metro Park Electric Duct Bank Replacement Parks and Recreation Board Presentation January 25th, 2022 Presenters: Gregory Montes, PARD John Biehn, Austin Energy Ernie Leaf, Stanley Engineers Dave Lambert, Austin Energy Temporary & Permanent Use of Parkland at Edward Rendon Sr. Metro Park at Festival Beach and Peace Point at Lady Bird Lake Metro Park Temporary & Permanent Use of Parkland This project is located in East Austin (Council District 3) within parkland on the north and south sides of Lady Bird Lake, north of Lakeshore Drive and south of Jesse E. Segovia Street. Temporary & Permanent Use of Parkland at Edward Rendon Sr. Metro Park at Festival Beach and Peace Point at Lady Bird Lake Metro Park Electric Line Need This project is to replace, via boring, an aging electric cable across Lady Bird Lake housing two circuits that feed a significant portion of South Austin Description Installation of approx. 1,225 linear feet of underground primary electric through Edward Rendon Sr. Metro Park and Peace Point at Town Lake Metro Park parkland and under Lady Bird Lake. Schedule Estimated duration not to exceed 90 calendar days Easement Request Temporary Use - 59,885 sq. ft. Permanent Use - 10,792 sq. ft. Temporary & Permanent Use of Parkland at Edward Rendon Sr. Metro Park at Festival Beach and Peace Point at Lady Bird Lake Metro Park Potential Outage Area 4 Temporary & Permanent Use of Parkland at Edward Rendon Sr. Metro Park at Festival Beach and Peace Point at Lady Bird Lake Metro Park Temporary Staging Area 5 Temporary & Permanent Use of Parkland at Edward Rendon Sr. Metro Park at Festival Beach and Peace Point at Lady Bird Lake Metro Park Overall Scope Of Work 6 Temporary & Permanent Use of Parkland at Edward Rendon Sr. Metro Park at Festival Beach and Peace Point at Lady Bird Lake Metro Park Available Parking During Construction 7 Make a recommendation to City Council for approval of Permanent Use and Temporary Use of parkland located at Edward Rendon Sr. Metro Park at Festival Beach (2101 Jesse E. Segovia St.) and Peace Point at Lady Bird Lake Metro Park (2200 S. Lakeshore Blvd) not to exceed 90 Days. Total Mitigation is $327,608. Staff Contacts Dave Lambert David.Lambert@austinenergy.com John Biehn John.Biehn@austinenergy.com 8